OGX is among the 10 largest pure E&P companies globally with a market cap of approximately US$30 billion, and is the 3rd most traded stock in Latin America World class E&P portfolio with 10.8 billion boe of potential resources, mostly in shallow waters and onshore (low cost and off-the-shelf technology) Multi-billion barrel discoveries and overall success rate exceeding 85% with high productivity reservoirs amongst the best in Brazil Solid cash position allows OGX to conduct the largest and most successful private sector exploratory campaign in Brazil and to support production development (more than 90 wells spud since the beginning of its exploratory campaign in Sep. 2009) Highly successful and experienced management team, combining unique intellectual capital and superior execution skills
Proven execution capability (from concept to oil in an unprecedented timing) with fully established operations comprising more than 6,000 people
Brazils historical under-exploration underpins massive growth opportunities for OGX
4
OGX MAIN ACCOMPLISHMENTS
New Bond: US$ 1.1bn raised Updated OGX portfolio to 10.8 bn(1) boe of potential resources
1st Oil 1 block acquired in Parnaba (50% stake) Arrival of FPSO OSX-1
US$1.3 bn raised through an equity Private Placement 21 blocks acquired during the 9th Bidding Round
Beginning of the drilling campaign
5 onshore blocks acquired in Colombia
Bond: US$ 2.6bn raised
Mar/12
Jan/12 Oct/11 Sep/11
Acquisition of 70% stake in the Parnaba Assets May/11 Apr/11 Jun/10 Sep/09 Aug/09 Survey and interpretation of the 3D seismic data Procurement of all equipment and services necessary to initiate the drilling campaign
IPO: US$4.1 bn raised OGX Creation
Total investments of US$ 4.1bn of Drilling Capex and Signature Bonus + US$ 245 M of Seismic Campaign
Total cash raised to date: US$9.4 bn
Jun/08
Jul/07 Nov/07
Proven Execution Capability (From Concept To First Oil in Unprecedented Timing) With Fully Established Operations Comprising More Than 6,000 People
(1) Calculated by OGX based on potential, prospective and contingent volumes contained in the DeGolyer and MacNaughton Reports
OGX OWNERSHIP AND CORPORATE STRUCTURE
61% 39% Free Float
Average daily traded volume (1 month): ~ US$150 million
~ 35 thousand investors 3rd most representative stock in Ibovespa index 5.4%
Petrleo e Gs Participaes S.A. (Market Capitalization (3): ~ US$25 Billion) 99.99% Petrleo e Gs Ltda Campos Petrleo e Gs S.A. 99.99% Maranho Petrleo e Gs S.A. 66.67%4
One of the most liquid common shares
100.00% International
100% 20 Blocks 5 - Santos (100%) 5 - PAMA (100%)
(2)
30% 7 Blocks
70% 8 Blocks
100%
100%
5 - Campos (100%) (2) 2 - Campos (70%)
(2)
7 - Parnaba (70%) 1 Parnaba (50%)
(2) (2)
5 - Esprito Santo (50%)
(2) (2)
OGX Austria
5 - Colombia (100%)
EBX represented through Centennial Asset Mining Fund LLC (Nevada, USA) (CAMF) OGX as operator data as of April 13, 2012 (4) MPX S.A. holds 33.33%
(1) (2) (3) Market
MANAGEMENT ORGANIZATION STRUCTURE(1)
Paulo Mendona (38)
CEO Joaquim Dib Cohen (32) Oil & Gas Commercialization
Paulo Ricardo (28) Exploration and Reservoir Officer
Paulo Ricardo (28) Exploration Campos & ES Roberto Toledo (31) Reservoir & Reserves Celso Martins (34) Onshore Basin Ernani Porsche (33) International Moacir Santos (38) Geological Operations
Jos Roberto Faveret General Counsel
Roberto Monteiro CFO
Olavo Foerch (32) Procurement
Reinaldo Belotti (34) Production Officer
Armando Ferreira (31) Production Development
Edmundo Marques (24) Exploration Santos & Eq. Margin Dolores Carvalho (35) E&P Laboratory Luiz Reis (45) Strategic Alliances
Ricardo Juiniti (27) Drilling and Completion Billy Pinheiro (30) Logistics Ricardo Abiramia (24) Production Leandro Leme (31) HSE
Paulo de Tarso Guimares(34) New Areas
Marcos Amaral (28) Applied Technology
Highly Successful And Committed Management Team, Combining Unique Intellectual Capital and Superior Execution Skills
(1)
Parentheses represent years of experience in the E&P industry
HIGHLY QUALIFIED EXPLORATION TEAM
Pbr Success Index
