Merge Fire

This document provides detailed abbreviations and symbols related to pipework and fire protection systems for a construction project. It emphasizes the importance of using nominal bore sizes and adhering to specifications for alternative pipe materials. Additionally, it outlines the need for contractors to verify as-built installations before commencing work.

Uploaded by

safety
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
5 views15 pages

Merge Fire

This document provides detailed abbreviations and symbols related to pipework and fire protection systems for a construction project. It emphasizes the importance of using nominal bore sizes and adhering to specifications for alternative pipe materials. Additionally, it outlines the need for contractors to verify as-built installations before commencing work.

Uploaded by

safety
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 15

P/EGG-ENG/02

NOTES:
REV.00
1. PIPE SIZES ON THE DRAWINGS ARE NOMINAL BORE (NB OR
ABBREVIATIONS PIPEWORK FIRE PROTECTION PIPING DRAWING EXAMPLE DN) FOR THE APPLICABLE “DEFAULT” PIPE MATERIAL
LISTED IN SPECIFICATION “PIPEWORK - GENERAL”. WHERE
ABBREVIATION DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION LEVEL 2 ALTERNATIVE PIPE MATERIALS ARE USED IN ACCORDANCE
CEILING SPACE
WITH THAT SPECIFICATION, USE THE EQUIVALENT PIPE
GENERAL CONCEALED PIPE IN CEILING SPACE SIZE TABLES THEREIN TO CONVERT SIZES SHOWN TO THE
SPRINKLER HEAD - PENDANT ON DROPPER
AFFL ABOVE FINISHED FLOOR LEVEL
APPLICABLE EQUIVALENT. ALTERNATIVE PIPE MATERIALS
AP ACCESS PANEL
EXPOSED PIPE AT HIGH LEVEL SPRINKLER HEAD - UPRIGHT ON RISER
LEVEL 1 THAT HAVE NOT BEEN SO CONVERTED MAY BE REJECTED.
c/w COMPLETE WITH
f FLOW
FA FROM ABOVE 2. THE SYMBOLS SHOWN ON THIS LEGEND MAY NOT
PIPE AT LOW LEVEL SPRINKLER HEAD - DIRECT ON PIPEWORK ELEVATION
FA/TB FROM ABOVE TO BELOW NECESSARILY APPEAR WITHIN THE SET OF DRAWINGS FOR
FB FROM BELOW THIS DISCIPLINE.
PIPE UNDER FLOOR SPRINKLER HEAD - PENDANT ON DROPPER WITH
FB/TA FROM BELOW TO ABOVE SU SD
GUARD 3. THIS DOCUMENT IS TO BE READ IN CONJUNCTION WITH
HL HIGH LEVEL ABOVE CEILING
ASPIRATING SMOKE DETECTION (LIGHT LINE RUN BELOW FLOOR THE SPECIFICATION, DRAWINGS AND ALL OTHER
IL INVERT LEVEL SPRINKLER HEAD - UPRIGHT ON RISER WITH GUARD
PARALLEL TO PIPE INDICATES EXTENT OF ASPIRATIONS) HIGH LEVEL CONTRACTUAL INFORMATION.
LL LOW LEVEL
SIZE SIZE LOW LEVEL
RL RELATIVE LEVEL CHANGE IN PIPE DIAMETER (CONCENTRIC)
SD SET DOWN SPRINKLER HEAD - UPRIGHT ON RISER WITH GUARD PLAN VIEW
SU SET UP
DIRECTION OF FLOW SPRINKLER HEAD - PENDANT ON DROPPER -
TA TO ABOVE

PIPE DROPS FA/TB


INSTITUTIONAL

PIPE TEES DOWN

PIPE SETS DOWN


TB TO BELOW

CHANGE - DOWN

PIPE DROPS TB
CHANGE IN PIPE ELEVATION - DROP

PIPE RISES TA
UNO UNLESS NOTED OTHERWISE SPRINKLER HEAD - DIRECT ON PIPEWORK IN

PIPE TEES UP

PIPE SETS UP
CHANGE - UP
PIPE LEVEL

PIPE LEVEL
N NEW CONCEALED SPACE
R RELOCATED CHANGE IN PIPE ELEVATION - RISE SPRINKLER HEAD - PENDANT ON DROPPER IN
PIPEWORK CONCEALED SPACE
ASD ASPIRATING SMOKE DETECTION PIPE TEES UP SPRINKLER HEAD - UPRIGHT ON RISER IN CONCEALED
FH FIRE HYDRANT SPACE
R FIRE HOSE REEL
PIPE TEES DOWN
DP SPRINKLER HEAD EXAMPLE
FS SPRINKLER SPRINKLER HEAD - DRY PENDANT ON DROPPER
CW COLD WATER (PLUMBING TRADE CONNECTION) LEVEL 2
PIPE RISES TA OR DROPS FA SPRINKLER HEAD - PENDANT ON DROPPER IN
FITTINGS CONCEALED SPACE - FLUSH TYPE CEILING SPACE
BFP BACKFLOW PREVENTION E
PIPE RISES FB OR DROPS TB SPRINKLER HEAD - EXTENDED RANGE PENDANT ON
FHR FIRE HOSE REEL
DROPPER
FSI FIRE SERVICES INLET XXX
GT GULLY TRAP VALVE (XX - SEE VALVE ABBREVIATIONS) HIGH VELOCITY SPRAYER
HYD HYDRANT INLET (PLAN ON LEFT, ELEVATION ON RIGHT)
TD TUNDISH ISOLATING VALVE (NORMALLY OPEN) MEDIUM VELOCITY SPRAYER
LEVEL 1
(PLAN ON LEFT, ELEVATION ON RIGHT) UNDERSTAIR
GENERAL VALVE
IR ISOLATING REGULATING VALVE ISOLATING VALVE (NORMALLY CLOSED)
MULTIPLE JET CONTROL HEAD
LC LOCKED CLOSED ELEVATION
LO LOCKED OPEN 3 WAY (3 PORT) VALVE SPRINKLER HEAD - SIDEWALL
LSV LOCK SHIELD VALVE
MON MONITORED ISOLATION VALVE NON-RETURN VALVE SPRINKLER HEAD - SIDEWALL (DIRECTION OF SPRAY
TV REGULATING VALVE (FULL ARROW IS DIRECTION OF FLOW) INDICATED)
SIV SUPERVISED ISOLATING VALVE ACTUATED VALVE, XXX = TYPE
SU
i.e. BMS = BUILDING MANAGEMENT SYSTEM SPRINKLER HEAD - ELEVATION
SWITCH / METER / SENSOR / CONNECTION XXX DP = DIFFERENTIAL PRESSURE PLAN VIEW
BMS BUILDING MANAGEMENT SYSTEM M = MOTORISED VALVE
FM FLOW METER PICV = PRESSURE INDEPENDENT CONTROL VALVE SPRINKLER HEAD WITH GUARD - ELEVATION
FR FLOW RESTRICTOR SV = SOLENOID VALVE FHR
FSW FLOW SWITCH FIRE HOSE REEL
PRESSURE VALVE
PS PRESSURE SENSOR XXX XXX = TYPE, NNNkPa = SET PRESSURE (OPTIONAL)
PSW PRESSURE SWITCH FHR
i.e. PRV = PRESSURE REDUCING VALVE FIRE HOSE REEL (CONCEALED)
TS TEMPERATURE SENSOR NNNkPa
(PRESSURE REGULATING VALVE)
PLV = PRESSURE LIMITING VALVE FIRE HYDRANT
DEVICES / CONNECTIONS FH
ASE ALARM SIGNALING EQUIPMENT RELIEF VALVE
BMS BUILDING MANAGEMENT SYSTEM XXX XXX = TYPE FIRE EXTINGUISHER
DBA DIRECT BRIGADE ALARM i.e. PR = PRESSURE RELIEF VALVE XXX = TYPE
FBA FIRE BRIGADE ALARM XXX i.e. DP = TRI-CLASS DRY POWDER
FCP FIRE CONTROL PANEL CO2 = CARBON DIOXIDE
FSW FLOW SWITCH CABLE CONNECTION BACKFLOW PREVENTION UNIT, XXX = TYPE
W = WATER
HO HOLD OPEN DEVICE i.e. RPZ = REDUCED PRESSURE ZONE
F = FOAM
I/O INPUT OUTPUT RESPONDER XXX (TESTABLE - HIGH RISK)
CH = WET CHEMICAL
MCP MANUAL CALL POINT DCV = DOUBLE CHECK VALVE
SIV SUPERVISED VALVE CABLE CONNECTION (TESTABLE - MEDIUM RISK) FIRE SERVICE INLET CONNECTION (ONE WAY)
ZIP ZONE INDICATION PANEL FSI
DOUBLE CHECK VALVE FIRE SERVICE INLET CONNECTION (TWO WAY)
(FULL ARROWS ARE DIRECTION OF FLOW) FSI
(NON TESTABLE - LOW RISK)
HYDRANT INLET CONNECTION
HYD
ALARM VALVE
HYDRANT COUPLING

