0% found this document useful (0 votes)
3 views1 page

House Office

quick quick

Uploaded by

akudzweshoko02
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3 views1 page

House Office

quick quick

Uploaded by

akudzweshoko02
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

3

B
3

7
1

2
ROAD
General Notes:
21 809
Kliplock roof sheet and ridge cap laid The design of this drawing is copyright protected & remains the property of Timocraft
@22° fall on 2mm roof insulation sheet Consulting. The project notes are to be read in conjunction with all relevant technical
ROOF APEX ROOF APEX specifications.
Gate 4562 4562

6 732 4 327 3 690 5 502 1 603 All work is to be carried out strictly in accordance with the National Building
new- prefabricated trusses to Regulations, Building Standards Act 103 of 1977, "good building practices" and the
comply to SABS 0163, drawings to relevant Municipal Regulations.
be approved by project engineer
Quality of all materials & workmanship to comply with the relevant S.A.B.S. and
Kliplock roof sheet and ridge cap laid
220 6 472 217 3 630 220 3 727 220 6 883 220
3M BUILDING LINE B.S.S. specification standards. The trade contractor shall provide finished mock-ups
@22° fall on 2mm roof insulation sheet and samples as noted or required by the contract documents for approval by the
new- prefabricated trusses to comply to Plaster & Paint LINTEL
architects prior to fabrication.
LINTEL SABS 0163, drawings to be approved by
2123 project engineer This drawing is not to be scaled, figured dimensions to be used at all times.
2123

220
220
KITCHEN Unless noted otherwise, all dimensions are given in millimetres.

ab
ab

600
erf2207

2 950
BEDROOM TOILET

1 786

A
1 198
Contractor is responsible for the correct setting out of the buildings, all external & all
1 697 600
Plaster & Paint internal walls with particular reference to boundaries, building lines, etc. No part of the

ab
D01
OFFICE structure, including roof & rainwater goods, is to encroach upon any servitude area or

923

D02

ab

2 880
cadastrial boundary.
600 Plaster & Paint

ic m 2
FFL FFL

)
es
969

em , 4 6
til

2 151
Contractors are to locate and identify, if any, existing services on site, and to protect

2 040
22

bic
00 00

A:
these from damage throughout the duration of the works.

BUILDING
er

EXISTING
(c
ab

ab
ex-40mm concrete screed

(ex.ceramic tiles)
Refer to the relevant consultants drawings for co-ordination of work. The work of all

D03
56 m2

ab
ex-150mm thick concrete floor slab

A.18,45m2

5 142
5 145
5 145
ab

OFFICE
disciplines shall be carefully co-ordinated with the overall aesthetic appearance of the

5 362
WALL TO BE DEMOLISHED
ex-DPM

2 040
-1000
exist- ceramic tile floor finish ex-25mm sand blinding
-1000 building.
ex-40mm concrete screed

D01
& ceramic skirting (colour to

bic
ex-150mm thick concrete floor slab ex-Well compacted earth fill (to be approved and termite treated)

retaining wall
581
All relevant details, levels & dimensions to be checked on site prior to commencement
ex-DPM

ic m 2 R 2
architects spec) installed by

7 149
of work. Any queries are to be forwarded timeously to the architects.

D02
ex-25mm sand blinding
1 697

em 1,5 E
T

ab
specialist.

(c A: 2 IT

em 4 T
ex-Well compacted earth fill (to be approved and termite treated)

es
exist- ceramic

S
640

er : 3,3 E
ic m 2
til

IL
BEAM OVERHEAD ab

ED

655

)
Discrepancies existing between the drawings of the various trades shall be brought to

es
TO

til
B
tile floor finish &

er
337 304 the immediate attention of the project manager and the architects.

A
2 375
W02

(c
ceramic (colour

1 720
Architects drawings & details show design intent and are meant to be indicative of the
ab ab ab D03 ab
steps to architects profiles and detailing required for the work.

220
220
220

D04
spec) installed by
specialist. Architects decision on the contractors interpretation shall be final and binding.

B
1 090
811
F
F Build-in, only approved d.p.c.'s, whether or not these are shown on drawings, to all

1 609 220
SECTION B-B
W05 W05 W05 external walls at each floor, beam or parapet level & to all windows, doors, grilles or

W04
other opening in external walls. Stepped brickgrip dpc to all external cavity walls with

C
weepholes at max 900c/c if not stated differently. Dpc to be min 150mm above n.g.l.

222
EXTENDED

2M BUILDING LINE
am 8 m M
2M BUILDING LINE

er ,8 O

w
c
2
x. c 14 O

ra 30 T E
s)
(e A. DR

05

SCALE 1:100
tile

Any queries arising from all the above must be reported to the architects for

mi m 2
( ce . 6, U I

D
E

s)
ic

01

(ex.ceramic tiles)
B

A S

ile
D
clarification before any work is put in hand. Airbricks to local authority requirements, if

ct
M

E
sin
AREA

A.21,36m2
k
O

D02
not stated otherwise.