Exploratory Team Paulo Mendona led the Petrobras exploration team from 2002 to 2007 Success index in excess of 60% on average offshore Brazil from 2002-2007 whilst at Petrobras Over 9 billion boe and more than 50 new fields discovered
Proven Track Record Having Opened Several New Oil Frontiers, Including The Pre-salt, and Discovering Over 50 New Oil Fields
8
BRAZIL
Vast Untapped Oil & Gas Potential
Largest Oil And Gas Discoveries In The World
Oil and Gas Discovered Volumes + 35 bn boe 2000 2010 (Bn boe)
Brazil Turkmenistan Iran Kazakhstan China Russia Australia Kuwait Israel Saudi Arabia India Indonesia Venezuela Papua New Guinea Ghana
New Provinces Could Propel Brazil Into Top Reserves Holders
Oil Resources - December 2009 (Bn bbl)
Still Significantly Under-explored
% of sedimentary basins under concession
Licensed 4%
Saudi Arabia Venezuela Iran Iraq Kuwait Brazil post Tupi UAE Russia Libya Kazakhstan Nigeria Canada US Qatar
265 172 138 115 102 100 98
Unlicensed Unlicensed 96% 96%
Source: ANP
74
44 40 37 33 28 27 15 14 13
Oil & Gas in The World
COUNTRY USA (1900-2010) EX-USSR (1900-2010) SAUDI ARABIA (1938-2010) BRAZIL (1941-2010) HISTORICAL O&G PROD.(BN BOE) 440 335 145 14.5
Bn Boe 0 10 20 30 40
China Angola Brazil
Source: IHS
Source: BP Statistical Review of World Energy 2010 & analyst estimates
Source: EIA-DOE, BP Statistical Review of World Energy 2010, Saudi Aramco, UPPSALA University, Petrobras, ANP and OGX analysis
Brazils Historical Under-Exploration Underpins Massive Growth Opportunities for OGX
9
OGX PORTFOLIO AND EXECUTION
OGX PORTFOLIO
35 blocks: 30 blocks in 5 Brazilian sedimentary basins and 5 onshore blocks in 3 Colombian sedimentary basins Unique portfolio with 10.8 billion potential recoverable barrels of oil equivalent (boer) OGXs business plan is based on 4.1 billion barrels already discovered in the shallow waters of the Campos Basin
Shallow water ~120m
Shallow water ~150m
PORTFOLIO
Shallow water ~60m
Deep water ~1,000m
11
Breakdown
OGX PORTFOLIO POTENTIAL
Oil discoveries of 4.1 bn bbl are already under production development in the shallow waters of Campos Basin
OGX PORTFOLIO POTENTIAL(1) BILLION BOE (7) CAMPOS Contingent Delineation
(2) (3)
OGX Net 5.7 3.0 1.3 1.4 1.8 0.8 0.4 1.0 0.1 0.6 0.4 1.1 0.1 1.0 10.8
Portfolio Breakdown
19% Onshore 73% Shallow Water 8% Deep Water
Prospective (POS = 56.2%) SANTOS (4)(6) (POS = 27.0%) ESPRITO SANTO(4) PAR-MARANHO PARNABA Contingent
(2) (4)
(POS = 32.6%) (POS = 21.3%)
Conventional Prospective (POS = 16.5%) Unconventional Prospective (POS = 18.2%) COLOMBIA Prospective (POS = 10.4%)(4) Potential Petroleum Quantities(5) OGX Portfolio
21% Gas 79% Oil
Note: POS defined as geological probability of success (1) The OGX portfolio potential was calculated by OGX based on volume estimates contained in the DeGolyer and MacNaughton Reports (2) We consider the 3C contingent resources in the arithmetic summation of our potential portfolio based on the assumption that most of these resources will be converted to 2C and 1C resources and that they should be converted into reserves after the removal of contingencies (3) We consider the high estimate and not Pg-adjusted delineation area prospective resources as we believe the delineation area is part of the 3C area (4) Prospective resources mean estimates Pg-adjusted. Colombia considered two Colombian basins, the Lower and Middle Magdalena Valleys Basins (5) Includes petroleum potential quantities in one Colombian basin, the Cesar-Ranchera Basin (6) OGX net interests in the table are not the same as OGX net interests contained in the DeGolyer and MacNaughton September 2009 report due to the fact that OGX now holds 100% of the interests in the concessions included in that report 12 (7) Gas volumes were converted by OGX to barrels of oil, using a conversion rate of 5,615 ft of natural gas to one boe
CAMPOS BASIN
Low Risk, Shallow Water And Large Volumes
Campos Basin
5.7 bn bbl of net 3C, net delineation and net mean risked prospective resources, evaluated by D&M (pre-salt not included)
7 blocks operated by OGX
Total area of 1,177 km2 Average water depth of ~120m 63 wells drilled Up to 90% of success rate
