Qway Function Manual
Qway Function Manual
Table of Contents
Table of CONTENTS
1 INTRODUCTION ....................................................................................................................... 3
2 POLICIES, OBJECTIVES.............................................................................................................. 3
3 CONTEXT OF ORGANIZATION .................................................................................................. 3
4 ORGANIZATION STRUCTURE ................................................................................................... 4
4.1 ORGANISATION CHART .................................................................................................................. 5
4.2 ROLES AND RESPONSIBILITIES ......................................................................................................... 5
5 KEY PROCESSES/SUB-FUNCTIONS ............................................................................................ 5
5.1 SBU DA TEAM ............................................................................................................................ 6
5.1.1 DA checks done during the Project Management lifecycle: 8
5.1.2 Delivery Excellence Partner Program (DEP) 8
5.2 PROCESS EXCELLENCE GROUP ......................................................................................................... 9
5.2.1 PEG 9
5.2.2 Metrics Council 10
5.2.3 Business Excellence – The Mahindra Way (TMW) 11
5.3 AUTOMATION ............................................................................................................................ 12
5.4 COMPLIANCE ............................................................................................................................. 12
5.4.1 Central Audit Function 13
5.4.2 Support Unit Assurance (SUA) 14
5.5 OPERATIONS SUPPORT ................................................................................................................ 15
6 INTERFACES WITH OTHER FUNCTIONS................................................................................... 16
7 RISK MANAGEMENT .............................................................................................................. 16
8 SERVICE LEVEL NORMS (SLN) ................................................................................................. 16
9 QUALITY RECORDS ................................................................................................................ 17
10 STATUS REPORTING TO MANAGEMENT ................................................................................ 18
11 ESCALATION MATRIX ............................................................................................................ 18
12 REFERENCES .......................................................................................................................... 18
13 GLOSSARY ............................................................................................................................. 19
14 DOCUMENT HISTORY ............................................................................................................ 20
15 ANNEXURE 1 BALANCED SCORECARD – QWAY ...................................................................... 22
16 ANNEXURE2 – ROLES AND RESPONSIBILITIES ........................................................................ 22
1 INTRODUCTION
Quality Function in Tech Mahindra is called as QWAY and it is primarily a function in IT Division that provides
an independent view on the progress made towards meeting business objectives and customer requirements.
Through quality policy deployment, QWAY helps to ensure that overall management processes, support
function processes, engineering practices, and project / programs are executed as per the defined standards
& processes and ensure that the monitoring of the performance is done at regular frequency.
QWAY is also responsible for establishing and maintaining the Business Management System (BMS) compliant
with various best in class quality models (TMW) and latest industry standards like ISO 9001:2015, ISO 20000-
1:2018; ISO 27001:2013, ISO 22301:2019, CMMI Level 5 (v2.0), TL9000(RH6.2/MH5.6) and in line with the
company’s business objectives.
2 POLICIES, OBJECTIVES
Quality Policy: We are committed to provide solutions and services to our customers, which are
predictable, relevant and reliable. We will strive to enhance customer experience through collaborative
approach to innovation and continual process improvements.
Qway Charter is defined to operationalize and agree on how the Quality policy and the Quality objectives
are met. The main tenets being to design, develop and deploy systems, processes and methods to meet the
needs (current & future) of Tech M delivery function to enable them to cater the customer needs.
The Quality Objectives are derived from the Quality Policy:
• Building best in class methods/processes, adopting relevant tools and global best practices & being
certified for the international standards.
• Enabling the implementation through industrialisation of processes built
• Encourage continuous improvements by employing PDCA methodology and build a system of healthy
comparisons through regular benchmarks.
The Quality objectives are translated into quantified objectives for QWAY. These are then cascaded and
translated into the Balanced Scorecard. Refer Annexure 1 at the end of the document.
3 CONTEXT OF ORGANIZATION
Tech Mahindra offers convergent, digital, design experiences, innovation platforms and reusable assets which
connect across several technologies to deliver tangible business value and experiences to our stakeholders. In
order to achieve greater agility towards executing agreed goals, the organization moved towards a federated
structure, which in Tech M parlance came to be known as ‘SBU Structure’.
