High IV Chips - -
https://www.projectstoday.com/Projects/ProjectPrint.aspx?news=1&token=aa82235169faa95ab7bbb0ae4fc624d5a4ba807ad3c69dc6c67b01d85… 1/42
5/21/25, 3:43 PM PToday
Promoter Offices
Company Name : AYM Syntex Ltd.
Contact :
Mr. Neeraj Bharadwaj (Associate Vice
President-Projects & Commercial)
Mobile No : 08108152854
Email :neeraj_bhardwaj@aymgroup.com
Project: Kh.No,
178/91/75min,179/91/75,181/91/75min,
182/91/75
Maksoospur Village
Kathua - 184101
Jammu & Kashmir, India
It proposed to set up Sewage Treatment Plant (STP) with capacity of 550 KLD and
Effluent Treatment Plant (ETP) with capacity of 20 KLD based on MBBR
technology.
Progress:
11 May 2025: AYM Syntex has submitted a fresh application to MoEF&CC to grant terms
of reference (ToR) for the project.
15 May 2025: As communicated to Projects Today by an official from AYM Syntex Ltd.,
the company is awaiting for Terms of Reference (ToR) for the project.
Go Top
https://www.projectstoday.com/Projects/ProjectPrint.aspx?news=1&token=aa82235169faa95ab7bbb0ae4fc624d5a4ba807ad3c69dc6c67b01d85… 2/42
5/21/25, 3:43 PM PToday
Industry Apparels
Promoter Offices
Company Name : Jain Cord Industries Pvt. Ltd.
Contact :
Mr. Aditya Jain (Partner)
Mobile No : 07860866666
https://www.projectstoday.com/Projects/ProjectPrint.aspx?news=1&token=aa82235169faa95ab7bbb0ae4fc624d5a4ba807ad3c69dc6c67b01d85… 3/42
5/21/25, 3:43 PM PToday
Progress:
05 May 2025: The project is under initial stage of planning.(more)
14 May 2025: As communicated to Projects Today by an official from Jain Cord Industries
Pvt. Ltd., the project is in its initial stage.
Go Top
https://www.projectstoday.com/Projects/ProjectPrint.aspx?news=1&token=aa82235169faa95ab7bbb0ae4fc624d5a4ba807ad3c69dc6c67b01d85… 4/42
5/21/25, 3:43 PM PToday
Promoter Offices
Company Name : Gloster Ltd.
Contact :
Mr. R K Maheshwari (Manager - Purchase)
Mobile No : 09836166666
Email :purchase@glosterjute.com
Bag 20
Progress:
18 April 2025: The West Bengal Pollution Control Board granted consent to establish the
project.
Go Top
https://www.projectstoday.com/Projects/ProjectPrint.aspx?news=1&token=aa82235169faa95ab7bbb0ae4fc624d5a4ba807ad3c69dc6c67b01d85… 5/42
5/21/25, 3:43 PM PToday
https://www.projectstoday.com/Projects/ProjectPrint.aspx?news=1&token=aa82235169faa95ab7bbb0ae4fc624d5a4ba807ad3c69dc6c67b01d85… 6/42
5/21/25, 3:43 PM PToday
Promoter Offices
Company Name : Unify Texturisers Pvt. Ltd.
Contact :
Mr. Chandrashekhar Mukund Chincholikar
(General Manager-Commenrcial)
Mobile No : 09824466302
Email
:unifysil@rediffmail.com,unifysil@gmail.com
Progress:
30 January 2024: As told to Projects Today (PT), Unify Texturisers was awaiting for
environment clearance for the project.
08 August 2024: As told to Projects Today (PT), Unify Texturisers was still awaiting for
environment clearance for the project.
Go Top
https://www.projectstoday.com/Projects/ProjectPrint.aspx?news=1&token=aa82235169faa95ab7bbb0ae4fc624d5a4ba807ad3c69dc6c67b01d85… 7/42
5/21/25, 3:43 PM PToday
Promoter Offices
Company Name : Satkar Processors Pvt. Ltd.
Contact :
Mr. JP Sodani (Director)
Mobile No : 09672515000
https://www.projectstoday.com/Projects/ProjectPrint.aspx?news=1&token=aa82235169faa95ab7bbb0ae4fc624d5a4ba807ad3c69dc6c67b01d85… 8/42
5/21/25, 3:43 PM PToday
The project also includes a unit for cotton fabric with a capacity of 110 lakh meters
per annum.
The project will also include DG sets with a capacity of 3 x 500 KVA.
Progress:
30 May 2024: The Rajasthan Pollution Control Board granted consent to establish the
project.
Go Top
https://www.projectstoday.com/Projects/ProjectPrint.aspx?news=1&token=aa82235169faa95ab7bbb0ae4fc624d5a4ba807ad3c69dc6c67b01d85… 9/42
5/21/25, 3:43 PM PToday
Promoter Offices
Company Name : Khatri Dyeing Pvt. Ltd.
Contact :
Mr. Mohammed Salim E Khatri (Director)
Mobile No : 09820072649
https://www.projectstoday.com/Projects/ProjectPrint.aspx?news=1&token=aa82235169faa95ab7bbb0ae4fc624d5a4ba807ad3c69dc6c67b01d8… 10/42
5/21/25, 3:43 PM PToday
The project will spread over 1.23 acres (5,000 sq mtr) of land.
Finance:
19 April 2022: Around Rs 11.45 crore of project cost will be funded through bank loan and
remaining Rs 6.27 crore from internal accruals & Rs 6.28 crore from others.
Progress:
19 April 2022: As told to Projects Today (PT), work on the project was expected to
commence by January 2023.