OGXs Discovered Accumulations Confirm a New Hydrocarbon Province in the Southern Campos Basin
13
CAMPOS BASIN
Wildcat Wells
2009 OGX-1 OGX-2A OGX-3 2010 OGX-4 OGX-5 OGX-6 OGX-7A OGX-8 OGX-10 OGX-14 OGX-15 OGX-18 OGX-20 MRK-3/4P 2011 OGX-25/27 OGX-28D OGX-29/32 OGX-31 MRK-5 OGX-33 OGX-37 OGX-52 OGX-58DP
Focusing On Wildcat & Appraisal Wells
Appraisal Wells
2012 OGX-78 OGX-79 2010 OGX-9D OGX-13 OGX-21/OGX-26HP 2011 - Drilling Area 1C OGX-50D/OGX-55HP OGX-53D/OGX-60HP OGX-65D/OGX-68HP 1C Albian 52m 1C Albian 71m 1C Albian 97m OGX-71 OGX-72 OGX-76 2012 - Drilling Area 3C 3C Albian 129m 2C Albian 6m 2012 - Drilling Area OGX-73 OGX-75 OGX-80 OGX-81 Albian 37m Albian 49m Albian: 51m In progress
2011 - Drilling Area 2C OGX-40D OGX-41D/OGX-44HP 2C Albian 107m 2C Albian 92m
2011 - Drilling Area 3C OGX-35D OGX-36D/OGX-39HP OGX-42D OGX-48 OGX-56D OGX-61 OGX-62 OGX-64DP OGX-67 OGX-69 OGX-70 3C Albian 80m 3C Albian 60m 3C Albian 82m 3C Albian 12m 3C Albian 60m 3C - Albian 9m 3C Santonian 26m Albian 20m 3C Santonian 23m 3C -
3C - Albian 38m 3C -
Blocks that OGX acquired 20% from Maersk (OGX now owns 70%)
2011 - Drilling Area Delineation OGX-43D OGX-45D OGX-54 Delineation Albian 50m Delineation Maastric. 5m Delineation Albian 24m
28 Wildcat Wells and 35 Appraisal Wells Drilled and Results Which Support Expectations
Note: Drilling area as per D&Ms Dec/10 reports and net pay indicated in meters
14
CAMPOS BASIN
Positive Horizontal Wells Test Results
Horizontal Well Tested Drill-stem Tests Performed in Horizontal Wells
WAIMEA OGX26HP
Production capacity of up to 20,000 bbl/day
Oil Quality of 20o API Tested in Jan/2011
WAIKIKI OGX-44HP
Production capacity of up to 20,000 bbl/day
Oil Quality of 23o API
Tested in Jun/2011
PIPELINE OGX-39HP
Production capacity of around 10,000 bbl/day Oil Quality of 19o API Tested in Jul/2011
High Productivity Confirmed Through Drill-stem Tests Performed in Several Horizontal Wells
15
CAMPOS BASIN
Production in the Waimea Accumulation
Main characteristics: OGX-26HP under production 2 additional horizontal wells drilled Possibly a 4th producer well to be connected 2 injection wells planned Expected production of 40-50 kbpd level by year end 2012 Oil quality of 20 API Water depth of 140 meters
OSX-1
Buoy Risers and Umbilicals Wet christmas tree
Flexible lines
Wet christmas tree OGX-26HP
Electrical submersible pump
Wet christmas tree
OGX First Oil Flowing Since January/12 Through EWT
16
CAMPOS BASIN
From Discovery to 1st Oil in Waimea
Sep 16, Granting of the 2011 preliminary and installation license by IBAMA Dec 18, Discovery of 2009 Waimea OGX-3
Dec 25, FPSO OSX-1 sets sail 2011 from the port of Rio de Janeiro Dec 19, 2011 Flexible lines launched and connected to the wet christmas tree Jan 31, FPSO OSX-1 begins 2012 production
Oct 4, Arrival of the 2011 FPSO OSX-1 in Rio de Janeiro
1st Oil
Sep 17, Beginning of the subsea 2011 installation (piles, moorings and MWA)
Dec 23, Concluded the connection of 2011 the flexible lines to the detachable turret
Jan 12, Connection of the FPSO 2012 OSX-1 to the turret
17
CAMPOS BASIN
1st Month of Production
FPSO OSX-1 Operational Efficiency
100%
Highlights and Ongoing Production Performance
Electrical submersible pump working path to highest operational performance standards Processing plant and FPSO OSX-1 operating with ~95% operational efficiency, an outstanding achievement for the first month
17-Mar
80%
60%
40%
Average Efficiency Feb: 95% Mar: 99%
20%
0% 1-Feb 6-Feb 11-Feb 16-Feb 21-Feb 26-Feb 2-Mar 7-Mar 12-Mar
Tested production levels between 10 and 18 kbpd since production began Average flow rate of 11.1 kbpd in Feb 2012 Flow rate estimated to stabilize at between 10 and 13 kbpd for the coming few months (before water injection)
18
CAMPOS BASIN
OSX-2 and OSX-3 Production Schematic
Main characteristics: OSX-2: 1st oil expected for 2H13 OSX-3: 1st oil expected for 2H13 4 subsea wells connected to each FPSO Average production per well: 10-20 kbpd Oil quality: 20-28 API
Water depth: ~120 meters
Dry christmas tree
OSX-2/OSX-3
WHP-1/WHP-2
Flexible lines
Wet christmas tree
19 19
CAMPOS BASIN
OSX-2 and OSX-3 Engineering Status