STRAINER 1 ISSUE FOR SHOP DRAWING NDR RDC AGP 17.12.24


HOSE COUPLING
No. Revision By Chk Appd Date
PLUGGED TEE CONNECTION
D FIRE SEPARATION HAVING A FRR OF NOT LESS THAN
(PLAN ON LEFT, ELEVATION ON RIGHT) Original Design NA14 12.09.24 Approved for
45/45/45 (SHOWN FOR SPRINKLER ZONING - REFER Scale (A1) Shop Drawing
FIRE ENGINEERING DRAWINGS FOR ACTUAL DETAILS N.T.S Drawn NDR 17.12.24
TO DRAIN
OF FIRE SEPARATION) Dsg Verifier RDC 17.12.24
SWITCH / METER / SENSOR / CONNECTION Reduced
XXX Scale (A3) Drg Check Date
XXX = TYPE - REFER SWITCH / METER / SENSOR /
CONNECTION ABBREVIATIONS
FIRE ALARM * Refer to Revision 1 for Original Signatures
P
S SMOKE DETECTOR/CIRCUIT
PRESSURE GAUGE (WITH VALVE AND SNUBBER)
H HEAT DETECTOR/CIRCUIT
T
TEMPERATURE GAUGE VISUAL ALERTING DEVICE (STROBE)
MCP
M WATER METER MANUAL CALL POINT
MEP CONTRACTORS
ANCHOR SINGLE PIPE ALARM SOUNDER

ANCHOR MULTIPLE PIPE ALARM SPEAKER - CEILING MOUNTED

STRUCTURAL PENETRATION ALARM SPEAKER - WALL MOUNTED (BOX SPEAKER) PT. EPCON GRAHA GUNA Jalan Arjuna No. 35 jakarta 11480 - Indonesia
Phone : 62-61-5322448 (H), 5321723, 5322101, 5322586
Fax : 62-21-5356986 http://www.epcon.co.id

FLEXIBLE PIPE / CONNECTOR ALARM SPEAKER - CEILING MOUNTED DIRECTIONAL Client


APPLE Inc.
EXPANSION JOINT (BELLOWS TYPE) ALARM BELL

ORIFICE PLATE FIRE PANEL


XXX XXX = PANEL REFERENCE
i.e. FAP = FIRE ALARM PANEL
UNION
FIP = FIRE INDICATOR PANEL
Project
CAPPED PIPE PUMP CONTROL STARTER PANEL
APPLE ACADEMY BALI FITOUT
PUMP FIREMAN'S INTERCOM JACK POINT
BALI INDONESIA
DEVICE OR CONNECTION SPRINKLER GONG
XXX XXX = TYPE - REFER DEVICE / CONNECTION Title
ABBREVIATIONS
TD TD
TUNDISH
LEGEND
(PLAN ON LEFT, ELEVATION ON RIGHT)

HAND OPERATED ISOLATION VALVE


Discipline

FIRE PROTECTION
SHOP DRAWING Drawing No.
5866961-BF-0001
Rev.

1
P/EGG-ENG/02 LEGEND:
REV.00 OUT OF SCOPE

5 6 7 8 9 10

J 8P MEETING
211 SF
6P MEETING
175 SF
8P MEETING
211 SF PURA
ADMIN OFFICE
305 SF

FFL -0.050
PHONE ROOM PHONE ROOM PHONE ROOM
78 SF 78 SF 78 SF

VACANT
215.6 M2
16P CONFERENCE
540 SF
LEARNING PODS &
COLLABORATION SPACE
2045 SF

I
6P MEETING
185 SF

H FLEXIBLE SPACE
220 SEATS (LECTURE STYLE)

1 56 SEATS (WITH TABLE)


2475 SF

BF-1001
SHEET 1 CAVE STYLE LAB
30 SEATS

KORRIDOR
1480 SF

FFL±0.000

M
G

UP

KORRIDOR
FFL±0.000
BREAK SPACE
1313 SF
STORE
183 SF

F 3

1600

ENTRANCE
FFL±0.000

FFL-2.050

DROP OFF
FFL-2.200
DN LOBBY
1076 SF

PARKIR MOTOR
DN
E
IT HELP DESK
206 SF
1 ISSUE FOR SHOP DRAWING NDR RDC AGP 17.12.24
DN
No. Revision By Chk Appd Date
STORE
415 SF Original Design NA14 12.09.24 Approved for
Scale (A1) Shop Drawing
1:150 Drawn NDR 17.12.24
Dsg Verifier RDC 17.12.24
NETWORK ROOM Reduced
265 SF Scale (A3) Drg Check Date
1:300 * Refer to Revision 1 for Original Signatures
D
KORRIDOR
FFL±0.000

WESTSIDE

JANITOR
FFL ±0.000
#L1 - 08A
40.70 M2

BREAK SPACE
352 SF
LAB 1 - 21 X 6 = 126 SEATS
5155 SF
1
BF-1002
SHEET 2
VACANT
FFL -0.050

MEP CONTRACTORS
40.70 M2
#L1 - 08

C
KORIDOR MALL

Jalan Arjuna No. 35 jakarta 11480 - Indonesia


PT. EPCON GRAHA GUNA Phone : 62-61-5322448 (H), 5321723, 5322101, 5322586
Fax : 62-21-5356986 http://www.epcon.co.id

Client
APPLE Inc.

FACILITY 6P MEETING
STORE 174 SF
111 SF

B Project

LEARNING PODS &


APPLE ACADEMY BALI FITOUT
COLLABORATION SPACE
2055 SF

BALI INDONESIA
Title

DEMOLITION FIRE PROTECTION


ENTRANCE
FFL-0.100

LAYOUT LEVEL 1 OVERALL


A Discipline
FFL-0.050

FFL-0.050

FIRE PROTECTION
DN
SHOP DRAWING Drawing No.
5866961-BF-1000
Rev.

1
P/EGG-ENG/02 NOTES:
REV.00 1. PRIOR DO THE WORK, CONTRACTOR TO CHECK AND VERIFY
AS-BUILT INSTALLATION. ANY DEVIATIONS, CONTRACTOR TO
INFORM PROJECT MANAGEMENT AND CONSULTANT.

2. CONTRACTOR TO GET APPROVAL FROM LANDLORD PRIOR


DEMOLITION WORK.

3. CONTRACTOR TO DEMOLISH PIPES AND SPRINKLER HEAD AS


INDICATED.

4. CONTRACTOR TO REINSTALL SPRINKLER AT NEW HEAD


LOCATION AS INDICATED ON DWG BF-2001.
5 6 7 8 9 10
5. DEMOLISH EXISTING PIPE ABOVE SERVER ROOM.

LEGEND:

OUT OF SCOPE

DEMOLITION

J
8P MEETING
211 SF
6P MEETING
175 SF
8P MEETING
211 SF PURA
ADMIN OFFICE
305 SF
FFL -0.050

PHONE ROOM PHONE ROOM PHONE ROOM


78 SF 78 SF 78 SF
VACANT
215.6 M2

16P CONFERENCE
540 SF
LEARNING PODS &
COLLABORATION SPACE
2045 SF

6P MEETING
185 SF

H FLEXIBLE SPACE
220 SEATS (LECTURE STYLE)
56 SEATS (WITH TABLE)
2475 SF

CAVE STYLE LAB


30 SEATS
KORRIDOR

1480 SF
FFL±0.000

1 ISSUE FOR SHOP DRAWING NDR RDC AGP 17.12.24


No. Revision By Chk Appd Date

M Original Design NA14 12.09.24 Approved for


G Scale (A1)
1:100 Drawn NDR 17.12.24
Shop Drawing

Dsg Verifier RDC 17.12.24


Reduced
Scale (A3) Drg Check Date
1:200 * Refer to Revision 1 for Original Signatures

UP
KORRIDOR
FFL±0.000

BREAK SPACE
1313 SF
MEP CONTRACTORS
STORE
183 SF

ABE 2.7kg

F 3
PT. EPCON GRAHA GUNA Jalan Arjuna No. 35 jakarta 11480 - Indonesia
Phone : 62-61-5322448 (H), 5321723, 5322101, 5322586
Fax : 62-21-5356986 http://www.epcon.co.id

Client
APPLE Inc.
FOR CONTINUATION REFER DRAWING: BF-1002

Project

APPLE ACADEMY BALI FITOUT


BALI INDONESIA
Title

DEMOLITION FIRE PROTECTION


LAYOUT LEVEL 1 - SHEET 1
Discipline

FIRE PROTECTION
SHOP DRAWING Drawing No.
5866961-BF-1001
Rev.

1
P/EGG-ENG/02 NOTES:
REV.00 1. PRIOR DO THE WORK, CONTRACTOR TO CHECK AND VERIFY
AS-BUILT INSTALLATION. ANY DEVIATIONS, CONTRACTOR TO
INFORM PROJECT MANAGEMENT AND CONSULTANT.

2. CONTRACTOR TO GET APPROVAL FROM LANDLORD PRIOR


DEMOLITION WORK.

3. CONTRACTOR TO DEMOLISH PIPES AND SPRINKLER HEAD AS


INDICATED.

4. CONTRACTOR TO REINSTALL SPRINKLER AT NEW HEAD


5 6 7 8 9 10 LOCATION AS INDICATED ON DWG BF-2001.

