0% found this document useful (0 votes)
18 views1 page

Cebu City BLDG Permit Checklist

Uploaded by

Neil Naranjo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views1 page

Cebu City BLDG Permit Checklist

Uploaded by

Neil Naranjo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Republic of the Philippines

City of Cebu
OFFICE OF THE BUILDING OFFICIAL

BUILDING PERMIT APPLICATION EVALUATION CHECKLIST


√ LINE AND GRADE / GEODETIC SECTION - blow- up plans and details of the ff: septic tank, catch basin, grease trap, sump
☐ Unified Application Forms signed and sealed by Engr/Archi and Owner pit, rainwater tank, cistern tank, overhead/elevated tank, underground tank STP
☐ Inspection Report (for approval of Inspector Recommendation) ☐Rainwater tank with blow-up plans and details (refer CO 1711 and 2103)
☐ Certified True Copy of Lot Title ☐ Residential (3 cu. m. capacity) ☐ Commercial (7 cu. m. capacity)
☐ Certified True Copy of LAND Tax Declaration ☐ Septic tank shall not be located under the building. Septic tank Certification –
☐ Certified True Copy of LAND Tax Clearance distance from artesian well (refer to Sanitary Code and Plumbing Code)
☐ Lot Owner Consent and Authority/ Deed of Absolute Sale/ Lease of Contract ☐ Sewage Treatment Plant (STP) is required (for high rise offices, condominiums,
(Notarized) commercial centers, hotels, sports and recreational facilities, hospitals, and industrial
complex)
☐ Extra Judicial Settlement (If applicable)
☐ Sanitary Engineer must plan and design the ff: deep well, water purification plants,
☐ Sketch Plan signed and sealed by Geodetic Engineer (w/ complete details)
STP, water collection and distribution system, reservoirs and the like; and apply the
☐ Relocation Plan (if applicable) permit forms.
☐ Updated PTR and PRC ID of Geodetic Engineer √ ELECTRICAL SECTION
☐ Barangay Clearance (Original and Updated) ☐ Electrical Permit Forms, duly accomplished signed and sealed by PEE and Owner
☐ SRP Clearance (If applicable) ☐ Electrical plans and details signed and sealed by PEE
☐ Homeowners Clearance. If none, Affidavit of No Homeowners - location and site plans - electrical layout
☐ CCTO Clearance (if applicable) - legend or symbols - design analysis
☐ DPWH Clearance (if applicable) for National Roads - general notes and specs - one line diagram
☐ Affidavit-For Building Lots affected by Road Widening and other Proposed - schedule of loads, transformers, generating/UPS units
Development Projects ☐ Electrical Lightning Arrester details
☐ Zoning Board Resolution for Granted Variance ☐ PCAB License specialty in Electrical Works
☐ Other Clearances from Other Agencies (if applicable) (for 200 amp and above main breaker)
☐ Corporate Secretary Certificate / Corporate Board Resolution ☐ Updated PTR and PRC ID of PEE
√ ELECTRONICS SECTION
(For Corporation) or DTI Certificate (for Sole Proprietorship)
☐ Electronic Permit forms signed and sealed by PECE and Owner
☐ SPA for the Authorized Representative (notarized)
☐ Electrical plans and details signed and sealed by PECE
☐ Easements and Setbacks compliance (refer to NBC/CO 1656, respectfully)
- gen. layout plans w/ legends - isometry system
☐ Technical Description at Site Development Plan
-single line diagram -riser diagram
(Reflect boundaries, monuments, lot name, lot area, lot line) -design analysis (if applicable) -unit/equipment specs
Additional Req. for Renovation/ Interior Renovation Projects:
☐ Updated PTR and PRC ID of PECE
☐ Occupancy Permit of the Building
√ ARCHITECTURAL / LAND USE AND ZONING SECTION
☐ If no occupancy permit ☐ Architectural Permit forms signed and sealed by Architect and Owner
- Certified True Copy of Land and Building Tax Declaration
☐ Fence permit forms signed and sealed by Architect/Engr and Owner (if applicable)
- Certified True Copy of Land and Building Tax Clearance
☐ Sign permit forms signed and sealed by Architect/Engr and Owner (if applicable)
- Certified True Copy of Lot Title ☐ Enforcement division forms duly signed and sealed
- Sketch Plan
☐ Fire Safety Evaluation Certification (OBO copy/pink slip)
√ STRUCTURAL / CIVIL SECTION
☐ Updated PTR and PRC ID of Architect
