PLD Accs

The document contains technical drawings and specifications for the construction of the Rabigh Housing 110/13.8kV substation by Hitachi Energy Ltd. It includes details on the capacitor bank control logic and protection schemes, along with revision history and certification information. The document is proprietary and requires written consent for reproduction.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views19 pages

PLD Accs

The document contains technical drawings and specifications for the construction of the Rabigh Housing 110/13.8kV substation by Hitachi Energy Ltd. It includes details on the capacitor bank control logic and protection schemes, along with revision history and certification information. The document is proprietary and requires written consent for reproduction.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 19

8

02 19 of 1 WD-0641821 RB417 P 19WN109 4400016679 3 4 5 6 7 NOTES


REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.

1 2

A HITACHI ENERGY LTD. A


SECOND INDUSTRIAL CITY
RIYADH-11383, K.S.A

B B

MANUFACTURER : HITACHI
CEPCO ENERGY LTD.

NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CLIENT : NATIONAL GRID SA

C PROJECT : CONSTRUCTION OF RABIGH HOUSING(RBG-H) 110/13.8kV SUBSTATION C

SUBSTATION : RABIGH HOUSING (RBG-H) 110/13.8KV SUBSTATION


REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.

TITLE : PLD - ACCS FOR 13.8KV CAPACITOR BANK

National Grid SA
D
D

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF
AS-BUILT BY DATE

E E
02 2023-02-09 PG REVISED AS PER COMMENTS - DTS-075 R01 SS SS RR
01 2023-01-19 PG REVISED AS PER COMMENTS - DTS-075 R00 SS SS RR
00 2022-11-28 PG FOR APPROVAL SS SS RR
REV.
DATE BY DESCRIPTION CHKD. CERT. APPD.
NO.

DRAWING COMPLETION CERTIFICATE (DCC) :

Saudi Electricity Company

DRAWN BY PG CHECKED BY SS SCALE:

DATE STARTED 2022-11-28 DATE COMPLETED

OPRG.DEPT. ENG. DEPT. -

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED


F F CONSTRUCTION OR FOR ORDERING
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

1
COVER SHEET
MANUFACTURER/ VENDOR NAME
PLD - ACCS FOR 13.8KV CAPACITOR BANK

CONSTRUCTION OF RABIGH HOUSING(RBG-H) 110/13.8kV SUBSTATION


HITACHI ENERGY LTD.
7 RABIGH SAUDI ARABIA
DRAWING NUMBER SHEET NO. REV. NO. CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.
WD-0641821 1 of 19 02 2 3 4 5 6 4400016679 19WN109 P RB417 WD-0641821 1 of 19 02
NG-A (2012/01)
DMS VECTOR NGA00
8
02 19 of 2 WD-0641821 RB417 P 19WN109 4400016679 3 4 5 6 7 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.

1 2

A A

LEGEND
RELAY DESCRIPTION TYPE MAKE
UNIFIED CONTROL SCHEMATIC PROTECTION LOGIC DIAGRAM
ACCS FOR 13.8KV CAPACITOR BANK
B B

SR NO PROTECTION IED APPROVED ORDERING CODE PROPOSED ORDERING CODE REMARKS

NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1 A1-ACCS RELAY REC670*2.2 - 1MRK 002 814-AG REC670*2.2 - 1MRK 002 814-AG

2 A2-ACCS RELAY REC670*2.2 - 1MRK 002 814-AG REC670*2.2 - 1MRK 002 814-AG

C C

REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.

DRAWING CONTROL SHEET EE-609682


MAIN ONE LINE DIAGRAM EA-609704

National Grid SA
D
D

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF
AS-BUILT BY DATE

E E
02 2023-02-09 PG REVISED AS PER COMMENTS - DTS-075 R01 SS SS RR
01 2023-01-19 PG REVISED AS PER COMMENTS - DTS-075 R00 SS SS RR
00 2022-11-28 PG FOR APPROVAL SS SS RR
REV.
DATE BY DESCRIPTION CHKD. CERT. APPD.
NO.

DRAWING COMPLETION CERTIFICATE (DCC) :

Saudi Electricity Company

DRAWN BY PG CHECKED BY SS SCALE:

DATE STARTED 2022-11-28 DATE COMPLETED

OPRG.DEPT. ENG. DEPT. -

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED


F F CONSTRUCTION OR FOR ORDERING
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

1
COVER SHEET FOR PLD
MANUFACTURER/ VENDOR NAME
PLD - ACCS FOR 13.8KV CAPACITOR BANK

RABIGH HOUSING (RBG-H) 110/13.8KV SUBSTATION


HITACHI ENERGY LTD.
7 RABIGH SAUDI ARABIA
DRAWING NUMBER SHEET NO. REV. NO. CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.
WD-0641821 2 of 19 02 2 3 4 5 6 4400016679 19WN109 P RB417 WD-0641821 2 of 19 02
NG-A (2012/01)
DMS VECTOR NGA00
8
02 19 of 3 WD-0641821 RB417 P 19WN109 4400016679 3 4 5 6 7 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.

1 2

A A

LEGEND
RELAY DESCRIPTION TYPE MAKE

B B
CASE-1 BUS SECTION A/B OPEN AND BUS SECTION B/C OPEN CASE-1 BUS SECTION A/B OPEN AND BUS SECTION B/C OPEN
CAPACITOR-1 SWITCHING ON/OFF LOGIC CAPACITOR-2 SWITCHING ON/OFF LOGIC
T1 HV VT MCB HEALTHY T2
CLOSED &
T1 IN SERVICE AND
&
CLOSED
AND

NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
IN SERVICE MV BS-AB OPEN OR
OUT OF SERVICE

MV BS-AB OPEN OR C1_CASE-1_ON_SWITCHING MV BS-BC OPEN OR


/7.A4 OUT OF SERVICE
OUT OF SERVICE

C2_CASE-1_ON_SWITCHING
/8.A4

MEASURED AT T1
C1 MVAr-1
HIGH

CAP C1
OPEN
IN SERVICE

C C

CAP C1 &
CLOSED AND T2 HV VT MCB HEALTHY
IN SERVICE

MEASURED AT T1
C1 MVAr-2 C1_CASE-1_OFF_SWITCHING MEASURED AT T2
/7.C4 C2 MVAr-1
LOW
HIGH REFERENCE DRAWINGS
&
CAP C2 AND DRAWING TITLE DRAWING NO.
OPEN
IN SERVICE DRAWING CONTROL SHEET EE-609682
MAIN ONE LINE DIAGRAM EA-609704
T3 HV VT MCB HEALTHY CASE-1 BUS SECTION A/B OPEN AND BUS SECTION B/C OPEN
T3
CLOSED CAPACITOR-3 SWITCHING ON/OFF LOGIC
IN SERVICE

National Grid SA
&
CAP C2 D
CLOSED
D MV BS-BC OPEN OR AND IN SERVICE
OUT OF SERVICE
MEASURED AT T2
C2 MVAr-2
C3_CASE-1_ON_SWITCHING LOW C2_CASE-1_OFF_SWITCHING
/9.A4 /8.C4

MEASURED AT T3

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF
C3 MVAr-1
HIGH

CAP C3 &
OPEN
AND
IN SERVICE

CAP C3 AS-BUILT BY DATE


CLOSED
IN SERVICE
E E
MEASURED AT T3 02 2023-02-09 PG REVISED AS PER COMMENTS - DTS-075 R01 SS SS RR
C1 MVAr-2 C3_CASE-1_OFF_SWITCHING 01 2023-01-19 PG REVISED AS PER COMMENTS - DTS-075 R00 SS SS RR
LOW /9.C4
00 2022-11-28 PG FOR APPROVAL SS SS RR
REV.
DATE BY DESCRIPTION CHKD. CERT. APPD.
NO.

DRAWING COMPLETION CERTIFICATE (DCC) :

Saudi Electricity Company

DRAWN BY PG CHECKED BY SS SCALE:

DATE STARTED 2022-11-28 DATE COMPLETED

OPRG.DEPT. ENG. DEPT. -

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED


F F CONSTRUCTION OR FOR ORDERING
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

1
ACCS MVAR BASED LOGIC
MANUFACTURER/ VENDOR NAME
PLD - ACCS FOR 13.8KV CAPACITOR BANK

RABIGH HOUSING (RBG-H) 110/13.8KV SUBSTATION


HITACHI ENERGY LTD.
7 RABIGH SAUDI ARABIA
DRAWING NUMBER SHEET NO. REV. NO. CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.
WD-0641821 3 of 19 02 2 3 4 5 6 4400016679 19WN109 P RB417 WD-0641821 3 of 19 02
NG-A (2012/01)
DMS VECTOR NGA00
8
02 19 of 4 WD-0641821 RB417 P 19WN109 4400016679 3 4 5 6 7 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.

1 2

A A

LEGEND
RELAY DESCRIPTION TYPE MAKE

B B
CASE-2 BUS SECTION A/B OPEN AND BUS SECTION B/C CLOSED CASE-3 BUS SECTION A/B CLOSED AND BUS SECTION B/C OPEN
CAPACITOR-2 & 3 SWITCHING ON/OFF LOGIC CAPACITOR-1 & 2 SWITCHING ON/OFF LOGIC
T2 HV VT MCB HEALTHY SWITCHING ON/OFF CAPACITOR-1 CAN BE SWITCHED ON/OFF AS IN CASE-1 T1 HV VT MCB HEALTHY SWITCHING ON/OFF CAPACITOR-3 CAN BE SWITCHED ON/OFF AS IN CASE-1

MV BS-BC MV BS-AB &

NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CLOSED & CLOSED
IN SERVICE AND AND
IN SERVICE
MV BS-AB MV BS-BC
OUT OF SERVICE OR OPEN OUT OF SERVICE OR OPEN
& 13.8kV BS-AB &
T2 T1 LOR
13.8kV BS-BC AND AND
CLOSED CLOSED RESET
LOR
IN SERVICE RESET IN SERVICE

T1 & T2 SUMMATED MEAS. C1_CASE-3_ON_SWITCHING


T2 & T3 SUMMATED MEAS. C2_CASE-2_ON_SWITCHING /7.B4
/8.A4 C1+C2 MVAr-3
C2+C3 MVAr-3 HIGH
HIGH
CAP C1
C CAP C2 OPEN
C
OPEN IN SERVICE
IN SERVICE &
AND
T2 & T3 SUMMATED MEAS. & T1 & T2 SUMMATED MEAS. C1_CASE-3_OFF_SWITCHING
AND /7.C4
C2+C3 MVAr-4 C1+C2 MVAr-4
LOW LOW
C2_CASE-2_OFF_SWITCHING
CAP C2 /8.C4 CAP C1
CLOSE CLOSE
IN SERVICE IN SERVICE