OSX-2 Overview
1st oil expected for 2H13 EPC: Single Buoy Moorings Inc (SBM) Shipyard: Keppel Fels - Singapore Technical specifications: Production capacity: 100 kbbl/day Storage capacity: 1.3 Mboe
OSX-3 Overview
1st oil expected for 2H13 EPC: MODEC Shipyard: Jurong Shipyard (JSL) Singapore Technical specifications: Production capacity: 100 kbbl/day
Storage capacity: 1.3 Mboe
Both FPSOs Underway and On Schedule, Constructed in Top Tier Shipyards
20
SECURED PRODUCTION EQUIPMENT
FPSOs WHPs
OSX-1:
Production capacity of 60 kbpd and storage of 950 kbbl Average Day rate of US$ 263 k Arrived in Oct/11
OSX-2:
Production capacity of 100 kbpd and storage of 1.3 Mbbl Expected Average day rate of US$ 360 k Contracted by OSX with SBM Expected delivery: 2H13
OSX-3:
Production capacity of 100 kbpd and storage of 1.3 Mbbl Expected Average day rate of US$ 360 k Contracted by OSX with MODEC Expected delivery: 2H13
WHP-1: Capacity to drill up to 30 wells Equipment on-stream by the 1H14 Detailed engineering ongoing (EPC awarded to Techint by OSX) WHP-2: Capacity to drill up to 30 wells Equipment on-stream by 1H14 Detailed engineering ongoing (EPC awarded to Techint by OSX) WHP-3 and WHP-4:
Order placed for charter and construction with OSX Both WHPs will be built in the Au Superport
First oil in Jan/12
Two sister VLCCs (Very Large Crude Oil Carriers) purchased on November, 2010 by OSX to be converted into FPSOs
OSX-4:
Production capacity of 100 kbpd and storage of 1.3 Mbbl Order placed for Leasing contract and EPCI under procurement
OSX-5:
Production capacity of 100 kbpd and storage of 1.3 Mbbl Order placed for Leasing contract and EPCI under procurement
21 21
CAMPOS BASIN
Oil Production Ramp-Up 150
Oil Production Target (kbpd)
40-50
2012
Equipment Used Accumulation Total # of Horizontal Wells OSX-1 Waimea 3
2013
OSX-1 OSX-2 OSX-3 Waimea Waikiki 11+ 1 Potential additional well to be connected to OSX-1
Production Capacity
Note: 1 To be reached through the end of the period
60 Kbpd
260 Kbpd
22 22
SANTOS BASIN
High Potential
Santos Basin
1.8 bn boe of net risked prospective resources (POS of 27%), evaluated by D&M 5 blocks operated by OGX (100% owned) Total area of 769 km
Average water depth of ~150 m
11 wells drilled Recent significant pre-salt discovery in shallow waters (OGX63) Up to 70% success rate
Santos Basin is One of The Most Promising Exploratory Areas in Brazil, With Significant Potential For Gas and Light Oil
23
SANTOS BASIN
Positive Drill-Stem Test Results
Drill-stem Tests Performed
Macei (OGX 47) Gas and condensate (~20% with approx. 50 API) AOF production potential results: Vertical well: 1.0M m/day of gas Horizontal well: 2.5M m/day of gas
Exploratory Campaign
2010 Activities MRK-2B OGX-11D OGX-12 OGX-17 OGX-19 2011 Activities OGX-23 OGX-24 OGX-30 OGX-47 OGX-63 2012 Activities OGX-74
Natal (OGX-11D) Gas and condensate (~25% with approx. 47 API) AOF production potential results: Vertical well: 1.0 M m/day of gas and 1.2K bbl/day of condensate Horizontal well: 5.0M m/day of gas and 6K bbl/day of condensate
Drill-stem Test for Fluid Identification
Natal (OGX-74) Light oil (38 API) confirmation Sandstone reservoirs (Santonian age) 4 km distant from OGX-11D
Illustrative
Encouraging Results From 3 Drill-stem Tests Confirm Emergence of a New Oil, Gas and Condensate Center in The Region
24
SANTOS BASIN
Highlights
Albian reservoir
Pre-salt Discovery In Shallow Waters
Albian Gas Interval
Good porosity Dolomitized layers with open fractures
Approximately 1,000 meters of column and 110 meters of net pay Good permoporosity and fractures Shallow waters Pre-salt (Aptian reservoir) Drilled up to 6,135 meters and thus far identified column of 150 meters 1st microbiolite Pre-salt discovery in shallow waters in Brazil Same reservoir rock in pre-salt as only seen so far in deep and ultra-deep waters in the Santos and Campos Basins
MDT Dual-Packer Test collected 47
API hydrocarbons
Aptian Interval
Oil Dolomitized microbial Connected vugular porosity Light oil/condensate shows
Strong kick in the last drilled layer of the reservoir with shows of hydrocarbons