5. DEMOLISH EXISTING PIPE ABOVE SERVER ROOM.

FOR CONTINUATION REFER DRAWING: BF-1001


LEGEND:

1600 OUT OF SCOPE

ENTRANCE
DEMOLITION

FFL±0.000

FFL-2.050

DROP OFF
FFL-2.200
DN LOBBY
1076 SF

PARKIR MOTOR
DN
E

IT HELP DESK
206 SF

DN
STORE
415 SF

NETWORK ROOM
265 SF

D
KORRIDOR
FFL±0.000

WESTSIDE

JANITOR
FFL ±0.000
#L1 - 08A
40.70 M2

BREAK SPACE
352 SF
LAB 1 - 21 X 6 = 126 SEATS
5155 SF
VACANT
FFL -0.050
40.70 M2
#L1 - 08

C
FH
KORIDOR MALL

ABE 2.7kg

1 ISSUE FOR SHOP DRAWING NDR RDC AGP 17.12.24


No. Revision By Chk Appd Date

Original Design NA14 12.09.24 Approved for


Scale (A1) Shop Drawing
1:100 Drawn NDR 17.12.24
Dsg Verifier RDC 17.12.24
FACILITY 6P MEETING Reduced
Scale (A3) Drg Check Date
STORE 174 SF
111 SF 1:200 * Refer to Revision 1 for Original Signatures

LEARNING PODS &


COLLABORATION SPACE MEP CONTRACTORS
2055 SF

Jalan Arjuna No. 35 jakarta 11480 - Indonesia


PT. EPCON GRAHA GUNA Phone : 62-61-5322448 (H), 5321723, 5322101, 5322586
Fax : 62-21-5356986 http://www.epcon.co.id
ENTRANCE

Client
FFL-0.100

APPLE Inc.

A
FFL-0.050

FFL-0.050

Project

DN APPLE ACADEMY BALI FITOUT


BALI INDONESIA
Title

DEMOLITION FIRE PROTECTION


LAYOUT LEVEL 1 - SHEET 2
Discipline

FIRE PROTECTION
SHOP DRAWING Drawing No.
5866961-BF-1002
Rev.

1
P/EGG-ENG/02 LEGEND:
REV.00 OUT OF SCOPE

5 6 7 8 9 10

J 8P MEETING
211 SF
6P MEETING
175 SF
8P MEETING
211 SF PURA
ADMIN OFFICE
305 SF

FFL -0.050
PHONE ROOM PHONE ROOM PHONE ROOM
78 SF 78 SF 78 SF

VACANT
215.6 M2
16P CONFERENCE
540 SF
LEARNING PODS &
H H COLLABORATION SPACEH H H H
2045 SF

I
6P MEETING
185 SF

S
S

H H

H FLEXIBLE SPACE
220 SEATS (LECTURE STYLE)
56 SEATS (WITH TABLE)
2475 SF

1 H H SHEET 1 CAVE STYLE LAB


30 SEATS

KORRIDOR
1480 SF

FFL±0.000
BF-1011

S H H

G
S

UP
H

KORRIDOR
FFL±0.000
H

S BREAK SPACE
1313 SF
STORE
183 SF

F S
3

1600

ENTRANCE
FFL±0.000

FFL-2.050

DROP OFF
S S

FFL-2.200
DN LOBBY
1076 SF

PARKIR MOTOR
DN
E
IT HELP DESK
206 SF

DN 1 ISSUE FOR SHOP DRAWING NDR RDC AGP 17.12.24


H No. Revision By Chk Appd Date
H
STORE
415 SF S Original Design NA14 12.09.24 Approved for
Scale (A1) Shop Drawing
H Drawn NDR 17.12.24
1:150
Dsg Verifier RDC 17.12.24
NETWORK ROOM Reduced
265 SF
Scale (A3) Drg Check Date
1:300 * Refer to Revision 1 for Original Signatures
D
KORRIDOR
FFL±0.000

WESTSIDE

JANITOR
FFL ±0.000
#L1 - 08A
40.70 M2

BREAK SPACE
H 352 SF H LAB 1 - 21 X 6 = 126 SEATS
S 5155 SF
H H
1
BF-1012
SHEET 2
VACANT
FFL -0.050

S
MEP CONTRACTORS
40.70 M2
#L1 - 08

C
KORIDOR MALL

Jalan Arjuna No. 35 jakarta 11480 - Indonesia


PT. EPCON GRAHA GUNA Phone : 62-61-5322448 (H), 5321723, 5322101, 5322586
S S Fax : 62-21-5356986 http://www.epcon.co.id

Client
APPLE Inc.
H H
FACILITY 6P MEETING
STORE 174 SF
111 SF
H H H

B Project

LEARNING PODS &


COLLABORATION SPACE
APPLE ACADEMY BALI FITOUT
2055 SF

BALI INDONESIA
H H H H H
Title

DEMOLITION FIRE ALARM


ENTRANCE
FFL-0.100

LAYOUT LEVEL 1 OVERALL


A Discipline
FFL-0.050

FFL-0.050

FIRE PROTECTION
DN
SHOP DRAWING Drawing No.
5866961-BF-1010
Rev.

1
NOTES:
P/EGG-ENG/02
1. PRIOR DO THE WORK, CONTRACTOR TO CHECK AND VERIFY
REV.00 AS-BUILT INSTALLATION. ANY DEVIATIONS, CONTRACTOR TO
INFORM PROJECT MANAGEMENT AND CONSULTANT.

2. CONTRACTOR TO GET APPROVAL FROM LANDLORD PRIOR


DEMOLITION WORK.

3. CONTRACTOR TO DEMOLISH DETECTORS AS INDICATED.

4. CONTRACTOR TO REINSTALL DETECTORS TO THE NEW


LOCATION AS INDICATED ON FIRE ALARM PROPOSED
DRAWING.
5 6 7 8 9 10 5. CONTRACTOR TO KEEP SAFELY THE CABLING TO BE
RECONNECTED WITHIN THE NEW WORKS SPACE.

LEGEND:

OUT OF SCOPE

DEMOLITION

J
8P MEETING
211 SF
6P MEETING
175 SF
8P MEETING
211 SF PURA
ADMIN OFFICE
305 SF
FFL -0.050

PHONE ROOM PHONE ROOM PHONE ROOM


78 SF 78 SF 78 SF
VACANT
215.6 M2

16P CONFERENCE
540 SF
LEARNING PODS &
H H COLLABORATIONHSPACE H H H
2045 SF

6P MEETING
185 SF

S
S

H H

H FLEXIBLE SPACE
220 SEATS (LECTURE STYLE)
56 SEATS (WITH TABLE)
2475 SF

CAVE STYLE LAB


30 SEATS
KORRIDOR

H H 1480 SF
FFL±0.000

S H H
1 ISSUE FOR SHOP DRAWING NDR RDC AGP 17.12.24
No. Revision By Chk Appd Date

Original Design NA14 12.09.24 Approved for


G Scale (A1)
1:100 Drawn NDR 17.12.24
Shop Drawing

Dsg Verifier RDC 17.12.24


S Reduced
Scale (A3) Drg Check Date
1:200 * Refer to Revision 1 for Original Signatures

UP
H
KORRIDOR
FFL±0.000

BREAK SPACE
1313 SF
MEP CONTRACTORS
STORE
183 SF

F 3
PT. EPCON GRAHA GUNA Jalan Arjuna No. 35 jakarta 11480 - Indonesia
Phone : 62-61-5322448 (H), 5321723, 5322101, 5322586
Fax : 62-21-5356986 http://www.epcon.co.id

Client
APPLE Inc.
FOR CONTINUATION REFER DRAWING: BF-1012

Project

APPLE ACADEMY BALI FITOUT


BALI INDONESIA
Title

DEMOLITION FIRE ALARM


LAYOUT LEVEL 1 - SHEET 1
Discipline

FIRE PROTECTION
SHOP DRAWING Drawing No.
5866961-BF-1011
Rev.

1
NOTES:
P/EGG-ENG/02
1. PRIOR DO THE WORK, CONTRACTOR TO CHECK AND VERIFY
REV.00 AS-BUILT INSTALLATION. ANY DEVIATIONS, CONTRACTOR TO
INFORM PROJECT MANAGEMENT AND CONSULTANT.

2. CONTRACTOR TO GET APPROVAL FROM LANDLORD PRIOR


DEMOLITION WORK.

3. CONTRACTOR TO DEMOLISH DETECTORS AS INDICATED.

4. CONTRACTOR TO REINSTALL DETECTORS TO THE NEW


LOCATION AS INDICATED ON FIRE ALARM PROPOSED
DRAWING.

5 6 7 8 9 10 5. CONTRACTOR TO KEEP SAFELY THE CABLING TO BE


RECONNECTED WITHIN THE NEW WORKS SPACE.

FOR CONTINUATION REFER DRAWING: BF-1011 LEGEND:

OUT OF SCOPE

1600
DEMOLITION
S

ENTRANCE
FFL±0.000

FFL-2.050

DROP OFF
FFL-2.200
S S
DN LOBBY
1076 SF

PARKIR MOTOR
DN
E

IT HELP DESK
206 SF

DN
H
H
STORE
415 SF S

NETWORK ROOM
265 SF

D
KORRIDOR
FFL±0.000

WESTSIDE

JANITOR
FFL ±0.000
#L1 - 08A
40.70 M2

BREAK SPACE
352 SF H
LAB 1 - 21 X 6 = 126 SEATS
S 5155 SF H H
VACANT
FFL -0.050
40.70 M2
#L1 - 08

C
KORIDOR MALL

1 ISSUE FOR SHOP DRAWING NDR RDC AGP 17.12.24


No. Revision By Chk Appd Date

Original Design NA14 12.09.24 Approved for


Scale (A1) Shop Drawing
1:100 Drawn NDR 17.12.24
H H Dsg Verifier RDC 17.12.24
Reduced
Scale (A3) Drg Check Date
FACILITY 6P MEETING 1:200 * Refer to Revision 1 for Original Signatures
STORE 174 SF
111 SF
H H H

LEARNING PODS & MEP CONTRACTORS


COLLABORATION SPACE
2055 SF

Jalan Arjuna No. 35 jakarta 11480 - Indonesia


PT. EPCON GRAHA GUNA
H H H H H Phone : 62-61-5322448 (H), 5321723, 5322101, 5322586
Fax : 62-21-5356986 http://www.epcon.co.id

Client
ENTRANCE

APPLE Inc.
FFL-0.100

A
FFL-0.050

FFL-0.050

Project

APPLE ACADEMY BALI FITOUT


DN
BALI INDONESIA
Title

DEMOLITION FIRE ALARM


LAYOUT LEVEL 1 - SHEET 2
Discipline

FIRE PROTECTION
SHOP DRAWING Drawing No.
5866961-BF-1012
Rev.