DINING
ra .3 RO

er

D01
ow
ile 2

SITTING ROOM
sh
( ce . 27 G
mi 9 m

43 670
A IN

s)
T

ct

er ,82 OM

4 634 120 2 296 224 6 987 225 6 884


IT

(ceramic tiles)
08
am m 2 M
S

A.27.39m2
x. c 0 O

er 76 O
s)
am m

C
01

(e A.1 R

x.c .9, RO
tile

01
s)
D

4 101
NO. DATE REVISION DRAWN

4 073
D

tile

D
ic

6 714
E

A D
B

ic
B

11 080
01

(ex.ceramic tiles)
D

(e

2 521 5 779 10 860

KITCHEN
01

A.19,00m2
D
C
1 0

5 919
220 2 741 5 999 11 080
D

EXISTING

BI

(ceramic tiles)

LOUNGE
erf2208

A.23.9m2
erf2206
A
1 214 2 414 5 140 7 835 10 035 11 080
k

er ,97 ET
sin

A
ic 2
s)
am m

5 176
x. c . 4 L

tile
er ,36 G

2 940
(e A OI

w
(e A.2 NIN

AREA
1 0

5 601
T

STEPS STEPS

20 167
D
am m

s)

D01

219
tile

W02 D01
I
D

ic

D05
x. c 1

er
ow

5 079

5 076

5 084
5 084
sh
sin

ab ab ab ab
k

220
220 4 633 110 1 056 1 139 225 2 880 110 1 086 110 2 798 224 1 198 220 5 466 220

ab
20 165

D01
am m N

110

D01
TOILET
er ,34 E

F
2
x. c 1 H

s)

D01
(e A.1 ITC

tile

BEAM OVERHEAD
ic
K

OPENING TO BE FILLED
sink
wc

1 216

IN WITH BRICKS
4
WALL TO BE DEMOLISHED
BED SITTER 1

D01
01
D

BED SITTER 2
sin

BEDROOM 1
A: 22,46 m2

149

(ex.ceramic tiles)
sink
M

10
wc

07
A: 21,5 m2

A.10,82m2
H

220
F

(ceremic tiles)
N 1 720 2
2 375
D
02

375

220
F

(ceremic tiles)

3 158

640
640
E

E
(ex.ceramic tiles)
mi 6 E
EXTENDED

shower
ct m 2
(ce .25 NG

4 860 2 709 1 786

3 380
01

1 257
W01 5 780 3 269 2 380
s)

D
A OU

D01

BIC
TOILET

304
r a .3

ab
ile

A.4,97m2
2 040 2 040

sink
D02
L

D02
er ,3 E

1 316
1 206
2
x.c .11 FIC

581

1 697
1 697
1 697
am 4m

s)

bic

2 419
tile

490
1 984
bic
A F

AREA

ab
TOILET
O

ic

W03

777 1 590
118

STEPS
D03
(e

1 055
B A: 3,34 m2 1 198 B

969
D01
W01

970
wc
600

4 856
(ceremic tiles)

D01 102

110
110

D01
808

600
5 076
ab

779
ab

ab
ab ab ab ab ab

G
F

F
W01 W01 W02 W01

6 706
BEDROOM 2
(ex.ceramic tiles)
BEDROOM 3
(ex.ceramic tiles)

A.14,88m2
1 457 2 828

A.9,76m2
4 028 7 169 8 369 11 079
257

3 128
7 418 2 509 5 780 8 964 10 860

3 720

3 955
220 2 740 6 000 9 074 11
11 080

W02
080

W03
FLOOR PLANS
C
A 09

110
3M BUILDING LINE
SCALE 1:100

D01
ISSUED FOR COUNCIL SUBMISSION
109

ENSUITE
sink

(ceramic tiles)

222
A.6,30m2

1 814
1 214

shower
Kliplock roof sheets PROJECT TEAM

1 090
@5° fall on 2mm roof

220
wc

insulation sheet on +4325 Kliplock roof sheets +4325


Roof apex

38x38mm timber purlins


Roof apex @5° fall on 2mm roof Timocraft Consulting
G

G
23 164 insulation sheet on Project Manager
W01
6mm gypsum board 114x75mm SA pine
220

38x38mm timber purlins

G
erf2188 ceiling panels laid to timber rafters resting on 6mm gypsum board 114x75mm SA pine Architect Timocraft Consulting

