0% found this document useful (0 votes)
16 views20 pages

Facility Maintenance

Uploaded by

srregulatory
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views20 pages

Facility Maintenance

Uploaded by

srregulatory
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 20

FACILTY MAINATENCE REQUIRED

Date: 29/07/2025

Observation: Drainage & Grass Cleaning


Observation : Crack in wall
Observation: Tiles need to fix. It was done just one month back, please do effective civil work.
Observation: Paint work (in light grey colour)
Observation: Oil paint to avoid dirtiness
Observation: Water supply (Sensor is not working)
Observation : Epoxy Patch work (FMG Location). It was planned in last repair, but they didn’t complete it.
Observation : The corner needs to close (slope). It is needed to avoid dust accumulation.
Observation: The wall of FMG is misaligned. Need to fix it with proper clamping and foam closing of holes.
Observation : In loom lading area. It is damaging every times. Need to fix with ramp of metallic corner protection.
Observation : Facelift required

You might also like