References: Key Plan Schedule of Co-Ordinates
References: Key Plan Schedule of Co-Ordinates
W
NIZAR
20000 39100 C/C OF EJ 39100 C/C OF EJ 39100 C/C OF EJ 39100 C/C OF EJ 39100 C/C OF EJ 39100 C/C OF EJ 20000
900
900
900
900
900
900
900
900
900
900
NESU
900 37300 C/C OF BRG 37300 C/C OF BRG 37300 C/C OF BRG 37300 C/C OF BRG 37300 C/C OF BRG 37300 C/C OF BRG 900
N
S
CRASH BARRIER / RAILING
D/S
100mm THK. WEARING COAT 100mm THK. WEARING COAT 100mm THK. WEARING COAT 100mm THK. WEARING COAT 100mm THK. WEARING COAT 100mm THK. WEARING COAT
RIVER
WEEP HOLES APPROACH SLAB APPROACH SLAB WEEP HOLES
SLOPE 240mm DECK SLAB 240mm DECK SLAB 240mm DECK SLAB FRL 240mm DECK SLAB FRL : 112.720
240mm DECK SLAB 240mm DECK SLAB SLOPE
E
EXISTING BRIDGE
1.5
1 ABUTMENT CAP ABUTMENT CAP
PSC GIRDER PIER CAP PSC GIRDER PIER CAP PSC GIRDER PIER CAP PSC GIRDER PIER CAP PSC GIRDER PSC GIRDER 1.5
PIER CAP
UKAI DAM HFL : 106.990 1 PITCHING AS
WEEP HOLES WEEP HOLES PROPOSED BRIDGE
PER DETAILS
PITCHING AS PIER PIER PIER PIER PIER
ABUTMENT UKAI DAM FULL RESERVOIR RL : 105.156
PER DETAILS AL P1 P2 P3 P4 P5 AR
ABUTMENT
PILE CAP TOP PILE CAP TOP PILE CAP TOP PILE CAP TOP PILE CAP TOP
TOE WALL PILE CAP TOP TOE WALL
RL: 102.600 RL: 102.600 RL: 102.600 RL: 102.600 RL: 102.600
RL: 102.250
RETAINING WALL RIDING PILE CAP PILE CAP PILE CAP PILE CAP PILE CAP RIDING RETAINING WALL
PILE CAP BOTTOM PILE CAP BOTTOM PILE CAP BOTTOM PILE CAP BOTTOM PILE CAP BOTTOM PILE CAP BOTTOM RETURN
RETURN RL: 100.000 RL: 100.000 RL: 100.000 RL: 100.000 RL: 100.000 RL: 100.000
U/S
HFL : 94.634
1500 DIA. BORED 1500 DIA. BORED 1500 DIA. BORED 1500 DIA. BORED 1500 DIA. BORED HYDRAULIC DATA:-
CAST IN-SITU PILE CAST IN-SITU PILE CAST IN-SITU PILE CAST IN-SITU PILE CAST IN-SITU PILE
1500 DIA. BORED 1500 DIA. BORED 1. CATCHMENT AREA : 692.500 Sq.Km.
CAST IN-SITU PILE CAST IN-SITU PILE 2. DESIGN DISCHARGE : 3576.90m3/sec
(126317.150 CUSECS)