BS-AB OPEN OR & REFERENCE DRAWINGS


TEST BS-BC OPEN OR &
AND TEST DRAWING TITLE DRAWING NO.
AND
BS-BC CLOSED DRAWING CONTROL SHEET EE-609682
IN SERVICE BS-AB CLOSED
IN SERVICE MAIN ONE LINE DIAGRAM EA-609704

MV BS-BC MV BS-AB
CLOSED & &
CLOSED
IN SERVICE AND T3 HV VT MCB HEALTHY AND
IN SERVICE

National Grid SA
MV BS-AB MV BS-BC & D
OUT OF SERVICE OR OPEN OUT OF SERVICE OR OPEN 13.8kV BS-AB AND
LOR
D RESET
T3 T2
13.8kV BS-BC & CLOSED
CLOSED LOR
IN SERVICE AND IN SERVICE
RESET

T2 HV VT MCB HEALTHY

C3_CASE-2_ON_SWITCHING T1 & T2 SUMMATED MEAS. C2_CASE-3_ON_SWITCHING


T2 & T3 SUMMATED MEAS. /8.B4

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF
/9.B4 C1+C2 MVAr-5
C2+C3 MVAr-5
HIGH HIGH

CAP C3 CAP C2
OPEN OPEN
IN SERVICE &
IN SERVICE & AND
AND
C3_CASE-2_OFF_SWITCHING T1 & T2 SUMMATED MEAS. C2_CASE-3_OFF_SWITCHING
T2 & T3 SUMMATED MEAS. /9.C4 /8.C4
C2+C3 MVAr-6 C1+C2 MVAr-6
LOW LOW

CAP C3 CAP C2
CLOSE CLOSE AS-BUILT BY DATE
IN SERVICE IN SERVICE

E E
02 2023-02-09 PG REVISED AS PER COMMENTS - DTS-075 R01 SS SS RR
BS-AB OPEN OR BS-BC OPEN OR &
& TEST 01 2023-01-19 PG REVISED AS PER COMMENTS - DTS-075 R00 SS SS RR
TEST AND
AND 00 2022-11-28 PG FOR APPROVAL SS SS RR
REV.
BS-BC CLOSED BS-AB CLOSED NO.
DATE BY DESCRIPTION CHKD. CERT. APPD.
IN SERVICE IN SERVICE
DRAWING COMPLETION CERTIFICATE (DCC) :

Saudi Electricity Company

DRAWN BY PG CHECKED BY SS SCALE:

DATE STARTED 2022-11-28 DATE COMPLETED

OPRG.DEPT. ENG. DEPT. -

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED


F F CONSTRUCTION OR FOR ORDERING
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

1
ACCS MVAR BASED LOGIC
MANUFACTURER/ VENDOR NAME
PLD - ACCS FOR 13.8KV CAPACITOR BANK

RABIGH HOUSING (RBG-H) 110/13.8KV SUBSTATION


HITACHI ENERGY LTD.
7 RABIGH SAUDI ARABIA
DRAWING NUMBER SHEET NO. REV. NO. CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.
WD-0641821 4 of 19 02 2 3 4 5 6 4400016679 19WN109 P RB417 WD-0641821 4 of 19 02
NG-A (2012/01)
DMS VECTOR NGA00
8
02 19 of 5 WD-0641821 RB417 P 19WN109 4400016679 3 4 5 6 7 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.

1 2

A A

LEGEND
RELAY DESCRIPTION TYPE MAKE

B B

T1 HV VT MCB HEALTHY CASE-4 BS-AB CLOSED & BS-BC CLOSED AND INCOMER # OPEN T2 HV VT MCB HEALTHY CASE-4 BS-AB CLOSED & BS-BC CLOSED AND INCOMER # OPEN
CAPACITOR BANK C1 SWITCHING CONTROL MV BS-AB
CAPACITOR BANK C2 SWITCHING CONTROL
MV BS-AB
CLOSED CLOSED

NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
IN SERVICE 13.8kV BS-BC IN SERVICE
LOR 13.8kV BS-BC
MV BS-BC & MV BS-BC LOR &
RESET
CLOSED AND CLOSED RESET AND
IN SERVICE IN SERVICE
13.8kV BS-AB
LOR 13.8kV BS-AB
RESET LOR
RESET
T1
CLOSED
IN SERVICE

T1,T2&T3 SUMMATED MEAS.


C1+C2+C3 MVAr-3
HIGH
& &
C AND AND C
C1_CASE-4_ON_SWITCHING C2_CASE-4_ON_SWITCHING
/7.B4 /8.B4

& &
AND AND

T1,T2&T3 SUMMATED MEAS.


C1+C2+C3 MVAr-4 &
LOW AND
C1_CASE-4_OFF_SWITCHING &
/7.D4
CAP C1 AND
C2_CASE-4_OFF_SWITCHING
OPEN /8.D4 REFERENCE DRAWINGS
CAP C2
IN SERVICE DRAWING TITLE DRAWING NO.
OPEN
CAP C1 IN SERVICE
DRAWING CONTROL SHEET EE-609682
CLOSED
CAP C2 MAIN ONE LINE DIAGRAM EA-609704
IN SERVICE
CLOSED
IN SERVICE

National Grid SA
D
D

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF
AS-BUILT BY DATE

E E
02 2023-02-09 PG REVISED AS PER COMMENTS - DTS-075 R01 SS SS RR
01 2023-01-19 PG REVISED AS PER COMMENTS - DTS-075 R00 SS SS RR
00 2022-11-28 PG FOR APPROVAL SS SS RR
REV.
DATE BY DESCRIPTION CHKD. CERT. APPD.
NO.

DRAWING COMPLETION CERTIFICATE (DCC) :

Saudi Electricity Company

DRAWN BY PG CHECKED BY SS SCALE:

DATE STARTED 2022-11-28 DATE COMPLETED

OPRG.DEPT. ENG. DEPT. -

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED


F F CONSTRUCTION OR FOR ORDERING
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

1
ACCS MVAR BASED LOGIC
MANUFACTURER/ VENDOR NAME
PLD - ACCS FOR 13.8KV CAPACITOR BANK

RABIGH HOUSING (RBG-H) 110/13.8KV SUBSTATION


HITACHI ENERGY LTD.
7 RABIGH SAUDI ARABIA
DRAWING NUMBER SHEET NO. REV. NO. CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.
WD-0641821 5 of 19 02 2 3 4 5 6 4400016679 19WN109 P RB417 WD-0641821 5 of 19 02
NG-A (2012/01)
DMS VECTOR NGA00
8
02 19 of 6 WD-0641821 RB417 P 19WN109 4400016679 3 4 5 6 7 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.

1 2

A A

LEGEND
RELAY DESCRIPTION TYPE MAKE

B B

T3 HV VT MCB HEALTHY CASE-4 BS-AB CLOSED & BS-BC CLOSED AND INCOMER # OPEN
CAPACITOR BANK C3 SWITCHING CONTROL
MV BS-AB
CLOSED

NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
IN SERVICE

MV BS-BC 13.8kV BS-BC


CLOSED LOR &
IN SERVICE RESET AND

13.8kV BS-AB
LOR
T3 RESET
CLOSED
IN SERVICE

T1,T2&T3 SUMMATED MEAS.


C1+C2+C3 MVAr-5
HIGH
C & C
AND
C3_CASE-4_ON_SWITCHING
/9.B4

&
AND
REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.
T1,T2&T3 SUMMATED MEAS.
C1+C2+C3 MVAr-6 & DRAWING CONTROL SHEET EE-609682
LOW AND
C3_CASE-4_OFF_SWITCHING MAIN ONE LINE DIAGRAM EA-609704
/9.D4

National Grid SA
D
D
CAP C3
OPEN
IN SERVICE

CAP C3
CLOSED
IN SERVICE

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF
AS-BUILT BY DATE

E E
02 2023-02-09 PG REVISED AS PER COMMENTS - DTS-075 R01 SS SS RR
01 2023-01-19 PG REVISED AS PER COMMENTS - DTS-075 R00 SS SS RR
00 2022-11-28 PG FOR APPROVAL SS SS RR
REV.
DATE BY DESCRIPTION CHKD. CERT. APPD.
NO.

DRAWING COMPLETION CERTIFICATE (DCC) :

Saudi Electricity Company

DRAWN BY PG CHECKED BY SS SCALE:

DATE STARTED 2022-11-28 DATE COMPLETED

OPRG.DEPT. ENG. DEPT. -

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED


F F CONSTRUCTION OR FOR ORDERING
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

1
ACCS MVAR BASED LOGIC
MANUFACTURER/ VENDOR NAME
PLD - ACCS FOR 13.8KV CAPACITOR BANK

RABIGH HOUSING (RBG-H) 110/13.8KV SUBSTATION


HITACHI ENERGY LTD.
7 RABIGH SAUDI ARABIA
DRAWING NUMBER SHEET NO. REV. NO. CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.
WD-0641821 6 of 19 02 2 3 4 5 6 4400016679 19WN109 P RB417 WD-0641821 6 of 19 02
NG-A (2012/01)
DMS VECTOR NGA00
8
02 19 of 7 WD-0641821 RB417 P 19WN109 4400016679 3 4 5 6 7 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.

