0% found this document useful (0 votes)
4 views2 pages

A35

Uploaded by

Mohd Rahees
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views2 pages

A35

Uploaded by

Mohd Rahees
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Date Description Remarks

05.07.2025 Take out the windows and other materials from the building.
06.07.2025 Take out the windows and other materials from the building.
07.07.2025 Take out the cable from the building.
08.07.2025 Take out the cable, Wire and MCB Box from the building.
09.07.2025 Take out the cable, Wire, MCB Box and other materials from the building.
10.07.2025 Take out the cable, Wire, MCB Box and other materials from the building.
11.07.2025 Holiday
12.07.2025 Take out the iron from the building.
13.07.2025 Starting the demolition of building and Annex floor of building has been demolished.
14.07.2025 Starting the demolition of 1st floor of the building
15.07.2025 1st floor of building has been demolished upto 70%.
16.07.2025 Take out the iron from the building.
17.07.2025 Take out the iron from the building.
18.07.2025 Holiday
19.07.2025 1st floor of building has been demolished upto 70% and take out garbage.
20.07.2025 1st floor of building has been demolished upto 100% and take out garbage.
21.07.2025 Starting the demolition of Ground floor of the building
22.07.2025 Ground floor has been demolished upto 50%
23.07.2025 Ground floor has been demolished upto 75% and take out garbage.
24.07.2025 Did not work today
25.07.2025 Holiday
26.07.2025 Ground floor has been demolished upto 100% and take out garbage.
27.07.2025 Take out the iron from the building.
28.07.2025 Building has been demolished upto plinth level.
29.07.2025 Workers didn't come today.
30.07.2025 Workers didn't come today.
31.07.2025 Workers didn't work today.
01.08.2025 Holiday
02.08.2025 Did not work today
03.08.2025 Did not work today
04.08.2025 Beams and footings are being deconstructed. 20% work has been completed.
Beams and footings are being deconstructed. 30% work has been completed and
05.08.2025
took the soil away.
06.08.2025 They picked up the soil and took it away.
Beams and footings are being deconstructed and excavation work started and 35%
07.08.2025
work has been completed.
08.08.2025 Holiday
09.08.2025 I went to taif today so I didn't check project jeddah.
10.08.2025 They picked up the soil and took it away.
11.08.2025 Beams and footings are being deconstructed and excavation work started and 40%
work has been completed. They picked up the soil and took it away.

12.08.2025 They picked up the soil and took it away.


13.08.2025 Beams and footings are being deconstructed and excavation work started and 55%
work has been completed.
14.08.2025 Beams and footings are being deconstructed and excavation work started and 65%
work has been completed.
15.08.2025 Holiday
16.08.2025 They picked up the soil and took it away.
17.08.2025 Beams and footings are being deconstructed and excavation work started and 70%
work has been completed.
18.08.2025 Beams and footings are being deconstructed and excavation work started and 72%
work has been completed.
19.08.2025 People's is not answering. Don't know how much work is finished today.
20.08.2025 Did not work today because the Jcb has been broken down.
21.08.2025 Did not work today because the Jcb has been broken down.