WQ wwtp5 64
WQ wwtp5 64
March 2005
Wq-wwtp5-64
Table of Contents
Page
Table of Contents i.
Acknowledgments 1
I. Introduction 3
II. The Permitting Process. 4
III. Nitrogen Analysis and Considerations 4
IV. Preliminary RIB Design 6
V. Requirements for Site, Soils and Hydrogeologic Site Evaluation 8
VI. Determining Hydraulic Loading Rates 8
VII. Ground Water Mounding 10
VIII. Operational Criteria 10
IX. Engineering Design Report Submittal Requirements 12
X. Example Problem 12
XI. Summary and Conclusions 15
References 15
Table Number
1 Suggested Loading and Resting Cycles 11
2 Phosphorous Impact Evaluation 26
iii
Purpose and Scope of this Document
The purpose of this guidance document is to assist the Minnesota Pollution Control Agency
(MPCA) and consulting technical staff (engineers, soil scientists, and geologists) in the design,
permitting and operation of Rapid Infiltration Basin (RIB) wastewater dispersal systems
(systems). This document presents discussions on the various technical requirements, and
provides an overview of what is required to obtain an MPCA permit for an RIB system.
Acknowledgments
This guidance was written by Neal Wilson, Minnesota Pollution Control Agency Senior
Hydrogeologist. The author would like to acknowledge the assistance of the following
individuals in the preparation of this document: Stephanie Handeland, EuDale Mathiason,
Brad Nordberg, Sally Patrick, Gene Soderbeck, Steve Stark, and Mark Wespetal.
1
Rapid Infiltration Basins
I. Introduction
Particulates, BOD, trace metals and suspended solids are removed at least in part at or near the
soil surface. Pathogen removal by RIB systems may be as high as 99.99%, with less attenuation
occurring in coarser sands and gravel. Limited studies indicate that some degree of treatment
may be afforded to volatile organic compounds by RIBs, by volatilization, sorption and
degradation.
A RIB drying cycle is typically five to ten times longer than the wetting cycle and in Minnesota
RIB systems are usually not operated in the winter (120-150 days). These criteria need to be
considered when proposing RIB hydraulic loading rates.
3
Figure 1: Rapid Infiltration Basins.
4
III. Nitrogen Management Options
Although there are several constituents of concern in wastewater one of the main constituents of
concern that influences RIB system design is nitrate-nitrogen. In terms of nitrogen treatment and
system design there are two options for obtaining an MPCA SDS Permit as described below.
Irrespective of which track is selected at least a preliminary phosphorous setback evaluation will
be required (see bottom of Appendix II).
Option One
If the effluent going to the RIBs (verified by on-going effluent monitoring) contains a maximum
of 10 mg/L total nitrogen and there is adequate (a minimum of 100’) separation between the
RIBs and the property line/and or the nearest receptor (surface water or potable water supply
well) then only a limited hydrogeologic investigation, and no ground-water monitoring will be
required. The requirements for a limited hydrogeologic investigation are included in Appendix
V.
Option Two
If the conditions described in Option One above cannot be met then a complete hydrogeologic
investigation and ground-water monitoring will be required. If the hydrogeologic evaluation
demonstrates little potential for ground water impacts (e.g., the RIBs are in a ground-water
discharge zone, no proximal water supply wells etc.) then a limit of 10 mg/L for nitrate-N will be
assigned to down-gradient monitoring wells. If the hydrogeologic evaluation determines that the
ground water has the potential for being impacted by the RIBs then a limit of 5 mg/L will be
assigned to down-gradient monitoring wells.
To reflect ambient conditions where existing ground water nitrate nitrogen concentrations are
already elevated nitrate-N limits will be set at the mean of a minimum of three up-gradient
ground water samples. In order to set limits an up-gradient well will have to have been sampled
at least three times prior to public noticing the permit. Due to discharge flow dynamics more
monitoring wells will usually be required the further the monitoring wells are placed from
the RIBs.
Normally RIBs should be located as far hydraulically up-gradient from the property line as
possible. Any amount of land may be used as a treatment zone between the RIBs and the
property line, but this land must not be used in any manner other than as an undeveloped
treatment zone.
Several nitrogen reduction methods may be employed at the same site to reduce ground water
impacts from RIBs. Nitrogen reduction methods include:
(1) initially locating the system where natural soil and/or ground water conditions promote
denitrification (anoxic and reducing conditions with some dissolved organic carbon);
(2) locating the RIB system near a downgradient wetland, river or stream that captures, and
has the ability to further attenuate the discharge plume;
(3) the RIBs being located as far up-gradient as possible, with the downgradient
property maintained as green space;
5
(4) the RIBs designed as long as practical and perpendicular to the ground water
contour;
(5) (clean) stormwater infiltration downgradient of an RIB;
(6) for suitable soils and shallower ground water using hybrid poplar trees to evapotranspirate
the discharge;
(7) installation of downgradient recovery wells for non-potable (E.G. irrigation) use;
(8) selecting loading and resting cycles that promote denitrification; and
(9) control of downgradient land to the ground water discharge point which prohibits
the installation and use water supply wells.