1 2

+CAPACITOR BANK C1
A CAPACITOR BANK C1 SWITCHING OUTPUT TIME DELAY T1 A
Vm<V1 & FOR C1 SWITHING ON CASE-1 ≥1 ON COMMAND
AND OR
& C1_CASE-1_ON_SWITCHING TIMER
/3.B3
AND T1

5min

&
EMERGENCY ≥1 AND ≥1
TRIP OR OR

ACCS AUTO/MANUAL SWITCH TIME DELAY T3


AT MANUAL Vm<V1 & FOR C1 SWITHING ON CASE-3 LEGEND
C1_CASE-3_ON_SWITCHING AND
CAP C1 /4.C6 TIMER RELAY DESCRIPTION TYPE MAKE
LOCAL/PARKING KEY NOT T3

CAP-1 ACCS READY TO


INSERTED/TRIP OPTD
5min

CLOSE/MVAR
=1
INV &
AND &
CAP C1
OUT OF SERVICE AND
B TIME DELAY T3 OR B
& FOR C1 SWITHING ON CASE-4
Vm<V1
AND
C1_CASE-4_ON_SWITCHING TIMER CAP-1 ACCS READY TO CLOSE/VOLTAGE
/5.C4 /14.B7
T3
13.8kV SEC-1 &
AND CAP C1 CB READY 5min
86BB LOR
RESET
CAP-1 CB OPEN

NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CAP C1 CB OPEN Td>10min &
13.8kV CAP-1 AND
86C1&86C2 T1 T1 OPEN
Td>10min &
LOR REST CLOSED OR TEST
IN SERVICE AND
≥1
OR
BS-A/B OPEN
OR TEST
TIME DELAY T2 +CAPACITOR BANK C1
CAP C1 & FOR C1 SWITHING OFF CASE-1

CAP-1 CB NOT READY


86CBF OFF COMMAND
AND OR
LOR REST CAP C1 CB C1_CASE-1_OFF_SWITCHING TIMER
/3.C3
CLOSED T2
13.8kV GT-1 IN SERVICE CAP-1 CB TEST
86T1,86B,86CBF&86T2 5min
LOR RESET ≥1
C ACCS AUTO/MANUAL SWITCH & OR
C
≥1
AT MANUAL AND
OR

CAP C1
LOCAL/PARKING KEY NOT TIME DELAY T4
INSERTED & FOR C1 SWITHING OFF CASE-3
AND
C1_CASE-3_OFF_SWITCHING TIMER
/4.C6 &
=1 T4
INV AND

CAP-1 ACCS READY TO


10min
OR
CAP C1

OPEN/MVAR
OUT OF SERVICE & REFERENCE DRAWINGS
AND
CAP-1 ACCS READY TO OPEN/VOLTAGE DRAWING TITLE DRAWING NO.
/14.D7
DRAWING CONTROL SHEET EE-609682
MAIN ONE LINE DIAGRAM EA-609704
TIME DELAY T4
& FOR C1 SWITHING OFF CASE-4 CAP-1 CB CLOSE
AND
C1_CASE-4_OFF_SWITCHING
/5.C4 TIMER
T4

National Grid SA
D
10min
D
&
AND

BS-B/C CLOSED IN SERVICE &


AND

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF
I/C-3 OPEN OR TEST

I/C OPER OR TEST &


AND

BS-A/B CLOSED
IN SERVICE

AS-BUILT BY DATE
&
E I/C OPEN OR TEST AND E
02 2023-02-09 PG REVISED AS PER COMMENTS - DTS-075 R01 SS SS RR
01 2023-01-19 PG REVISED AS PER COMMENTS - DTS-075 R00 SS SS RR
00 2022-11-28 PG FOR APPROVAL SS SS RR
BS-B/C OPEN OR TEST REV.
DATE BY DESCRIPTION CHKD. CERT. APPD.
NO.
CAP-1 CLOSED IN SERVICE
DRAWING COMPLETION CERTIFICATE (DCC) :

Saudi Electricity Company

DRAWN BY PG CHECKED BY SS SCALE:

DATE STARTED 2022-11-28 DATE COMPLETED

OPRG.DEPT. ENG. DEPT. -

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED


F F CONSTRUCTION OR FOR ORDERING
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

1
ACCS MVAR BASED LOGIC CAP1 ON/OFF
MANUFACTURER/ VENDOR NAME
PLD - ACCS FOR 13.8KV CAPACITOR BANK

RABIGH HOUSING (RBG-H) 110/13.8KV SUBSTATION


HITACHI ENERGY LTD.
7 RABIGH SAUDI ARABIA
DRAWING NUMBER SHEET NO. REV. NO. CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.
WD-0641821 7 of 19 02 2 3 4 5 6 4400016679 19WN109 P RB417 WD-0641821 7 of 19 02
NG-A (2012/01)
DMS VECTOR NGA00
8
02 19 of 8 WD-0641821 RB417 P 19WN109 4400016679 3 4 5 6 7 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.

1 2

≥1
A A
CAPACITOR BANK C2 SWITCHING OUTPUT TIME DELAY T1 OR
Vm<V1 & FOR C2 SWITHING ON CASE-1
& +CAPACITOR BANK C2
13.8kV SEC-2 AND & AND TIMER
86BB LOR AND C2_CASE-1_ON_SWITCHING
/3.C6 T1 ON COMMAND
RESET
5min
≥1 &
13.8kV CAP-2 EMERGENCY OR AND
TRIP ≥1
86C1&86C2
TIME DELAY T3 OR
LOR REST Vm<V1 & FOR C2 SWITHING ON CASE-2
ACCS AUTO/MANUAL SWITCH C2_CASE-2_ON_SWITCHING AND
/4.C4 TIMER
AT MANUAL
T3 LEGEND
CAP C2
& 5min RELAY DESCRIPTION TYPE MAKE
LOCAL/PARKING KEY NOT
CAP C2 INSERTED/TRIP OPTD AND
86CBF TIME DELAY T5

CAP-2 ACCS READY TO


LOR REST Vm<V1 & FOR C2 SWITHING ON CASE-3
=1 AND
C2_CASE-3_ON_SWITCHING

CLOSE/MVAR
/4.D6 TIMER &
13.8kV GT-2 INV T5 AND
86T1,86B,86CBF&86T2
CAP C2 &
LOR RESET 10min OR
OUT OF SERVICE AND
B T1,T2&T3 SUMMATED MEAS. Vm<V1 B
& TIME DELAY T5 CAP-2 ACCS READY TO CLOSE/VOLTAGE
C1+C2+C3 MVAr-5 AND FOR C2 SWITHING ON CASE-4 /15.C7
HIGH C2_CASE-4_ON_SWITCHING
/5.C7
TIMER
T1 T5
CAP C2 CB READY CLOSED & CAP-2 CB OPEN
IN SERVICE AND & 10min
Td>10min AND

NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CAP C2 CB OPEN T2
CLOSED
T2 IN SERVICE
Td>10min &
CLOSED
T1 =1 T3 =1 AND TIMER
& IN SERVICE T1,T2&T3 SUMMATED MEAS.
CLOSED CLOSED T3
INV AND INV C1+C2+C3 MVAr-3
IN SERVICE IN SERVICE
HIGH 5min
T2 ≥1 ≥1
CLOSED OR OR
IN SERVICE T2 OPEN &
+CAPACITOR BANK C2

CAP-2 CB NOT READY


OR TEST AND OR
T3 &
CLOSED
C2_CASE-1_OFF_SWITCHING TIME DELAY T2
/3.D6 AND OFF COMMAND
IN SERVICE BUS-A/B OPEN FOR C2 SWITHING OFF CASE-1 TIMER CAP-2 CB TEST
OR TEST T2
T1 =1 CAP C2 CB & 5min ≥1
CLOSED & CLOSED
C IN SERVICE
INV AND IN SERVICE ACCS AUTO/MANUAL SWITCH
AND
TIME DELAY T4
OR C
AT MANUAL ≥1 & C2_CASE-2_OFF_SWITCHING & FOR C2 SWITHING OFF CASE-2
T2 BUS-B/C OPEN /4.C4 AND
CLOSED OR TEST OR AND TIMER
IN SERVICE CAP C2 T4
LOCAL/PARKING KEY NOT
T3 &
=1 INSERTED 10min
CLOSED AND &
INV =1 AND

CAP-2 ACCS READY TO


IN SERVICE TIME DELAY T6
INV &
T1 C2_CASE-3_OFF_SWITCHING FOR C2 SWITHING OFF CASE-3 OR
/4.E6 AND

OPEN/MVAR
CLOSED & CAP C2 TIMER
IN SERVICE AND OUT OF SERVICE T6
CAP-2 ACCS READY TO OPEN/VOLTAGE
T2 & 5min /15.D7 REFERENCE DRAWINGS
CLOSED ≥1 AND DRAWING TITLE DRAWING NO.
IN SERVICE OR TIME DELAY T6
C2_CASE-4_OFF_SWITCHING
T1,T2&T3 SUMMATED MEAS. /5.D7 & FOR C2 SWITHING OFF CASE-4 DRAWING CONTROL SHEET EE-609682
T3 =1 AND CAP-2 CB CLOSE
CLOSED C1+C2+C3 MVAr-6 TIMER MAIN ONE LINE DIAGRAM EA-609704
INV HIGH
IN SERVICE T6

T1 =1
CLOSED & T1 =1 &
INV AND CLOSED & AND
IN SERVICE INV

National Grid SA
IN SERVICE AND D
T2
D CLOSED T2 & TIMER
IN SERVICE CLOSED T1,T2&T3 SUMMATED MEAS. AND T4
IN SERVICE C1+C2+C3 MVAr-4
T3 =1 HIGH
CLOSED T3
INV CLOSED
IN SERVICE
IN SERVICE

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF
&
BS-B/C CLOSED IN SERVICE AND
BS-A/B OPEN OR TEST & ≥1
AND OR I/C-3 OPEN OR TEST

AS-BUILT BY DATE
I/C-1 OPEN OR TEST &
E BS-A/B CLOSED IN SERVICE AND E
02 2023-02-09 PG REVISED AS PER COMMENTS - DTS-075 R01 SS SS RR
I/C-2 OPEN OR TEST & 01 2023-01-19 PG REVISED AS PER COMMENTS - DTS-075 R00 SS SS RR
AND
CAP-2 CLOSED IN SERVICE 00 2022-11-28 PG FOR APPROVAL SS SS RR
REV.
DATE BY DESCRIPTION
BS-B/C OPEN OR TEST NO. CHKD. CERT. APPD.

DRAWING COMPLETION CERTIFICATE (DCC) :

Saudi Electricity Company

DRAWN BY PG CHECKED BY SS SCALE:

DATE STARTED 2022-11-28 DATE COMPLETED

OPRG.DEPT. ENG. DEPT. -

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED


F F CONSTRUCTION OR FOR ORDERING
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

1
ACCS MVAR BASED LOGIC CAP2 ON/OFF
MANUFACTURER/ VENDOR NAME
PLD - ACCS FOR 13.8KV CAPACITOR BANK

RABIGH HOUSING (RBG-H) 110/13.8KV SUBSTATION


HITACHI ENERGY LTD.
7 RABIGH SAUDI ARABIA
DRAWING NUMBER SHEET NO. REV. NO. CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.
WD-0641821 8 of 19 02 2 3 4 5 6 4400016679 19WN109 P RB417 WD-0641821 8 of 19 02
NG-A (2012/01)
DMS VECTOR NGA00
8
02 19 of 9 WD-0641821 RB417 P 19WN109 4400016679 3 4 5 6 7 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.

