0% found this document useful (0 votes)
9 views1 page

2 BHK Flat # 1001

Uploaded by

piaro36
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views1 page

2 BHK Flat # 1001

Uploaded by

piaro36
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Date: 18/09/2025

QUOTATION
To,
TOTAL UPKEEP BUILDING MAINTENANCE LLC
Sharjah- United Arab Emirates.

SUBJECT: QUOTATION FOR MAINTENANCE WORKS


PROJECT: PROPOSED RABWA- A1 BUILDING (2 BHK Flat #: 1001) @ AL BARSHA
AREA IN DUBAI, UAE
SCOPE OF WORK:
Sl# Description of works Qty. Rate Total AED.
01  Kitchen cabinet repairing work 1nos. 250 250.00
02  Cabinet hangers changing with new fixing 12nos. 8 96.00
03  Shower mixer & stand changing with new fixing 2nos. 250 500.00
04  Wall cabinet back part changing with new fixing 1nos. 350 350.00
06  Wash basin mixer changing with new fixing 1nos. 150 150.00
07  Kitchen sink mixer changing with new fixing 1nos. 150 150.00
08  Shattaf changing with new fixing 3nos. 35 105.00
09  W/C full set changing with new fixing- Normal INDIA 2nos. 490 980.00
10  3Light & 2Mirror Light changing with new fixing 5nos. 35 175.00
11  Light valve changing with new fixing 6nos. 10 60.00
12  1st, 2nd, 3rd Bathroom: 60x60 porcelain tiles changing 32 nos. 3.5 112.00
 120 Channel- 10nos. 60Channel- 14nos. 26 nos. 5 130.00
 Mentee 3 nos. 15 45.00
 Working charge -- -- 180.00
13  Kitchen inside: 60x60 porcelain tiles changing 28 nos. 3.5 98.00
 120 Channel- 10nos. 60Channel- 11nos. 21 nos. 5 105.00
 Mentee 2 nos. 15 30.00
 Working charge -- -- 100.00
14  Store inside: 60x60 porcelain tiles changing 12 nos. 3.5 42.00
 120 Channel- 5nos. 60Channel- 5nos. 10 nos. 5 50.00
 Mentee 1 nos. 15 15.00
 Working charge -- -- 60.00
15  Bathroom & kitchen: Silicon apply 1nos. 120 120.00
17 Flat internal ceiling & wall paint (All partition) -- LS 1,850.00
 Cleaning, Crack repairing, under coat, Stucco-touchup
 1 coat primer, Sanding, Final 2coat Emulsion paint apply
18  After completion of work, deep cleaning & all waste throw -- LS 350.00
the municipality dust area
Total Amount AED. 6,103.00
Terms & conditions:
 Included all material & working charge
 Payment System: 50% advance (for material supply), 50% on completion of work
Thanking you anticipation,
For/ AMWAJ AL SHAMS BUILDING MAINT. L.L.C.
AYNUL HOQUE, Mobile: 050 785 1322