3. HFL (BY DISCHARGE) : 94.634m
4. AHFL (BY DISCHARGE) : 94.775m
5. RUGOSITY COEFFICIENT : 0.045
6. VELOCITY : 5.723 m/sec.
PILE TERMINATION PILE TERMINATION PILE TERMINATION PILE TERMINATION PILE TERMINATION PILE TERMINATION PILE TERMINATION
RL: RL: RL: RL: RL: RL: RL:
UKAI DAM DATA:-
1. HFL : 106.990m
2. FRL : 105.156m
FORMATION LEVEL (m) 112.580 112.699 112.720 112.720 112.720 112.720 112.720 112.720 112.720 112.720 112.720 112.720 112.720 112.720 112.720 112.677 112.559
3. CREST RL : 91.135m
GROUND/RIVER BED LEVEL (m) 99.931 100.385 100.530 100.437 100.324 100.300 94.495 90.670 88.687 90.011 94.399 100.303 100.353 100.490 100.577 100.830 101.383 4. MDDL : 84.000m
CHAINAGE (km) 00+120.000 00+130.000 00+131.798 00+140.000 00+150.00000+151.798 00+190.898 00+229.998 00+269.098 00+308.198 00+347.298 00+386.39800+390.000 00+400.000 00+406.398 00+410.000 00+420.000
NOTES:-
SECTIONAL ELEVATION OF NEW BRIDGE GENERAL:
( SCALE - 1 : 250) 1. ALL DIMENSIONS ARE IN MILLIMETER AND LEVELS ARE IN METER UNLESS OTHERWISE
MENTIONED.
2. DIMENSIONS SHALL NOT BE SCALED OFF FROM THE DRAWING. ONLY WRITTEN
CL OF BRG CL OF BRG CL OF BRG CL OF BRG CL OF BRG DIMENSIONS SHALL BE FOLLOWED.
D/S
CL OF EJ CL OF EJ CL OF EJ CL OF EJ CL OF EJ CL OF EJ CL OF BRG 3. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH OTHER RELATED DRAWINGS.
CL OF BRG CL OF BRG CL OF BRG CL OF BRG CL OF BRG CL OF BRG CL OF EJ
20000 39100 C/C OF EJ 39100 C/C OF EJ 39100 C/C OF EJ 39100 C/C OF EJ 39100 C/C OF EJ 39100 C/C OF EJ 20000 MATERIAL:
900
900
900
900
900
900
900
900
900
900
4. GRADE OF CONCRETE SHALL BE AS FOLLOWS:
900 37300 C/C OF BRG 37300 C/C OF BRG 37300 C/C OF BRG 37300 C/C OF BRG 37300 C/C OF BRG 37300 C/C OF BRG 900 PILE AND PILECAP = M40, PIER AND PIER CAP = M40,
ABUTMENT, RETURN WALL, DIRT WALL, RETAINING WALL AND RAFT = M40,
APPROACH SLAB = M30, CRASH BARRIER = M40, WEARING COAT = M40,
UCHCHHAL PSC-GIRDER = M50, DIAPHRAGM AND DECK SLAB = M50, PEDESTAL = M40,
NIZAR PCC LEVELLING COURSE = M15 UNLESS OTHER WISE MENTIONED.
EXISTING BRIDGE EXISTING BRIDGE EXISTING BRIDGE EXISTING BRIDGE 5. REINFORCEMENT SHALL BE OF HYSD (TMT) FBEC/CRS BARS OF FE 550D, CONFORMING TO
IS-1786 (LATEST REVISION).
6. BACK FILL MATERIAL BEHIND ABUTMENT WALL, RETAINING WALL SHALL BE OF
COHESIONLESS (C=0 AND PHY = 30 DEGREE) CONFORMING TO APPENDIX:6, IRC-78:2014.
7. PRE-MOULDED EXPANSION JOINT FILLER SHALL BE USED TO FILL SEPARATION GAP AT
RETURNWALL, ABUTMWNT, RETAINING WALL..
CONSTRUCTION:
FEELING BETWEEN EXISTING
CL OF PROPOSED ROAD /
8. THIS DRAWING IS RELEASED FOR THE PURPOSE OF TENDER ONLY. THIS DRAWING SHALL
5000
AND NEW BRIDGE 1500 DIA. BORED 1500 DIA. BORED 1500 DIA. BORED BE USED TO UNDERSTAND THE EXTENT OF WORK, TYPE/MATERIAL OF CONSTRUCTION
AND NEW BRIDGE
CAST-IN-SITU RCC PILE CAST-IN-SITU RCC PILE CAST-IN-SITU RCC PILE
500
1500 DIA. BORED PSC GIRDER RCC PSC GIRDER RCC PSC GIRDER RCC EXPECTED AND TO WORK OUT CONSTRUCTION METHOD AND SCHEDULE ETC.