Unsuitable Locations
Systems that are within wellhead protection areas, are proposed to be located in areas with
shallow bedrock, are above sole-source aquifers, are located on a flood plain, or are in karst areas
are most likely not suitable locations for RIB systems.
Number of RIBs
The minimum number of RIBs in a system is 3, but the number of basins can vary from 3-17
depending on whether continuous wastewater discharge is required. Individual basin size can
range from 0.5-5 acres for small to medium-sized systems, to 5-20 acres for larger systems. The
EPA has provided guidance on the number of basins needed, based on the projected number and
duration of loading and resting cycles (3).
Dimensions
To maximize land use basins should adjoin, and be square or rectangular in shape. Long, narrow
basins with their length perpendicular to ground water flow direction may reduce ground water
mounding. The potential that basins will cause unacceptable mounding in adjacent basins needs
to be evaluated during system design.
Dikes
Each basin should be constructed at least 12 inches deeper than the maximum design wastewater
depth (4). Dikes need to be compacted to prevent seepage through them, and should be sloped
so storm water runoff is routed away from the site. Extra freeboard is not recommended for
routine wastewater containment (5). Dikes must be protected from erosion both during and after
construction to keep fines from washing in and reducing basin infiltration.
6
Solutions for Less Favorable Soil Conditions
Whenever possible basins should not be constructed on backfilled materials, and soil compaction
during construction must be minimized. At sites where the infiltration rate is slow (finer,
structureless soils) then more and larger basins with lower loading rates may be required.
At sites with coarser soils, the soils may not provide uniform basin loading, or the soil based
treatment (aerobic/anaerobic conditions) necessary to protect ground water. In Section 4.7.3. on
page 48 of the United States Environmental Protection Agency (EPA) document Process Design
Manual, Supplement on Rapid Infiltration and Overland Flow it states “In all cases, uniform
wastewater application over the entire basin surface is necessary”. In more coarse soils to ensure
uniform distribution “The distribution system might range from a network of pipes and troughs
to sprinklers in the extreme case”.
At RIB sites where the infiltration rate is too fast several options may be considered including
the following:
• Having smaller basins and multiple inlets;
• Carefully removing and stockpiling approximately 12” of the basin soil and then blending
finer textured soils (silt, 5%-10%) into the stockpiled soil, and then placing this reworked
soil on top of a Geotextile material laid out in the basins;
• Placing a Geotextile material that sufficiently slows down infiltration directly on top of
the RIBs (possibly using sandbags as anchors), and then placing 12” of clean sand on top
of the reduced hydraulic conductivity Geotextile material;
• Installing a (very) level matrix of troughs made of concrete or pipe cut lengthwise that is
installed and kept level so uniform distribution within the RIBs is maintained. A part of
the Operations and Maintenance (O&M) Plan will require that the operator must
routinely observe drainage, and re-level the drainage channels as necessary;
• Installing a matrix of pressure-distributed distribution lines (i.e. drain tile) with the
orifices sized and positioned optimally (sideways or upright) so as to ensure uniform
loading and reduced basin scouring;
• Spraying into the basins using a fixed set (overhead or vertical uprights) sprinkler system;
or
• Finding a more suitable site, or selecting an alternative treatment technology.
It should be noted that these are only some examples of possible solutions that may or may not
work at a particular site. Other solutions may be possible, and calculations and bench and/or
field testing of the selected design should be considered to ensure system viability, uniform
distribution of the effluent, and optimally so that the predicted dosing periods would be long
enough to induce anaerobic conditions for at least some portion of the load/rest cycle.
7
is to characterize the area where the system is proposed to be installed, and to characterize the
site soils for design purposes.
Soils are critical for the treatment process. The person who prepares the soils report must certify
by signature that they have expertise in Soil Science (defined by education and experience,
especially soil morphology). They should have also have taken the Onsite Sewage Treatment
Workshop Soils class or equivalent. Under some circumstances the person who designates
where the soil pits are to be located may differ from the individual who actually logs the soil pits.
If this occurs, then it must be noted in the Soils Report.
When designing the system a minimum of three feet of soil must exist between the bottom of the
RIBs and the actual ground water mound height (including the capillary fringe). For systems
where mounding may be an issue (based on the mounding analyses) piezometers must be
installed, and on-going measurements must be made in the piezometers to ensure that at
minimum three feet of separation is maintained during operation.
Appendices II, III and IV respectively provide more detailed discussions on what is required for
the Site, Soils, and Hydrogeologic Investigations.