Within Tech Mahindra, QWAY is an independent function enabling delivery units to achieve their objective
and customer satisfaction.
Refer APEX Manual (GOV-PO000) for detail on relevant Internal and External Issues that affect the ability to
achieve the intended results of Tech Mahindra’s Quality Management System.
Following table gives an understanding of the needs and expectation of interested parties and how are these
monitored and reviewed.
External • Complying with the • Implement and sustain the • Periodic audits
Auditing chosen industry compliance to standard • Closure of NC’s on time
Agencies & standards as scoped requirements
Internal Audit • Objective evidence for
Groups assessments
4 ORGANIZATION STRUCTURE
In line with IT Division’s philosophy - ‘Connected World, Connected Experiences’ the QWAY function is
structured and organized into central Qway Functions such as PEG, MC, OS(PMO), TMW, DEP and SBU Delivery
Assurance (DA).
QWAY function focuses on implementation of Quality Policy, QM practices, drives organization-level initiatives
and quality improvements including BMS process definition, deployment and enhancement.
QWAY Team aligned with the SBUs (referred as DA – Delivery Assurance) supports projects to enable process
implementation, ensure delivery excellence and customer satisfaction
This alignment helps QWAY to become an integral part of the delivery organization and help foster customer
centricity and improve operational effectiveness and efficiency.
5 KEY PROCESSES/SUB-FUNCTIONS
The Business Management System (BMS) of Tech Mahindra is an integrated system of processes based on the
PDCA cycle (Plan–Do-Check–Act) focusing on continuous improvement of our products and services. It meets
the requirements of international standards like ISO 9001, ISO 27001, ISO 27701, ISO 27017, ISO 27018, ISO
20000, ISO 22301, TL9000 and AS9100.
The purpose of Tech Mahindra’s Business Management System is to:
• Establish Tech Mahindra wide processes to implement quality policy & other policies outlined in the
Apex manual
• Consistently provide products and services which meet/exceed requirements of relevant interested
parties which include All associates, Customer amongst others
• Describe the interaction between various processes used in developing, testing and maintaining the
products and services
BMS processes cater to all Processes starting from Lead Generation till Order to Delivery and support function
processes through the BMS components shown below:
Scope:
SBU DA teams are aligned to the SBUs. Adherence and monitoring of the projects in scope is achieved by DA
through various assurance activities.
SBU DA Activities:
PLAN DO
• Responsible for implementing and monitoring • Facilitate in preparation of Project Plan
DA practices and DA plans within their respective document and Operational Process document,
business units and reviewing of the same
• Plan for of all the quality interventions such as • Provide consultation to delivery projects on the
IQA, DRA, DA, Kick-offs, PMR etc. processes to be implemented
• Ensure proper process tailoring happens based • Facilitate PMRs and QMRs as per the agreed
on project / client requirements frequency (mostly quarterly)
• Plan for standard metrics including customer • Review SBU/Program/Project Performance
mandated metrics. through the various Qway Tools used and ensure
timely action closure
• Timely escalation of high-risk projects through
risks raised in the Risk Management Tool[R1]
• For High and Medium risk projects, updates to
be provided at account level through AED –
Account Escalation Dashboards.