CARRIAGE WAY
CAST-IN-SITU RCC PILE BEARING CRASH BARRIER BEARING BEARING CRASH BARRIER BEARING BEARING CRASH BARRIER BEARING DIMENSIONS, LEVELS, THICKNESS GIVEN ARE TENTATIVE AND MAY CHANGE AT THE TIME
OF EXECUTION.
PCC PCC PCC PCC 9. PILE AND PILECAP LEVELS & SIZE SHOWN ARE TENTATIVE, AND MAY BE CHANGE DURING
RETAINING WALL DETAILED DESIGN.
4500
RETAINING WALL PIER CAP PIER CAP PIER CAP PIER CAP PIER CAP ABUTMENT CAP APPROACH 10. THE WORK SHALL BE EXECUTED IN ACCORDANCE WITH MOST'S SPECIFICATION FOR
SLAB ROAD AND BRIDGE WORKS AND IRC CODE PROVISIONS UNLESS OTHERWISE
7500
PEDESTAL INTERMEDIATE INTERMEDIATE PEDESTAL PEDESTAL INTERMEDIATE INTERMEDIATE PEDESTAL PEDESTAL INTERMEDIATE INTERMEDIATE PEDESTAL
DIAPHRAGM DIAPHRAGM DIAPHRAGM DIAPHRAGM DIAPHRAGM DIAPHRAGM 11. NECESSARY SUITABLE SHORING AND STRUTTING SHALL BE PROVIDED FOR CASTING OF
1500 DIA. BORED ABUTMENT WALL DIRT STRUCTURAL MEMBERS AND OTHER PLACE WHEREVER REQUIRED TO PROTECT
RCC PIER RCC PIER RCC PIER
CAST-IN-SITU WALL EXISTING BRIDGE COMPONENT OR OTHRE STRUCTURE.
RCC PILE RETAINING WALL END DIAPHRAGM END DIAPHRAGM END DIAPHRAGM END DIAPHRAGM END DIAPHRAGM END DIAPHRAGM 12. WEEP HOLES OF 100mm DIA @ 1000C/C SHOULD BE PROVIDED STAGGERED BOTH
450
RETAINING WALL VERTICALLY AND HORIZONTALLY IN RETAINING/ WING/ RETURN WALL/ ABUTMENT WALL.
1500 13. A CLEAR VERTICAL CONSTRUCTION JOINT SHALL BE PROVIDED AT THE JUNCTION OF
ABUTMENT AND RETAINING WALL AND AT THE VERTICAL SECTIONS WHERE THERE IS
STEPPING UP IN FOUNDATION LEVELS OR CHANGES IN CROSS SECTION OF RETAINING
425
RCC RAILING DRAINAGE SPOUT RCC RAILING DRAINAGE SPOUT RCC RAILING DRAINAGE SPOUT
RETURN WALL.
RCC CRASH BARRIER RCC CRASH BARRIER RCC CRASH BARRIER WALL 14. BORE LOGS ARE REPRODUCED FROM THE GEOTECHNICAL INVESTIGATION REPORT FROM
HALF BOTTOM PLAN HALF TOP PLAN
RETURN M/S MATTEST ENGINEERING SERVICES. REPORT NO. MES/Surat/20240331002/012.
U/S
WALL 15. THE PILE CAPACITY AT THE FOUNDATION LEVELS IS CONSIDERED AS PER GEOTECH
REPORT MENTIONED IN NOTE-14.
TOE WALL TOE WALL 16. MAXIMUM BASE PRESSURE AT FOUNDING LEVEL OF RETAINING WALL IS 35.0 T/SQ.M.
17. BACKFILLING AT ABUTMENT SHALL BE DONE BEFORE CASTING OF SUPERSTRUCTURE.
18. INITIAL PILE LOAD TEST SHALL BE CARRIED OUT PRIOR TO EXECUTION OF ACTUAL PILE.
P1 P2 P3 P4 P5
SIGN: SIGN:
AL HALF TOP PLAN AT DECK LEVEL HALF BOTTOM PLAN AT FOUNDATION LEVEL AR
( SCALE - 1 : 250) ( SCALE - 1 : 250)
W
D/S
Uchchhal Vyara
N
NESU
S
FOR TENDER PURPOSE
RIVER
E
REVISION
PARTICULARS
NO. DATE
DRAWN BY
U/S
0+160.00
0+180.00
0+200.00
0+220.00
0+240.00
0+260.00
0+280.00
0+300.00
0+320.00
0+340.00
0+360.00
0+380.00
0+400.00
SCALE NTS THE DEPUTY EXECUTIVE ENGINEER,
CLIENT UCHCHHAL (R&B) SUB DIVISION, UCHCHHAL .
