ST John
ST John
1 2 3 4 A B C D E F G H I K
lamp
300
p. c. coping
400x300 r. c. columns
15x15 iron bars
900
tyrolean rendering
2400
p. c. coping
2900 2900 facing bricks
150 concrete blocks
1200
13 BNDRY. WALL ELEV. smooth coloured
stonework
scale : 1 : 50 dpc
2900 2900
3,730 7,770 3,730 2,000 3,030 3,720 3,720 3,720 3,720 3,720 3,720 3,230
200x500 concrete fdtn.
boundary wall ( mix : 1 : 3 : 6 )
polythene sheeting
stormwater drain to existing stormwater drain
piers at 2900 c/c
as expansion joint
at 5800 c/c
SECTION
14 scale
3,730 7,770 3,730
: 1 : 50
25
Ridge cap
86
1:150
114
0
90
1,871
1 2 3 4
1,476
1,
30
5
B1
3,730 7,770 3,730 K I H G F E D C B A
1,000 1,000 1,000 1,000 150x50mm rafter 100x50mm strut
815 500 415 1,685 1,000 5,485 415 500 815
230 3,500 230 5,890 150 1,500 230 3,500 230
D-04
230
230
230
W1
A A - 1:100 Notes:-
213 788
1,558
RAMP SEPTIC TANKS' STANDARD DIMENSIONS
2,000
1,770
1,770
2,000
1. All dimensions to be checked on site, written
B
1,000
D4
No. OF L B DNo. OF CAPACITY PERCOLATION dimensions to be followed in preference to scaled
USERS (length) (breadth)(depth) TONS in litres TRENCH in
dimensions.
W1
mm mm mm metres (L)
6 2700 900 1050 1 2320 7
10 3300 900 1050 1 2800 12
2. All walls less than 200mm thick to be
BOARD ROOM
213
15 3900 900 1050 1 3400 18
W1 W1 W1 W1 20 4500 900 1050 1 4000 24 reinforced with hoop iron at every alternate
B B A B 150X100 cast A 25 3600 1200 1200 1 4600 30
course.
Tryford Tiles iron dip pipes 30 4200 1200 1200 1 5200 36
2,800 230
2,800 230
35 5000 1200 1200 1 5800 42
1,730
1,730
40 5100 1200 1200 1 6400 48
L
45 4200 1200 1500 1 7000 54 3. All reinforced concrete work is to be in
50 4500 1200 1500 1 7600 60 accordance with structural engineer's details.
OFFICE-1 OFFICE-2 SECTIONAL PLAN B
60
70
5300 1200 1500 1
6000 1200 1500 1
8800
10400
66
72
Tryford
3,030
3,030
80 5700 1200 1800 1 11200 78 4. All sanitary work to be in accordance with
STORE
Tiles
Tryford Tryford scale: 1 : 50 90 6200 1200 1800 1
100 7100 1200 1800 1
12400
13600
84
90 M.O.H rules and regulations.
125 4200 1200 1800 2 16600 96
Tiles Tiles
1,000
1,000
150 5000 1200 1800 2 19600 102
175 5800 1200 1800 2 22600 108
5. Where drain passes under building or driveway
D2
D2
D2
200 6700 1200 1800 2 25600 114 area,
225 7300 1200 1800 2 28600 120 pipe to be of cast iron or encased in 150mm
250 6400 1500 1800 2 31600 126
275 7000 1500 1800 2 34600 132 concrete.
1,030
1,030
300 7600 1500 1800 2 37600 138
C C WHERE GOOD SOAKAGE MAY BE OBTAINED, 6. All waste pipes and soil pipes are to be in ducts
230
230
D2 D2 MAY BE POSSIBLE TO REDUCE THIS FIGURE and the bends to have all cleaning eyes accessible
from outside.
1,000
1,000
3,230 3,720 3,720 3,720 3,720 3,720 3,720 3,030 2,000 25 thick scumboard in channel guide 75x38
7. All windows and external glazed doors on
B
W1
W1
C precast conc weir
ground floor to have burglar proofing to
K I H G F E D C B A Architect's detail.
3,720
3,720
8. All door frames to be rebated & moulded & be
VISITORS PULPIT
fall
full width of wall with moulded architrave to
1,000
1,000
490
1,230 490
D A A detail, provide rubber door stops to all doors.
Tryford Tryford Elevation B
W1
W1
150X100 cast
iron dip pipes 9. Stair case and lobby doors to be self closing
Tiles Tiles
- 1:150
fall
and 1/2 hour fire resistant.
1,230
25mm ThicK 11. All manholes within building area, driveway and
parking to have heavy duty air tight covers and
SECTIONAL PLAN
1,000
1,000 1,000
concrete screed 150x50mm 10x75mm double sealed.