• Ensure timely reporting & actions taken on
Customer Complaints and Escalations
• Ensure identified metrics are submitted by the
projects and - its review
• Facilitate RCA and corrective actions as part of
the defect prevention activities planned
• Help project teams to do small improvements
such as Kaizens
• Facilitate to take projects to high maturity, i.e.,
L4, L5
• Facilitate Project closure where appropriate,
capture of lessons learnt
Act Check
• Ensure NC verification and Closure providing • Monitor implementation of Quality
necessary escalations for timely closure Improvement Practices across delivery
• Action items from Audit/PMR/QMR/QG • Track the various performance parameters thru
findings are closed Cluster reports for coverage, compliance and
• Action plan for CSAT low feedback tracked to process effectiveness
closure • Improve and drive better QA reporting
• Address team sourcing with help of RMG mechanisms in line with the management
• Ensure competency building within the team expectations
and for self, by monitoring of the mandatory • Review the performance of QA function at
skills that they require to undertake cluster level with leadership
• Ensure audits/PMRs are conducted as planned
• QGs are conducted at planned milestones
• Review and monitor, High Risk projects, and
EWRs on monthly basis
• Review projects for Maturity Levels L4/L5 and
ensure case studies are in place
5.2.1 PEG
PEG is responsible for identifying the process needs of the organization, and to implement and monitor the
continual process improvements across the organization. The objective being simplified and relevant
processes ensuring agile delivery
Scope:
PEG Activities:
PLAN DO
• Prepare a plan (Charter for the year) at the • Implementation of activities as per the plan.
beginning of the year e.g. Jan to March’21 for • Review and finalisation of CRs with CCB
FY21’22. • Process definition as per Hub tickets
• Plan for process improvements, trainings, key received/proactive improvements
initiatives, certifications • Monthly BMS Releases
• Process Evangelisation
• Trainings
• Support to Certifications/Org initiatives
Act Check
• Act on CRs received • Feedbacks through Hub/ Other sources based
• Further process changes as result of on review of Processes released in BMS/Audit
improvements/reviews analysis/ Organisation initiatives
• Process automation through Qway Tools [R1] • Change Requests based on analysis of current
• Analyse process training feedback in terms of performance, Organizational goals and
training material content and where required innovations in the industry.
take appropriate action • Review and Approval by CCB
• Training Feedback
PLAN DO
• Goal setting for the various lifecycles/types of • Defining organizational level metrics for
projects different solution offerings by continuously
• Identify and drive new quality initiatives across aligning with the current business needs and
Organization that are related to industry best customer requirements and latest external
practices and available through quality / business benchmarking analysis
model (e.g. CMMI, TL9000) • Data collection from eligible projects and
• readiness for QI computation
• Publish overall Quality Index for Projects,
Programs, IBUs, IBGs and SBUs along with detailed
analysis
• Benchmarking key process metrics with
relevant peers/competition
• Analysing Metrics submitted for Process
Performance Baselines (PPBs) and base lining
Process performance by arriving at periodic PPBs
which will aid projects in setting up goals for the
metrics chosen by them to manage the project
• Preparing and publishing the organization level
process performance models
• Preparing and reporting trends across various
industry benchmarks like ISBSG, SPIN etc.
Act Check
• Initiate CAPA activities for identified • Verifying the data accuracy and correctness for
improvement areas due to PPB, Benchmarking, metrics data submitted for projects
QI • Compare performance w.r.t. PPB,
• Training on Metrics program and QPM Benchmarking, QI across cycles
• Assist PEG in process improvements based on • Validating and approving project level
requirement of models that will be taken up time prediction models and metrics models used by
to time, for implementation the project teams
The objective of the TMW team is the help IT Division achieve higher levels of TMW Maturity Stages.
Scope: IT Division
Activities:
PLAN DO
• Plan and facilitate TMW implementation • Prepare the process owners and guide them to
• Facilitate TMW planning and selection of prepare the document that captures progress on
business-critical processes for improvement implementation of TMW principles in their areas
through adoption of TMW principles which is needed for TMW assessment
• Plan and execute necessary trainings and • Participate in the annual assessment
facilitation for the teams taking up TMW • Liaising with MIQ
improvement projects • Conduct annual planning workshops
• Plan periodic reviews on selected business • Guide and facilitate improvement teams
critical processes project progress with • Work closely with the process owners to
stakeholders and monitor timelines implement the TMW guidelines and the best
practices in their processes
Act Check
• Standardization of templates for assessment • Periodic review of TMW activities and reporting
• Institutionalization of evaluation criteria’s the same to TMW Steering Committee and Top
• Ensure cross learning between teams and Management
processes • Periodic assessment of progress towards
• Continuously bring in quality management implementation of improvement actions and
knowledge with outside experts and guidelines.
organizations and share it within organization
• Carry out TMW promotional activities within
company
5.3 Automation
The Automation team within Qway works as part of the larger Automation Team supporting the Qway Tools
in scope.