1 2

A A
CAPACITOR BANK C3 SWITCHING OUTPUT ≥1
TIME DELAY T1
Vm<V1 & FOR C3 SWITHING ON CASE-1 OR +CAPACITOR BANK C3
& C3_CASE-1_ON_SWITCHING AND
AND /3.D3 TIMER ON COMMAND
T1

5min

&
AND ≥1
EMERGENCY OR
TRIP ≥1
OR
ACCS AUTO/MANUAL SWITCH TIME DELAY T5 LEGEND
AT MANUAL
Vm<V1 & FOR C3 SWITHING ON CASE-2
RELAY DESCRIPTION TYPE MAKE
CAP C3 C3_CASE-2_ON_SWITCHING AND
LOCAL/PARKING KEY NOT /4.D4 TIMER
INSERTED/TRIP OPTD T5

CAP-3 ACCS READY TO


10min

CLOSE/MVAR
=1
INV &
& AND
CAP C3 AND
OUT OF SERVICE OR
B B
TIME DELAY T7
FOR C3 SWITHING ON CASE-4 CAP-3 ACCS READY TO CLOSE/VOLTAGE
Vm<V1 & /16.B6
AND TIMER
C3_CASE-4_ON_SWITCHING
/6.C4 T7
CAP C3 CB READY
5min CAP-3 CB OPEN

NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
& Td>10min &
13.8kV SEC-3 AND CAP C3 CB OPEN
T3 OPEN AND
86BB LOR
T3 OR TEST &
RESET Td>10min
CLOSED AND
IN SERVICE ≥1
13.8kV CAP-3 CAP C3 CB
86C1&86C2 OR
CLOSED
LOR REST IN SERVICE
TIME DELAY T2

CAP-3 CB NOT READY


& FOR C3 SWITHING OFF CASE-1 +CAPACITOR BANK C3
C3_CASE-1_OFF_SWITCHING
BUS-B/C OPEN /3.E3 AND OR
TIMER OFF COMMAND
OR TEST
T2
CAP C3 CAP-3 CB TEST
86CBF & 5min
LOR REST AND ≥1
C & OR
C
13.8kV GT-3 AND
86T1,86B,86CBF&86T2
LOR RESET
TIME DELAY T6
C3_CASE-2_OFF_SWITCHING & FOR C3 SWITHING OFF CASE-2
/4.E4
AND TIMER &
ACCS AUTO/MANUAL SWITCH T6 AND
≥1
AT MANUAL

CAP-3 ACCS READY TO


OR 5min OR
CAP C3

OPEN/MVAR
LOCAL/PARKING KEY NOT & REFERENCE DRAWINGS
INSERTED AND CAP-3 ACCS READY TO OPEN/VOLTAGE
/16.D6 DRAWING TITLE DRAWING NO.

DRAWING CONTROL SHEET EE-609682


=1 MAIN ONE LINE DIAGRAM EA-609704
INV TIME DELAY T8 CAP-3 CB CLOSE
& FOR C3 SWITHING OFF CASE-4
CAP C3 C3_CASE-4_OFF_SWITCHING AND
/6.D4 TIMER
OUT OF SERVICE
T8

National Grid SA
D
10min
D
&
AND

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF
& &
AND I/C-1 OPEN AND
ACCS AUTO OPEN CAP-1

AS-BUILT BY DATE
BS A/B CLOSED IN SERVICE

E E
02 2023-02-09 PG REVISED AS PER COMMENTS - DTS-075 R01 SS SS RR
& 01 2023-01-19 PG REVISED AS PER COMMENTS - DTS-075 R00 SS SS RR
BS B/C CLOSED IN SERVICE I/C-2 OPEN AND
OPEN CAP-2 00 2022-11-28 PG FOR APPROVAL SS SS RR
REV.
DATE BY DESCRIPTION CHKD. CERT. APPD.
NO.

CAP.1 CLOSED IN SERVICE DRAWING COMPLETION CERTIFICATE (DCC) :

CAP.2 CLOSED IN SERVICE


& Saudi Electricity Company
I/C-3 OPEN AND
OPEN CAP-3
DRAWN BY PG CHECKED BY SS SCALE:
CAP.3 CLOSED IN SERVICE

DATE STARTED 2022-11-28 DATE COMPLETED

OPRG.DEPT. ENG. DEPT. -

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED


F F CONSTRUCTION OR FOR ORDERING
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

1
ACCS MVAR BASED LOGIC CAP3 ON/OFF
MANUFACTURER/ VENDOR NAME
PLD - ACCS FOR 13.8KV CAPACITOR BANK

RABIGH HOUSING (RBG-H) 110/13.8KV SUBSTATION


HITACHI ENERGY LTD.
7 RABIGH SAUDI ARABIA
DRAWING NUMBER SHEET NO. REV. NO. CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.
WD-0641821 9 of 19 02 2 3 4 5 6 4400016679 19WN109 P RB417 WD-0641821 9 of 19 02
NG-A (2012/01)
DMS VECTOR NGA00
8
02 19 of 10 WD-0641821 RB417 P 19WN109 4400016679 3 4 5 6 7 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.

1 2

A A

LEGEND
RELAY DESCRIPTION TYPE MAKE

CASE-1 BUS SECTION A/B OPEN AND BUS SECTION B/C OPEN CASE-1 BUS SECTION A/B OPEN AND BUS SECTION B/C OPEN
B CAPACITOR-1 SWITCHING ON/OFF LOGIC CAPACITOR-2 SWITCHING ON/OFF LOGIC B
BUS-A VT MCB HEALTHY T2
CLOSED &
T1 IN SERVICE AND
&
CLOSED
AND MV BS-AB OPEN OR
IN SERVICE
OUT OF SERVICE

NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
MV BS-AB OPEN OR C1_CASE-1_UV_ON_SWITCHING MV BS-BC OPEN OR
/14.B4 OUT OF SERVICE
OUT OF SERVICE

C2_CASE-1_UV_ON_SWITCHING
/15.B4

MV BB-A
Vm<V2
CAP C1 &
REMOTE
CAP C1 AND
OPEN
IN SERVICE
ACCS AUTO

T1
OPEN
IN SERVICE
C C

BUS-B VT MCB HEALTHY


CAP C1
CLOSED
MV BB-B
IN SERVICE
Vm<V2

C1_CASE-1_OV_OFF_SWITCHING
MV BB-A /14.C4
Vm>V1 CAP C2
REMOTE &
CAP C2 AND
OPEN REFERENCE DRAWINGS
IN SERVICE ACCS AUTO DRAWING TITLE DRAWING NO.

BUS-C VT MCB HEALTHY CASE-1 BUS SECTION A/B OPEN AND BUS SECTION B/C OPEN T2 DRAWING CONTROL SHEET EE-609682
T3 OPEN
CLOSED CAPACITOR-3 SWITCHING ON/OFF LOGIC MAIN ONE LINE DIAGRAM EA-609704
IN SERVICE
IN SERVICE

CAP C2
& CLOSED
MV BS-BC OPEN OR AND IN SERVICE

National Grid SA
OUT OF SERVICE D
D C3_CASE-1_UV_ON_SWITCHING
/16.B4 C2_CASE-1_OV_OFF_SWITCHING
/15.D4
MV BB-C MV BB-B
Vm<V2 Vm>V1

CAP C3

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF
CAP C3 REMOTE &
OPEN
AND
IN SERVICE
ACCS AUTO

T3
OPEN
IN SERVICE

CAP C3
CLOSED
IN SERVICE
AS-BUILT BY DATE

E C3_CASE-1_OV_OFF_SWITCHING
/16.C4 E
02 2023-02-09 PG REVISED AS PER COMMENTS - DTS-075 R01 SS SS RR
MV BB-C 01 2023-01-19 PG REVISED AS PER COMMENTS - DTS-075 R00 SS SS RR
Vm=the measured voltage.
Vm>V1 00 2022-11-28 PG FOR APPROVAL SS SS RR
REV.
DATE BY DESCRIPTION CHKD. CERT. APPD.
NO.

DRAWING COMPLETION CERTIFICATE (DCC) :

Saudi Electricity Company

DRAWN BY PG CHECKED BY SS SCALE:

DATE STARTED 2022-11-28 DATE COMPLETED

OPRG.DEPT. ENG. DEPT. -

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED


F F CONSTRUCTION OR FOR ORDERING
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

1
ACCS UV & OV BASED LOGIC
MANUFACTURER/ VENDOR NAME
PLD - ACCS FOR 13.8KV CAPACITOR BANK

RABIGH HOUSING (RBG-H) 110/13.8KV SUBSTATION


HITACHI ENERGY LTD.
7 RABIGH SAUDI ARABIA
DRAWING NUMBER SHEET NO. REV. NO. CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.
WD-0641821 10 of 19 02 2 3 4 5 6 4400016679 19WN109 P RB417 WD-0641821 10 of 19 02
NG-A (2012/01)
DMS VECTOR NGA00
8
02 19 of 11 WD-0641821 RB417 P 19WN109 4400016679 3 4 5 6 7 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.

1 2

A A

LEGEND
RELAY DESCRIPTION TYPE MAKE

B CASE-3 BUS SECTION A/B CLOSED AND BUS SECTION B/C OPEN B
CASE-2 BUS SECTION A/B OPEN AND BUS SECTION B/C CLOSED
CAPACITOR-1 & 2 SWITCHING ON/OFF LOGIC
CAPACITOR-2 & 3 SWITCHING ON/OFF LOGIC
SWITCHING ON/OFF CAPACITOR-3 CAN BE SWITCHED ON/OFF AS IN CASE-1
SWITCHING ON/OFF CAPACITOR-1 CAN BE SWITCHED ON/OFF AS IN CASE-1
BS-AB LOR RESET
BS-BC LOR RESET

BUS-A VT MCB HEALTHY


BUS-B VT MCB HEALTHY

NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
MV BS-AB &
MV BS-BC 13.8kV BS-BC & CLOSED 13.8kV BS-AB &
LOR AND AND LOR
CLOSED & IN SERVICE AND
IN SERVICE RESET RESET
AND MV BS-BC
OUT OF SERVICE OR OPEN
MV BS-AB
OUT OF SERVICE OR OPEN
T1
CLOSED
T2
IN SERVICE
CLOSED
IN SERVICE
MV BB-A C1_CASE-3_UV_ON_SWITCHING
MV BB-B C2_CASE-2_UV_ON_SWITCHING /14.B4
/15.B4 Vm<V2
Vm<V2

CAP C1
CAP C2 OPEN
OPEN IN SERVICE
C IN SERVICE & C
AND
& MV BB-A
MV BB-B Vm>V1
C1_CASE-3_OV_OFF_SWITCHING
AND /14.D4
Vm>V1

