0% found this document useful (0 votes)
22 views3 pages

54AB

Uploaded by

crgweeding44
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views3 pages

54AB

Uploaded by

crgweeding44
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Asian Paints (Polymers) Private

Limited
Dahej Project

Pump GA drawing for PMP-D9-54A/B


[Security Level2]
TOYO Project Doc. No.: Page 1 of 1
Work No. : 6447 6447-D9-MR-GAD-APMP009A-0013-A1 Date : 12-Nov-24

Asian Paints (Polymers) Private Limited

Dahej Project

Green field
Vinyl Acetate Ethylene Emulsion (VAE),
Vinyl Acetate Monomer (VAM) and Offsite & Utilities
In Dahej, Gujarat, India

Pump GA drawing for PMP-D9-54A/B

(AP) Approved

(AC) Approved with Comments

(RE) Not Approved

(RI) Retained for Information

Received Date:

PROJECT ORIGINATOR

Returned Date:

4 13-03-2025 Approval CAS CAS CAS

3 19-02-2025 Approval CAS CAS CAS

2 23-01-2025 Approval CAS CAS CAS

1 01-01-2025 Approval CAS CAS CAS

0 26-10-2024 Approval CAS CAS CAS

ISSUE
REV DATE ISSUED PREPARED CHECKED APPROVED AUTHORIZED
PURPOSE

THIS VOLUME EMBODIES PROPRIETARY INFORMATION OF TOYO ENGINEERING INDIA PRIVATE LIMITED. THIS VOLUME OF THE MATERIAL
DESCRIBEDTHEREON MAY NOT BE COPIED OR DISCLOSED IN ANYFORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE
PURPOSE FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY TOYO
ENGINEERING INDIA PRIVATE LIMITED.
COMMENT RESOLUTION SHEET

CLIENT : APPPL Job No.


PROJECT : Dahej
Document No. 6447-D9-MR-GAD-APMP009A-0013-A1

Document Name GA drwaing for PMP-D9-54A/B

Sr. Referance
COMMENT/ OBSERVATION BY APG/PERSTORP RESOLUTION/ ACTION
No.

NOTED
1 Noted and incorporated

2 Noted and incorporated NOTED

3 Noted and incorporated NOTED

4 Noted and incorporated NOTED

5 Noted and incorporated NOTED

Flanges are complying to ASME std. dimensions but same are threaded as
6 there is less space underneth of pump for nut tighting. Hence we have placed
note.
NOTED

7 we confirm baseplate drain is at center line of pump/current location. NOTED

8 Noted and incorporated NOTED

9 Noted and incorporated NOTED

10 Noted and incorporated NOTED


In Rev0 it was conveyed to remove cover sheet. We are using drawing
formate provided by APPPL fomr rev 0. in drawing no. 6447-D7-MR-GAD-
APMP009A-0001-A1 as common comments for all drawing.

11

Now as again we are getting same comment we are adding cover sheet again.
Hope we didn’t get comment again to remove it.
NOTED

PC-2023-031_R0