Pore
25
PARNABA BASIN
Major Gas Province
Parnaba Basin
1.0 bn boe of net risked mean prospective resources POS (17%) and net 3C, evaluated by D&M 8 blocks operated by OGX Maranho Total area of 24,500 km Monetization of gas through thermoelectric plants to be developed by MPX/Petra (3,722 MW already licensed) 70% success rate (11 wells drilled) Commerciality declared for 2 accumulations
New Frontier Basin With High Potential For Gas Production
26
PARNABA BASIN
Business Plan
Project 1 1st gas: 2H12
Parnaba Complex
More than 20 prospects identified Declaration of commerciality of two fields (Gavio Real & Gavio Azul) already submitted to ANP Initial production expected in 2H12 Available production capacity of up to ~6 M m per day in 2013
Gavio Azul
Gas to be sold to MPX Power Plants MPX has obtained installation license of 3,722 MW 3 seismic crews working on the site
Gavio Real
Legend: Seismic Lines
27
PARNABA BASIN
Project Development
Gas Thermal Power Plant Development
Parnaba Development Schematic
OGX Maranho (70%) + Petra (30%)
Capex
Total drilling cost: US$ 340 M Total facilities1 cost: US$ 110M UTG TPP
MPX + Petra
Opex field life
Less than US$ 0.30/1,000 cubic feet
CAMPO DE GAVIO AZUL
Short Gas Pipeline (<2 km)
Poos de produo
SITE DA MPX
Manifold de Manifold produo Site UTG OGX
Production wells
Planta de Tratamento
Gasoduto
2 x 12" - 11,7 km
Notes: 1 Facilities cost includes: gathering system (lines and manifolds), a production facility for dry gas and a very short pipeline 2 Includes operating and maintenance of production facilities, lines, gas pipelines and wells
28 28
PARNABA BASIN
Execution Highlights
Project Development
Thermal Power Plant
GE TURBINES CONTRACTED BY MPX
Environmental permits already granted (LP+LI) 6 producing wells already drilled and 2 well in progress Drilled and tested the first production well GVR-1 Production potential of 5.0 M m/day (AOF) EPC contracted for the construction of the gas processing facility
E&P
CONTRACTED RIG AND DRILL-STEM TEST PERFORMED
Awarded to Valerus-Geogas
Beginning of the civil works on the site in Feb 2012 Clearing the rights-of-way for the pipeline
Gas treatment facility construction
First gas schedule for the second half of 2012
29
ESPRITO SANTO BASIN
New Frontier In Deep Water
Esprito Santo Basin
817 mn boe of net mean risked prospective resources (PoS of 33%), evaluated by D&M 5 blocks operated by Perenco (50% owned) Total area of 3,620 km Average water depth of ~1,000 m 1st well drilled in 4Q11 (Moriche) 2nd well drilled in 1Q12 (Guarapari)
The New Frontier of Esprito Santo Has Proven to be a Very Active Petrolific System With Recent Important Discoveries in Neighboring Blocks
30
PAR MARANHO BASIN
Promising New Frontier
Par-Maranho Basin
447 mn boe of net mean risked prospective resources (PoS of 21%), evaluated by D&M 5 blocks operated by OGX (100% owned) Total area of 960 km Average water depth of ~60m 1st well to be drilled in 2012
New Frontier With Geological Model Similar to West Africa, Where Significant Discoveries Were Made Recently
31
COLOMBIA
Cesar-Ranchera, Middle and Lower Magdalena Valleys Great Upside Potential
Colombian Basins
1.1 bn boe of net prospective resources and net potential petroleum quantities, evaluated by D&M 5 blocks operated by OGX (100% owned), 3 of which are located close to Maracaibo Basin (~80 bn boe discovered and ~50 bn boe already produced) Beginning of the Seismic Campaign in 1H12 First well to be drilled in 2012
Balanced Portfolio of Exploratory Assets, Combining Production Regions With Less Explored Areas Next to The Maracaibo Basin, One of The Most Prolific Provinces in The World
32
PRODUCTION TARGETS
OGX Production Targets
In kboepd
OGX Offshore Equipment Demand
FPSO
19 units 12 units for Campos Basin discoveries
Development of Campos and Parnaba discoveries 730
1,380
40 -50
165
24 units 11 units for Campos Basin discoveries 5 units expected to be used in the Esprito Santo Basin (the only deep water blocks in OGXs portfolio)
2012
2013
2015
2019 TLWP
boepd of
Offshore equipment already secured for initial production (OSX-1, 2 & 3)