C2_CASE-2_OV_OFF_SWITCHING
CAP C2 /15.D4 CAP C1
CLOSE CLOSE
IN SERVICE IN SERVICE

BS-AB OPEN OR &


TEST
AND BS-BC OPEN OR &
TEST
BS-BC CLOSED AND REFERENCE DRAWINGS
IN SERVICE
DRAWING TITLE DRAWING NO.
BS-AB CLOSED
IN SERVICE
DRAWING CONTROL SHEET EE-609682

BUS-C VT MCB HEALTHY MAIN ONE LINE DIAGRAM EA-609704


BUS-B VT MCB HEALTHY

MV BS-BC
CLOSED & MV BS-AB &
IN SERVICE CLOSED
AND AND

National Grid SA
13.8kV BS-BC
IN SERVICE 13.8kV BS-AB & D
MV BS-AB MV BS-BC LOR AND
LOR &
D OUT OF SERVICE OR OPEN
RESET OUT OF SERVICE OR OPEN RESET
AND
T3 T2
CLOSED CLOSED
IN SERVICE IN SERVICE

MV BB-B C2_CASE-3_UV_ON_SWITCHING
MV BB-C C3_CASE-2_UV_ON_SWITCHING Vm<V2 /15.B4
/16.B4
Vm<V2

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF
CAP C3 CAP C2
OPEN OPEN
IN SERVICE &
IN SERVICE & AND
AND MV BB-B
MV BB-C Vm>V1 C2_CASE-3_OV_OFF_SWITCHING
Vm>V1
C3_CASE-2_OV_OFF_SWITCHING /15.D4
/16.D4

CAP C3 CAP C2
CLOSE CLOSE
IN SERVICE IN SERVICE
AS-BUILT BY DATE

BS-AB OPEN OR BS-BC OPEN OR &


E & TEST E
TEST AND 02 2023-02-09 PG REVISED AS PER COMMENTS - DTS-075 R01 SS SS RR
AND
01 2023-01-19 PG REVISED AS PER COMMENTS - DTS-075 R00 SS SS RR
BS-BC CLOSED BS-AB CLOSED
IN SERVICE IN SERVICE Vm=the measured voltage. 00 2022-11-28 PG FOR APPROVAL SS SS RR
REV.
DATE BY DESCRIPTION CHKD. CERT. APPD.
NO.

DRAWING COMPLETION CERTIFICATE (DCC) :

Saudi Electricity Company

DRAWN BY PG CHECKED BY SS SCALE:

DATE STARTED 2022-11-28 DATE COMPLETED

OPRG.DEPT. ENG. DEPT. -

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED


F F CONSTRUCTION OR FOR ORDERING
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

1
ACCS UV & OV BASED LOGIC
MANUFACTURER/ VENDOR NAME
PLD - ACCS FOR 13.8KV CAPACITOR BANK

RABIGH HOUSING (RBG-H) 110/13.8KV SUBSTATION


HITACHI ENERGY LTD.
7 RABIGH SAUDI ARABIA
DRAWING NUMBER SHEET NO. REV. NO. CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.
WD-0641821 11 of 19 02 2 3 4 5 6 4400016679 19WN109 P RB417 WD-0641821 11 of 19 02
NG-A (2012/01)
DMS VECTOR NGA00
8
02 19 of 12 WD-0641821 RB417 P 19WN109 4400016679 3 4 5 6 7 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.

1 2

A A

LEGEND
RELAY DESCRIPTION TYPE MAKE

B B

BUS-A VT MCB HEALTHY CASE-4 BS-AB CLOSED & BS-BC CLOSED AND INCOMER # OPEN BUS-B VT MCB HEALTHY CASE-4 BS-AB CLOSED & BS-BC CLOSED AND INCOMER # OPEN
CAPACITOR BANK C1 SWITCHING CONTROL CAPACITOR BANK C2 SWITCHING CONTROL
MV BS-AB MV BS-AB
CLOSED CLOSED

NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
IN SERVICE 13.8kV BS-BC IN SERVICE
LOR & 13.8kV BS-BC
MV BS-BC AND MV BS-BC LOR &
RESET
CLOSED CLOSED RESET AND
IN SERVICE 13.8kV BS-AB IN SERVICE
LOR 13.8kV BS-AB
RESET LOR
T1 RESET
CLOSED
IN SERVICE

MV BB-A MV BB-B
Vm<V2 Vm<V2

& &
C AND AND C
C1_CASE-4_UV_ON_SWITCHING C2_CASE-4_UV_ON_SWITCHING
/14.C4 /15.C4

& &
AND AND

REFERENCE DRAWINGS
MV BB-A MV BB-B DRAWING TITLE DRAWING NO.
Vm>V1 & Vm>V1 &
AND AND DRAWING CONTROL SHEET EE-609682
C1_CASE-4_OV_OFF_SWITCHING C2_CASE-4_OV_OFF_SWITCHING
/14.D4 /15.E4 MAIN ONE LINE DIAGRAM EA-609704

National Grid SA
D
D CAP C1 CAP C2
OPEN OPEN
IN SERVICE IN SERVICE

CAP C1 CAP C2
CLOSED CLOSED
IN SERVICE IN SERVICE

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF
AS-BUILT BY DATE

E E
02 2023-02-09 PG REVISED AS PER COMMENTS - DTS-075 R01 SS SS RR
01 2023-01-19 PG REVISED AS PER COMMENTS - DTS-075 R00 SS SS RR
00 2022-11-28 PG FOR APPROVAL SS SS RR
REV.
DATE BY DESCRIPTION CHKD. CERT. APPD.
NO.

DRAWING COMPLETION CERTIFICATE (DCC) :


Vm=the measured voltage.

Saudi Electricity Company

DRAWN BY PG CHECKED BY SS SCALE:

DATE STARTED 2022-11-28 DATE COMPLETED

OPRG.DEPT. ENG. DEPT. -

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED


F F CONSTRUCTION OR FOR ORDERING
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

1
ACCS UV & OV BASED LOGIC
MANUFACTURER/ VENDOR NAME
PLD - ACCS FOR 13.8KV CAPACITOR BANK

RABIGH HOUSING (RBG-H) 110/13.8KV SUBSTATION


HITACHI ENERGY LTD.
7 RABIGH SAUDI ARABIA
DRAWING NUMBER SHEET NO. REV. NO. CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.
WD-0641821 12 of 19 02 2 3 4 5 6 4400016679 19WN109 P RB417 WD-0641821 12 of 19 02
NG-A (2012/01)
DMS VECTOR NGA00
8
02 19 of 13 WD-0641821 RB417 P 19WN109 4400016679 3 4 5 6 7 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.

1 2

A A

LEGEND
RELAY DESCRIPTION TYPE MAKE

B B

BUS-C VT MCB HEALTHY CASE-4 BS-AB CLOSED & BS-BC CLOSED AND INCOMER # OPEN
CAPACITOR BANK C3 SWITCHING CONTROL
MV BS-AB
CLOSED

NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
IN SERVICE

MV BS-BC 13.8kV BS-BC


CLOSED LOR &
IN SERVICE RESET AND

T3 13.8kV BS-AB
CLOSED LOR
IN SERVICE RESET

MV BB-C
Vm<V2

C &
C
AND
C3_CASE-4_UV_ON_SWITCHING
/16.C4

&
AND REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.

MV BB-C DRAWING CONTROL SHEET EE-609682


Vm>V1 &
AND MAIN ONE LINE DIAGRAM EA-609704
C3_CASE-4_OV_OFF_SWITCHING
/16.D4

National Grid SA
D
D
CAP C3
OPEN
IN SERVICE

CAP C3
CLOSED
IN SERVICE

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF
AS-BUILT BY DATE

E E
02 2023-02-09 PG REVISED AS PER COMMENTS - DTS-075 R01 SS SS RR
01 2023-01-19 PG REVISED AS PER COMMENTS - DTS-075 R00 SS SS RR
00 2022-11-28 PG FOR APPROVAL SS SS RR
REV.
DATE BY DESCRIPTION CHKD. CERT. APPD.
NO.

DRAWING COMPLETION CERTIFICATE (DCC) :


Vm=the measured voltage.

Saudi Electricity Company

DRAWN BY PG CHECKED BY SS SCALE:

DATE STARTED 2022-11-28 DATE COMPLETED

OPRG.DEPT. ENG. DEPT. -

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED


F F CONSTRUCTION OR FOR ORDERING
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

1
ACCS UV & OV BASED LOGIC
MANUFACTURER/ VENDOR NAME
PLD - ACCS FOR 13.8KV CAPACITOR BANK

RABIGH HOUSING (RBG-H) 110/13.8KV SUBSTATION


HITACHI ENERGY LTD.
7 RABIGH SAUDI ARABIA
DRAWING NUMBER SHEET NO. REV. NO. CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.
WD-0641821 13 of 19 02 2 3 4 5 6 4400016679 19WN109 P RB417 WD-0641821 13 of 19 02
NG-A (2012/01)
DMS VECTOR NGA00
8
02 19 of 14 WD-0641821 RB417 P 19WN109 4400016679 3 4 5 6 7 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.

1 2

A A

TIME DELAY T10 ≥1


& FOR C1 UV SWITHING ON CASE-1 OR +CAPACITOR BANK C1
CAPACITOR BANK C1 SWITCHING LOGIC ON UNDER VOLTAGE MEASUREMENT /10.B4
C1_CASE-1_UV_ON_SWITCHING
AND LEGEND
TIMER ON COMMAND
& T10 RELAY DESCRIPTION TYPE MAKE
EMERGENCY ≥1 AND
TRIP 60sec
OR

ACCS AUTO/MANUAL SWITCH & ≥1


AT MANUAL AND OR

CAP C1 TIME DELAY T10


LOCAL/PARKING KEY NOT
& FOR C1 UV SWITHING ON CASE-3
INSERTED/TRIP OPTD C1_CASE-3_UV_ON_SWITCHING
B =1 /11.C7 AND B
CAP C1 INV TIMER
OUT OF SERVICE
T10

CAP-1 ACCS READY TO


13.8kV SEC-1 &
60sec

CLOSE/VOLTAGE
86BB LOR AND
RESET
CAP-1 ACCS READY TO CLOSE/VOLTAGE
/7.B6
&
13.8kV CAP-1

NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AND
86C1&86C2
LOR REST
TIME DELAY T10
CAP C1 & FOR C1 UV SWITHING ON CASE-4
86CBF
C1_CASE-4_UV_ON_SWITCHING
/12.C4 AND
LOR REST TIMER
T10
13.8kV GT-1 60sec
86T1,86B,86CBF&86T2
LOR RESET &
CAP C1
& REMOTE & AND
CAP C1 CB READY AND AND

Td>10min ACCS AUTO


CAP C1 CB OPEN ≥1
C T1 OR
C
T1 OPEN
Td>10min
CLOSED IN SERVICE
IN SERVICE TIME DELAY T9
CAP C1 CB FOR C1 OV SWITHING OFF CASE-1
CLOSED & +CAPACITOR BANK C1
C1_CASE-1_OV_OFF_SWITCHING
IN SERVICE /10.C4 AND
CAPACITOR BANK C1 SWITCHING LOGIC OFF OVER VOLTAGE MEASUREMENT TIMER OFF COMMAND
T9

5sec
& ≥1
AND & OR
AND REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.