Hydraulic loading rates are estimated primarily on soil texture, consistence and structure of the
most hydraulically limiting soil horizon above the seasonal high water table. A combination of
these three soil properties will determine the most limiting soil horizon, and infiltration rates
below the system.
Laboratory sieve and permeability measurements, and/or preferably in-situ measurements using
a double ring infiltrometer or equivalent method (6) of the most transmissive (i.e. quantity) and
the most hydraulically limiting (MHL) horizons especially on less favorable sites should be
undertaken for estimating hydraulic loading rates (see example on page 12, section IX).
When working with RIBs the terms vertical hydraulic conductivity (K v ), horizontal hydraulic
conductivity (K h ) and saturated hydraulic conductivity (K sat ) are used. Vertical hydraulic
conductivity is used to estimate the rate of flow of water into and through the soil, in other words
a “soil acceptance rate”. Horizontal hydraulic conductivity is used for mounding analysis.
Mounding occurs when infiltrated wastewater (which is moving in a vertical direction)
encounters the water table and cannot flow “away” from the application site fast enough.
The direction of this saturated flow or subsurface drainage has to be in a lateral direction “away”
from the application site. Therefore some combination of K v and K h are used for mounding
analysis. The further from the center of the mound, the more the ground water is controlled by
8
K h . Saturated hydraulic conductivity (K sat ) is a field-derived K v . Saturated hydraulic
conductivity typically represents the fastest rate that clean water will move through the soil, and
wastewater infiltration rates are usually lower than the K sat .
Field-scale flooding basin tests (test areas at least 75 ft 2 ) should also be considered for design
purposes. This is because field-scale flooding measurements are typically more accurate than
laboratory-derived permeabilities or double ring infiltrometer measurements for estimating
hydraulic acceptance rates and ultimately system performance. The primary purpose of a
flooding basin test is to define K v . Basin flooding tests are conducted by flooding the basin(s)
at an estimated rate, to determine a rate such that no standing water is present at the end of the
loading period. The EPA has provided guidelines that should be used for conducting flooding
basins tests (7).
Depending on suspended and dissolved solids the performance of RIBs may decrease with time.
The EPA’s allowable hydraulic loading rate (incorporating a safety factor) is approximately an
order of magnitude less than the actual “effective” hydraulic conductivity (8).
To expedite permit issuance annual basin hydraulic loading limits will be set at ten percent of the
measured in-situ infiltration rates (9). Laboratory and in-situ measurements are estimates of
hydraulic performance. The final annual loading rates will be obtained by taking ten percent of
the effective infiltration rate(s) obtained by basin-by-basin flooding tests, conducted after the
permit is issued and the RIBs are built. These final loading rates will be included in the revised
Final O & M plan that must be submitted for MPCA review and approval at the completion of
the performance certification period (twelve months after initiation of operations).
Individual loading cycle application rates (as opposed to annual rates) are usually set at less than
50% of the observed infiltration rate to allow for reduced infiltration caused by organic matter
and solids in the wastewater (10). This should also be addressed in the O & M Plan.
Hydraulic acceptance rates are not mounding calculations. Mounding calculations need to be
determined based on hydraulic loading rates, aquifer thickness, K h and K v , and depth to the
seasonal high water table to ensure that an adequate aerated treatment zone is maintained. As
per the EPA “The capillary fringe above ground water mounds should never be closer than 2 feet
to the bottom of the infiltration basin. This corresponds to a water table depth of about 3 to 7
feet, depending on soil texture” (11).
Under certain circumstances such as systems located in coarse soils with a deep water table a
more formal mounding analyses may not be necessary. However the closer the water table is to
9
the base of the RIBs, the more variable the soils, the higher the proposed loading rates and the
lower the K h , the more important mounding calculations become and corresponding, the more
conservative the assumptions used should be when making the calculations. The EPA estimation
(12) and the Finnemore and Hantzsche method (13) are acceptable methods for estimating
mounding (see bottom of Appendix II).
Mounding calculations are estimates. Depending on the potential for mounding estimated from
the mounding analyses piezometers will need to be installed between or immediately adjacent to
the RIBs. An enforceable part of the MPCA permit will state that even with mounding, the
ground water surface as measured in the piezometers will need to be kept 3 feet or lower than the
bottom of the RIBs. Therefore the surveyed elevation(s) of the bottom of the RIBs need to be
obtained for operational and comparative use later.
During construction, marginal overlying soils may be carefully removed from the proposed RIB
site(s) to expose less hydraulically restrictive horizons. Unfortunately by doing so, it may bring
the base of the RIB closer to the acceptable three feet separation distance of the (mounded) water
table. When constructing RIBs the equipment that is used must minimize soil compaction.