Portfolio potential of 10.8 bn of recoverable boe: >10 years of production growth Current discoveries production level can support 730,000
WHP
Expected demand of 48 offshore units Total of 23 units estimated for OGXs Campos Basin discoveries (12 FPSOs and 11 WHPs) Strategy to expedite development with production equipment contracted 2-3 years in advance
Additional potential resources would allow OGX to reach and sustain a plateau of 1.4 million boepd from 2019 and beyond
33
OGX OPERATIONS
EXPLORATION DRILLING CAMPAIGN
Offshore Drilling Onshore Drilling
Ocean Ambassador (Diamond):
Daily Rate: US$ 260k Max. well depth: 20,000 ft Contract Expires: Sep.2012 (+ one optional year)
Ocean Lexington (Diamond):
Daily Rate: US$ 270k Max. well depth: 20,000 ft Contract Expires: Feb.2013
Ocean Quest (Diamond):
Daily Rate: US$ 265k Max. well depth: 25,000 ft Contract expires: Dec.2013
QG-1 (Queiroz Galvo):
Daily Rate: US$ 34k Max. well depth: 14,750 ft Contract Expires: Fev.2013 (+ one optional year)
BCH-05E (BCH):
Daily Rate: US$ 32k Max. well depth: 11,500 ft Contract Expires: May 2012
BCH-012 (BCH): Ocean Star (Diamond):
Daily Rate: US$ 300k Max. well depth: 25,000 ft Contract Expires: Feb.2014
ENSCO 5002 (Ensco)
Daily Rate: US$ 220k Max. well depth : 20,000 ft Contract Expires: Nov.2013
ENSCO 5004 (Ensco):
Daily Rate: US$235k Max. well depth: 20,000 ft Contract Expires: Nov.2013
Daily Rate: US$ 33k Max. well depth: 13,800 ft Contract Expires: March 2015 (+ one optional year)
WILDCAT+APPRAISAL WELLS Campos Santos Esprito Santo Par-Maranho Parnaba Colombia Total
2009 5 1 0 0 0 0 6
2010 18 6 0 0 2 0 26
2011 31 3 2 0 8 0 44
2012 12 4 1 2 6 1 26
2013 2 1 2 3 8 3 19
TOTAL 68 15 5 5 24 4 121
35
OPERATIONAL CAPABILITIES AND STRUCTURE
Logistics OFFSHORE DRILLING Operational Support
QUANTITY:5 CONTRACTOR: EDISON CHOUEST/ TIDE WATER
ANCHOR HANDLING TUG SUPPLY (AHTS)
First Class Suppliers
EFFICIENCY, AGILITY AND OPERATIONAL SECURITY
PLATFORM SUPPLY VESSEL (PSV)
QUANTITY: 6 CONTRACTOR: EDISON CHOUEST/ NORSKAN/MAERSK
FAST SUPPLY VESSEL (FSV)
QUANTITY: 1 CONTRACTOR: EDISON CHOUEST
MID SIZE HELICOPTER
OGX Team: ~300 employees
High Qualified Team
QUANTITY: 4 CONTRACTOR: AERLEO
Over 6,000 people dedicated
3D Room / IOSC
36
FINANCIAL OVERVIEW
STRONG CASH POSITION
Cash Position Evolution
R$ billion
8. 0
US$ 1.063 bn
Cash Allocation
US$ billion
8. 0
CS 4% Votorantim 8%
Others 9%
6. 0
R$ 600 M
6. 0
4. 0
4. 0
Bradesco 30%
Santander 8%
2. 0 2. 0
0. 0 3Q 11 O CT
C as h in R $
0. 0 NO V
OG X Maranho
BTG Pactual 7%
Itau Unibanco 34%
DEC
B ond
M AR
C as h in US$
Solid cash position of R$ 8.0 billion, or US$ 4.4 billion (proforma as of March 27, 2012), to support exploration commitments, development and initial production: ~62% of total cash protected against FX variations US$ 2.7 billion (pro-forma) invested in offshore deposits Operating cash flow after net financial results of US$ 450 850 million until year end 2013 Capex of US$ 3.5 4.2 billion through 2013
Note: Pro-forma figures do not contemplate cash disbursement in 1Q12
Cash allocation in R$: Average cumulative gross return equivalent to 103.5% of the Interbank Deposit Rate (CDI), or 12% p.a. Cash Allocation in US$: Average cumulative gross return equivalent to 2.3% p.a. Cash position in fixed income instruments allocated to Brazils most solid financial institutions
38
US$ 1.063 BILLION NOTES OFFERING
Transaction Highlights
OGX raised US$ 1.063 billion in a bond issuance in March 27, 2012 Moodys, Fitch and S&P maintained their previous ratings on OGX for this transaction Use of Proceeds Changes in production ramp-up strategy Appraisal campaign of Santos pre-salt discovery Incremental capex in blocks BM-C-37 and BM-C-38, where OGX recently increased its participation and became operator General corporate purposes including potential new ventures and bidding rounds
Offering
Summary of Terms
Issuer
Guarantors
OGX Austria GMBH OGX Petrleo e Gs Participaes S.A.; OGX Petrleo e Gs Ltda.; OGX Campos Petrleo e Gs S.A. Senior Unsecured Notes 144A / Reg-S B1 / B+ / B (stable) by Moodys, Fitch and S&P respectively US$1.063 billion 10 year