TIME DELAY T7 DRAWING CONTROL SHEET EE-609682


& FOR C1 OV SWITHING OFF CASE-3
C1_CASE-3_OV_OFF_SWITCHING MAIN ONE LINE DIAGRAM EA-609704
/11.C7 AND
TIMER
T7

CAP-1 ACCS READY TO


ACCS AUTO/MANUAL SWITCH 10sec
≥1

OPEN/VOLTAGE

National Grid SA
AT MANUAL
OR
D
D CAP C1 & CAP-1 ACCS READY TO OPEN/VOLTAGE
=1 AND /7.D6
LOCAL/PARKING KEY NOT
INV
INSERTED

CAP C1 TIME DELAY T7


OUT OF SERVICE FOR C1 OV SWITHING OFF CASE-4
&
C1_CASE-4_OV_OFF_SWITCHING
/12.D4 AND
TIMER
T7

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF
10sec

&
AND

AS-BUILT BY DATE

E E
02 2023-02-09 PG REVISED AS PER COMMENTS - DTS-075 R01 SS SS RR
01 2023-01-19 PG REVISED AS PER COMMENTS - DTS-075 R00 SS SS RR
00 2022-11-28 PG FOR APPROVAL SS SS RR
REV.
DATE BY DESCRIPTION CHKD. CERT. APPD.
NO.

DRAWING COMPLETION CERTIFICATE (DCC) :

Saudi Electricity Company

DRAWN BY PG CHECKED BY SS SCALE:

DATE STARTED 2022-11-28 DATE COMPLETED

OPRG.DEPT. ENG. DEPT. -

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED


F F CONSTRUCTION OR FOR ORDERING
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

1
ACCS UV & OV BASED CAP-1 ON/OFF LOGIC
MANUFACTURER/ VENDOR NAME
PLD - ACCS FOR 13.8KV CAPACITOR BANK

RABIGH HOUSING (RBG-H) 110/13.8KV SUBSTATION


HITACHI ENERGY LTD.
7 RABIGH SAUDI ARABIA
DRAWING NUMBER SHEET NO. REV. NO. CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.
WD-0641821 14 of 19 02 2 3 4 5 6 4400016679 19WN109 P RB417 WD-0641821 14 of 19 02
NG-A (2012/01)
DMS VECTOR NGA00
8
02 19 of 15 WD-0641821 RB417 P 19WN109 4400016679 3 4 5 6 7 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.

1 2

A A

LEGEND
RELAY DESCRIPTION TYPE MAKE

TIME DELAY T10 ≥1


CAPACITOR BANK C2 SWITCHING LOGIC ON UNDER VOLTAGE MEASUREMENT C2_CASE-1_UV_ON_SWITCHING & FOR C2 UV SWITHING ON CASE-1 OR +CAPACITOR BANK C2
/10.C7 AND
EMERGENCY TIMER
≥1 & T10 ON COMMAND
TRIP
OR AND 60sec
B ACCS AUTO/MANUAL SWITCH B
AT MANUAL & ≥1
& AND TIME DELAY T10 OR
13.8kV SEC-2 CAP C2
86BB LOR AND FOR C2 UV SWITHING ON CASE-2
LOCAL/PARKING KEY NOT C2_CASE-2_UV_ON_SWITCHING
RESET /11.C4 & TIMER
INSERTED/TRIP OPTD
=1 AND T10
13.8kV CAP-2 CAP C2 INV
86C1&86C2 OUT OF SERVICE 60sec
LOR REST

NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
&
CAP C2 AND TIME DELAY T8
86CBF

CAP-2 ACCS READY TO


C2_CASE-3_UV_ON_SWITCHING & FOR C2 UV SWITHING ON CASE-3
LOR REST /11.D7
AND TIMER

CLOSE/VOLTAGE
13.8kV GT-2 T8
86T1,86B,86CBF&86T2 CAP-2 ACCS READY TO CLOSE/VOLTAGE
120sec /8.B6
LOR RESET
& &
CAP C2 CB READY AND AND
T1 TIME DELAY T8
CLOSED & C2_CASE-4_UV_ON_SWITCHING &
CAP C2 CB OPEN Td>10min AND /12.C7 FOR C2 UV SWITHING ON CASE-4
IN SERVICE AND
TIMER
T2 T2 T8
Td>10min CLOSED
CLOSED
IN SERVICE IN SERVICE 120sec
C &
C
T3 =1
CLOSED AND
INV &
CAPACITOR BANK C2 SWITCHING LOGIC OFF OVER VOLTAGE MEASUREMENT IN SERVICE
AND
TIMER
T1 T3
=1 &
CLOSED 5min
INV AND CAP C2 & ≥1 +CAPACITOR BANK C2
IN SERVICE
REMOTE AND OR
T2 ≥1
OR OFF COMMAND
CLOSED
IN SERVICE ACCS AUTO TIME DELAY T9
FOR C2 OV SWITHING OFF CASE-1 REFERENCE DRAWINGS
T3 T2
CLOSED OPEN DRAWING TITLE DRAWING NO.
TIMER
IN SERVICE IN SERVICE C2_CASE-1_OV_OFF_SWITCHING &
/10.D7 T9 DRAWING CONTROL SHEET EE-609682
CAP C2 CB AND
T1 =1 CLOSED 5sec MAIN ONE LINE DIAGRAM EA-609704
CLOSED &
INV IN SERVICE
IN SERVICE AND & ≥1
AND TIME DELAY T7 OR
T2 FOR C2 OV SWITHING OFF CASE-2
CLOSED
C2_CASE-2_OV_OFF_SWITCHING &
/11.C4

National Grid SA
IN SERVICE AND TIMER D
T7
D T3 =1
CLOSED 10sec
INV ACCS AUTO/MANUAL SWITCH ≥1 &
IN SERVICE &
AT MANUAL
OR AND AND
T1 TIME DELAY T9
& CAP C2

CAP-2 ACCS READY TO


CLOSED =1 C2_CASE-3_OV_OFF_SWITCHING
AND LOCAL/PARKING KEY NOT /11.E7 & FOR C2 OV SWITHING OFF CASE-3
IN SERVICE INV

OPEN/VOLTAGE
INSERTED AND TIMER
T2 T9
CLOSED ≥1 CAP C2
IN SERVICE OUT OF SERVICE
CAP-2 ACCS READY TO OPEN/VOLTAGE
OR 5sec /8.D6

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF
&
T3 =1 AND
CLOSED
INV TIME DELAY T9
IN SERVICE C2_CASE-4_OV_OFF_SWITCHING &
/12.D7 FOR C2 OV SWITHING OFF CASE-4
AND
T1 =1 T1 TIMER
CLOSED & =1 & T9
INV CLOSED
IN SERVICE AND INV AND
IN SERVICE
5sec
T2 &
T2 AND
CLOSED CLOSED
IN SERVICE IN SERVICE & TIMER
T3 AND T4
=1 T3 AS-BUILT BY DATE
CLOSED CLOSED
INV
IN SERVICE IN SERVICE
E E
02 2023-02-09 PG REVISED AS PER COMMENTS - DTS-075 R01 SS SS RR
01 2023-01-19 PG REVISED AS PER COMMENTS - DTS-075 R00 SS SS RR
00 2022-11-28 PG FOR APPROVAL SS SS RR
REV.
DATE BY DESCRIPTION CHKD. CERT. APPD.
NO.

DRAWING COMPLETION CERTIFICATE (DCC) :

Saudi Electricity Company

DRAWN BY PG CHECKED BY SS SCALE:

DATE STARTED 2022-11-28 DATE COMPLETED

OPRG.DEPT. ENG. DEPT. -

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED


F F CONSTRUCTION OR FOR ORDERING
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

1
ACCS UV & OV BASED CAP-2 ON/OFF LOGIC
MANUFACTURER/ VENDOR NAME
PLD - ACCS FOR 13.8KV CAPACITOR BANK

RABIGH HOUSING (RBG-H) 110/13.8KV SUBSTATION


HITACHI ENERGY LTD.
7 RABIGH SAUDI ARABIA
DRAWING NUMBER SHEET NO. REV. NO. CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.
WD-0641821 15 of 19 02 2 3 4 5 6 4400016679 19WN109 P RB417 WD-0641821 15 of 19 02
NG-A (2012/01)
DMS VECTOR NGA00
8
02 19 of 16 WD-0641821 RB417 P 19WN109 4400016679 3 4 5 6 7 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.

1 2

A A

TIME DELAY T10 ≥1


FOR C3 UV SWITHING ON CASE-1 OR LEGEND
CAPACITOR BANK C3 SWITCHING LOGIC ON UNDER VOLTAGE MEASUREMENT C3_CASE-1_UV_ON_SWITCHING & +CAPACITOR BANK C3
/10.D4 AND TIMER RELAY DESCRIPTION TYPE MAKE
ON COMMAND
& T10
AND 60sec
EMERGENCY
TRIP ≥1
OR & ≥1
ACCS AUTO/MANUAL SWITCH AND
AT MANUAL OR

CAP C3
B LOCAL/PARKING KEY NOT C3_CASE-2_UV_ON_SWITCHING
TIME DELAY T8 B
INSERTED/TRIP OPTD /11.D4 & FOR C3 UV SWITHING ON CASE-2
=1 AND
CAP C3 INV
& OUT OF SERVICE TIMER
13.8kV SEC-3 T8

CAP-3 ACCS READY TO


86BB LOR AND

CLOSE/VOLTAGE
RESET 120sec
CAP-3 ACCS READY TO CLOSE/VOLTAGE
/9.B6

NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
13.8kV CAP-3 &
86C1&86C2 AND
LOR REST

CAP C3 TIME DELAY T7


86CBF FOR C3 UV SWITHING ON CASE-4
&
LOR REST C3_CASE-4_UV_ON_SWITCHING
/13.C4 AND
TIMER
13.8kV GT-3 T7
86T1,86B,86CBF&86T2
LOR RESET 5min
&
CAP C3 CB READY AND CAP C3 &
REMOTE & AND
AND
CAP C3 CB OPEN Td>10min
C ACCS AUTO
C
T3 ≥1
Td>10min T3 OR
CLOSED
IN SERVICE OPEN
IN SERVICE