DATE 21/07/2025
DRG.NO. REV. MATTEST ENGINEERING SERVICES
A-39,40,41, City Industrial Estate, Udhana Navsari Road,
BOREHOLE BH-01 BORELOG LOCATION BOREHOLE BH-02 BOREHOLE BH-03 BOREHOLE BH-04 BOREHOLE BH-05 BOREHOLE BH-06 BOREHOLE BH-07 1/1 R1 Near Swaminarayan Temple, Surat, 394210
Ph. No. 0261-2272261
CL OF EXISING BRIDGE CL OF NEW BRIDGE CL OF EXISING BRIDGE CL OF NEW BRIDGE CL OF NEW BRIDGE
3073
3073
PRECAST 600 1500 150 150 1500 600
2726
GIRDER
3410
150 THICK 150 THICK
GIRDER 150 THICK PCC (M15) PCC (M15) PCC (M15) 150 THICK PCC (M15)
(TYP.)
(TYP.)
FILLING MATERIALC=0, FILLING MATERIALC=0,
600
600
DIRT WALL
493
493
429
429
PEDESTAL PEDESTAL PHY=30 DEG(NO COHESIVE SOIL) PHY=30 DEG(NO COHESIVE SOIL)
364 300 RL : 109.222 WEEP HOLES POT-PTFE BEARING 364 300 RL : 109.222 POT-PTFE BEARING PEDESTAL
600
600
850 900 900 850
800 700
800 700
1325 2575 2575 2575 1325 640 PEDESTAL 912.5 2575 2575 2575 912.5
1500
1500
ABUTMENT CAP 150 PIER CAP EXTRUDED BIAXIAL EXTRUDED BIAXIAL
900 THK. ABUTMENT CAP POLYPROPYLENE POLYPROPYLENE
WIRE MESH
RETURN WALL PIER CAP GEOGRID GEOGRID
1150 1200 1150 (REFER NOTE) (REFER NOTE)
ABUTMENT 2675 150 4200 2675
UKAI DAM HFL : 106.990 UKAI DAM HFL : 106.990 3500
9550
600 THICK FILTER MEDIA 100mm DIA PVC PIPE
WEEP HOLES
CONFORMING TO (WEEP HOLES) AT
RCC ABUTMENT CLAUSE 2.1 OF APPENDIX-6 1.00m c/c STAGGERED RCC PIER RCC PIER
OF IRC:78-2014
UKAI DAM FULL RESERVOIR RL : 105.156 UKAI DAM FULL RESERVOIR RL : 105.156
10375 4200
2462.5 5187.5 5187.5 2462.5 PILE CAP 4250 1200 5450 PILE CAP 4050 600 3000 600 4050 2925 1200 2925
PILE CAP
TOP RL:102.250 TOP RL:102.250 TOP RL:102.600
7050
15300
10900
2250
2250
PILE CAP PILE CAP
2600
2600
12300 PILE CAP
PILE CAP PILE CAP BOTTOM
BOTTOM RL:100.00 RL: 100.000 PILE CAP
BOTTOM RL:100.00
900 4500 4500 4500 900 900 4550 4550 900 100 THICK PCC M15
100 THK. PCC M15
15300
10900 100 THK. PCC M15 EXISTING GROUND LEVEL EXISTING GROUND LEVEL
900 5250 5250 900 900 2625 2625 900 NATURAL SOIL REPLACEMENT REQUIRED NATURAL SOIL REPLACEMENT REQUIRED
IF S.B.C. < 10 T/SQ.M IF S.B.C. < 10 T/SQ.M
5250
SPECIAL NOTES:-
900
2463
CL OF BRG
TRAFFIC CL OF EXPANSION JOINT
DIRECTION
CL OF BRG
SIGN: SIGN:
900
4500
900
1500 1500
1500 DIA. BORED 1500 DIA. BORED CAST ROUGH CAST ROUGH
RETURN WALL CAST-IN-SITU CAST-IN-SITU