10
Table 1
Suggested Loading and Resting Cycles
Objective Pond Application Drying Period
Discharge Period
(days)
Maximize Primary 1-2 5-7
Infiltration Secondary 1-3 4-5
Rates
Maximize Primary 1-2 10-14
Nitrogen Secondary 7-9 10-15
Removal
These wet/dry cycles are usually expressed as ratios. For example a load/rest cycle of load for
one day and rest for five days would have a load/rest ratio of 0.2. For maximizing nitrogen
removal from a secondary pond a load/rest ratio of 0.5 to 1 may be suggested. Loading and
resting cycles are adjusted based on site-specific factors that include soil conditions and influent
constituent of concern concentrations. The EPA six-step method may be used to estimate
nitrogen removal based on wastewater strength, and various load/rest cycles (15).
From the MPCA’s perspective the most important operational criteria may be summarized as
follows:
A. Unless otherwise specified RIBs will not be operated in the winter (between
120-150 days);
B. A minimum of three feet must be maintained between the top of the ground
water mound and the bottom of the RIBs. If piezometers are required then the prescribed
separation distance between the ground water and the bottom of the RIB system must be
routinely observed and noted in the on-going operator’s reports;
C. To the greatest extent possible flooded conditions should be maintained for the entire
loading period to provide the anaerobic conditions necessary for denitrification;
D. For each RIB all standing water at the end of the flooding period must infiltrate within
the first one third of the drying period;
E. The entire basin cross-sectional area must be uniformly loaded;
F. Effluent limits and/or ground water limits in monitoring wells need to be met; and
G. No springs, seeps or overland flow will be allowed hydraulically downgradient of the
RIBs.
Depending on soil conditions (no soil horizons that restrict vertical root growth) and the depth to
ground water (less than ten feet) a dense stand of hybrid poplar trees planted hydraulically down-
gradient of the RIBs may evapotranspirate much of the effluent from the system. The local Soil
and Water Conservation District may be able to assist with the cost of planting and maintaining
the trees. Due primarily to problems observed with reduced infiltration Reed Canary grass
should not be grown in the RIBs to add a transpirational component.
11
IX. Engineering Design Report Submittal Requirements
The purpose of the Engineering Design Report is to ensure that the system will meet or exceed
MPCA and accepted engineering standards for design, construction, operation, and maintenance.
The requirements for the Engineering Design Report are found in Appendix VI.
With the Engineering Design Report a detailed draft O & M Plan needs to be submitted with the
permit application. The O & M Plan (a manual) must include the following:
• system maintenance (basin maintenance performed when the basins are dry);
• proposed system yearly loading rate;
• specify the number and duration of individual loading and resting cycles;
• specify the order in which the RIBs will be loaded;
• describe how uniform distribution of the effluent over the entire basin floors will be
undertaken and documented for each event;
• a Mitigation Plan; and
• a Sampling and Analysis Plan (for sampling the system, piezometers, and monitoring
wells as required).
A Final O & M Plan must be submitted to the MPCA for review and approval at least 60 days
prior to initiation of operation of the system. A revised Final O & M Plan that includes revised
basin-by-basin loading rates must be submitted for review and approval at the end of the
performance certification period (twelve months after initiation of operation). The revised Final
O & M Plan must be complete enough to be used as a textbook for start-up training and plant
start-up, including suggested operational criteria to be used as a guideline in attaining optimum
treatment efficiency as soon as possible. More guidance on O & M Plans may be found at the
following Internet address:
http://www.pca.state.mn.us/water/wastewater.html#operation
X. Example Problem
The following are examples of two soil profiles within a prospective site, and the associated
analyses in terms of providing a preliminary estimate on hydraulic acceptance rates. The most
hydraulically limiting (MHL) horizon in the profile is determined, and the vertical hydraulic
conductivity (K v ) of that horizon is used for estimating hydraulic acceptance rates:
Profile A
0’-1’ silty sand topsoil (SM/OL)
1’-2’ clayey sand (SC), K v = 4 x 10 −6 cm/s ---MHL ---
2’-7.5’ poorly graded sand with gravel (SP), saturated/mottles at 7.0’
7.5’-14’ lean clay, lean clay with sand (CL) --base of the water table aquifer---
14’-16’silt (ML)
As per the EPA RIB guidance “Fine-textured soils, and even sandy soils with a significant silt or
clay content (>10%) are not desirable” (16). This is because of their low in-situ permeabilites,
and possibly the re-suspension and clogging of soil pores by fines. Therefore the SC soils as
described in the boring log are “not desirable” for RIBs.
12
If the clayey sand is removed (excavated) from this location then only about 5’ of unsaturated
sand would be available to transmit the relatively large volume of water away from the RIB,
without causing unacceptable mounding, or seeps or springs to emerge (daylight) downgradient
of the proposed RIBs.
If the site is still being considered then mounding calculations need to be run with the SP
hydraulic conductivity using 5’ of sand over clay (assuming that the SM is excavated).
Alternatively the RIB should be constructed elsewhere. Ground water depth and aquifer
thickness must be accounted for when running mounding calculations.