The objectives of the team are:
• Maintain Qway Tools in scope refer [R1]
• Address change requests pertaining to the Qway Tools coming from business (for critical CRs only or as
per priority defined by CIO team supporting the changes)
• MIS / Dashboards for the management from QWAY on need basis
Activities:
PLAN DO
• Identify, prioritise and plan for the Tool related • Resolve Issues/Queries for Qway Tools in scope
inputs gathered from the Issues/queries from with technical assistance from CIO as needed
users for the Qway Tools in scope and CRs raised • CR requirement documentation and discussion
with CIO
Act Check
• Training/orientation on Qway Tools supported • UAT for the implemented CRs
5.4 Compliance
Compliance sub function ensures effective audits and assessments for the defined processes and provide
Process Assurance to support functions. They are also responsible for sustaining the organization’s
certifications.
PLAN DO
• Plan, Select and contract manage external • Perform detailed analysis of all internal audit
audit agencies parameters and release dashboards to enhance
• Collect and compile locations, auditable the effectiveness of Audits and disseminate the
projects and finalization of audit schedule observations to QWAY/Business teams.
• Planning, Coordination of Logistic support for • Program management of external audits
the External Auditors Coordination with external auditees and auditors
• Plan for the process improvements pertaining for smooth conduct of audits
to the framework of Internal Auditing and • Support for selection and contract
circulating the information regarding the management of audit agencies for location and
progress through Periodic communication to all project specific certification requirements like
relevant stakeholders. Aerospace, TL9K, HSE and ISO 13485 etc.
• Plan for Internal Audit Trainings to ensure • Coordination with internal & external
upskilling of internal quality auditors stakeholders for smooth conduct of AS9100 and
TL9000 certifications
• Extend support to DA for delivery projects
internal audit readiness of respective account or
location or organization
•
•
• Provide support to Sales teams in providing
responses to RFP / RFQ’s related to org level
quality certifications
Act Check
• Liaise with External Certifying agencies for • Monitor Maturity index
adoption and maintenance of Certifiable • Monitoring & tracking the teams to take
Standards an Organization / Account level effective and timely actions for closure of audit
• Strengthen the audit process through observations/Lessons learnt.
competency building interventions • Perform Gap analysis on Standard undergone
• Maintain IQA Apex level artefacts such as revision/upgrade & inform respective interested
Internal Audit procedure, Guidelines, templates, parties to perform necessary changes
Audit checklists for the applicable standards / • To verify the process compliance through
processes, IQA Help document and internal conduct of internal quality audit for the defined
auditor’s training artefacts based on any scope.
improvements improvement suggestions coming • Monitor Non-conformities
as a result of audit findings/NC analysis
• Audit Tool and Audit Process improvements
PLAN DO
• Plan and assist the support function in • Facilitate Support Functions in developing,
identifying and implementing Process implementing and improving the effectiveness of
Improvements identified through Customer the QMS through document reviews, process
feedbacks, Internal/External audits and improvements and drive ICSAT annually
assessments or reviews. • Facilitate Support Units in preparation for
• Prepare and Plan for the annual IQA calendar external and customer audits and provide
for support functions. training wherever required.
• Scheduling, assigning internal auditors • Drive the Internal Customer Satisfaction Survey
• Plan for IQA enhancements for the support (ICSAT) survey annually in collaboration with
functions QWAY PMO group.
• Conduct Internal Quality Audits as per the
standards followed for the scoped functions at
defined frequency
• Facilitate scoped support functions in
preparation for “The Mahindra Way”
assessment.