150
150 150
RCC PILE RCC PILE
77
500 Deputy Executive Engineer, Executive Engineer,
CL OF NEW BRIDGE
5250
PILE 587.5 325 587.5 587.5 325 587.5
1200
CL OF NEW BRIDGE
SCOUR RL (m) TERMINATION RL RCC ABUTMENT
600
(m)
FOR TENDER PURPOSE
10375
15300
SCHEDULE OF CO-ORDINATES
4500
8575
P1 79.496 68.900
1700
RCC PILE CAP
12300
4200
3000
CD1 377396.4942 2351668.6043
2500
2500
P2 79.496 66.600 REVISION
PARTICULARS
CD2 377399.7206 2351707.5710 NO. DATE
2273
287.5 287.5 287.5 287.5
P3 79.496 66.100 CD3 377402.9470 2351746.5376
100 R0 04/02/2025 FOR TENDER PURPOSE
P4 79.496 66.000 100 CD4 377406.1734 2351785.5043 RCC PILE CAP
R1 21/07/2025 REVISED AS PER R&B DESIGN CIRCLE OBSERVATIONS
600
P5 79.496 71.300 CD5 377409.3998 2351824.4709
THIS DRAWING IS THE PROPERTY OF MATTEST ENGINEERING SERVICES AND MUST BE
CD6 377412.6262 2351863.4376 RETURNED ON REQUEST. IT IS SUBMITTED AS CONFIDENTIAL INFORMATION IN CONNECTION
AR 85.021 73.300
5250
4250 WITH THE ENQUIRY, TENDER ORDER OR CONTRACT. IT IS NOT TO BE USED FOR ANY OTHER
CD7 377415.8526 2351902.4042 PURPOSE OR ORDER NOR MAY IT BE COPIED OR LENT WITHOUT OUR AUTHORITY IN WRITING.
PCC
4500
200
PROJECT NO. GENERAL ARRANGEMENT DRAWING
TITLE
( SCALE - 1 :30 ) (BRIDGE PORTION)(SHEET 2 OF 2)
DRAWN BY
300
REFERENCES (LATEST REVISION) VIVEK PARMAR MAJOR BRIDGE ACROSS RIVER NESU,
2463
900
KM. 0/0 TO 74/4 (SH-80)
BRIJESH KUNJALIYA WORK
900
AL AR
AL A2
CL OF EJ
CL OF EJ
151798 133602
APPROACH PORTION APPROACH PORTION
131798 20000 20000 113602
1.5
1
1.5
1
WEEP HOLES WEEP HOLES
ABUTMENT
ABUTMENT
TOE WALL TOE WALL
REFERENCES (LATEST REVISION)
11000 RIDING RIDING 11000 · 1/1............ GENERAL ARRANGEMENT DRAWING
RETAINING WALL RETURN RETURN RETAINING WALL (BRIDGE PORTION)(SHEET 1 OF 2)
· 1/2............ GENERAL ARRANGEMENT DRAWING
(BRIDGE PORTION)(SHEET 2 OF 2)
NOTES:-
1700
1500
W-METAL BEAM 500 500
1200
FEELING BETWEEN `1'
EXISTING AND NEW SLOPE 2.5% `1' CRASH BARRIER
BRIDGE SLOPE 2.5%
KERB M15(500x300)
500 500 50mm FILTER MEDIA
230mm STONE PITCHING
BACK FILL
EXISTING APPROACH (C=0, PHY=30 DEGREE)
2
EMBANKMENT SLOPE EXISTING APPROACH 1 PCC PANEL (300X230) M-15
(INDICATIVE) EMBANKMENT SLOPE
BACK FILL IF HEIGHT MORE THAN 3.0M
(INDICATIVE) 600 THICK FILTER MEDIA
EXISTING EXISTING APPROACH (C=0, PHY=30 DEGREE) EXISTING APPROACH