1
P/EGG-ENG/02 LEGEND:
5 6 7 8 9 10 REV.00 OUT OF SCOPE

J 8P MEETING
211 SF
6P MEETING
175 SF
8P MEETING
211 SF PURA
ADMIN OFFICE
305 SF

FFL -0.050
PHONE ROOM PHONE ROOM PHONE ROOM
78 SF 78 SF 78 SF

VACANT
215.6 M2
16P CONFERENCE
540 SF
LEARNING PODS &
COLLABORATION SPACE
2045 SF

I
6P MEETING
185 SF

H FLEXIBLE SPACE
220 SEATS (LECTURE STYLE)
56 SEATS (WITH TABLE)
2475 SF

1 CAVE STYLE LAB


30 SEATS
BF-2001

KORRIDOR
1480 SF

G FFL±0.000

UP

KORRIDOR
FFL±0.000
BREAK SPACE
1313 SF
STORE
183 SF

F 3

1600

ENTRANCE
FFL±0.000

FFL-2.050

DROP OFF
FFL-2.200
DN LOBBY
1076 SF

PARKIR MOTOR
DN
E
IT HELP DESK
206 SF

DN
STORE
415 SF 1 ISSUE FOR SHOP DRAWING NDR RDC AGP 17.12.24
No. Revision By Chk Appd Date

NETWORK ROOM Original Design NA14 12.09.24 Approved for


265 SF Scale (A1) Shop Drawing
1:150 Drawn NDR 17.12.24

D Dsg Verifier RDC 17.12.24


KORRIDOR

Reduced
FFL±0.000

WESTSIDE

JANITOR
Scale (A3) Drg Check Date
FFL ±0.000

1:300 * Refer to Revision 1 for Original Signatures


#L1 - 08A
40.70 M2

BREAK SPACE
352 SF
LAB 1 - 21 X 6 = 126 SEATS
5155 SF
1
BF-2002
VACANT
FFL -0.050
40.70 M2
#L1 - 08

C MEP CONTRACTORS
KORIDOR MALL

Jalan Arjuna No. 35 jakarta 11480 - Indonesia


PT. EPCON GRAHA GUNA Phone : 62-61-5322448 (H), 5321723, 5322101, 5322586
Fax : 62-21-5356986 http://www.epcon.co.id

Client
FACILITY
STORE
111 SF
6P MEETING
174 SF APPLE Inc.

B
LEARNING PODS &
COLLABORATION SPACE
2055 SF Project

APPLE ACADEMY BALI FITOUT


BALI INDONESIA
ENTRANCE
FFL-0.100

Title

PROPOSED FIRE PROTECTION


A LAYOUT LEVEL 1 OVERALL
FFL-0.050

FFL-0.050

DN
Discipline

FIRE PROTECTION
SHOP DRAWING Drawing No.
5866961-BF-2000
Rev.

1
NOTES:
P/EGG-ENG/02
1. CONTRACTOR TO INSTALL NEW PIPE BASED ON THIS DRAWING.
REV.00 THE NEW PIPE MATERIAL SHOULD FOLLOW WITH EXISTING
PIPE.

2. CONTRACTOR TO RE INSTALL EXISTING SPRINKLER HEAD


FROM LOCATION ON DWG BF-1001 TO NEW LOCATION AS
SHOWN IN THIS DRAWING.

3. MECHANICAL COUPLING IS ALLOWED FOR PIPE AND FITTING


CONNECTION. FOR WELDING JOIN, CONTRACTOR TO
COORDINATE AND GET APPROVAL FROM LANDLORD PRIOR TO
DO THE WELDING.

4. ALL NEW DROPPER PIPES ARE Ø25mm UNLESS STATED


OTHERWISE.

5. HEAD SPRINKLER IN DROP CEILING AREA WILL BE DROPPED


5 6 7 8 9 10 FOLLOW THE CEILING.

6. HEAD SPRINKLER IS BELOW GRATING CEILING.

7. PROVIDE FIRE EXTINGUISHER WITH ELEVATION MAX.1,5 m


FROM TOP FIRE EXTINGUISHER TO FINISH FLOOR.

8. SPRINKLER ON CEILING IS PENDANT TYPE FOLLOW EXISTING.

9. CONTRACTOR TO INSTALL FIRE STOPPING AS SPECIFIED ON


SPECIFICATION

10. REPLACE EXISTING SPRINKLER WITH NEW CONCEALED


SPRINKLER HEAD TYPE AND RELOCATION, NOT NEED
J Sprinkle NOTE
8P MEETING
N
11 6P MEETING
175 SF
8P MEETING
211 SF PURA ADDITIONAL SPRINKLER.

Ø25
concealed Sprinkle NOTE 3 11. PROVIDE NEW SPRINKLER HEAD CONCEALED SPRINKLER TYPE.

Ø25
211 SF Sprinkle
Ø25 Ø25UprightØ25 Ø25 Ø25 (TYPICAL) NOTE 11 Upright NOTE 11 N
N Sprinkle
Sprinkle
N N Sprinkle Sprinkle N N N Sprinkle Sprinkle ADMIN OFFICE Sprinkle N
Sprinkle
12. DISTANCE TOP OF UPRIGHT SPRINKLER HEAD TO BOTTOM
R N Upright
Sprinkle concealed NOTE 11 concealed Upright
Upright Sprinkle concealed concealed N Ø25 Upright concealed
N N 305 SF SLAB IS BETWEEN 25mm TO 300mm.
concealed NOTE 11 NOTE 11 NOTE 12 Ø25 Sprinkle N
NOTE 11 Sprinkle Ø25 Sprinkle
N Ø25 NOTE 11
concealed Ø25

Ø32
Upright
FFL -0.050

Upright
PHONE ROOM PHONE ROOM PHONE ROOM
13. CONTRACTOR TO AVOID CLASH FOR ALL PIPE AND SPRINKLER
Ø2578 SF 78 SF 78 SF WITH OTHER SERVICES.
VACANT
215.6 M2

Ø25
Ø40 16P CONFERENCE
NOTE 11 Ø65 Ø65 Ø50 540 SF
Sprinkle N LEARNING PODS & Ø25 N Sprinkle Sprinkle
concealed Sprinkle Sprinkle Sprinkle Sprinkle N LEGEND:
COLLABORATION SPACE Sprinkle Sprinkle
NOTE 11 Pendant Pendant Pendant Pendant R NOTE 11 Upright Upright
Sprinkle Sprinkle R R2045 SF Pendant
R R R Pendant
Sprinkle
NOTE 11
concealed
N N Upright concealed
N Ø25 Sprinkle N
concealed OUT OF SCOPE
Ø40

Ø40
I
Sprinkle Sprinkle Sprinkle Sprinkle
Sprinkle N Pendant R Pendant R Pendant R Pendant
N
Upright R Sprinkle Sprinkle
N
Ø25

Upright Upright
Ø25 Ø25
6P MEETING Ø25
Sprinkle
N Sprinkle N
185 SF
concealed
NOTE 11 N concealed Ø25
Sprinkle Sprinkle
concealed concealed
R Sprinkle NOTE 11 NOTE 11 N
Sprinkle R Pendant
Pendant Sprinkle N
Pendant
Ø25

R R
Sprinkle Sprinkle

Ø50
Pendant Pendant
Ø25

H FLEXIBLE SPACE R
220 SEATS (LECTURE STYLE)
Ø25 Sprinkle
56 SEATS (WITH TABLE) Pendant
2475 SF
Ø25 R R
Sprinkle Sprinkle
Sprinkle
Pendant CAVE STYLE LAB
R Pendant Pendant
Ø25 30 SEATS
KORRIDOR

1480 SF
FFL±0.000

Ø25

Ø40
Ø50

R
Sprinkle 1 ISSUE FOR SHOP DRAWING NDR RDC AGP 17.12.24
Pendant
No. Revision By Chk Appd Date

Ø25 R Original Design NA14 12.09.24 Approved for


Sprinkle Sprinkle R Scale (A1) Shop Drawing
Sprinkle Drawn
PendantR Pendant 1:100 NDR 17.12.24
Pendant Ø25
Dsg Verifier RDC 17.12.24
Ø50 Ø50 Reduced
Ø100 Ø100 Drg Check Date
Scale (A3)
Ø65 Ø50
G 1:200 * Refer to Revision 1 for Original Signatures
Ø25

Ø50
Sprinkle Sprinkle
Pendant N Pendant
R R
Sprinkle
Pendant Sprinkle R Sprinkle R
R Ø25 Pendant Pendant
Sprinkle Ø25 Ø25 Sprinkle
R
Ø25

Pendant
UP Pendant
KORRIDOR

N
FFL±0.000

Sprinkle
Pendant MEP CONTRACTORS
R
Sprinkle Sprinkle
Pendant Pendant R
BREAK SPACE
R 1313 SF R
Sprinkle STORE Sprinkle
Pendant
Ø25
183 SF Pendant
Sprinkle
R ABE 4,5 kg PT. EPCON GRAHA GUNA Jalan Arjuna No. 35 jakarta 11480 - Indonesia
Phone : 62-61-5322448 (H), 5321723, 5322101, 5322586
Pendant (TYPICAL) N Fax : 62-21-5356986 http://www.epcon.co.id
Ø25 N Ø25
Sprinkle Sprinkle
Pendant Client
Pendant
F 3 APPLE Inc.
FH

FOR CONTINUATION REFER DRAWING: BF-2002


Project

APPLE ACADEMY BALI FITOUT


BALI INDONESIA
Title

PROPOSED FIRE PROTECTION


LAYOUT LEVEL 1 - SHEET 1
Discipline

FIRE PROTECTION
SHOP DRAWING Drawing No.
5866961-BF-2001
Rev.