• Providing support to Sales teams in providing
responses to RFP / RFQ’s related to org level
quality certifications Support to RFP/RFQs
Act Check
• Support implementation of Action Items and • Tracking of Non-Conformances and areas of
closure of NCs identified during the IQA and improvement
external audits.
• Drive Organization level Business Process
Improvements by collaborating with various
stakeholders involved
Activities:
PLAN DO
• Assist Function leaders for any support • Ensure the reach out of Quality Policy and
needed in Planning the Budget for the FY for Quality Philosophy to all associates
the group and monitor the same for the year • End to End Management of Internal Customer
• Plan and organize Function Level Induction Satisfaction survey (ICSAT) for Support
for New Joiners Functions and Competency Support Groups
• Plan for capability building of the QWAY (CSGs)
team - Maintain the Skills database of the • Resource Management - Liaise with the RMG
QWAY associates teams and monitor the fulfilment of requests
raised
• Coordination of important meetings, events in
QWAY viz. MRM, Quality related events
• Maintain the Central Repository for Data
Backup and Retrieval for QWAY Team
• Interfacing with various Central Teams / SBU
DA Pillars on need basis to satisfy their ad-hoc
needs and requirements
• Periodic reporting the status of the Health,
Progress and Overall functioning of QWAY DA
Team through various dashboards and reports
published on a periodic basis
• Organize best practice/knowledge sharing
sessions for the QWAY team
Act Check
• Track all details of projects and ensure Project • Data consolidation requests from QWAY
master, Qway Tools data is up to date. leadership to compile critical reports for review
• Generate & Track the Reports at various by Qway Senior Management
frequencies (Monthly, quarterly etc.)
Sr. Interfacing
Interfacing areas of work
No Function
1 Delivery Delivery excellence, customer satisfaction, process definition, compliance, improvements
QWAY related tools support, Metrics and external assessments
2 Support Business support excellence, internal customer satisfaction, process definition, compliance
functions and improvements, Metrics and external assessments
3 CIO Design and implementation of QWAY tools
4 TLS Liaise for upskilling related creation of SKUs, trainings, upskilling input data into the NAD
system
5 ISG Periodic security audits, assessments for the function
6 Large Deal For conducting PRA and DRA of eligible large deals
Team
7 Presales Liaising for PRA for eligible deals for self-assessment for non-large deals and panel assessment
Team for large deals
6 CCO CAPS, customer escalations and customer feedbacks (CSAT)
7 RISK MANAGEMENT
Qway Risks are identified and tracked in the Qway Tool. The Risks are reviewed periodically. Opportunities
should be recorded in the Opportunity Register (GOV-TP014).
Whenever there is a significant deviation in the performance from the agreed service level norms, corrective
actions will be initiated.
Refer Corrective and Preventive Actions Procedure [GOV-PR010].
9 QUALITY RECORDS
The table below identifies the records maintained by QWAY (records are maintained in a soft copy either in
MINK, Appropriate Tool or available as action items in JIRA.
# Record description Media Responsibility Retention Period
(Custodian)
1 Audit Schedule Refer [R1] Audit Tool Corporate Audit 3 years from the date of issue
Champion
2 Audit Reports and NC Refer [R1] Audit Tool Corporate Audit 3 years from the date of issue
Reports Champion
3 Review Records Mails from the review Author/Team Till next version of document
of BMS authority owning the is issued
Documents Process changes
4 Process Soft copy Metrics Council 3 years from the date of issue
Performance (Organizational Assets
Baseline Library in BMS)
5 R
QI dashboard Repository on Mink Metrics Council 2 years from date of issue
8 Benchmarks Soft copy Metrics Council 3 years from the date of issue
generated for (Organizational Assets
below defined Library in BMS)
lifecycles
• Waterfall
• Agile
• Testing
• MS
11 ESCALATION MATRIX
QWAY escalation matrix is available under “Help & Support “option in BMS.