CAP C3 CB TIME DELAY T9


CLOSED & FOR C3 OV SWITHING OFF CASE-1 +CAPACITOR BANK C3
C3_CASE-1_OV_OFF_SWITCHING
IN SERVICE /10.E4 AND
CAPACITOR BANK C3 SWITCHING LOGIC OFF OVER VOLTAGE MEASUREMENT TIMER OFF COMMAND
T9
&
AND 5sec
≥1 REFERENCE DRAWINGS
& OR
DRAWING TITLE DRAWING NO.
AND
DRAWING CONTROL SHEET EE-609682
TIME DELAY T9 MAIN ONE LINE DIAGRAM EA-609704
C3_CASE-2_OV_OFF_SWITCHING & FOR C3 OV SWITHING OFF CASE-2
/11.E4
AND
TIMER
T9

National Grid SA
ACCS AUTO/MANUAL SWITCH D

CAP-3 ACCS READY TO


≥1 5sec
AT MANUAL
OR

OPEN/VOLTAGE
D &
CAP C3 =1
LOCAL/PARKING KEY NOT AND CAP-3 ACCS READY TO OPEN/VOLTAGE
INV /9.D6
INSERTED

CAP C3
OUT OF SERVICE TIME DELAY T8
& FOR C3 OV SWITHING OFF CASE-4
C3_CASE-4_OV_OFF_SWITCHING
/13.D4 AND
TIMER

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF
T8

10min

&
AND

AS-BUILT BY DATE

E E
02 2023-02-09 PG REVISED AS PER COMMENTS - DTS-075 R01 SS SS RR
01 2023-01-19 PG REVISED AS PER COMMENTS - DTS-075 R00 SS SS RR
00 2022-11-28 PG FOR APPROVAL SS SS RR
REV.
DATE BY DESCRIPTION CHKD. CERT. APPD.
NO.

DRAWING COMPLETION CERTIFICATE (DCC) :

Saudi Electricity Company

DRAWN BY PG CHECKED BY SS SCALE:

DATE STARTED 2022-11-28 DATE COMPLETED

OPRG.DEPT. ENG. DEPT. -

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED


F F CONSTRUCTION OR FOR ORDERING
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

1
ACCS UV & OV BASED CAP-3 ON/OFF LOGIC
MANUFACTURER/ VENDOR NAME
PLD - ACCS FOR 13.8KV CAPACITOR BANK

RABIGH HOUSING (RBG-H) 110/13.8KV SUBSTATION


HITACHI ENERGY LTD.
7 RABIGH SAUDI ARABIA
DRAWING NUMBER SHEET NO. REV. NO. CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.
WD-0641821 16 of 19 02 2 3 4 5 6 4400016679 19WN109 P RB417 WD-0641821 16 of 19 02
NG-A (2012/01)
DMS VECTOR NGA00
8
02 19 of 17 WD-0641821 RB417 P 19WN109 4400016679 3 4 5 6 7 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.

1 2

A A

LEGEND
RELAY DESCRIPTION TYPE MAKE

B B
NOTE

1.IF ANY BUS DE-ENERGIZED FOR ANY REASON, THE ASSOCIATED CAPACITOR MUST BE OPEN.
WHEN ACCS IS AUTO, AND THIS WILL BE ACHEIVED BY TRIPPING THE CAPACTOR CB WHEN THE ASSOCIATED INCOMER CB WILL OPEN.

2.THE MINIMUM INPUTS TO THE ACCS SHALL CONSIST OF STATUS OF ALL 132kV/13.8kV INCOMER(TRANSFORMER) CBs, BUS TIE CBs,
EACH 13.8kV BUS VOLTAGE, EACH POWER TRANSFORMER'S VAR READINGS ON THE HV SIDE,

NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AND STATUS OF LOCKOUT RELAYS OF INCOMER CBs AND CAPACITOR CBs.

3.THE CB OF THE CAPACITOR BANK ONCE SWITCHED OFF SHALL NOT SWITCH ON WITHIN 10MINUTES.
IN ANY CASE THE 13.8kV INCOMER CBs OF THE TRANSFORMERS T-1,T-2&T-3 ARE SWITCHED ON,
THE ASSOCIATED CAPACITOR SHALL NOT SWITCHED ON WITH IN 10 MINUTES.

4.THE ACCS SHALL PREVENT UNDESIRED SWITCHING 'ON' OPERATION OF CBs OF ASSOCIATED CAPACITOR BANKS IN ANY ONE OF THE FOLLOWING CASES:

i. 13.8kV BUS FAULT (86B1 OR 86B2 OR 86B3) OPERATES & 13.8kV CBF.
ii. 13.8kV CAPACITOR FEEDER UNCLEAR FAULTS (MAIN FEEDER CB OR DEDICATED CAPACITOR FEEDER CB LOCKOUT RELAY OPERATES).
iii. 13.8kV INCOMERS LOCKOUT OPERATES.
iv. 13.8kV BUS TIE LOCKOUT OPERATES

C C

REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.
NOTE
DRAWING CONTROL SHEET EE-609682
1.DURING ACCS AUTO MODE, WHEN ANY 13.8kV INCOMER CB SWITCHED OFF, MAIN ONE LINE DIAGRAM EA-609704
THE ASSOCIATED CAPACITOR BANK SHALL ALSO SWITCHED OFF BEFORE 13.8kV BUS SECTION CB SWITCHED ON.
THIS CONDITION WILL NOT BE APPLICABLE WHEN ACCS IN ON MANUAL MODE.
2.ACCS CONTROL COMMAND IN AUTO MODE SHOULD NOT CONCERNED BY CONTROL PANEL LOCAL/REMOTE SELECTIVITY.
3.IF ANY CAPACITOR BANK CB IS NOT IN REMOTE AND IN SERVICE MODE IN SWITCHGEAR PANEL,

National Grid SA
ACCS IN AUTO MODE SHOULD NOT ISSUE COMMAND TO THIS CAPACITOR.
D
D 4.DURING ACCS MANUAL OPERATION MODE, BOTH FUNCTIONS (TRANSFORMER LOADING MEASUREMENT MVAR AND
ASSOCIATED BUS VOLTAGE MEASUREMENT) ARE NOT REQUIRED. AUTHORITY SHALL BE GIVEN TO
CONTROL AND FIELD OPERATION THROUGH HARD WIRING OR SWITCHGEAR BCU (NOT THROUGH ACCS RELAY)
TO PUT THE CAPACITOR BANK IN SERVICE OR NOT. UNLESS IF THERE ARE SAFETY REQUIREMENTS OR
PROTECTION INTERLOCK PREVENT CB, OPERATION SHALL BE EXECUTED BY HARDWARE FROM SCHEME AND SOFTWARE FROM SWITCHGEAR BCU.

5.AUTO/MANUAL OPERATION MODE SELECTIVITY SHALL BE EXECUTED


(LOCALLY IN THE PANEL USING PUSH BUTTON OR SPRING RETURN SELECTOR SWITCH) THROUGH
BI-STABLE RELAYS SO THAT MANUAL OPERATION CAN BE CARRIED OUT FROM CONTROL CENTRE.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF
IT SHOULD NOT BE SELECTED FROM ACCS CONTROLLER.
6.MANUAL OPERATION SHALL NOT BE DISTURBED IF ACCS RELAY IS FAULTY/OFF.

AS-BUILT BY DATE

E E
02 2023-02-09 PG REVISED AS PER COMMENTS - DTS-075 R01 SS SS RR
01 2023-01-19 PG REVISED AS PER COMMENTS - DTS-075 R00 SS SS RR
00 2022-11-28 PG FOR APPROVAL SS SS RR
REV.
DATE BY DESCRIPTION CHKD. CERT. APPD.
NO.

DRAWING COMPLETION CERTIFICATE (DCC) :

Saudi Electricity Company

DRAWN BY PG CHECKED BY SS SCALE:

DATE STARTED 2022-11-28 DATE COMPLETED

OPRG.DEPT. ENG. DEPT. -

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED


F F CONSTRUCTION OR FOR ORDERING
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

1
ACCS LOGIC
MANUFACTURER/ VENDOR NAME
PLD - ACCS FOR 13.8KV CAPACITOR BANK

RABIGH HOUSING (RBG-H) 110/13.8KV SUBSTATION


HITACHI ENERGY LTD.
7 RABIGH SAUDI ARABIA
DRAWING NUMBER SHEET NO. REV. NO. CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.
WD-0641821 17 of 19 02 2 3 4 5 6 4400016679 19WN109 P RB417 WD-0641821 17 of 19 02
NG-A (2012/01)
DMS VECTOR NGA00
8
02 19 of 18 WD-0641821 RB417 P 19WN109 4400016679 3 4 5 6 7 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.

1 2

A A

LEGEND
RELAY DESCRIPTION TYPE MAKE

ACCS FINAL SETTINGS FOR 3 TRANSFORMERS SYSTEM

CASE 1: BUS SECTION A/B OPEN AND BUS SECTION B/C OPEN

SET Mvar FOR CLOSING SET Mvar FOR OPENING


Mvar TIME Mvar TIME

B QC1 CLOSE 9 Mvar-1 5 min. t1 OPEN 1 Mvar-2 5 min. t2 B


QC2 CLOSE 9 Mvar-1 5 min. t1 OPEN 1 Mvar-2 5 min. t2
QC3 CLOSE 9 Mvar-1 5 min. t1 OPEN 1 Mvar-2 5 min. t2

SET VOLTAGE FOR CLOSING SET VOLTAGE FOR OPENING


Voltage TIME Voltage TIME

NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
QC1 CLOSE 12.1 V2 60 sec. t10 OPEN 14.6 V1 5 sec. t9
QC2 CLOSE 12.1 V2 60 sec. t10 OPEN 14.6 V1 5 sec. t9
QC3 CLOSE 12.1 V2 60 sec. t10 OPEN 14.6 V1 5 sec. t9

CASE 2: BUS SECTION A/B OPEN AND BUS SECTION B/C CLOSED

SET Mvar FOR CLOSING SET Mvar FOR OPENING


Mvar TIME Mvar TIME
QC1 CLOSE 9 Mvar-1 5 min. t1 OPEN 1 Mvar-2 5 min. t2

QC2 CLOSE 10 Mvar-3 5 min. t3 OPEN 2 Mvar-4 10 min. t4


QC3 CLOSE 11 Mvar-5 10 min. t5 OPEN 3 Mvar-6 5 min. t6
C C
SET VOLTAGE FOR CLOSING SET VOLTAGE FOR OPENING
Voltage TIME Voltage TIME
QC1 CLOSE 12.1 V2 60 sec. t10 OPEN 14.6 V1 5 sec. t9
QC2 CLOSE 12.1 V2 60 sec. t10 OPEN 14.6 V1 10 sec. t7
QC3 CLOSE 12.1 V2 120 sec. t8 OPEN 14.6 V1 5 sec. t9