1
P/EGG-ENG/02 NOTES:

REV.00 1. CONTRACTOR TO INSTALL NEW PIPE BASED ON THIS DRAWING.


THE NEW PIPE MATERIAL SHOULD FOLLOW WITH EXISTING
PIPE.

2. CONTRACTOR TO RE INSTALL EXISTING SPRINKLER HEAD


FROM LOCATION ON DWG BF-1002 TO NEW LOCATION AS
SHOWN IN THIS DRAWING.

3. MECHANICAL COUPLING IS ALLOWED FOR PIPE AND FITTING


5 6 7 8 9 10 CONNECTION. FOR WELDING JOIN, CONTRACTOR TO
COORDINATE AND GET APPROVAL FROM LANDLORD PRIOR TO
DO THE WELDING.
FOR CONTINUATION REFER DRAWING: BF-2001 4. ALL NEW DROPPER PIPES ARE Ø25mm UNLESS STATED
FH OTHERWISE.

5. HEAD SPRINKLER IN DROP CEILING AREA WILL BE DROPPED


Sprinkle Sprinkle FOLLOW THE CEILING.
N
Ø25 Upright N
Ø25 Upright N
Ø32 Ø25
N 1600
Sprinkle Sprinkle
Upright Sprinkle
Ø25 Ø25 Upright 6. HEAD SPRINKLER IS BELOW GRATING/BUFFLE CEILING.
R

ENTRANCE
Pendant
R

Ø25
NOTE 12

FFL±0.000
Sprinkle
N 7. PROVIDE FIRE EXTINGUISHER WITH ELEVATION MAX.1,5 m

FFL-2.050
Pendant

DROP OFF
Sprinkle Sprinkle

FFL-2.200
DN NOTE 12
Concealed
LOBBY
N Concealed FROM TOP FIRE EXTINGUISHER TO FINISH FLOOR.

1076 SF 8. SPRINKLER ON CEILING IS PENDANT TYPE FOLLOW EXISITING.

PARKIR MOTOR
DN
Sprinkle
9. ENSURE FIRE STOPPED INSTALLED WITHIN FIRE
Sprinkle
Upright Upright COMPARTMENTS FOR ANY SERVICES PENETRATION.
N Ø25 N Ø25 Ø32 Ø25 N N
Sprinkle Sprinkle
Upright Ø25 Ø25 Ø32 Upright 10. CONTRACTOR TO INSTALL SPRINKLER HEAD C/W WITH CAGE
N N N
N Ø25 Ø25 AT SERVER ROOM AS PER APPLE GUIDELINE
E NOTE 3
11. CONTRACTOR TO PROVIDE WATER TRAY ALONG THE
Sprinkle Sprinkle (TYPICAL)
Pendant Sprinkle SPRINKLER PIPE ABOVE THE SERVER ROOM COMPLETE WITH
N NPendant Pendant Sprinkle R
Sprinkle R N Pendant LEAK DETECTION WITH ALARM AND DRAIN PAN.
Sprinkle
Upright Upright
IT HELP DESK
206 SF
Ø25 R Ø25 12. REPLACE EXISTING SPRINKLER WITH NEW CONCEALED
Sprinkle R
Pendant SPRINKLER HEAD TYPE AND RELOCATION, NOT NEED
Ø25 DN ADDITIONAL SPRINKLER.

13. DISTANCE TOP OF UPRIGHT SPRINKLER HEAD TO BOTTOM


STORE SLAB IS BETWEEN 25mm TO 300mm.
415 SF

Ø25
Sprinkle
Pendant 14. CONTRACTOR TO AVOID CLASH FOR ALL PIPE AND SPRINKLER
NOTE 10,11 R WITH OTHER SERVICES .
R Sprinkle
Sprinkle Pendant

Ø25
Upright Ø25
NETWORK ROOM N
265 SF LEGEND:

Ø25
R
CO2 5kg
Sprinkle
Pendant
D OUT OF SCOPE
KORRIDOR
FFL±0.000

WESTSIDE

JANITOR Sprinkle

Ø25
Sprinkle Sprinkle
FFL ±0.000

Pendant Pendant Pendant

N
#L1 - 08A
40.70 M2

Sprinkle
Pendant R
Sprinkle
Pendant

BREAK SPACE
352 SF R

Ø32
Sprinkle LAB 1 - 21 X 6 = 126 SEATS
Pendant 5155 SF
VACANT

Ø25
FFL -0.050

Sprinkle
Sprinkle R Sprinkle Sprinkle
Pendant
Pendant Pendant Pendant
40.70 M2
#L1 - 08

Sprinkle
Pendant

C N
Ø40
KORIDOR MALL

Ø25

Sprinkle
Pendant

1 ISSUE FOR SHOP DRAWING NDR RDC AGP 17.12.24


N
No. Revision By Chk Appd Date
Ø25 Ø25 Ø25
Ø25 Original Design NA14 12.09.24 Approved for
FACILITY Sprinkle N
6P MEETING Scale (A1) Shop Drawing
STORE Upright
174 SFN 1:100 Drawn NDR 17.12.24
Sprinkle
111 SF
Sprinkle N Concealed N Sprinkle Dsg Verifier RDC 17.12.24
Concealed Reduced
Pendant
NOTE 12 Scale (A3) Drg Check Date
NOTE 12
1:200 * Refer to Revision 1 for Original Signatures

Sprinkle
R Ø25 LEARNING PODS &
COLLABORATION SPACE
Pendant
2055 SF

MEP CONTRACTORS
ENTRANCE
FFL-0.100

Jalan Arjuna No. 35 jakarta 11480 - Indonesia


PT. EPCON GRAHA GUNA Phone : 62-61-5322448 (H), 5321723, 5322101, 5322586
Fax : 62-21-5356986 http://www.epcon.co.id

ABE 4,5 kg Client


(TYPICAL) APPLE Inc.
A
FFL-0.050

FFL-0.050

DN Project

APPLE ACADEMY BALI FITOUT


BALI INDONESIA
Title

PROPOSED FIRE PROTECTION


LAYOUT LEVEL 1 - SHEET 2
Discipline

FIRE PROTECTION
SHOP DRAWING Drawing No.
5866961-BF-2002
Rev.

1
P/EGG-ENG/02 LEGEND:
REV.00 OUT OF SCOPE

5 6 7 8 9 10

J TV 75"
8P MEETING
211 SF
6P MEETING
175 SF

S
8P MEETING
211 SF

S
open
shelf
PURA
TV
TV
75"
S
ADMIN OFFICE
65"
S S S 305 SF

FFL -0.050
PHONE ROOM PHONE ROOM PHONE ROOM
S 78 SF 78 SF 78 SF

VACANT
215.6 M2
TV 75" TV 75"
16P CONFERENCE
540 SF
LEARNING PODS &
COLLABORATION SPACE
2045 SF
TV 65"

I S
S S TV TV
65" 65" S
S
6P MEETING
185 SF

S
0.00 +0.15

TV 98" TV 98" TV 55" TV 55" TV 55"

H 1 FLEXIBLE SPACE
S
220 SEATS (LECTURE STYLE)
BF-2011 56 SEATS (WITH TABLE)
2475 SF

TV
S S
SHEET 1 S
CAVE STYLE LAB
30 SEATS S

KORRIDOR
98" 1480 SF

FFL±0.000
TV S
98"

TV 55" TV 55" TV 55"

G
S S

UP

blackout
KORRIDOR
FFL±0.000
TV 98"

S S
S
BREAK SPACE
1313 SF
STORE
183 SF
WATER
FILTER

t
ou
ck
F

bla
3
HYDRANT blackout

1600

0.00

ENTRANCE
FFL±0.000

FFL-2.050

DROP OFF
FFL-2.200
DN

0.00
+0.15
LOBBY
S 1076 SF
S

PARKIR MOTOR
DN
TV 55" blackout

E bla
ck
ou
S t
IT HELP DESK
206 SF
S
TV S S DN 1 ISSUE FOR SHOP DRAWING NDR RDC AGP 17.12.24
98"
No. Revision By Chk Appd Date
TV
STORE 98"
415 SF Original Design NA14 12.09.24 Approved for
S S Scale (A1) Shop Drawing
1:150 Drawn NDR 23.01.25
Dsg Verifier RDC 23.01.25
NETWORK ROOM Reduced

blackout
265 SF
Scale (A3) Drg Check Date
keypad lock
1:300 * Refer to Revision 1 for Original Signatures
D MCB & PANELS
KORRIDOR
FFL±0.000

