Kind Attention: Yoginder Singh (Authorized Person)
Sub: – Work order for Execution of a portion of the project.
Name of Civil, Structural & Architectural works of entire Power Block Area (T-Yard to FGD
Project:- up to Chimney Raft) Power House, Boiler, ESP, Mill & Bunker, TG, BFP, Fan Foundations,
FGD, TG, CEP, CW pit, ESP Control Room, Chimney Raft, ID Ducts, Paving Works,
Transformer Yard, CST Pump House, Compressor, DG, MRS, AC & Ventilation Ducting,
Labor Hutment for 1000 workers including land leasing Rooftop Solar System foundation
(Within power block area), Sewage water line (Within BTG area), Civil work for LP piping &
Fire Fighting (Within BTG area), Pipe rack/cable rack (Within BTG area), CW Duct Buried
(Civil work within powerhouse area), Worker's Rest Room etc. at 1X800 MW NTPC Sipat
Project.
1. Price Schedule
SR No. Description of item Amount
Civil, Structural & Architectural works of entire Power Block Area (T-
1. Yard to FGD up to Chimney Raft) Power House, Boiler, ESP, Mill &
Bunker, TG, BFP, Fan Foundations, FGD, TG, CEP, CW pit, ESP
Control Room, Chimney Raft, ID Ducts, Paving Works, Transformer
Yard, CST Pump House, Compressor, DG, MRS, AC & Ventilation
Ducting, Labor Hutment for 1000 workers including land leasing
Rooftop Solar System foundation (Within power block area), Sewage
water line (Within BTG area), Civil work for LP piping & Fire Fighting
(Within BTG area), Pipe rack/cable rack (Within BTG area), CW Duct
Buried (Civil work within powerhouse area), Worker's Rest Room etc. at
1X800 MW NTPC Sipat Project
The work is to be carried out as per good engineering practice,
2. specifications given in the tender document and Contract signed
with BHEL and the requirement of the BHEL under strict
directions, control and supervision of the Company, for the
following works:
1. Labor Accommodations.
2. TG Raft, Columns up to Final Lift and TG Deck
3. Power House Foundations Including Auxiliary Foundations and
Back-filling
4. Pipe cum Cable Rack
5. Transformer Yard foundation for GT/ST/UT/UAT