Distribution
Ratings Size Maturity Optional redemption Coupon Price Yield to Maturity
Demand (geographic region)
Other 3% LatAm 8%
10 year NC5
8.375% p.y. $100.00
Europe 19%
8.375% p.y.
USA 70%
39
APPENDIX
ONGOING ACTIVITIES
Well BW CB CC CD CE OGX-74 OGX-77 OGX-78 GVR-8D OGX-79 Block BM-S-59 PN-T-85 BM-C-43 PN-T-68 BM-C-39 Accumulation Natal 1 Fazenda Axix Honolulu Gavio Real Itacoatiara Rig Ocean Quest BCH-05 ENSCO 5002 BCH-12 ENSCO 5004 Coast Distance 115 km Water Depth 196m Status In progress since 02/09/12 In progress since 03/16/12 In progress since 03/25/12 In progress since 03/27/12 In progress since 04/04/12 Albian: 64m Albian: 51m Net Pay
Onshore Block 99 km 320m
Onshore Block 89 km 102m
CG
CF CH
OGX-80
GVR-7D OGX-81
BM-C-41
PN-T-68 BM-C-41
Pipeline 6
Gavio Real Tambora 2
Ocean Lexington
QG-1 Ocean Ambassador
76 km
128m
In progress since 04/09/12
In progress since 13/04/12 In progress since 04/24/12
Onshore Block 87 km 139m
CAMPOS BASIN
PARNABA BASIN
SANTOS BASIN
ESPRITO SANTO BASIN
1OGX Maranho
has 70% W.I
OGX Blocks
Oil & Gas Fields
41
CONCLUDED WELLS (1 OF 6)
Well A B J N 1- MRK - 2B OGX-1 OGX-9D OGX-13 Block BM-S-29 BM-C-43 BM-C-41 BM-C-41 Accumulation Abacate Vesvio Vesvio Direcional Vesvio Vertical Rig Sovereign Explorer Ocean Ambassador Ocean Ambassador Ocean Lexington Coast Distance 130 km 85 km 87 km 87 Km Water Depth 100 m 140 m 142 m 138m Net Pay Oil &Gas shows Eocene: 57m Eocene: 60m Eocene: 10m Eocene: Shows Cretac.: Shows Albian: 100m Aptian: 50m Barremian: 15m Albian: 74m Aptian: 17m Albian: 80m Apt./Barrem: 50m Albian: 43m Aptian: 44m Eocene: 17m Maastric.: Shows Albian: 30m Aptian: 20m Albian: >17m Aptian: 35m Cenomanian: 11m Albian: >13m Aptian: 40m Santonian: 75m Albian: 35m & 27m Albian: 32m Aptian: 31m
OGX-2A
BM-C-41
Pipeline
Ocean Ambassador
77 km
130 m
G D I E F H
OGX-6 OGX-3 OGX-8 OGX-4 OGX-5 OGX-7A
BM-C-41 BM-C-41 BM-C-41 BM-C-42 BM-C-43 BM-C-42
Etna Waimea Fuji Kilawea Krakatoa Huna
Ocean Quest Sea Explorer Ocean Star Ocean Quest Ocean Ambassador Ocean Lexington
82 km 83 km 82 km 79 km 79 km 86 km
137 m 130 m 125 m 150 m 145 m 152 m
K L M O P
OGX-10 OGX-11D OGX-12 OGX-14 OGX-15
BM-C-42 BM-S-59 BM-S-57 BM-C-40 BM-C-41
Hawaii Natal Niteri Per Santa Helena
Sea Explorer Ocean Quest Ocean Star Ocean Lexington Ocean Ambassador
79 km 84 km 95 Km 96 Km 78km
158 m 180m 150m 104m 130m
42
CONCLUDED WELLS (2 OF 6)
Well Q R S T U V W X Y Z OGX-16 OGX-17 OGX-18 OGX-19 OGX-20 OGX-21D OGX-22 OGX-23 OGX-24 MRK-3/ 4P Block PN-T-681 BM-S-56 BM-C-40 BM-S-58 BM-C-41 BM-C-41 PN-T-681 BM-S-58 BM-S-56 BM-C-372 Accumulation California Belm Ing Aracaju Tupungato Waimea Direcional Fazenda So Jos Ilhus Itagi Carambola A Rig QG-1 Ocean Star Ocean Lexington Ocean Quest Ocean Ambassador Sea Explorer QG-1 Ocean Quest Ocean Star Blackford Dolphin 85 Km 95 Km 112 Km 84 Km 84 Km Onshore Block 107 Km 94 Km 74 Km 152m 140m 134m Santonian: 14m Albian: 43m Aptian: 12m Eocene: 8m (gas) Albian-cenomanian: 145m Albian: 1,000m (horizontal section) Albian: 24m Oil shows Albian: 48m Aptian: 23m Coast Distance Water Depth Net Pay Devonian: Gas shows, 23m & 25m (column) 136m 105m 172m 132m 134m Albian: 43m Santonian: Oil shows Albian: 12m (Oil column) Santonian: 40m Maastrichtian: 9m & 3m Albian: 50m Aptian: 42m Albian: 14m Upper Devonian: 49m Lower Devonian: 47m Onshore Block
AA V AB AC AE
OGX-25/ 27P OGX-26HP OGX-28D OGX-29/ 32 OGX-31
BM-C-39 BM-C-41 BM-C-41 BM-C-39 BM-C-41
Waikiki Waimea Horizontal Illimani Itaipu Osorno
Pride Venezuela Sea Explorer Ocean Star Ocean Lexington Ocean Ambassador
94 Km 84 Km 80 Km 86 Km 79 Km
105m 134m 126m 104m 136m
43 43
CONCLUDED WELLS (3 OF 6)
Well AJ AH AG AF OGX-36D OGX-35D MRK-5 OGX-33 Block BM-C-41 BM-C-39 BM-C-37
2
Accumulation Pipeline D Waikiki Direcional Carambola B Chimborazo
Rig Ocean Star Ocean Lexington Blackford Dolphin Pride Venezuela
Coast Distance 77 Km 89 Km 80 Km 84 Km
Water Depth 128m 104m 130m 127m Albian: 60m
Net Pay
Albian-Cenomanian: 80m Albian: 17m Albian: 42m
BM-C-41
AK AO
AN AD AI
OGX-37 OGX-41D
OGX-40D OGX-30 OGX-34 OGX-43D OGX-44HP OGX-38 OGX-46D OGX-48 OGX-42D OGX-50D OGX Maranho has 70% W.I.