Profile B
0’-2.5’ medium sand (SP)
2.5’-4.5’ sand, some silt (SP/SM)
4.5-7.5’ fine silty sand (SM), K v = 1.9 x 10 −3 cm/sec ---MHL---
7.5’-25’+ fine to medium grained sand (SP), saturated/mottles 10 feet below grade
Based on the boring log the hydraulic conductivity from 4.5’-7.5’ needs to be used for estimating
hydraulic loading rates. Alternatively removing the top 7.5’ of soils would expose the
underlying, much more permeable sands, but this may bring the top of the basin too close to the
(mounded) water table.
What may be inferred from analyzing the two borings (if taken together) is a high degree of soil
variability, possibly even within an individual RIB. Depending on the degree of variability more
borings or test pits may be needed in the proposed RIB area(s), possibly with the less favorable
areas being excluded from consideration.
The following is a worked example for estimating annual hydraulic loading rates. The most
restrictive K v within the proposed basin needs to be used for estimating hydraulic loading rates.
The EPA only allows averaging of K v s if there is no obvious restrictive layer (17).
The system is not operated between November 15 and April 15: 365 days – 150 days = 215
days;
Assume loading cycle is 1/3 of loading/resting cycle: 215/3 = 71 days;
13
(764,787 ft 3 /yr)(7.48052 gal/ ft 3 ) = 5,721,000 gal/yr @ 10%; 3 basins =17,163,000 gal/yr
In summary (as a preliminary estimate) if ten percent of the most restrictive vertical hydraulic
conductivity is used then 38 feet/ year would be allowed in each of the three RIBs, for a total of
17,163,000 gallons per year.
Calculated loading rates are needed to provide an estimate of the hydraulic performance (and
potential viability) of the system. Interim permit limits in the permit will be based on ten percent
of insitu hydraulic conductivity tests. Final permit limits will be based on basin-by-basin loading
tests run after construction of the basins, as specified in the revised Final O & M Plan that is
submitted to the MPCA for review and approval at the completion of the performance
certification period (twelve months after initiation of operation). The results of the post-
construction basin flooding tests are multiplied by 0.1 (ten percent) to provide annual limits that
includes the safety factor set by the EPA (18) and the MPCA.
Individual loading cycle application rates (as opposed to annual rates) are usually set at less than
50% of the K v to allow for reduced infiltration by organic matter and solids in the wastewater.
Note that depending on soil variability each basin may have its own hydraulic conductivity, and
associated acceptance rate.
14
XI. Summary and Conclusions
RIBs may provide a cost-effective means of treating and dispersing municipal wastewater. A
thorough site characterization is needed to determine system viability, and to estimate the
hydraulic performance of the system. Empirically derived basin-by-basin loading tests
conducted after the basins are constructed are used in conjunction with a “safety factor” to set
final basin loading rates.
Depending on nitrogen concentrations in the effluent, ground water monitoring may be required.
The separation distance between the ground water mound height and the base of the RIBs must
be greater than three feet, and this separation distance may need to be verified with piezometers.
References
15
18. EPA. Process Design Manual Land Treatment of Municipal Wastewater Supplement on
Rapid Infiltration and Overland Flow. EPA 625/1-81-013a 10/1984. EPA p. 29
16
Appendix I
The RIB Permitting Process
Minnesota Pollution Control Agency staff is not required to begin review of a proposed project
until it receives a complete application, including all of the necessary supporting documents.
Failure to complete the application or submit the supporting documents will likely result in a
delay in the issuance of the permit. The following is a description of the permitting process for a
RIB system:
The following information is required to initiate processing the RIB permit application:
1. SDS Permit application forms found at the MPCA’s Web site.
http://www.pca.state.mn.us/water/permits/index.html#
Including:
• Water Quality Transmittal Form
• Attachment for Municipal Facilities
• Stabilization Pond Information Sheet
• Attachment for Municipal Land Application
2. RIB Guidance Document attachments that include the following:
• Site Evaluation (Appendix II)
• Soils Report (Appendix III)
• Hydrogeologic Report and checklist (Appendix IV)
3. Engineering Report (Appendix V)
4. Additional information as appropriate.
The completed permit application forms, attachments and check must be sent to:
Minnesota Pollution Control Agency
Attn: Beckie Olson, Permit Document Coordinator
520 Lafayette Road North
St. Paul, Minnesota 55155-4194
17
To complete the permitting process the following must be submitted to and be approved by the
MPCA prior to permit issuance:
• The MPCA-approved site investigation, soils, and hydrogeologic reports of the proposed site;
• the MPCA-approved Engineering Report. Please provide in the estimations the number and
sizes of the basins, and any buffer areas. Projections of future wastewater needs should also
be incorporated into these calculations;
• as needed, a workplan and report for installing piezometers and monitoring wells;
• as needed, a sampling and analysis plan for monitoring wells; and
• a draft O & M Plan. The O&M Plan will need to specify individual and annual loading rates,
maintenance of the system, monitoring, etc. Interim limits in the will be based on ten percent
of insitu hydraulic conductivity tests. Final limits will be based on basin-by-basin loading
tests run after construction of the basins, as specified in the revised Final O & M Plan.