1 111
SA pine truss on 114x50mm timber wall

609
38x38mm brandering ceiling panels laid to timber rafters resting on
plate fixed to specialists +3125 U/S SA pine truss on 114x50mm timber wall
+2650 U/S
Wallplate Quantity Surveyor Timocraft Consulting
spaced @800mm/cc detail Wallplate
38x38mm brandering plate fixed to specialists
spaced @800mm/cc detail +2525 U/ Civil/Structural Engineers Afroteam Consulting
New lintels +2525 U/
S Lintel
Gutter and down S Lintel
+2525 U/ Electrical Engineers Afroteam Consulting
220 4 633 110 1 056 1 139 220 2 888 110 1 083 110 2 797 225 1 198 220 5 466 220 pipes fitted on 7 New lintels S Lintel
New windows +2525 U/
Gutter and down

SITE PLAN FLOOR PLAN

2 600
S Lintel
110 250x38mm fascia pipes fitted on New windows

2 623
boards Half brick on edge 250x38mm fascia

3 001
window sill boards Half brick on edge
7 495 4 217 2 989 1 037 6 067 Wash hand basin
Wall mounted window sill
SCALE 1:200 SCALE 1:100 Exisitng brick work BED SITTER 02 cabinets and sink
New tiles and skirting +300
New tiles and skirting
Exisitng brick work
BED SITTER 01
Wall mounted
cabinets and sink +300
FFL
MUNICIPALITY
21 585 2
FFL

7
1

2
TOILET & LAUNDRY +000

B
NGL
+000
NGL

ROOF APEX ROOF APEX


SECTION A-A SECTION C-C
BCM
4562 4562 Kliplock roof sheets +4325
@5° fall on 2mm Roof apex
roof insulation sheet
Kliplock roof sheet and ridge cap laid
@22° fall on 2mm roof insulation sheet
114x50mm timber
wall plate fixed to
specialists detail
on 38x38mm timber
purlins 114x75mm
SA pine timber
SCALE 1:100 SCALE 1:100 Kliplock roof
@2650mm above ffl sheets @5° fall on
rafters resting on +3125 U/S
2mm roof +4325
6mm gypsum board 114x50mm timber
Wallplate
Roof apex
Kliplock roof sheet and ridge cap laid ceiling panels laid to
W02
W01 wall plate fixed to insulation sheet
@22° fall on 2mm roof insulation sheet SA pine truss on W01
specialists detail on 38x38mm
LINTEL W01 LINTEL 38x38mm brandering
+2525 U/
S Lintel timber purlins

2 600
2123 spaced @800mm/cc
W01 PLASTER AND PAINT
114x75mm SA
2123
250x30mm Barge board New lintels +2525 U/
S Lintel
pine timber rafters +3125 U/S
1 897 1 067 1 907 208 3 069 200 1 028 1 295 resting on Wallplate

2 604
W04

PLASTER & PAINT New windows 114x50mm timber

3 000
D05
250x30mm Barge board W04
D01 D01
W02
wall plate fixed to +2525 U/S
balustrade @1200mm OLD -PLASTER & Box gutter and BED SITTER 1
New doors and specialists detail Lintel

PAINT +500 windows External wall


svp
downpipe fixed to mounted light

NGL
BED SITTER 2
FFL 250x30mm fascia board FFL -400
+000 +300
FFL
G
D04 TOILET
00 00 -400
+000
balustrade @1200mm NGL

Signature .......................... Date ..../..../...........


-1000
SECTION B-B +300
FFL

+000
NGL

SCALE 1:100 ELEVATION 08


ELEVATION 1 SCALE 1:100
CLIENT
SCALE 1:100 ROOF APEX ROOF APEX MR IK SHONE
4562 4562
+4325 Kliplock roof sheets +4325
Roof apex @5° fall on 2mm roof Roof apex

Kliplock roof sheet and ridge Kliplock roof sheet and ridge insulation sheet on
ROOF APEX ROOF APEX cap laid @22° fall on 2mm roof 38x38mm timber
cap laid @22° fall on 2mm roof purlins 114x75mm
4562 4562
insulation sheet insulation sheet SA pine timber
+3125 U/S
Wallplate rafters resting on
114x50mm timber
+3125 U/S
Wallplate ARCHITECT
Kliplock roof sheet and ridge Kliplock roof sheet and ridge
Gutter and wall plate fixed to
cap laid @22° fall on 2mm roof cap laid @22° fall on 2mm roof LINTEL LINTEL +2525 U/ specialists detail +2525 U/
S Lintel down pipes S Lintel
insulation sheet insulation sheet 2123 250x30mm Barge board 250x30mm 2123 W01 W01
New windows
PLASTER & PAINT PLASTER & PAINT fitted on PLASTER AND PAINT
Barge board
W01 250x30mm W01