WESTSIDE

JANITOR
FFL ±0.000

S TV 55"
#L1 - 08A
40.70 M2

BREAK SPACE
352 SF
LAB 1 - 21 X 6 = 126 SEATS
TV 5155 SF TV
98" 98"
1 S

SHEET 2 S
VACANT
FFL -0.050

BF-2012
MEP CONTRACTORS
40.70 M2
#L1 - 08

C
blackout
TV 55"
KORIDOR MALL

Jalan Arjuna No. 35 jakarta 11480 - Indonesia


PT. EPCON GRAHA GUNA Phone : 62-61-5322448 (H), 5321723, 5322101, 5322586
Fax : 62-21-5356986 http://www.epcon.co.id
TV
98"
0.00 +0.15 Client
0.00 APPLE Inc.
TV 65" TV 65"
S S
FACILITY
STORE S
6P MEETING S
174 SF
111 SF
S
blackout

+0.15

B Project
TV 55"

LEARNING PODS &


COLLABORATION SPACE
APPLE ACADEMY BALI FITOUT
2055 SF

BALI INDONESIA
fle h w 20
wit H

TV
x he
ta e

98"
ble ls

S
7

TV
98" S S Title
TV TV
65" 65"
PROPOSED FIRE ALARM LAYOUT
ENTRANCE
FFL-0.100

S
bla

LEVEL 1 OVERALL
ck
ou
t

TV 98" TV 98"

A blackout blackout blackout blackout blackout blackout

Discipline
FFL-0.050

FFL-0.050

FIRE PROTECTION
DN
SHOP DRAWING Drawing No.
5866961-BF-2010
Rev.

1
P/EGG-ENG/02 NOTES:
REV.00 1. CONTRACTOR TO INSTALL NEW DETECTORS AND RE-INSTALL
THE EXISTING DETECTORS AS SHOWN IN THIS DRAWING.

2. FIRE ALARM SYSTEM IS SEMI-ADDRESSABLE WHICH FIRE


ALARM ZONE IS AS SHOWN IN THIS DRAWING.

3. THE BRAND OF NEW DETECTORS AND ITS INSTALLATION


SHOULD FOLLOW THE EXISTING INSTALLATION.

4. ALL CABLES SHALL BE NYA 2x1.5mm² FOR DETECTOR AND


AWG18 STP FOR FLOW SWITCH .THE CABLE INSTALLED IN
CONDUIT 20mm.

5. DETECTOR TO BE CONNECTED TO EXISITNG MCFA.


5 6 7 8 9 10
6. CONTRACTOR TO COORDINATE WITH THE LANDLORD AND
EXISTING VENDOR FOR RE-PROGRAMMING AFTER INSTALLED
NEW ADDITIONAL DETECTORS.

7. THE CONTRACTOR SHOULD CHECK AND ENSURE THAT


EXISITING SMOKE DETECTORS, WHICH ARE TO BE
REINSTALLED OR RELOCATION STILL GOOD CONDITION AND
FUNCTION PROPERLY.

LEGEND:

J
8P MEETING
211 SF
6P MEETING
175 SF

S
N
8P MEETING
211 SF

S
N
N N
PURA OUT OF SCOPE
OUT OF SCOPE

11 10 N N S
ADMIN OFFICE
S S S 305 SF
6
N 9 8 7
FFL -0.050
PHONE ROOM PHONE ROOM PHONE ROOM
S 12 78 SF 78 SF 78 SF
VACANT
215.6 M2

16P CONFERENCE
540 SF
LEARNING PODS &
COLLABORATION SPACE
2045 SF
FIRE ALARM ZONE-3
N R R
I S
S S N
1 2 3 N
S
4 S
5
6P MEETING
185 SF

N
S

N
H S
FLEXIBLE SPACE
220 SEATS (LECTURE STYLE)
56 SEATS (WITH TABLE)
2475 SF
N N N
S S N CAVE STYLE LAB
S 30 SEATS S
KORRIDOR

1480 SF
FFL±0.000

R
S 2 ISSUE FOR SHOP DRAWING NDR RDC AGP 23.01.25
1 ISSUE FOR SHOP DRAWING NDR RDC AGP 17.12.24

FIRE ALARM ZONE-2 No. Revision By Chk Appd Date

Original Design NA14 12.09.24 Approved for


Scale (A1) Shop Drawing
1:100 Drawn NDR 23.01.25
G Reduced
Dsg Verifier RDC 23.01.25
Scale (A3) Drg Check Date
N
N 1:200 * Refer to Revision 1 for Original Signatures
S S

UP
KORRIDOR
FFL±0.000

N N
S S
S MEP CONTRACTORS
BREAK SPACE
N 1313 SF
STORE
183 SF

F
Jalan Arjuna No. 35 jakarta 11480 - Indonesia
PT. EPCON GRAHA GUNA
3 Phone : 62-61-5322448 (H), 5321723, 5322101, 5322586
Fax : 62-21-5356986 http://www.epcon.co.id

Client
APPLE Inc.

FOR CONTINUATION REFER DRAWING: BF-2012

Project

APPLE ACADEMY BALI FITOUT


BALI INDONESIA
Title

PROPOSED FIRE ALARM LAYOUT


LEVEL 1 - SHEET 1
Discipline

FIRE PROTECTION
SHOP DRAWING Drawing No.
5866961-BF-2011
Rev.

1
P/EGG-ENG/02 NOTES:
REV.00 1. CONTRACTOR TO INSTALL NEW DETECTORS AND RE-INSTALL
THE EXISTING DETECTORS AS SHOWN IN THIS DRAWING.

2. FIRE ALARM SYSTEM IS SEMI-ADDRESSABLE WHICH FIRE


ALARM ZONE IS AS SHOWN IN THIS DRAWING.

3. THE BRAND OF NEW DETECTORS AND ITS INSTALLATION


SHOULD FOLLOW THE EXISTING INSTALLATION.

4. ALL CABLES SHALL BE NYA 2x1.5mm² FOR DETECTOR AND


AWG18 STP FOR FLOW SWITCH .THE CABLE INSTALLED IN
CONDUIT 20mm.
5 6 7 8 9 10
5. DETECTOR TO BE CONNECTED TO EXISITNG MCFA.

6. CONTRACTOR TO COORDINATE WITH THE LANDLORD AND


FOR CONTINUATION REFER DRAWING: BF-2011 EXISTING VENDOR FOR RE-PROGRAMMING AFTER INSTALLED
NEW ADDITIONAL DETECTORS.

7. THE CONTRACTOR SHOULD CHECK AND ENSURE THAT


EXISITING SMOKE DETECTORS, WHICH ARE TO BE
FIRE ALARM ZONE-1 1600
REINSTALLED OR RELOCATION STILL GOOD CONDITION AND
FUNCTION PROPERLY.

ENTRANCE
FFL±0.000

FFL-2.050

DROP OFF
FFL-2.200
DN R LOBBY R
LEGEND:
S 1076 SF
S
4 OUT OF SCOPE

PARKIR MOTOR
5

DN
E
N
S
3
IT HELP DESK
206 SF
N
S R N
11 S S DN
8 7
STORE
415 SF
N N
S S
1 2
NETWORK ROOM
265 SF

D
KORRIDOR
FFL±0.000

N
WESTSIDE
JANITOR
FFL ±0.000

S
12
#L1 - 08A
40.70 M2

BREAK SPACE
352 SF
LAB 1 - 21 X 6 = 126 SEATS
R 5155 SF
N
S S
9 6
VACANT
FFL -0.050

N
40.70 M2
#L1 - 08

S
13
C
KORIDOR MALL

FIRE ALARM ZONE-4 2


1
ISSUE FOR SHOP DRAWING
ISSUE FOR SHOP DRAWING
NDR
NDR
RDC
RDC
AGP
AGP
23.01.25
17.12.24
No. Revision By Chk Appd Date

Original Design NA14 12.09.24 Approved for


N N Scale (A1) Shop Drawing
Drawn NDR 23.01.25
S S 1:100
N N 10 5 Reduced
Dsg Verifier RDC 23.01.25
FACILITY
S
6P MEETING S Scale (A3) Drg Check Date
STORE
N111 SF
174 SF
15 14 1:200 * Refer to Revision 1 for Original Signatures

S
16
B

LEARNING PODS &


COLLABORATION SPACE MEP CONTRACTORS
2055 SF

N
S N N
1 S S PT. EPCON GRAHA GUNA Jalan Arjuna No. 35 jakarta 11480 - Indonesia
Phone : 62-61-5322448 (H), 5321723, 5322101, 5322586

3 4 Fax : 62-21-5356986 http://www.epcon.co.id

N
ENTRANCE

Client
FFL-0.100

S APPLE Inc.
2

A
FFL-0.050

FFL-0.050

Project

DN APPLE ACADEMY BALI FITOUT


BALI INDONESIA
Title

PROPOSED FIRE ALARM LAYOUT


LEVEL 1 - SHEET 2
Discipline

FIRE PROTECTION
SHOP DRAWING Drawing No.
5866961-BF-2012
Rev.