18
Appendix II
RIB Site Suitability Evaluation Methodology
Step-by-Step Procedure
Name of Project:
Legal Location:
County:
Name, address, and phone of project proposer:
Preliminary evaluation
A. The average daily flow for the design to the RIB will be: _________ Gallons per day.
B. Cultural and Other Conditions. Please prepare a preliminary map of the proposed site including the
following information:
Floodplain designation and flooding elevation from published data or data that is acceptable to
and approved by the permitting authority, within 50 feet of the proposed system;
no floodplain within 50’
flood elev. drawn on map
Wetland designations within 50 feet of the proposed system;
no wetland within 50’
wetland drawn on map
Property lines of the proposed site;
Yes No property lines drawn on map
Current land use of the site and surrounding areas.
Yes No Current land use drawn on map
19
Soil Survey Information
Please list all the soil map units for the proposed site along with the following soil characteristics.
Soil Feature Soil Map Unit Soil Map Unit Soil Map Unit
_____ _____ _____
Landscape
position
Flooding
potential
Slope range
Seasonally
saturated soil
level
Depth to bedrock
Texture of all soil
horizons
Permeability of
all soil horizons
Yes No Soil survey map submitted with the location of the
proposed site
Note: For availability on Soil Survey maps, please refer to the local
Natural Resource Conservation Service Office located in all counties in
Minnesota.
Surface Information
Yes No USGS quadrangle map submitted of proposed site and
surrounding area.
Maps depicting:
Yes No property lines;
Yes No any municipal, industrial or domestic wells within a half-mile radius of
the site;
Yes No actual boring and trench locations;
Yes No the proposed RIB configuration;
Yes No proposed monitoring points; and
Yes No any existing drain tile, and any surface water drainage features.
20
Field evaluation.
General:
Yes No Meet with permitting authority and determine if any additional fieldwork needs to be
conducted than what is outlined in this section
Note: Minnesota Statute 216D requires that anyone excavating must call the statewide notification center prior to
the start of digging. For more complete information please refer to: http://www.dps.state.mn.us/pipeline/gsoc.html/
Landscape position, landform, micro-features, slope gradient and surface morphometry in accordance with the Field
Book for Describing and Sampling Soils, USDA – NRCS.
21
Describe number, locations, descriptions of any hand borings:
Describe any discrepancies between the onsite soil information with the soil survey information.
Please resolve any discrepancies, and identify the soil information to be used for design.
Please list the elevation to bedrock, if encountered, and the determination of how that elevation was derived
(please refer to Minnesota Rules 7080)
Please list the elevation to the seasonally/periodically saturated soil, if encountered, and the determination of
how that elevation was derived* (please refer to MR 7080):
*If redoximorphic features are deemed not to be reflective of current day seasonally saturated levels, please submit
other information to determine the depth of the seasonally saturated soil (see footnote on redoximorphic features
below).
Determine the elevation of the bottom of the RIB system:
Please provide an assessment if the soil has been disturbed, compacted, cut filled or other unnatural
condition:
Please provide a description of the uniformity of the soil over the site.
Yes No Proposed site is or will be protected from disturbance, compaction or other damage by
staking, fencing, posting or other effective method.
22
Appendix III
RIB Site Soils Evaluation
The permittee must undertake a Site Soils Evaluation irrespective of the nitrogen management
option that is selected. The purpose of the Soils Evaluation is to adequately characterize the site
soils for design purposes.
Soils are critical for the treatment process. The person who prepares the soils report must certify
by signature that they have expertise in Soil Science as defined by education and experience
(especially soil morphology) which includes having taken the Onsite Sewage Treatment
Workshop Soils class or equivalent. Under some circumstances the person who designates
where the soil pits are to be located may differ from the individual who actually logs the soil pits.
If this occurs, then it must be noted in the Soils Report.
Test pits should be located immediately adjacent to the proposed RIBs, to reduce soil
disturbances within the basins. Test pits are generally less than 10’ deep. As such soil borings
must be used to provide information below and around the test pits as necessary.
A minimum of four deeper borings are also required to determine the depth to the seasonal high
water table. For mounding calculations at least two borings should extend all the way through
the saturated zone.
Continuous vertical observations and/or sampling of the entire vertical extent of the pit wall or
boring using the ASTM D 2487 or the USDA field taxonomy must be used. The test pit and soil
boring logs must contain the soil horizon, field texture, structure (grade and shape), consistence,
moisture content, elevation of ground water (perched or otherwise), Munsell colors, and
redoximorphic features such as gleying and mottling. A determination of seasonal high ground
water table must be made, and the elevations of the pits must also be submitted.