W1
W1
scale: 1 : 50
bed rafter purlin
10,930
10,930
12. Provide G.I. 125 x 100 rainwater down pipes and
3,720
3,720
125 x 100 G.I.box gutter with brackets etc. where
100mm Thick concrete floor 150x50mm shown.
28g iron effluent distribution
chamber
slab mix 1:2:4 on B.R.C rafter
1,000
490
1,230 490
sheet 13. All painting to be 3 coats.
A142 1000 guage polythene
W1
W1
100x75mm wall
d.p.m sheet c.i. cover & frame 14. Splash apron of 1000mm along the perimeter
plate 600x450
of building.
24
1,230
30
15. Samples of fittings, materials etc. to be
10
E E
55
230mm thick
12
produced &
TOP PLAN
37
burnt clay approved before commencing work.
scale: 1 : 50
1,000
reinforced concrete Pelmet boxes & timber
consolidated
W1
W1
3,720
230 17. Steel trusses/portal frames & purlins to be
well compacted fascia board effluent distribution
690x230mm thick chamber painted with 2 coats of oil paint.
marrum
hardcore
1,000
1,000
490
490
D
18. Fire fighting equipment to be provided and
A1 A1
30,810
230mm thick foundation 230x230mm installed by Building Fire Consultants where
W1
W1
690 thick
230
well burnt clay 230 230 shown on plan.
C1
1
c.i. cover & frame
D1
600x450
brick reinforced 150 fall 19.These architectural drawings shall be read in
beam conjunction with the Structural
1,575
1,575
230
scale: 1 : 50
TOP PLAN
scale: 1 : 50
discrepancy shall be reported immediately to the
RAMP RAMP Architect.
- 1:50 - 1:50 20. The Architect shall not accept any liability for
works which he has not been expressly instructed
3,720
1,800
3,490
3,490
1,800
3,720
D3
482
this dimension governed by the slope
1,032 1,032 of ground fall & length of drain
1,575
1,575
G G
75
SECTION B-B
400 min.
150
D scale: 1 : 50
230
230
to percolation trench
1,000
1,000
1,484
230 L 230
1 2 3 4
W1
W1
3,720
SECTION A-A
scale: 1 : 50
1/
3 length of tank 2/3 length of tank
1,000
490
1,230 490
D-04
W1
W1
150 fall
25
SECTION OF FLOOR
87
113
0
1,230
7,210
7,210
1,871
on 150x50mm rafters, 100x50mm
struts, on 150x50mm tie beam on
1,000
1,000
W1
1,476
fascia boards. 66
above TWL and manhole only carried up to
3,720
3,720
1,
ground level
30
beams to be reinforced with 2 no. 12 diam. rods)
Owner
5
G.L. G.L.
1,000
1,000
490
730 490
10,2
W1
W1
175
150 ST. JOHN CHURCH OF UGANDA
730
150
380
380
I I 15,000 weak concrete fill to percolation trench
230
230
W1 W1 W1 D1 W1 W1 W1 to any voids
1,150
3,000
3,000
3,230
3,230
3,230
450
4,000
25mm ThicK fall
Arch. a. barry BYAKWAGA
1,467
150
concrete screed 230 mass concrete (1:3:6)
Reg. No.: 285, P.C No.:3801
230
bbyakwaga@gmail.com
933
1,000 1,000 1,000 1,000 1,000 1,000 230mm 150 agricultural pipes 25 thick scum board
75x38
channel
3,230 500 415 815 770 3,000 770 815 415 500 1,366 consolidated 230 min. fall 1:100 guide
fixed to
690 3,730 7,770 3,730
walls
PROPOSED CONSTRUCTION OF ST. JOHN
hardcore on
760
hardcore infill
3,730 7,770 3,730 well compacted INSPECTION CHAMBERS SIZES CHURCH OF UGANDA, OPUYO SOROTI CITY,
230
EASTERN DIVISION
20,059 marrum 1 2 3 4 PERCOLATION TRENCHES
scale: 1:25
DEPTH TO INTERNAL WALL FOUNDATION
INVERT DIMENSIONS THICKNESS THICKNESS
(mm) (mm) (mm) (mm)
230 B 230
Earth (At least one foot of percolation trench
should be provided for every 2 gallons up to 450 450x450 114 127
A1 of effluent to be disposed of in 24 hours.
When sediment is seen in the effluent, the tank
should be dislodged without delay.
One trench should be at rest while the other
482-900 450x450
930-1500 600x1060
over 1500 760x1060
114
230
230
127
127
200
150 fall in floor
1 2 3 4 SECTION C-C
more than a month). internally in cem:sand plaster 12 mm thick
foundations to be 1:3:6 concrete
SUBMISSION DRAWINGS
D-5
1
scale: 1 : 50
0. GROUND FLOOR PLAN A Building Section Scale Date Drawn by; Design by
GSPublisherVersion 0.2.100.100