BM-C-43
BM-C-39 / BM-C-40 BM-C-41 BM-S-58 PN-T-68
1
Potosi Waikiki - 2D
Pipeline - 2D Salvador Bom Jesus Illimani - 1D Waikiki Fazenda So Jos Califrnia D Pipeline 4 Pipeline - 3D Waimea 3D
Ocean Ambassador Ocean Lexington
Sea Explorer Ocean Quest QG-1 Ocean Ambassador Ocean Lexington BCH-05 QG-1 Ocean Ambassador Pride Venezuela Sea Explorer
87 Km 90 Km
79 Km 105 Km Onshore Block
140m 110m
130m 151m
Oil Shows Albian: 92m
Albian: 107m Albian: 50m Devonian: 23m
AQ
AO AL AS AU AP AW
BM-C-41 BM-C-39/ BM-C- 40 PN-T-68 PN-T-68
1
80 km
90 Km Onshore Block Onshore Block 75 Km 78 km 84 Km
140 m
110m
Albian: 50m
Albian-Cenomanian: 1,063m (horizontal section) Devonian: 43m Devonian: 15m
BM-C-41 BM-C-41 BM-C-41
128m 120m 131m
Albian: 12m Eocene: 6m Albian: 82m Santonian: 1.7m Albian: 52m
OGX has 50% W.I. and Maersk is the operator
44
CONCLUDED WELLS (4 OF 6)
Well AR AM AX AS AV AY BB AT AZ BC BA OGX-45D OGX-39HP OGX-52 OGX-51DP OGX-49 OGX-53D OGX-57 OGX-47 OGX-54 OGX-58DP OGX-56D Block BM-C-40 BM-C-41 BM-C-41 PN-T-68 PN-T-68 BM-C-41 PN-T-68 BM-S- 59 BM-C-41 BM-C-41 BM-C-41 Accumulation Waikiki 3D Pipeline Horizontal Tambora Califrnia - 2DP Fazenda So Jos Waimea 2D Fazenda So Jos - 2 Macei Fuji - 2 Tambora Fuji 1D Rig Ocean Lexington Ocean Star Ocean Ambassador QG-1 BCH-05 Pride Venezuela QG-1 Ocean Quest Ocean Lexington Ocean Ambassador Ocean Star 110Km 81Km 93Km 77Km 84 Km Onshore Block 185m 136m 128m 128m Albian: 60m Santonian: 51m Albian: 24 Coast Distance 96 Km 77 Km 93 Km Onshore Block Onshore Block 132m Albian: 71m Water Depth 109m 128m 128m Net Pay Maastrichtian: 5m Albian: 1,000m (horizontal section) Santonian: 5m Albian: 96m Devonian: 8m -
BD
BG AW BE BF
OGX-59
OGX-62 OGX-55HP GVR-1D OGX-61
PN-T-49
BM-C-40 BM-C-41 PN-T-68 BM-C-41
Fazenda Torro
Ing - 1 Waimea 3HP Gavio Real Illimani 2
BCH-05
Ocean Lexington Sea Explorer QG-1 Ocean Ambassador 87 Km 93Km 84Km
Onshore Block
105m 131m Onshore Block 124m
Devonian: 9m
Albian-Cenomanian: 20m Santonian: 26m Albian: >1,000m (horizontal section) Development well Albian: 9m
OGX Maranho has 70% W.I.
OGX has 50% W.I. and Maersk is the operator
45
CONCLUDED WELLS (5 OF 6)
Well BJ BI BG BM BP BN BO BQ AY BH BL BS BX BT BR OGX-66 OGX-65D OGX-64DP PERN-1 OGX-69 GVR-3D GVR-2D OGX-70 OGX-60HP OGX-63 OGX-67 OGX-71 OGX-73 GVR-4D PERN-2 Block PN-T-67 BM-C-41 BM-C-40 BM-ES-37 BM-C-41 PN-T-68 PN-T-68 BM-C-41 BM-C-41 BM-S-57 BM-C-40 BM-C-40 BM-C-41 PN-T-68
1 4
Accumulation Angical Waimea 4D Ing 1DP Moriche Fuji - 4 Gavio Real Gavio Real Pipeline - 5 Waimea 2D Fortaleza Ing - 2 Ing - 3 Osorno 1 Gavio Real Guarapari
Rig BCH-05 ENSCO 5002 Ocean Lexington Ocean Star ENSCO 5002 QG-1 BCH-05 Ocean Lexington ENSCO 5004 Ocean Quest Ocean Ambassador Ocean Ambassador Ocean Ambassador QG-1 Ocean Star
Coast Distance
Water Depth 135m 105m 1,148m 125m Albian: 38m Albian: 97m
Net Pay
Onshore Block 83 km 93 km 52 km 81 km Onshore Block Onshore Block 80 km 84 km 102 km 93 km 93 km 78 km Onshore Block 110 km 823m 123m 132m 155m 111m 112m 130m
Santonian: 23m -
Development well Development well Albian: >1,000m (horizontal section) Albian: 110m Aptian: 150m (column) Albian: 37m Development well Development well 130m Albian: 129m Development well 135m Albian: > 1,000m (horizontal section)
BM-ES-384
BU
BV BZ BI
GVR-5D
OGX-72 GVR-6D OGX-68HP
PN-T-68
Gavio Real
Pipeline 7 Gavio Real Waimea 4HP
BCH-05
Ocean Lexington QG-1 ENSCO 5004
4OGX
Onshore Block
78 km Onshore Block 83 km
BM-C-41 PN-T-68 BM-C-41
OGX Maranho has 70% W.I.
OGX has 50% W.I. and Maersk is the operator Waiting for a new rig
has 50% W.I. and Perenco is the operator
46
CONCLUDED WELLS (6 OF 6)
Well CA BY OGX-76 OGX-75 Block BM-C-40 BM-C-41 Accumulation Per - 1 Tambora 3 Rig Ocean Lexington Ocean Ambassador Coast Distance 96 km 86 km Water Depth 103m 130m Albian: 6m Albian: 49m Net Pay
OGX Maranho has 70% W.I.
OGX has 50% W.I. and Maersk is the operator Waiting for a new rig
4OGX
has 50% W.I. and Perenco is the operator
47
PARNABA BASIN
Gas Sale Contract with MPX Revenue Schematic
TPP Maranho III
(by Jan/14 20 year contract 50% take-or-pay)
TPP Maranho IV + V
(by Jan/13 15 year contract 0% take-or-pay)
$ Fixed revenue (gas plant rental) $ Variable revenue (varies according to plants dispatch)
$
$
TPPs
Gas Producers
Future Projects
(MPX and Petra)
CONTRACT CONDITIONS: The contract should provide a 15% ROE for the TPP (Thermal Power Plant)
(OGX Maranho and Petra)
Gas producers should receive remaining revenue, guaranteeing extraordinary margins (net back)
48