Laboratory derived or preferably in-situ permeability measurements and grain size analyses of
the most transmissive and most hydraulically limiting soil horizons should be obtained and be
compared with other site information.
The estimated hydraulic loading rates are determined primarily from soil texture, consistency,
and structure. Loading rates are also determined from saturated hydraulic conductivity, (K sat )
measurements made of the most and least transmissive horizon within five feet of the bottom of
the proposed system, above the seasonal high water table.
Combinations of these soil properties assist in determining the most limiting horizon, and
provide estimates of individual and annual loading rates.
23
In-situ measurements of K sat using a double ring infiltrometer (or equivalent method) in most
cases should be undertaken, especially on less favorable sites. It should be noted that the
measured K sat typically represents the fastest rate that clean water will move through the soil,
and that waste water infiltration rates are usually lower than the K sat .
Perhaps the best method to estimate hydraulic acceptance rates is to use test infiltration basins.
If test infiltration basins (test areas at least 75 ft 2 ) are used then in-situ saturated hydraulic
conductivity measurements typically then would not be required.
Checklists and worksheets to be included with the Site Soils Evaluation Report
I. Soil Descriptions
Yes No A minimum of one soil pit per basin or one per 10,000 square feet (whichever is more)
of proposed site examined, with the pits located within or on the borders of the proposed system. If
possible the test pits should be located outside of the proposed basins to reduce soil disturbances.
Yes No Soil profiles in pits described to a depth of 5 feet below the proposed depth of the
system.
Submitted rationale for the final number of soil pits excavated and described
Submitted the number, location, and depth of the test pits
Submitted the number, location, and depth of deeper borings
Submitted in-depth discussion of site soils
Submitted Soil Description sheets (located on page 27) for all soil pits/borings.
Note: Occupational safety and health administration regulations (29 CFR 1926 Subpart P) apply to entering
certain types of excavations. For more information, please refer to:
http://www.osha.gov/SLTC/confinedspaces/
III. Soil interpretation for system design (use as an attachment to the Soils
Report)
24
Describe which surface topography and soil features will affect system siting design and performance
Localized run-on of storm water drainage:
Regional Flooding:
Yes No buildings
Yes No water supply
Yes No water pipes
Yes No surface water setbacks
Describe any discrepancies between the onsite soil information with the soil survey information.
Please resolve any discrepancies, and identify the soil information to be used for design.
Please list the elevation to bedrock, if encountered, and the determination of how that elevation was derived
(please refer to Minnesota Rules 7080)
Please list the elevation to the seasonally/periodically saturated soil, if encountered, and the determination of
how that elevation was derived* (please refer to MR 7080):
Please describe the suggested hydraulic loading rates for the proposed system.
Overall suitability evaluation of the site, and a description of any site limitations
25
Soil Description Worksheet
*If redoximorphic features are deemed not to be reflective of current day seasonally saturated levels, please submit
other information to determine the depth of the seasonally saturated soil (see footnote on redoximorphic features
below).
Yes No Based on the above chart, the proposed RIB is within the potential impact distance.
If yes, then I am, therefore required to complete a Phosphorus Impact Study.
NOTE: Designers should work with agency staff to perform this evaluation prior to application submittal.
26
USDA Methodology
Location:
Soil Survey Map Unit: Slope Form:
Disturbed Soil : Yes No Slope:
Type of Observation: pit boring auguring Floodplain: Yes No
(abundance and
Pores (Quantity
Redox Features
size, contrast)
size, contrast)
size, contrast)
Consistency
Matrix Color
(Shape, Size,
(abundance,
(abundance,
(abundance,
Concretions
Designation
Fragments
Depth (in)
Boundary
Structure
and size)
Horizon
Nodules
Texture
Grade)
Coarse
Roots
size)
Backhoe test Depth to Seasonally Depth of Standing Water in Depth to Proposed Bottom of System Estimated
pit ground Saturated Soil Hole/Pit (if any) Bedrock (if Elevation Infiltrative
surface any) Loading
elevation Rate
(see footnote below)
27
Appendix IV
RIB Hydrogeologic Report and Checklist
A detailed Hydrogeologic Investigation Report and ground water monitoring report will be
required for RIB systems unless the conditions described in Option 1 (see Section II) are met.
The purpose of the report is to document hydrogeologic properties that include depth to ground
water, ground-water flow direction, estimated ground water flow rates, ambient geochemistry,
proximal receptors, the potential for unacceptable ground water mounding, and to establish a
ground water monitoring network.
The person who prepares the report must certify by signature that they have expertise in
Hydrogeology as defined by education and experience. The report must summarize existing
(published) information, and information obtained in the field.
