0% found this document useful (0 votes)
9 views6 pages

Catchment Area Calculation

it is good technical summary

Uploaded by

NILRATAN SARKAR
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views6 pages

Catchment Area Calculation

it is good technical summary

Uploaded by

NILRATAN SARKAR
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

CATCHMENT AREA CALCULATION

Catchment area as per Topo sheet in sqcm = 129.300 Sqcm


Scale(Topo Sheet) 1 cm = 500.000 m
Area = 32325000 Sqm
Catchment area as per Topo sheet in sqkm = 32.325 Sqkm

DISCHARGE CALCUALTIONS USING DICKEN'S FORMULA

Catchment Area (A) = 32.325 SqKm


Coef. of discharge (C) = 14.000 (11.0 TO 14.0 in Rayalaseema &
Telangana regions where rain fall is 60 - 120 cm)
3/4
M. F. discharge (Q) = C A
3/4
= 14.000 x 32.325
= 189.794 Cumecs
Add 30% extra for CA < 500 SqKm
= 0% x 189.794
= 0.000 Cumecs
Max. Flood Discharge (Q) = 189.794 Cumecs

DISCHARGE CALCUALTIONS USING RYVE'S FORMULA

Catchment Area (A) = 32.325 SqKm


Coef. of discharge (C) = 8.500 ( 6.8 FOR Area with in 25km from coast)
( 8.5 FOR Area with in 25km to 160 from coast)
( 10-12 FOR Limited Areas near hills)
2/3
M. F. discharge (Q) = C A
2/3
= 8.500 x 32.325
Max. Flood Discharge (Q) = 86.354 Cumecs

Max. Flood Discharge (Q) = 192.440 Cumecs (Refer Area Vel. Cal. @Crossing)

Design Flood Discharge (Q) = 192.440 Cumecs


Say 192.440 Cumecs
Lacey's Bed width Calculations

Discharge, Q = = 324.000
P= = 4.75 Q^0.5 = 85.500 m
Bed width/L.W.W. = 60.000% x 85.500
= 51.300 m
LWW as per Lacey's BW = 51.300 m

L.W.W. calculations

1) LWW as per Lacey's BW = 51.300 m


2) LWW as per Site condition = 45.000 m (i.e Length of water way at O'MFL)

3) LWW as per MFL Cal.:


Sill Level at Crossing = +97.200 m
MFL at Crossing = +100.050 m
Depth of flow at Crossing = 2.850 m
Velocity of flow at X'ing(Vv) = 1.22 m/s (as obtained from Area Velocity Calculations)
Assuming Afflux (x) = 0.300 m
2 2
Head due to Afflux (ha) = V d
2
= 0.062 m
2g (d+x)
Combined head (ha + x) = 0.362 m

Velocity of Flow through vents = 0.9 2g(ha+x)


Vv = 2.399 m/s
LWW as per MFL Cal. = Q / (Vv d)
= 28.148 m
Max. of the above, LWW = 51.300 m

.'.Design Linear Water Way = 51.300 m

Clear Span of Each Vent = 8.000 m

No. of Vents required = 51.300 8.000


= 6.413
However proposing 6 Vents of 8.000 m clear span

Total Span of Each Vent = 8.760 m

Total length of the bridge = 52.560 m


RCL Fixation

MFL = 100.050 m

Vertical clearance = 1.200 m

Deck slab depth = 0.650 m

Afflux = 0.300 m

Wearing coat = 0.075 m

Road top level (RCL) = 102.275 m

Bottom deck level = 101.550 m


Drain Bed Slope Calculations:
I.
Level at 400 U/S = + 98.200
Level at 400 D/S = + 96.000
Diff. in levels = 2.200
Distance = 800
.'. Slope = 1 in 363.636

II.
Level at 400 U/S = + 98.200
Level at point of Crossing = + 97.200
Diff. in levels = 1.000
Distance = 400
.'. Slope = 1 in 400.000

III.
Level at point of Crossing = + 97.200
Level at 400 D/S = + 96.000
Diff. in levels = 1.200
Distance = 400
.'. Slope = 1 in 333.333

Average Slope = 1 in 363.636


Say 1 in 364.000
DRAIN M.W.L CALCULATIONS
@ CROSSING

Drain Discharge Q '===> 192.44 M3/ Sec


Bed slope : ===> 1 in 364.000
Value of 'n' : ===> = 0.0300
Max. water level assumed: ===> = 100.050
Side Slope of Channel: ===> 2.0 :1

Hori.
Depth of Peri-
Level Dis- Area
flow meter
tance
in m in m in m in Sq.m in m

100.200 A= 160.614 m2
99.900 10.000 0.150 0.375 5.002
99.650 10.000 0.400 2.750 10.003 P= 127.986 m
99.435 10.000 0.615 5.075 10.002
99.400 10.000 0.650 6.325 10.000 R= A/P
99.200 10.000 0.850 7.500 10.002 = 1.255 m
98.590 10.000 1.460 11.550 10.019
97.350 10.000 2.700 20.800 10.077 V = 1/n * R2/3 * S1/2
97.200 10.000 2.850 27.750 10.001
97.500 10.000 2.550 27.000 10.004 = 1.221 m/sec
97.840 10.000 2.210 23.800 10.006
99.000 10.000 1.050 16.300 10.067 Q= A xV
99.500 10.000 0.550 8.000 10.012
99.950 10.000 0.100 3.250 10.010 = 197.760 Cumecs
100.310 10.000 0.139 2.780
100.550 10.000 > Drain Discharge.
100.900 10.000
100.920 10.000 Hence the assumed MWL
100.930 10.000 is Correct.
100.940 10.000
100.950 10.000
SCOUR DEPTH CALCULATIONS FOR PIER

Discharge(in Cumecs), Q = 189.794 m3/sec


Bed Width(in metres), b = 51.300 m
Silt Factor, f = 1.000
MFL = +100.050
Scour Depth multiplication factor, x = 2.000
Discharge / metre width(in Cumecs/m), q = Q / b = 3.700 m3/sec/m
2 1/3
Normal scour depth R = 1.35(q / f ) = 3.229 m
Max scour depth = x. R = 6.459 m
Grip Length (Max. of R/3,1.2) = 1.200 m
Max scour level = MFL - scour depth - GL = +92.391

How ever the foundation is taken upto +92.000


Hence safe.

SCOUR DEPTH CALCULATIONS FOR ABUTMENT

Discharge(in Cumecs), Q = 189.794 m3/sec


Bed Width(in metres), b = 51.300 m
Silt Factor, f = 1.000
MFL = +100.050
Scour Depth multiplication factor, x = 1.270
Discharge / metre width(in Cumecs/m), q = Q / b = 3.700 m3/sec/m
2 1/3
Normal scour depth R = 1.35(q / f ) = 3.229 m
Max scour depth = x. R = 4.101 m
Grip Length (Max. of R/3,1.2) = 1.200 m
Max scour level = MFL - scour depth - GL = +94.749

How ever the foundation is taken upto +94.500


Hence safe.