Maintenance Problems

The document presents two EOQ problems involving spare parts inventory management, detailing calculations for economic order quantity, total inventory costs, and costs per item. Additionally, it includes a general exercise on maintenance labor performance and costs, as well as crew working hours and a work order problem for a hydraulic pump repair. The calculations and results are provided in a structured format, highlighting key metrics for inventory and maintenance efficiency.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views5 pages

Maintenance Problems

The document presents two EOQ problems involving spare parts inventory management, detailing calculations for economic order quantity, total inventory costs, and costs per item. Additionally, it includes a general exercise on maintenance labor performance and costs, as well as crew working hours and a work order problem for a hydraulic pump repair. The calculations and results are provided in a structured format, highlighting key metrics for inventory and maintenance efficiency.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

EOQ Problem 1

If the total items of certain spare parts is 1,200,000 items /years ,


while the price of one item = 5 LE . Following the carrying
out and ordering costs information / order are given in the
table below , Calculate :- Order No. No. Of Items Ordering Cost
(LE)
Carrying out
Cost (LE)

2 600,000 20,000 140,000


A) Economic Ordering Number / Years 4 300,000 40,000 80,000
B) Total Inventory Cost for the EOQ
6 200,000 60,000 50,000
C) Total Inventory Cost / Item
8 150,000 80,000 40,000
D) Total Cost / Item
10 120,000 100,000 30,000

12 100,000 120,000 25,000

Total Inventory Cost ($)

Ordering Cost
Order No. No. Of Items Carrying out Cost (LE) Total Cost 200K
(LE) Ordering Cost

180K Carrying Cost

2 600,000 20,000 140,000 160,000 160K Total Cost

140K
4 300,000 40,000 80,000 120,000
120K
6 200,000 60,000 50,000 110,000 100K
80K
8 150,000 80,000 40,000 120,000
60K
10 120,000 100,000 30,000 130,000 40K
20K
12 100,000 120,000 25,000 145,000 Number of
Orders per
2 4 6 8 10 12 Year

Total Inventory Cost ($)

A) EOQ = 6 Orders 200K


Ordering Cost

180K Carrying Cost

160K Total Cost

B) TOC = 110,000 L.E 140K


120K
100K
80K
C) TOC/Item = 110,000 / 200,000 = 0.55 L.E / Item
60K
40K
20K
D) TC/Item = 5 + 0.55 = 5.55 L.E Number of
Orders per
2 4 6 8 10 12 Year

1
EOQ Problem 2
If the total items of certain spare parts is 1200 items /years ,
while the price of one item = 500 LE . Following the carrying
out and ordering costs information / order
are given in the Order
No.
No. Of
Items
Ordering
Cost (LE)
Carrying out
Cost (LE)

table below , Calculate :- 2 600 20,000 180,000

4 300 40,000 120,000

A) Economic Ordering Number / Years 6 200 60,000 100,000

B) Total Inventory Cost for the EOQ 8 150 80,000 80,000


C) Total Inventory Cost / Item 10 120 100,000 60,000
D) Total Cost / Item 12 100 120,000 50,000

Total Inventory Cost ($)

Order No. Of Ordering Carrying out Total Inventory


Total Cost Ordering Cost
No. Items Cost (LE) Cost (LE) Cost / Item
200K Carrying Cost

180K
2
Total Cost
600 20,000 180,000 200,000 10
160K
4 300 40,000 120,000 160,000 4 120K
100K
6 200 60,000 100,000 160,000 2.67
80K
8 150 80,000 80,000 160,000 2 60K

10 120 100,000 60,000 160,000 1.6 40K


20K
12 100 120,000 50,000 150,000 1.25 Number of
Orders per
2 4 6 8 10 12 Year

A) EOQ = 10 Orders, Because it has Lowest Total Inventory Cost / Item


Total Inventory Cost ($)

B) TOC = 160,000 L.E


Ordering Cost

200K Carrying Cost

180K Total Cost

160K
120K
C) TOC/Item = 160,000 / 100,000 = 1.6 L.E / Item 100K
80K
60K

D) TC/Item = 500 + 1.6 = 501.6 L.E 40K


20K
Number of
Orders per
2 4 6 8 10 12 Year

2
General Exercise
Maintenance needs to 2 Mechanical and one helper where the estimated
planned hour is 10 hours . The maintenance labors finished the work in
12 Hours due to some problems , Average labor cost rates is 50 LE /hours
and the bearing cost 5000 LE , Calculate
A) Craft Performance
B) Determine Working Hours and Job Duration
C) Calculate the Repair & Fault costs if Production losses 2000 LE/hour

10
A) Cp = = 83.3 %
12

B) Working Hours = 12 x 3 = 36 Hour


Job Duration = 12 Hour

C) Labor Cost = 50 x 36 = 1,800 L.E


Repair Cost = 5000 + 1800 = 6,800 L.E
Production Losses = 2000 x 12 = 24,000 L.E
Fault Cost = 24000 + 6800 = 30,800 L.E

3
Crew Working Hours
A Maintenance crew consists of the following information

- 3 Mechanics with 10 hours work over and 15 hour leaves


- 1 Welder
- 5 Electricians with 20 hours leaves and 15 hours work-over
- 4 Helpers
The Crew works 10 hours daily and 6 days / week

Construct a table for weekly crew working hours


availability for this crew

Crew Work Hours Availability Forecast


Paid Work Available
Craft Pearsons Leave Train Misc
Hours Over Hours

Mechanics 3x60 180 15 - - 10 155


Welders 1x60 60 - - - - 60
Electricans 5x60 300 20 - - 15 265
Helpers 4x60 240 - - - - 240
Total 13x60 780 35 - - 24 720

4
Work Order Problem
A Faulted ball bearing (KSO150) in Hydraulic pump(Tag number
120WDG005) need to change in PM routine, It needs to 2
Mechanical and one helper where the estimated planned hour
is 10 hours. The labors finished the work in 12 Hours due to
some problems in bearing dis-assembling

Work Order #______


REQUESTER SECTION Priority______
Hydraulic Pump (Tag#120WDG005) has a Faulted ball
bearing (Def.Tag#KSO150) need to be changed , Needs
Mechanical Crew , No Outage Required , No Clearance
Required , No Confined Space Required
By : __________ , Date & Time : —/—/—— , Approval : ________

PLANNING SECTION
……………………………………………………………………………
………………Description of work to be Performed…………….
……………………………………………………………………………
Labor : 2 Mech 10Hr Working Hours : 30Hr , Actual : 36
1 Helper 10Hr Job Duration : 10Hr , Actual : 12
Parts : Ball Bearing , Qty 1 , Cost : 5000 L.E
By : ___ , Date & Time : -/-/— , Job Estimate : 6500 , Actual : 6800

CRAFT FEEDBACK
…………………………………………………………………………….
………..………………Work actually Performed…………………..
…………………………………………………………………………….
Actual Labor : 2 Mech - 12 Hours Each
Job Started : —/—/—— , Finished : —/—/——
By : ___ , Date & Time : —/—/——