Box gutter and Box gutter and fascia boards


LINTEL LINTEL downpipe fixed to
W01

2123 2123 downpipe fixed to D01 D01


250x30mm 250x30mm Barge board 250x30mm fascia board
250x30mm fascia board
NGL
Barge board FFL Exisitng brick
PLASTER & G FFL +300
FFL work +300
FFL
Box gutter and D03
PAINT 00 00 +000 +000
New concrete steps

ELEVATION 09
NGL NGL
downpipe fixed to
ex.Deck
250x30mm fascia board W05 W05
FFL W05
FFL
registered architects, urban designers & development planners
SCALE 1:100
00 00
#Contact Fill Address 02

NGL +4325
Roof apex Kliplock roof sheets +4325
Roof apex
PHONE 047 535 0052 CELL 0730112875 FAX 086 436 7841
timocraftconsulting@gmail.com
-1000 -1000
@5° fall on 2mm NUMBER 126 12TH AVENUE GONUBIE EASTERN CAPE 5256 SOUTH
roof insulation sheet

ELEVATION 2 on 38x38mm timber AFRICA


300x25mm painted purlins 114x75mm PHONE 033 342 9075 CELL 078 462 7734 FAX 086 436 7841
barge board to PLASTER AND PAINT
SA pine timber
+3125 U/S
Wallplate clients approval
+3125 U/S
Wallplate timocraftconsulting@gmail.com
rafters resting on
114x50mm timber

ELEVATION 3 SCALE 1:100 +2525 U/


S Lintel

+2525 U/
S Lintel
D03
wall plate fixed to
specialists detail
+2525 U/
S Lintel

+2525 U/
S Lintel
ARCHITECT
Kliplock roof sheet and ridge cap laid Kliplock roof sheet and ridge cap laid
Signature .......................... Date ..../..../...........
SCALE 1:100 ROOF APEX
4562
@23° fall on 2mm roof insulation sheet @23° fall on 2mm roof insulation sheet ROOF APEX
4562
Exisitng brick work
New door

new- prefabricated trusses to New concrete steps


new- prefabricated trusses to new- prefabricated trusses to comply to comply to SABS 0163, drawings to
comply to SABS 0163, drawings to SABS 0163, drawings to be approved by be approved by project engineer +150
FFL
+150
FFL
be approved by project engineer project engineer +000
NGL
+000
NGL
ROOF APEX ROOF APEX SHEET SIZE
NAME SIGNATURE DATE
4562
Kliplock roof sheet and ridge
cap laid @22° fall on 2mm roof
4562
LINTEL
2123
cornice Cornice
LINTEL
2123
ELEVATION 04 ELEVATION 0 4 DESIGNED
DRAWN
MC Phiri

Mc Phiri
28.08.24
28.08.24
A1
SCALE
AS SHOWN
KITCHEN LOUNGE
insulation sheet SITTING ROOM
SCALE 1:100 28.08.24
2 765

D05 CHECKED Shone IK (Pr.Arch) STATUS LEGEND


I = INFORMATION
D01 T =TENDER
D01 +4325 VALIDATED C = CONSTRUCTION
D01 Roof apex
Kliplock roof sheet and ridge cap Double Folding door as per schedule AB= AS BUILT

laid @22° fall on 2mm roof Kliplock roof


LINTEL LINTEL sheets @5° fall on
insulation sheet FFL 2mm roof PROJECT LOCATION
2123 250x30mm Barge board PLASTER & PAINT 2123 FFL insulation sheet
PLASTER AND PAINT
+3125 U/S
00 00 on 38x38mm Wallplate
2nd AVENUE GONUBIE EAST LONDON
250x30mm Barge board 40mm concrete screed 40mm concrete screed timber purlins
150mm thick concrete floor slab 150mm thick concrete floor slab 114x75mm SA
Box gutter and DPM DPM pine timber rafters
+2525 U/
S Lintel
downpipe fixed to W03 W03
25mm sand blinding 25mm sand blinding resting on +2525 U/
PROJECT
Well compacted earth fill (to be approved and termite Well compacted earth fill (to be approved and termite 114x50mm timber S Lintel
250x30mm fascia board treated) treated)
FFL
svp PLASTER & PAINT ex.Deck FFL wall plate fixed to
G specialists detail BUILDING ALTERATIONS & ADDITIONS
00 Box gutter and 00
downpipe fixed to Gutter and down
250x30mm fascia board pipes fitted on DRAWING TITLE
250x30mm fascia +300
FFL
-1000
ELEVATION 10
boards PLANS, ELAVATIONS & SECTIONS

ELEVATION 4 SECTION A-A


+000
NGL

SCALE 1:100
PROJECT NUMBER PROJECT TYPE DRAWING NUMBER STATUS REVISION

SCALE 1:100 SCALE 1:100 22TIMO01 ADDITIONS A001 C 28.08.24

GSPublisherVersion 0.0.100.100

You might also like