1
P/EGG-ENG/02
REV.00

SPRINKLER PIPE (NEW)


SLAB
ABOVE WELDED OR DART
FOR CONNECTION TO SPRINKLER MAIN PIPE
Ø150 SPRINKLER MAIN (EXISTING)

BRANCH SPRINKLER
BRANCH SPRINKLER
PIPES

MAIN SPRINKLER PIPES


ELBOW ELBOW

Ø25mm NEW PIPE


REDUCER REDUCER

SPRINKLER HEAD

CONCEALED SPRINKLER ESCUTCHEON PLATE CONCEALED SPRINKLER CEILING PLATE


RELOCATE RELOCATE

A RELOCATED OF SPRINKLER HEAD B TYPICAL DETAIL CONNECTION AT MAIN PIPE


- AT AREA WITH CEILING - OPEN CEILING AREA
NTS NTS

SPRINKLER PIPE (NEW)


MECHANICAL COUPLING SHOULD BE 1 ISSUE FOR SHOP DRAWING NDR RDC AGP 17.12.24
INSTALLED FOR CONNECTION TO SPRINKLER No. Revision By Chk Appd Date
MAIN PIPE
Ø150 SPRINKLER MAIN (EXISTING) Original Design NA14 12.09.24 Approved for
3000

Scale (A1) Shop Drawing


3000

N.T.S Drawn NDR 17.12.24


WALL MAX.DISTANCE 300mm
SLAB ABOVE Dsg Verifier RDC 17.12.24
SPRINKLER HEAD Reduced
SPRINKLER HEAD Drg Check Date
EXPANSION BOLT MAX.DISTANCE 1,5m Ø40x15 RED. TEE (THREADED) Scale (A3)
Ø25x15 BUSSING (THREADED)
Ø40 PIPE TO SPRINKLER HEAD Ø25 ELBOW THREADED * Refer to Revision 1 for Original Signatures

Ø25
Ø40x40 TEE (THREADED)
Ø40 SP
INPUT FROM AIMI
Ø80 PROJECT DROPPER PIPE

Ø25
MEP CONTRACTORS
DETAIL-A

Ø25
FLOOR Jalan Arjuna No. 35 jakarta 11480 - Indonesia
PT. EPCON GRAHA GUNA
LEVEL Phone : 62-61-5322448 (H), 5321723, 5322101, 5322586
Fax : 62-21-5356986 http://www.epcon.co.id

SPRINKLER HEAD Client


SPRINKLER APPLE Inc.
HEAD
PENDANT TYPE

C TYPICAL DETAIL CONNECTION D FIRE EXTINGUISHER E DETAIL SPRINKLER HEAD UPRIGHT F DETAIL SPRINKLER HEAD ON CEILING
- CONCEALED SPRINKLER - NTS - IN ACCOUSTIC CEILING - OF GRILLE CEILING (IF ANY) Project

NTS NTS NTS


APPLE ACADEMY BALI FITOUT
BALI INDONESIA
Title

STANDARD DETAIL

Discipline

FIRE PROTECTION
SHOP DRAWING Drawing No.
5866961-BF-9000
Rev.

1
P/EGG-ENG/02
NOTES:
REV.00
1. PIPE SIZES ON THE DRAWINGS ARE NOMINAL BORE (NB OR
DN) FOR THE APPLICABLE “DEFAULT” PIPE MATERIAL
ABBREVIATIONS PIPEWORK PIPEWORK FIXTURES TYPICAL FIXTURE CONNECTION SIZES LISTED IN SPECIFICATION “PIPEWORK - GENERAL”. WHERE
ALTERNATIVE PIPE MATERIALS ARE USED IN ACCORDANCE
ABBREVIATION DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION THE SIZES LISTED HERE ARE TYPICAL, ANY DEVIATIONS FROM THESE SIZE WILL BE
WITH THAT SPECIFICATION, USE THE EQUIVALENT PIPE
SPECIFICALLY NOTED ON THE DRAWINGS IDENTIFYING THE CONNECTIONS THAT DIFFER.
GENERAL CONCEALED PIPE IN CEILING SPACE FLEXIBLE PIPE / CONNECTOR
SIZE TABLES THEREIN TO CONVERT SIZES SHOWN TO THE
AFFL ABOVE FINISHED FLOOR LEVEL APPLICABLE EQUIVALENT. ALTERNATIVE PIPE MATERIALS
AP ACCESS PANEL
SANITARY SEWER MANHOLE DRAINAGE CONNECTIONS THAT HAVE NOT BEEN SO CONVERTED MAY BE REJECTED.
c/w COMPLETE WITH EXPOSED PIPE AT HIGH LEVEL ORIFICE PLATE
CSK DF EW
f FLOW 2. THE SYMBOLS SHOWN ON THIS LEGEND MAY NOT
DWM
FA FROM ABOVE PIPE AT LOW LEVEL UNION STORMWATER MANHOLE B BD NECESSARILY APPEAR WITHIN THE SET OF DRAWINGS FOR
FA/TB FROM ABOVE TO BELOW THIS DISCIPLINE.
FB FROM BELOW FO FWG GT
PIPE UNDER FLOOR CAPPED PIPE SUMP
FB/TA FROM BELOW TO ABOVE (PLAN ON LEFT, ELEVATION ON RIGHT) 3. THIS DOCUMENT IS TO BE READ IN CONJUNCTION WITH
HL HIGH LEVEL Ø50DW (VIA THE SPECIFICATION, DRAWINGS AND ALL OTHER
PIPE TRACE HEATING (LIGHT LINE RUN PARALLEL TO Ø50DW Ø40DW Ø50DW Ø40DW Ø40DW Ø40DW Ø65DW Ø100DW
IL INVERT LEVEL HOSE COUPLING STANDPIPE)
PIPE INDICATES EXTENT OF HEAT TRACE) SUMP WITH PUMP CONTRACTUAL INFORMATION.
LL LOW LEVEL
r RETURN SIZE SIZE (PLAN ON LEFT, ELEVATION ON RIGHT) WC
CHANGE IN PIPE DIAMETER (CONCENTRIC) FLOOR CUT OUT (e.g. EXTENT OF CONCRETE CUT) SK TUB UR WHB WT
RL RELATIVE LEVEL CD CHANNEL DRAIN GWM WM
SD SET DOWN (PLAN ON LEFT, ELEVATION ON RIGHT) WC
SU SET UP DIRECTION OF FLOW STRIPOUT (DEMOLITION) WORKS GULLY OUTLETS
TA TO ABOVE SHR
XXX XXX = TYPE, (PLAN ON LEFT, ELEVATION ON RIGHT)
TB TO BELOW CHANGE IN PIPE ELEVATION - DROP XXX i.e. GT = GULLY TRAP
STRUCTURAL PENETRATION
UNO UNLESS NOTED OTHERWISE ORG = OVERFLOW RELIEF GULLY Ø50DW Ø40DW Ø50DW Ø50DW Ø50DS Ø100DS Ø100DS Ø40DW Ø50DW Ø50DW
CHANGE IN PIPE ELEVATION - RISE SGT = SEALED GULLY TRAP
PIPEWORK ANCHOR SINGLE PIPE
CW COLD WATER FLOOR OUTLETS PLUMBING CONNECTIONS
XXX XXX XXX = TYPE, (PLAN ON LEFT, ELEVATION ON RIGHT)
DP DOWNPIPE PIPE TEES UP ANCHOR MULTIPLE PIPE

Ø20CW

Ø15CW

Ø15HW
Ø15CW

Ø15CW

Ø15CW

Ø15CW

Ø15CW

Ø20CW

Ø20CW
Ø20TW

Ø15TW

Ø20TW
DR DRAIN - STORMWATER (RAINWATER) i.e. FD = FLOOR DRAIN
DV DRAIN - VENT FWG = FLOOR WASTE GULLY
PIPE TEES DOWN M METER (WATER OR GAS) XXX XXX
DW DRAIN - WASTE FLOOR CLEAN-OUTS
DW(T) DRAIN - WASTE (TRADE) XXX = TYPE, (PLAN ON LEFT, ELEVATION ON RIGHT)
DW(G) DRAIN - WASTE (GREASE) PIPE RISES TA OR DROPS FA i.e. FCO = FLOOR CLEAN-OUT
DW(P) DRAIN - WASTE (PUMPED) XXX XXX OF = OVERFLOW
PUMP B BD CSK DF DWM EW GWM HT SHR
FAI FRESH AIR INTAKE (VENT) PIPE RISES FB OR DROPS TB IO = INSPECTION OPENING
FW FLUSHING WATER