CASE 3: BUS SECTION A/B CLOSED AND BUS SECTION B/C OPEN
REFERENCE DRAWINGS
SET Mvar FOR CLOSING SET Mvar FOR OPENING
DRAWING TITLE DRAWING NO.
Mvar TIME Mvar TIME
DRAWING CONTROL SHEET EE-609682
QC1 CLOSE 10 Mvar-3 5 min. t3 OPEN 2 Mvar-4 10 min. t4
MAIN ONE LINE DIAGRAM EA-609704
QC2 CLOSE 11 Mvar-5 10 min. t5 OPEN 3 Mvar-6 5 min. t6
QC3 CLOSE 9 Mvar-1 5 min. t1 OPEN 1 Mvar-2 5 min. t2

SET VOLTAGE FOR CLOSING SET VOLTAGE FOR OPENING

National Grid SA
D
Voltage TIME Voltage TIME
D QC1 CLOSE 12.1 V2 60 sec. t10 OPEN 14.6 V1 10 sec. t7
QC2 CLOSE 12.1 V2 120 sec. t8 OPEN 14.6 V1 5 sec. t9
QC3 CLOSE 12.1 V2 60 sec. t10 OPEN 14.6 V1 5 sec. t9

CASE 4: BUS SECTION A/B CLOSED AND BUS SECTION B/C CLOSED AND INCOMER Z OPEN

SET Mvar FOR CLOSING SET Mvar FOR OPENING

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF
Mvar TIME Mvar TIME
QCx CLOSE 10 Mvar-3 5 min. t3 OPEN 2 Mvar-4 10 min. t4
QCy CLOSE 11 Mvar-5 10 min. t5 OPEN 3 Mvar-6 5 min. t6

Voltage TIME Voltage TIME


QCx CLOSE 12.1 V2 60 sec. t10 OPEN 14.6 V1 10 sec. t7
QCy CLOSE 12.1 V2 120 sec. t8 OPEN 14.6 V1 5 sec. t9

Figure 1 Typical ACCS Settings Complying to above Mentioned Requirements AS-BUILT BY DATE

E E
02 2023-02-09 PG REVISED AS PER COMMENTS - DTS-075 R01 SS SS RR
01 2023-01-19 PG REVISED AS PER COMMENTS - DTS-075 R00 SS SS RR
00 2022-11-28 PG FOR APPROVAL SS SS RR
REV.
DATE BY DESCRIPTION CHKD. CERT. APPD.
NO.

DRAWING COMPLETION CERTIFICATE (DCC) :

Saudi Electricity Company

DRAWN BY PG CHECKED BY SS SCALE:

DATE STARTED 2022-11-28 DATE COMPLETED

OPRG.DEPT. ENG. DEPT. -

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED


F F CONSTRUCTION OR FOR ORDERING
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

1
ACCS LOGIC
MANUFACTURER/ VENDOR NAME
PLD - ACCS FOR 13.8KV CAPACITOR BANK

RABIGH HOUSING (RBG-H) 110/13.8KV SUBSTATION


HITACHI ENERGY LTD.
7 RABIGH SAUDI ARABIA
DRAWING NUMBER SHEET NO. REV. NO. CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.
WD-0641821 18 of 19 02 2 3 4 5 6 4400016679 19WN109 P RB417 WD-0641821 18 of 19 02
NG-A (2012/01)
DMS VECTOR NGA00
8
02 19 of 19 WD-0641821 RB417 P 19WN109 4400016679 3 4 5 6 7 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.

1 2

TRUTH TABLE

A A
C1 C2 C3 C1 C2 C3

CASE T1 T2 T3 BS-1 BS-2 MVAR-1 > MVAR-2 < MVAR-1 > MVAR-2 < MVAR-1 > MVAR-2 < V2< V1> V2< V1> V2< V1>

t-1 > t-2 > t-1 > t-2 > t-1 > t-2 > t-10 < t-9 > t-10 < t-9 > t-10 < t-9 >

CLOSE CLOSE CLOSE OPEN OPEN CLOSE OPEN CLOSE OPEN CLOSE OPEN CLOSE OPEN CLOSE OPEN CLOSE OPEN

OPEN CLOSE CLOSE OPEN OPEN OPEN OPEN CLOSE OPEN CLOSE OPEN OPEN OPEN CLOSE OPEN CLOSE OPEN
LEGEND
CLOSE CLOSE OPEN OPEN OPEN CLOSE OPEN CLOSE OPEN OPEN OPEN CLOSE OPEN CLOSE OPEN OPEN OPEN
RELAY DESCRIPTION TYPE MAKE
CASE-1 CLOSE OPEN CLOSE OPEN OPEN CLOSE OPEN OPEN OPEN CLOSE OPEN CLOSE OPEN OPEN OPEN CLOSE OPEN

OPEN OPEN CLOSE OPEN OPEN OPEN OPEN OPEN OPEN CLOSE OPEN OPEN OPEN OPEN OPEN CLOSE OPEN

OPEN CLOSE OPEN OPEN OPEN OPEN OPEN CLOSE OPEN OPEN OPEN OPEN OPEN CLOSE OPEN OPEN OPEN

CLOSE OPEN OPEN OPEN OPEN CLOSE OPEN OPEN OPEN OPEN OPEN CLOSE OPEN OPEN OPEN OPEN OPEN
B C1 C2 C3 C1 C2 C3 B

T1 T2 T3 BS-1 BS-2 MVAR-3 > MVAR-4 < MVAR-5 > MVAR-6 < MVAR-1 > MVAR-2 < V2< V1> V2< V1> V2< V1>

CASE-2 t-3 > t-4 > t-5 > t-6 > t-1 > t-2 > t-10 > t-7 > t-8 > t-9 > t-10 > t-9 >

CLOSE CLOSE OPEN CLOSE OPEN CLOSE OPEN CLOSE OPEN OPEN OPEN CLOSE OPEN CLOSE OPEN OPEN OPEN

NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CLOSE CLOSE CLOSE CLOSE OPEN CLOSE OPEN CLOSE OPEN CLOSE OPEN CLOSE OPEN CLOSE OPEN CLOSE OPEN

C1 C2 C3 C1 C2 C3

T1 T2 T3 BS-1 BS-2 MVAR-1 > MVAR-2 < MVAR-3 > MVAR-4 < MVAR-5 > MVAR-6 < V2< V1> V2< V1> V2< V1>

CASE-3 t-1 > t-2 > t-3 > t-4 > t-5 > t-6 > t-10 > t-9 > t-10 > t-7 > t-8 > t-9 >

OPEN CLOSE CLOSE OPEN CLOSE OPEN OPEN CLOSE OPEN CLOSE OPEN OPEN OPEN CLOSE OPEN CLOSE OPEN

CLOSE CLOSE CLOSE OPEN CLOSE CLOSE OPEN CLOSE OPEN CLOSE OPEN CLOSE OPEN CLOSE OPEN CLOSE OPEN

TRANSFORMER -1 & 2 PARALLEL


C C
C1 C2 C3 C1 C2 C3

T1 T2 T3 BS-1 BS-2 MVAR-3 > MVAR-4 < MVAR-5 > MVAR-6 < V2< V1> V2< V1>

t-3 > t-4 > t-5 > t-6 > t-10 > t-7 > t-8 > t-9 >

CLOSE CLOSE OPEN CLOSE CLOSE CLOSE OPEN CLOSE OPEN OPEN OPEN CLOSE OPEN CLOSE OPEN OPEN OPEN

TRANSFORMER -2 & 3 PARALLEL


REFERENCE DRAWINGS
C1 C2 C3 C1 C2 C3
DRAWING TITLE DRAWING NO.

CASE-4 T1 T2 T3 BS-1 BS-2 MVAR-3 > MVAR-4 < MVAR-5 > MVAR-6 < V2< V1> V2< V1> DRAWING CONTROL SHEET EE-609682
MAIN ONE LINE DIAGRAM EA-609704
t-3 > t-4 > t-5 > t-6 > t-10 > t-7 > t-8 > t-9 >

OPEN CLOSE CLOSE CLOSE CLOSE OPEN OPEN CLOSE OPEN CLOSE OPEN OPEN OPEN CLOSE OPEN CLOSE OPEN

National Grid SA
D
D
TRANSFORMER -1 & 3 PARALLEL

C1 C2 C3 C1 C2 C3

T1 T2 T3 BS-1 BS-2 MVAR-3 > MVAR-4 < MVAR-5 > MVAR-6 < V2< V1> V2< V1>

t-3 > t-4 > t-5 > t-6 > t-3 > t-4 > t-5 > t-6 >

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF
CLOSE OPEN CLOSE CLOSE CLOSE CLOSE OPEN OPEN OPEN CLOSE OPEN CLOSE OPEN OPEN OPEN CLOSE OPEN

NOTE IN CASE OF ASSOCIATED TRANSFORMER OPENED, THE CONCERNED CAPACITOR BANK SHOULD REMAIN CLOSED IF MVAR & VOLTAGE OUTSIDE THE SETTING LIMITS.

AS-BUILT BY DATE

E E
02 2023-02-09 PG REVISED AS PER COMMENTS - DTS-075 R01 SS SS RR
01 2023-01-19 PG REVISED AS PER COMMENTS - DTS-075 R00 SS SS RR
00 2022-11-28 PG FOR APPROVAL SS SS RR
REV.
DATE BY DESCRIPTION CHKD. CERT. APPD.
NO.

DRAWING COMPLETION CERTIFICATE (DCC) :

Saudi Electricity Company

DRAWN BY PG CHECKED BY SS SCALE:

DATE STARTED 2022-11-28 DATE COMPLETED

OPRG.DEPT. ENG. DEPT. -

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED


F F CONSTRUCTION OR FOR ORDERING
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

1
TRUTH TABLE FOR ALL ACCS CASES
MANUFACTURER/ VENDOR NAME
PLD - ACCS FOR 13.8KV CAPACITOR BANK

RABIGH HOUSING (RBG-H) 110/13.8KV SUBSTATION


HITACHI ENERGY LTD.
7 RABIGH SAUDI ARABIA
DRAWING NUMBER SHEET NO. REV. NO. CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.
WD-0641821 19 of 19 02 2 3 4 5 6 4400016679 19WN109 P RB417 WD-0641821 19 of 19 02
NG-A (2012/01)
DMS VECTOR NGA00

You might also like