If ground water monitoring is required then at least one monitoring well must be installed in the
approximate up-gradient location, and sampled three times prior to permitting. The purpose of
sampling prior to permitting is to ensure that the permit reflects ambient conditions, so limits will
not have to be changed once the system becomes operational.
Although not required to obtain a permit a Hydrogeologic Investigation Work Plan (Work Plan)
should be submitted to the MPCA prior to initiating the field work. If the field work is
performed without MPCA review and approval of a Work Plan, and it does not meet minimum
requirements, then more field work will be required.
Typically for a RIB system a minimum of four deep borings are completed (in addition to the
test pits required with the soils work) along with the three monitoring wells (a minimum of one
up-gradient, and two down-gradient). Down-gradient monitoring wells may be located no
further than the property boundary. Due to discharge flow dynamics the further from the system
the monitoring wells are located, the more monitoring wells may be required to adequately
monitor the site.
Under certain conditions constricted lateral movement of the effluent in the soil matrix may
cause mounding of ground water. For proper soil based treatment the system must maintain a
minimum of a three foot aerobic zone below the bottom of the RIBs. Mounding calculations are
suggested for all RIB systems. Under certain circumstances, such as systems located in coarse
soils with a deep water table, mounding analyses may not be necessary.
Alternative design approaches may be used to prevent and minimize the potential for mounding.
At minimum, either mounding calculations or a rationale for why mounding calculations are not
necessary for the project, must be submitted with the hydrogeologic evaluation. Additional
mounding caused by adjacent basins also must be taken into account.
Unless it can be clearly demonstrated that unacceptable mounding will not occur, piezometers
will be required. The purpose of the piezometers is to measure mounding during system
operations, and to maintain an aerobic zone under the system during operation.
29
The proposed locations and rationale for the piezometers needs to be submitted to the MPCA. A
MPCA-approved workplan will be needed for piezometer installation.
If ground water monitoring is required, then a ground water sampling and analysis plan (SAP)
will need to be submitted to the MPCA for review and approval. Depending on the proximity of
the RIBs to surface waters additional standards may need to be applied to the monitoring points.
A template for a SAP is available at the following Internet address:
http://www.pca.state.mn.us/water/pubs/gwprocwells.pdf
Deep borings must be conducted to a minimum of 10 feet below the proposed system bottom to
determine soil properties. In-situ hydraulic conductivity tests (slug tests, pump tests) conducted
sufficiently below the water table to conduct the tests may also be suggested. If not, a minimum
of three laboratory hydraulic conductivity measurements of the most and least transmissive
horizons must be made.
Note: The two dimensions of an RIB (length and width) is included in the Length to Width
(L/W) Ratio found in the "c" and "n" values of the formula
30
The final result of this calculation is to estimate if the proposed system will have at least three
feet of separation between the bottom of the system and the predicted mound (including a
capillary fringe) height.
The following checklist must be attached to the Hydrogeologic Report to ensure that all of
the required elements described above are included in the Report.
31
Required Elements for a RIB Completed? SUBMITTAL COMMENTS MPCA
Hydrogeologic Investigation Report PAGE No. USE
YES NO
6. Local, intermediate and regional hydrology, Including
site drainage
32
Appendix V
RIB Limited Hydrogeologic Report and Checklist
The following checklist must be used when submitting a Limited Hydrogeologic Investigation
Report for a RIB system with pretreatment sufficient to reduce total nitrogen concentrations in
the effluent to 10 mg/L or less (i.e. nitrogen management Option One).
On-going monitoring of total nitrogen in the effluent will be required to ensure that the total
nitrogen concentrations in the effluent remain at 10 mg/L or less. If subsequent on-going
monitoring demonstrates that the system cannot meet the limit of 10 mg/L or less, then a more
detailed Hydrogeologic Investigation and ground water monitoring may be required.
Please note that irrespective of any Hydrogeologic Investigation Report requirements that deeper
borings will be required to assess among other things ground water mounding.
33
Completed? COMMENTS MPCA
USE
6. Summary of the soils investigation
34
Appendix VI
RIB Engineering Report Requirements Checklist
The design professional shall certify (by signature) to the following general conditions:
• The plans and specifications including the Engineering Report were prepared
under the direct supervision of a Registered Professional Engineer licensed in the
State of Minnesota.
• The design professionals preparing the Engineering Report are qualified to design
wastewater systems.
• The wastewater system will not discharge directly to the surface of the ground or
to surface waters.
• That a minimum distance of three feet must exist between the discharge point and
the seasonal high water table and/or the estimated mound height.
• That the monitoring wells (if used) are installed according to the Minnesota Water
Well Construction Code, Minnesota Rules ch 4725.
• demographics
• wastewater characteristics
3. Design flow
4. Description of design loadings with
appropriate design manual references
5. A description of the proposed wastewater
treatment system referencing the plans
and specifications.
• description of flow monitoring methods
35