or Ø32FW
Ø15HW

Ø15CW

Ø15HW
Ø15CW

Ø15CW

Ø15CW

Ø15CW

Ø15HW
Ø15CW
Ø15TW
GL XXX PIPE DROPS TO FIXTURE CONNECTION XXX XXX TUNDISH
GAS LOW PRESSURE
HW (TYPICALLY PLUMBING - TYPE OPTIONAL) HEAT EXCHANGER XXX = TYPE, (PLAN ON LEFT, ELEVATION ON RIGHT)
HOT WATER
HW(T) XXX = TYPE - REFER FIXTURE ABBREVIATIONS i.e. TD = TUNDISH
HOT WATER HEAT TRACED
OF TPV = TRAP PRIMING VALVE (TUNDISH)
OVERFLOW XXX PIPE DROPS TO FIXTURE CONNECTION RWO RWO
PW PURIFIED WATER GD RAIN WATER OUTLET
(TYPICALLY DRAINAGE - TYPE OPTIONAL) GAS DETECTOR
ROW REVERSE OSMOSIS WATER (PLAN ON LEFT, ELEVATION ON RIGHT) SK TUB UR WC WHB WM
XXX = TYPE - REFER FIXTURE ABBREVIATIONS
TW TEMPERED WATER ESO
XX(NP) NON POTABLE- ADDITION TO ABBREVIATION XXX GAS EMERGENCY SHUT OFF TV
VALVE VENT - TERMINATION TYPICAL DRAINAGE PIPE SLOPES
e.g.. CW(NP) = NON POTABLE COLDWATER
XXX = TYPE - REFER GENERAL VALVE ABBREVIATIONS (PLAN ON LEFT, ELEVATION ON RIGHT)
or HW(T-NP) = NON POTABLE HEAT TRACED HOT WATER
THE SLOPES LISTED HERE ARE TYPICAL, ANY DEVIATIONS FROM THESE WILL BE SPECIFICALLY
FIXTURES ISOLATING VALVE (NORMALLY OPEN) NOTED ON THE DRAWINGS IDENTIFYING THE DRAINAGE PIPES THAT DIFFER.
B BATH HWC HOT WATER CYLINDER
BCU BOILER/CHILLER UNIT ISOLATING VALVE (NORMALLY CLOSED) Ø32DS @ 1:40 Ø80DS @ 1:60
BD BIDET B
NON-RETURN VALVE
BWU BOILING WATER UNIT BATH Ø40DS @ 1:40 Ø100DS @ 1:60
CSK CLEANERS SINK (FULL ARROW IS DIRECTION OF FLOW)
CM COFFEE MACHINE
3 WAY (3 PORT) VALVE BD Ø50DS @ 1:40 Ø150DS @ 1:100
CMU CHILLED WATER UNIT
DF DRINKING FOUNTAIN BIDET
ACTUATED VALVE
DWM DISHWASHING MACHINE XXX Ø65DS @ 1:40 Ø225DS @ 1:150
XXX = TYPE
EW EYE WASH
i.e. BMS = BUILDING MANAGEMENT SYSTEM
EWH ELECTRIC WATER HEATER SHR SHOWER
M = MOTORISED VALVE PIPE SIZE PIPE TYPE CODE
GWM GLASS WASHING MACHINE
SV = SOLENOID VALVE REFER PIPEWORK ABBREVIATIONS
GT GREASE TRAP UR
BACKFLOW PREVENTION UNIT PIPE SLOPE RATIO
HWC HOT WATER CYLINDER
XXX = TYPE UT URINAL AND URINAL TROUGH (PIPE FALLS AT 1 IN XX)
IWH INSTANTANEOUS WATER HEATER
ICE ICE MACHINE XXX i.e. RPZ = REDUCED PRESSURE ZONE ØXXDX @ 1:XX Ø100DS
SHR SHOWER (TESTABLE - HIGH RISK) WC
SK SINK DCV = DOUBLE CHECK VALVE FULL NOTATION TYPICAL NOTATION
SKRF RIM FLUSHING SINK (TESTABLE - MEDIUM RISK) FORMAT EXAMPLE
WC
TD TUNDISH WATER CLOSET PAN
DOUBLE CHECK VALVE
TUB LAUNDRY TUB (FULL ARROWS ARE DIRECTION OF FLOW)
UR URINAL
EQUIPMENT CODING
(NON TESTABLE - LOW RISK)
UT URINAL TROUGH BASIN
PRESSURE VALVE ALL EQUIPMENT SHALL BE CODED WITH AN ABBREVIATED REFERENCE NAME, A LOCATION
WC WATER CLOSET PAN XXX XXX = TYPE
XXX XXX = TYPE, NNNkPa = SET PRESSURE (OPTIONAL) IDENTIFIER (OPTIONAL) AND A SEQUENTIAL NUMBER (No. OF DIGITS DEPENDENT ON JOB SIZE).
WHB WASH HAND BASIN i.e. DF = DRINKING FOUNTAIN
i.e. PRV = PRESSURE REDUCING VALVE EW = EYE WASH FOR EXAMPLE :
WM WASHING MACHINE NNNkPa (PRESSURE REGULATING VALVE)
WT WASH TROUGH WHB = WASH HAND BASIN
PLV = PRESSURE LIMITING VALVE HWC - 4 01
FITTINGS RELIEF VALVE SINK
BFP BACKFLOW PREVENTOR XXX = TYPE
XXX = TYPE 1 ISSUE FOR SHOP DRAWING NDR RDC AGP 17.12.24
CD CHANNEL DRAIN XXX XXX i.e. CSK = CLEANERS SINK
i.e. - CWE = COLD WATER EXPANSION VALVE HWC No.1
DCV DOUBLE CHECK VALVE SK = SINK
No. Revision By Chk Appd Date
- PR = PRESSURE RELIEF VALVE HWC LOCATED ON LEVEL 4
FCO FLOOR CLEAN-OUT SKRF = SINK - RIM FLUSHING
- TPR = TEMPERATURE & PRESSURE RELIEF HOT WATER CYLINDER Original
FO FLOOR OUTLET (NOT TRAPPED) Design GT843 12.09.24 Approved for
TUB = LAUNDRY TUB Scale (A1) Shop Drawing
FWG FLOOR WASTE GULLY T TEMPERING VALVE Drawn NDR 17.12.24
WT = WASH TROUGH N.T.S
HT HOSE TAP Dsg Verifier RDC 17.12.24
IO INSPECTION OPENING M THERMOSTATIC MIXING VALVE WASHER UNIT PIPING DRAWING EXAMPLE Reduced
Drg Check Date
MH MANHOLE XXX Scale (A3)
XXX = TYPE LEVEL 2
ORG OVERFLOW RELIEF GULLY * Refer to Revision 1 for Original Signatures
TAP MIXTURE (FIXTURE) i.e. DWM = DISHWASHING MACHINE
RWO RAINWATER OUTLET GWM = GLASS WASHING MACHINE CEILING SPACE
RPZ REDUCED PRESSURE ZONE WM = WASHING MACHINE
SGT SEALED GULLY TRAP WV WASTE VALVE
SSMH SANITARY SEWER MANHOLE LEVEL 1
MISCELLANEOUS UNIT
SWMH STORMWATER MANHOLE XXX = TYPE
STRAINER
TP TRAP PRIMED i.e. BCU = BOILER/CHILLER UNIT
TV TERMINAL VENT XXX ELEVATION
BWU = BOILING WATER UNIT
FLOAT VALVE
CM = COFFEE MACHINE
GENERAL VALVE CWU = CHILLED WATER UNIT SU SD
CFV CONSTANT FLOW REGULATING VALVE DRAIN POINT ICE = ICE MACHINE ABOVE CEILING MEP CONTRACTORS
D
FV FLUSH IWH = INSTANTANEOUS WATER HEATER BELOW FLOOR
IR ISOLATING REGULATING VALVE HIGH LEVEL XXX XXX
DHU DRAIN POINT WITH HOSE UNION LOW LEVEL
LC LOCKED CLOSED PIPE SYSTEMS COLOUR LEGEND
LO LOCKED OPEN PLAN VIEW
LSV LOCK SHIELD VALVE HT HOSE TAP

FIXTURE CONNECTION

FIXTURE CONNECTION
(BOTTOM - DRAINAGE)
Jalan Arjuna No. 35 jakarta 11480 - Indonesia
NC NORMALLY CLOSED COLD WATER PT. EPCON GRAHA GUNA Phone : 62-61-5322448 (H), 5321723, 5322101, 5322586
AAR

PIPE DROPS FA/TB

(TOP - PLUMBING)
Fax : 62-21-5356986 http://www.epcon.co.id

PIPE TEES DOWN

PIPE SETS DOWN


NO NORMALLY OPEN

CHANGE - DOWN
AUTOMATIC AIR RELIEF

PIPE DROPS TB
HOT WATER

PIPE RISES TA
RV REGULATING VALVE Client

PIPE TEES UP

PIPE SETS UP
CHANGE - UP
APPLE Inc.

PIPE LEVEL

PIPE LEVEL
TMR THERMOSTATIC REGULATING
AIR ADMITTANCE VALVE HOT WATER FLOW
TVB VACUUM BREAK VALVE
PV TRAP PRIMING VALVE
PRESSURE STABILISER HOT WATER RETURN
XXX XXX = TYPE
SWITCHES / METERS / SENSORS / CONNECTIONS
BMS BUILDING MANAGEMENT SYSTEM i.e. WHA = WATER HAMMER ARRESTOR TEMPERED WATER
DP DIFFERENTIAL PRESSURE SENSOR VB = VACUUM BREAKER
DPSW DIFFERENTIAL PRESSURE SWITCH SWITCH / METER / SENSOR / CONNECTION FLUSHING WATER
XXX Project
FM FLOW METER XXX = TYPE - REFER SWITCH / METER / SENSOR /
FR FLOW RESTRICTOR CONNECTION ABBREVIATIONS DRAINAGE WASTE
FSW FLOW SWITCH P
APPLE ACADEMY BALI FITOUT
HS HUMIDITY SENSOR DRAINAGE VENT
LAH LEVEL ALARM HIGH PRESSURE GAUGE (WITH VALVE AND SNUBBER)
BALI INDONESIA
LAL LEVEL ALARM LOW REVERSE OSMOSIS WATER
LS LEVEL SENSOR T Title
PS PRESSURE SENSOR TEMPERATURE GAUGE TRADE WASTE
PSW PRESSURE SWITCH
TP
LEGEND
SPR STATIC PRESSURE SENSOR GREASY WASTE
TEMPERATURE & PRESSURE TEST POINT (BINDER)
T THERMOSTAT (ADJ. TEMP. SENSOR)
TS TEMPERATURE SENSOR
VSD VARIABLE SPEED DRIVE EXPANSION JOINT (BELLOWS TYPE)
Discipline

PLUMBING & DRAINAGE


SHOP DRAWING Drawing No.
5866961-BP-0001
Rev.

You might also like