0% found this document useful (0 votes)
6 views2 pages

Process Tie-In List

The document outlines the revision validation and design certification for the RTR Clean Fuels Project at Ras Tanura, Saudi Arabia. It includes a process tie-in list detailing various connections, specifications, and flow rates for existing and new lines. The document emphasizes that revisions are not to be used for construction until certified and dated by the appropriate authorities.

Uploaded by

mustafamd83
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views2 pages

Process Tie-In List

The document outlines the revision validation and design certification for the RTR Clean Fuels Project at Ras Tanura, Saudi Arabia. It includes a process tie-in list detailing various connections, specifications, and flow rates for existing and new lines. The document emphasizes that revisions are not to be used for construction until certified and dated by the appropriate authorities.

Uploaded by

mustafamd83
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

REVISION VALIDATION DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS REV. NO.

DATE REVISION DESCRIPTION


OTHER
THIS REVISION NO. IS COVERED, FOR ALL APPROVAL (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)

AND CERTIFICATION REQUIREMENTS, PER SAEP-334, UNDER ENGG./DATE CERTIFIED/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

DRAWING COMPLETION CERTIFICATE NO. JOB ORDER/EWO NO. THIS REVISION IS NOT TO BE
USED FOR CONSTRUCTION
10-00742-0006 UNTIL CERTIFIED AND DATED
Saudi Aramco 2616-ENG (11/2010)

RAS TANURA
00

Rev
00A
01A

PROCESS TIE-IN LIST

RTR CLEAN FLUES PROJECT


015 - TWO STAGE CRUDE UNIT
Date
12-jul-18

10-abr-17
10-may-18

Description
ISSUED FOR DESIGN

DOC

SAUDI ARABIA
DWG. TYPE
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

TRRT Revision History


RAS TANURA
SAUDI ARABIA

015
PLANT NO.
PROCESS TIE-IN LIST
SAUDI ARABIAN OIL COMPANY

A
INDEX
EMF

Prep
MPO
MPO
015 - TWO STAGE CRUDE UNIT

Chk
JYM
JYM
JYM
RAS TANURA REFINERY CLEAN FUELS PROJECT

DRAWING NO.

CD-359336
JLT
JLT
JLT

App

2
1
of
SHT.NO

01A
REV.NO.

EKRD/2616-1110.XLS
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PROCESS TIE-INs LIST Flowrate Flowrate Operating Design
New Line
Unit/ Plant Tie-in Existing Line Number or Normal Design
Rev
No. No. Existing Equipment
P&ID Description Press Temp Press Temp REMARKS
Size (psig) (F) (psig) (F)
Service Number Spec Flowrate Units Flowrate Units
(In)
INSTALL 4" CONNECTION WITH VALVE AND BLIND ON EXISTING LINE 6"-015-P-613-3T1AT (DISCHARGE OF
00 015 006 4 P 12104 3CL1P 6"-015-P-613-3T1AT 015-DA-280145-001 210 GPM 210 GPM 53.3 675 146.0 750
015-G-285A/B) TO FEED NEW 015-G-0512A/B.
VAC. OVER
00 015 007 Tie-in cancelled
FLASH
INSTALL A 4" CONNECTION WITH VALVE AND BLIND ON EXISTING 12" VACUUM RESIDUE RUNDOWN LINE
00 015 008 12 P 12084 6CL1P 12"-015-P-638-6A1 015-DA-280141-001 (12"-015-P-638-6A1), UPSTREAM 015-E-293. CUT PART OF EXISTING 12" LINE TO PROVIDE AT LEAST 5FT 210 GPM 210 GPM 480.0 675 730.0 750 Alternative design conditions: 810 psig @ 670ºF
OF STRAIGHT LENGTH WITH SPEC 6CL1P FROM MIXING POINT.
EXTENSION OF EXISTING BLOWDOWN HEADER 2"-015-BD-1321-1A1, INCLUDING A BLOCK VALVE AND
00 015 009 2 BD 11838 1CS1P 2"-015-BD-1321-1A1 015-DA-280167-001 NNF - - - 1.5 170 75.0 550
BLIND.
EXTENSION OF EXISTING COOLING WATER RETURN HEADER 3"-015-CWR-1302-1D1AT, INCLUDING A - Necessity of tie-in and flowrate to be confirmed according
00 015 010 3 CWR 13387 1CS1P 3"-015-CWR-1302-1D1AT 015-DA-280163-001 HOLD GPM HOLD GPM 44.0 140 74.0 185
BLOCK VALVE AND BLIND. to pump vendor information.
EXTENSION OF EXISTING COOLING WATER SUPPLY HEADER 3"-015-CWS-1302-1D1AT, INCLUDING A - Necessity of tie-in and flowrate to be confirmed according
00 015 011 3 CWS 13417 1CS1P 3"-015-CWS-1302-1D1AT 015-DA-280163-001 HOLD GPM HOLD GPM 54.0 120 74.0 185
BLOCK VALVE AND BLIND. to pump vendor information.