APPROACH CONFORMING TO
EMBANKMENT SLOPE EXISTING EMBANKMENT SLOPE
EMBANKMENT CLAUSE 2.1 OF APPENDIX-6
(INDICATIVE) APPROACH (INDICATIVE) SIGN: SIGN:
OF IRC:78-2014
10375
600 THICK FILTER MEDIA '2'
6975
EMBANKMENT
CONFORMING TO
GL
CLAUSE 2.1 OF APPENDIX-6 GL
OF IRC:78-2014 TOE WALL
12932 / 12686
PCC M20 RETAINING WALL RETAINING WALL
GL GL
TYPICAL APPROACH CROSS SECTION WITHOUT RETAINING WALL
12932
12686
( SCALE - 1 :100 ) Deputy Executive Engineer, Executive Engineer,
RETAINING WALL RETAINING WALL Uchchhal (R&B) Sub-Division Tapi (R&B) Division
12932
12686
Uchchhal Vyara
WEEP HOLES @ 1m C/C
STAGGERED BOTH
HORIZONTALLY AND
1200
WEEP
100mm
HOLES
DIA @
PVC
1mPIPE
C/C VERTICALLY
1700
(WEEP HOLES)
STAGGERED AT
BOTH FOR TENDER PURPOSE
1.00m
HORIZONTALLY
c/c STAGGERED
AND 500
VERTICALLY
1700
1700
230mm STONE PITCHING 10375
83
350 ROAD LVL. RAFT BOTTOM RAFT BOTTOM GENERAL ARRANGEMENT DRAWING
PROJECT NO. TITLE
1700 6975 1700 SLOPE 300 RL: 98.00 RL: 98.00 (APPROACH PORTION)
BEAM (M30) 200
1700
310
= =
194
MASONARY STEPS DRAWN BY
150 100 THICK PCC M15 100 THICK PCC M15
500
RAFT BOTTOM ROAD CRUST AS PER TENDER VIVEK PARMAR MAJOR BRIDGE ACROSS RIVER NESU,
750
RL: 98.00 1000 THICK RUBBLE SOLING 1000 THICK RUBBLE SOLING
450
SPECIFICATION AT CH : 17/4 TO 17/6 KM.
TOE WALL NAME
600
CHECKED BY ON UCHCHHAL NIZAR ROAD
150 150 11300 OF
100 THICK PCC M15
PEDESTAL(M30) OF PCC (M-20) TYP. CROSS SECTION OF 10675
BRIJESH KUNJALIYA WORK
KM. 0/0 TO 74/4 (SH-80)
(350X350X750) IN THE STATE OF GUJARAT
X
150
1000 THICK RUBBLE SOLING W METAL BEAM RAIL APPROVED BY
SAND FILLING/EMBANKMENT 100Thk. PCC (M15) EMBANKMENT ( SCALE - 1 : 30 )
10675 626 RAKESH GEVARIYA
LONGITUDINAL SECTION AT RETAINING WALL CROSS SECTION AT RETAINING WALL
REF.DRG.NO. -
DETAIL-1 C/S OF W-METAL BEAM CRASH BARRIER SECTION THROUGH STEPS DETAIL-2
( SCALE - 1 : 100) ( SCALE - 1 : 100)
ELEVATION OF W-METAL BEAM CRASH BARRIER ( SCALE - 1 :50 ) SCALE NTS THE DEPUTY EXECUTIVE ENGINEER,
( SCALE - 1 :50 ) ( SCALE - 1 :30 ) CLIENT UCHCHHAL (R&B) SUB DIVISION, UCHCHHAL .
TYPICAL APPROACH CROSS SECTION WITH RETAINING WALL ( SCALE - 1 :50 ) ( SCALE - 1 :30 )
DATE 21/07/2025
( SCALE - 1 100
: )
DRG.NO. REV. MATTEST ENGINEERING SERVICES
A-39,40,41, City Industrial Estate, Udhana Navsari Road,