http://bms.techmahindra.com/_layouts/15/WopiFrame2.aspx?sourcedoc=/Help%20and%20Support/QWAY
%20Escalation%20Matrix.xls&action=default
12 REFERENCES
Procedures
13 GLOSSARY
CCB Change Control Board NCNon- Sales CRM stage wherein verbal
ConformanceP4 communication/LOI is in place
14 DOCUMENT HISTORY
1.1 4-Sep- Vandita M Syamala Lanka Syamala Lanka Updated SLN details in Section 6
2014 QWAY SERVICE LEVEL NORMS
(SLN)
Structural Changes
incorporated after review by
QWAY Leaders and function
head’s inputs
V3.0 22-Nov- Anand Umrani, Sukriti Kumar, Sanjeev Chikodi Removed LSS reference, Added
2021 current BSC, NAD, updated the
Ashwini Sharada Patil,
interested parties and support
Chaudhari
Rajeev Kerur, function interfaces, ,SLNs, org
Madhuri Kenjale. chart, reference to
benchmarking, Added CAST,
Swati Pai,
Updated Annexure 2 - Roles and
Poonam Masarkar Responsibilities
V 3.1 1st Mar- Channabasappa Anandrao Narayan Anandrao ASPICE certification details
2022 Nandgadi Narayan added
V4.0 17-Oct Ashwini Sanjeev Chikodi, Sudha Qway Org chart updated.
2022 Chaudhari Yegnanarayanan Removed NAD reference,
Kshipra Dande,
Reference for Qway Tools List
Anand Umrani, added. DA Toll gates revised
Laxman added with DRA, reference to
Subramaniam, Automation added, R&R revised
for all roles, PDCA for every sub-
Poonam Masarkar, function revised, SLNs revisited
Amitabh Shanker,
Sharada Patil
V 4.1 17-Mar- Ashwini Amitabh Shanker Sanjeev Chekodi Remedy Reference removed and
2023 Chaudhari replaced with Hub
The weightages and targets for BSC change for each year depending on the Organizational strategic
priorities, initiatives and based on past performance of the function. BSC for Qway Head is cascaded
further down to the team
The below mentioned table covers key responsibilities of each role player only and do not constitute all the various
responsibilities performed by them.
The Qway team members have to complete the role-based SKUs assigned in NAD–Learn.
Quality • Approving project IDs after validating parameters against the SOW and support planning
Consultant activities with the PM
• Ensure Deliverability Risk Assessment (DRA) is conducted for all focus deals (EN/NN)at P4 /
P5 (post win) as per the categorization matrix
• Help in preparing and publishing critical risk reports at IBU / IBG / SBU and overall health's
status governance with SBU D&O heads.
• Raise the relevant early warning risk alerts in RAID & flagged to leadership as part of risk
governance
• Facilitate and enable successful setup of Quality process in transitions and transformational
programs
• Ensure proper planning, compliance and coverage of all quality parameters such as Kick-offs,
Audits, PMRs, DA, QMRs, Metrics, Introspections, and Retrospections
• Conduct training, e.g., Tech M Process, Metrics, Agile
• Participate in project/IBU level activities such PMR/QMR, DP meetings, process
improvements
• Conduct internal Quality audits for Projects
• Facilitate in achieving QI / DEI (as applicable) Targets and arriving at productivity
benchmarks
• Collect, review and consolidate metrics data from projects for organizational baselines and
trends
• Ensure internal audits are conducted and NCs are closed on time
• Coordinate with the Metrics group for Metrics Analysis
• Coordinate with the concerned project team to carry out root cause analysis and publish
reports.
• Support to maintain Org-wide certification wrt ISO 9K, 20K, 27K, 22301, ISO 13485 , etc.
CMMI, AS9100, AUTOSPICE, 17025 as applicable
• Support to sustain TMW stage 7 and enable the organization for FY 23-24 assessment
• Help achieve ICSAT score for QWay
• Ensure upskilling as per SKU aligned to role and technology of projects/programs supported.
teams for maintenance of Auditors pool and arrange for the same
• Improve the audit system and effectiveness through periodic IQA analysis as one of the
inputs
• Adopt best practices from other companies