0% found this document useful (0 votes)
7 views1 page

Program

The document outlines the spatial requirements and user capacity for various facilities, including administrative offices, student centers, and health services. It details the number of users, quantity, carpet area, and total area for each section, totaling an expected 572 users. The overall programmatic carpet area is 3045 sq.mt, with a built-up area of approximately 5694.15 sq.mt, accounting for circulation and informal activities.

Uploaded by

anshjain30aj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views1 page

Program

The document outlines the spatial requirements and user capacity for various facilities, including administrative offices, student centers, and health services. It details the number of users, quantity, carpet area, and total area for each section, totaling an expected 572 users. The overall programmatic carpet area is 3045 sq.mt, with a built-up area of approximately 5694.15 sq.mt, accounting for circulation and informal activities.

Uploaded by

anshjain30aj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Sub-Categories (opt.) Users No. of users Quantity Carpet Area (Sq.

mt) Total Area


Admin Office 1. Reception-Waiting 15 15 1 100 100
2. Manager/ Head Cabin
3. Working Cubicals
4. Account Section
5. Meeting Room
6. Server Room

Student Information Centre 1. Front Desk 30 visitors 40 1 80 80


2. Discussion Area 6-7 Staffs
3. AV Room- shared
International Affair Centre Waiting / Reception Area, Storage 25(with staff) 25 1 100 100
/ File Room, international achievement wall
Student Support Centre Reception/Waiting Area 15 15 1 20 20
Seminar Hall Main hall / Back stage/ Av room 150 150 1 250 250
Multipurpose Hall - 150 150 1 200 200
Incubation Centre office 20 20 3 15 45
Server room (Surveillance) Server Rack and Work Desk 4 Work Desks 4 1 15 15

Commercial 1. Thrift store/Stationary 1. 3-5 people working inside 40 15 30 450


2. Clg merchandise shop and student products shop 2.30 students at a time
3. Pop up stores 3. 3 to 5 people working inside
4. Bank & ATM
Cafeteria 1. Kitchen 1. 25 Worker 125 1 250 250
2. Seating Space 2. 100 Student

Pharmacy 1 30 30

Resource Centre 1. 70 students 100 1 300 300


1.Library 2. 20 students
2.Material & resource space 3. 10-students
3.Digital access zone

Counselling Room 1 counsellor + 4 student 5 1 15 15


Workshop Area 1)Wood Workshop (Carpentry Zone) 1) 15 students 70 5 150 750
2)Metal Workshop 2) 15 students
3)Model-Making Zone 3) 20 students
4)3D Printing & Rapid Prototyping Lab 4) 10 students
5)Laser Cutting 5) 10 students
Media & Publication V.E room,Record room , storage/display 10 10 1 40 40
Exhibition Hall 60 60 1 200 200
AV Room 30 at a time 30 1 90 90

Storage Room 1 50 50
Guest House 1.10 guest rooms with attached toilet 20 10 35 350
2.lobby & lounge 1 50 50
HVAC Room -
Meter room Pelectrical Panels, Transformers 1 150 150
Security Cabin 1 1 1 5 5
Parking 1. Two Wheeler. 1. 80 Two Wheeler
2. Four Wheeler. 2. 25 Four Wheeler
3. Four Wheeler Disabled. 3. 5 Disabled Parking
4. LCV 4. 2LCV

Health & Wellness Centre gym and cardio 20 100 1 250 250
indoor sports 50 1 400 400
yoga/meditaion 30 1 100 100
Health care centre Docter's desk ,beds, washroom 5 Staff 10 1 45 45
5 Patient

Total no. of expected users. 572

Total Programatic Carpet Area 3045


Total Programatic Built up Area (10% of carpet area) 3349.5
Total Builtup area with circulation and In-formal activity (70% of the programatic Area) May vary to 10-20% as per individuals 5694.15

You might also like