☐ Civil/Structural Permit forms, duly accomplished signed and sealed by Civil/Structural
Engr and Owner ☐ Bill of Materials signed and sealed by Architect and Owner
☐ Updated PTR and PRC ID of Civil/ Structural Engineer ☐ Methodology Specifications signed and sealed by Architect and Owner
☐ Boring test for 3-storeys and higher, if necessary, load tests shall be required. ☐ Approved Locational Clearance (Original)
However, adequate soil exploration shall also be required for lower buildings/structures at ☐ If Granted Variance: Board Resolution compliance with Plans
areas with geological/geotechnical hazards. ☐ Approved Architectural Plans with Zoning stamp
☐ Structural Analysis and Design for all buildings/structures signed and sealed by ☐ Architectural plans and details (2 sets) signed and sealed by an Architect
Civil/Structural Engineer and Owner - perspective - roof plan
☐ Construction Safety and Health Program/ DOLE Clearance - vicinity map/ location plan - ceiling plans (showing light fixtures
☐ Structural plans and details signed and sealed by Civil/Structural Engr - site development plan - schedule of doors and windows
- construction notes and gen. specs. - schedule of column, footings, wall - floor plans - fence details
- foundation plans and details footings, and floor slabs - elevations (4) - sections (2)
- blow-up plans and details of PWD features: PWD ramp, PWD parking, PWD toilet
- floor framing plans and details - schedule of beams and girders with
- roof / roof deck framing plans and details details ☐ Parking slots required (refer to City Ordinance 1656)
- schedule of trusses with details ☐ Minimum setback (refer to City Ordinance 1656)
Addt’l Req. for High-rise buildings and / or buildings with free from any obstruction from ground floor level to up in all sides
substructures/lower ground ☐Abutting firewalls (refer to City Ordinance 1656)
☐ Earthquake Recording Instrumentation (E.R.I.) and its ☐ R1 and R2 (1/3 rear abutment)
corresponding location (DPWH-NBCDO MC # 01 of 2015) ☐1.00m from the topmost roof line attached (fire code)
☐ Detailed Construction Methodology (SP Resolution # 15- 0241-2019) ☐ PWD Compliance (refer to BP344 and City Ordinance 2396)
☐ Soil protection analysis and methodology, signed and sealed Applicable for rentable and commercial spaces
☐ Detailed slope protection drawings, signed and sealed ☐ PWD parking (3.70 x 5.00m)
√ MECHANICAL SECTION ☐ PWD ramp (1:12 ramp slope with landing of 1.50m)
☐ Mechanical Permit Forms, duly accomplished signed and sealed by PME and Owner ☐ PWD toilet (2.00 x 2.00m clear width)
☐ Mechanical plans and details signed and sealed by PME Applicable for hotel, motel, pension houses, apartment,
- location and key plan - general layout plan and place of lodging (5 rooms & above)
-isometric drawings as stated -design computation ☐ PWD unit room with PWD toilet (must be at ground floor if no elevator)
-detailed plans of all machinery/ equipment Addt’l Req. for Renovation Projects:
☐ Updated PTR and PRC ID of PME ☐ As-found or Existing Condition Plans (for comparison purposes)
√ PLUMBING / SANITARY SECTION
☐ Plumbing Permit Forms, duly accomplished signed and sealed by RMP and Owner ☐Green Building Code Compliant (refer to the green building code for reference)
☐ Updated PTR and PRC ID of RMP/ SE __________________________________________________
☐ Drainage Tapping Permit from DEPW/TIC Office – for NOTE:
Cebu City roads and National roads (CO 2135) ☐ All drawing plans shall be drawn to scale and coincide with
☐ Plumbing Analysis for 20 water closets and more, signed and sealed. other plans of all sections, signed and sealed
☐ Plumbing plans and details signed and sealed by RMP ☐ Reflect practitioners initials to all the corrections
- locational plan and site plan - water supply/ line plan ☐ No pasting/ patching/ correction ink or tape
- legend and general notes - drainage, waste, and vent plan for all working drawing plans and application forms
- pipe joint/ connection details - storm drainage plan
- isometric diagram of entire plumbing system BUILDING PLANS AND DOCUMENTS ON E-FILE (PDF FORMAT)
☐USB
OBO-FM-PII-B-23 Eff. Date May 15, 2023 Rev. 00