00 015 012 MP STEAM Tie-in cancelled

00 015 013 MP STEAM Tie-in cancelled

00 015 014 OIL MIST Tie-in cancelled

00 015 018 3 P 12092 3CS1P 4"-015-P-1303-3A1 015-DA-280171-001 EXTENSION OF EXISTING WASH OIL HEADER 3"-015-P-1303-3A1, INCLUDING A BLOCK VALVE AND BLIND. NNF - - - 77.0 140 131.0 190

NEW EXCHANGER 015-E-261D TO BE CONNECTED IN SERIES WITH 015-E-261C. TIE-IN REFERS TO 015-E-
00 015 019 14 P - - 14"-015-P-32-3A1C 015-DA-280134-001 5,674 GPM 6,241 GPM 313.0 214 620.0 360
261D CRUDE OUTLET (SHELL SIDE)
NEW EXCHANGER 015-E-261D TO BE CONNECTED IN SERIES WITH 015-E-261C. TIE-IN REFERS TO 015-E-
00 015 020 12 P - - 12"-015-P-504-6A1 015-DA-280134-001 3,329 GPM 3,662 GPM 402.0 268 660.0 400
261D SC6 INLET (TUBE SIDE)

00 015 021 CRUDE Tie-in cancelled

00 015 022 SC6 Tie-in cancelled

CUT EXISTING NO. 5 SIDECUT (SC5) LINE (6"/8"-015-P-420-1T1JT) FROM FV-110 DOWNSTREAM VALVE /
00 015 023A 6 P 12100 3CL1P 8"-015-P-420-3T1AT 015-DA-280111-001 BYPASS VALVE AND INSTALL A SPOOL WITH 8" CONNNECTION TEE (RATING 300#), INCLUDING 8" 273 GPM 273 GPM 50.8 630 380.0 745 Flow corresponding to 7 MBSD of SC5
ISOLATION VALVE AND BLIND, TO DIRECT SC5 DRAW-OFF TO VBCR & MIDDLE REFLUX LINE TO 015-C-200
(10"-015-P-588-3T1AT). 8" ISOLATION VALVE AND BLIND ALSO INSTALLED IN EXISTING SC5 LINE, Design flow corresponds to 015-G-270 minimum
00 015 023B 8 P 12105 1CL1P 8"-015-P-420-1T1JT 015-DA-280133-001 CONNECTING TO 8"-015-P-420-1T1JT, TO BE CLOSED AFTER CFP. NNF - 400 GPM 50.8 555 80.0 745
continuous stable flow
015-G-270 MINIMUM FLOW LINE TO BE RECONNECTED DOWNSTREAM NEW CLOSED GATE VALVE AT
SC5 LINE. Design flow corresponds to 015-G-270 minimum
00 015 023C 3 P 12105 1CL1P 3"-015-P-570-1T1JT 015-DA-280133-001 NNF - 400 GPM 50.8 555 80.0 745
continuous stable flow

CUT EXISTING 10" VBCR & MIDDLE REFLUX LINE TO 015-C-200 (10"-015-P-588-3T1AT) AND INSTALL A
00 015 024 8 P 12999 3CL1P 10"-015-P-588-3T1AT 015-DA-280133-001 SPOOL WITH A 8" CONNECTION, WITH VALVE AND BLIND, TO DIRECT NO.5 SIDECUT (SC5) FROM 015-C- 273 GPM 273 GPM 50.8 630 380.0 745 Flow corresponding to 7 MBSD of SC5
100. A NEW TEMPERATURE TRANSMITTER TO BE INCLUDED DOWNSTREAM 8" CONNECTION.

INSTALL 2" CONNECTION WITH VALVE AND BLIND ON EXISTING FLUSHING OIL HEADER 6"-015-P-1300-
00 015 026 2 P 12101 3CS1P 6"-015-P-1300-3A1 015-DA-280171-001 NNF - - - 77.0 140 131.0 190
3A1 TO PROVIDE FLUSHING FOR NEW BOOSTER PUMP 015-G-0512 DISCHARGE SYSTEM.

00 015 027 1 150S 11719 3CS1P 1"-15S5029-1A1S 015-DA-280198-001 STEAM FOR NEW UTILITY STATION FOR 015-G-0512 AREA 150 LB/H 165 LB/H 155.0 425 185.0 650 Flow based on 1 Utility Station working.

00 015 028 1 UA 13427 1SD0P 1"-15A5033-1D1AT 015-DA-280198-001 UTILITY AIR FOR NEW UTILITY STATION FOR 015-G-0512 AREA 3,720 SCFH 4,092 SCFH 112.0 102 150.0 150 Flow based on 1 Utility Station working.

00 015 029 1 RW 13439 1LC0U 1"-15W5029-2E3A 015-DA-280198-001 RAW WATER FOR NEW UTILITY STATION FOR 015-G-0512 AREA 26 GPM 29 GPM 75.0 80 150.0 150 Flow based on 1 Utility Station working.