15 May 2024: As told to Projects Today (PT), land acquisition process was still underway.
07 June 2024: As told to Projects Today (PT), land acquisition process was still
underway.
07 May 2025: As communicated to Projects Today by an official from Khatri Dyeing Pvt.
Ltd., land acquisition is in progress.
Go Top
https://www.projectstoday.com/Projects/ProjectPrint.aspx?news=1&token=aa82235169faa95ab7bbb0ae4fc624d5a4ba807ad3c69dc6c67b01d8… 11/42
5/21/25, 3:43 PM PToday
- Bharuch Gujarat
https://www.projectstoday.com/Projects/ProjectPrint.aspx?news=1&token=aa82235169faa95ab7bbb0ae4fc624d5a4ba807ad3c69dc6c67b01d8… 12/42
5/21/25, 3:43 PM PToday
Promoter Offices
Company Name : Texfil Pvt. Ltd.
Contact :
Mr. Shailesh Bhagat (-Purchase Manager)
Mobile No : 08000514500
Email :shaileshrbhagat@gmail.com
Mr. Akilesh Diwan (Senior Manager)
Mobile No : 09687773773
Email :ajayyadav2346@gmail.com
The project will use polyester textile waste in all forms to produce polyester chips.
Note: Earlier, the company plans to set up Recycled Polyester Yarn manufacturing
unit with the capacity of 26,250 MT.
Finance:
11 June 2024: The project will be funded through a mix of equity and debt.
Progress:
11 June 2024: The project is under planning stage.
https://www.projectstoday.com/Projects/ProjectPrint.aspx?news=1&token=aa82235169faa95ab7bbb0ae4fc624d5a4ba807ad3c69dc6c67b01d8… 13/42
5/21/25, 3:43 PM PToday
Go Top
https://www.projectstoday.com/Projects/ProjectPrint.aspx?news=1&token=aa82235169faa95ab7bbb0ae4fc624d5a4ba807ad3c69dc6c67b01d8… 14/42
5/21/25, 3:43 PM PToday
Promoter Offices
Company Name : Reliance Industries Ltd.
Contact :
Mr. Prashant Gogate (Senior Vice President)
Mobile No : 07043054030
Email :prashant.gogate@ril.com
https://www.projectstoday.com/Projects/ProjectPrint.aspx?news=1&token=aa82235169faa95ab7bbb0ae4fc624d5a4ba807ad3c69dc6c67b01d8… 15/42
5/21/25, 3:43 PM PToday
Progress:
16 October 2024: Reliance Industries has submitted an application to MoEF&CC to grant
terms of reference (ToR) for the project.
28 November 2024: As informed to Projects Today by Mr. Prashant Gogate, Senior Vice
President of Reliance Industries Ltd., currently the company is awaiting Terms of
Reference (ToR) for the project.
Go Top
Promoter Offices
Company Name : Filatex India Ltd.
https://www.projectstoday.com/Projects/ProjectPrint.aspx?news=1&token=aa82235169faa95ab7bbb0ae4fc624d5a4ba807ad3c69dc6c67b01d8… 17/42
5/21/25, 3:43 PM PToday
Note: Earlier, the company plans expansion of Fully Drawn Yarn (FDY) with 14,400
MTPA capacity.
Progress:
29 January 2025: The Board of Directors has granted approval for the project.
23 April 2025: The Board of Directors has granted further investment approval for the
project.
Go Top
Promoter Cottonworld
Industry Apparels
https://www.projectstoday.com/Projects/ProjectPrint.aspx?news=1&token=aa82235169faa95ab7bbb0ae4fc624d5a4ba807ad3c69dc6c67b01d8… 18/42
5/21/25, 3:43 PM PToday
Apparels - -
Promoter Offices
Company Name : Cottonworld
Contact :
Mr. Alagappan Ramiah (Administrative
Officer-Head - Admin And Systems)
Mobile No : 09367333533
Email :alagappanrm@gmail.com
https://www.projectstoday.com/Projects/ProjectPrint.aspx?news=1&token=aa82235169faa95ab7bbb0ae4fc624d5a4ba807ad3c69dc6c67b01d8… 19/42
5/21/25, 3:43 PM PToday
Progress:
31 December 2022: The State Level Single Window Clearance Authority (SLSWCA) has
approved the industrial investment proposal of Rs 50 crore for the project.
19 March 2024: As told to Projects Today (PT), land has been acquired for the project.
Cottonworld awaiting for other necessary government approvals for the project.
13 June 2024: As told to Projects Today (PT), Cottonworld was still awaiting for other
necessary government approvals for the project.
Go Top
Industry Apparels
https://www.projectstoday.com/Projects/ProjectPrint.aspx?news=1&token=aa82235169faa95ab7bbb0ae4fc624d5a4ba807ad3c69dc6c67b01d8… 20/42
5/21/25, 3:43 PM PToday
Readymade Garments - -
Promoter Offices
Company Name : Kashida Apparels Pvt. Ltd.
Contact :
Mr. Surendra Paswan (Manager-Eectrical)
Mobile No : 09584839711
https://www.projectstoday.com/Projects/ProjectPrint.aspx?news=1&token=aa82235169faa95ab7bbb0ae4fc624d5a4ba807ad3c69dc6c67b01d8… 21/42
5/21/25, 3:43 PM PToday
The project will be implemented in two phases and will generate employment to
3,000 people.
Progress:
21 April 2023: Cabinet Committee on Investment Promotion of Madhya Pradesh
government approved the project.
01 June 2023:
Work on the Phase I was commenced.
23 April 2024: As told to Projects Today (PT), designing work for the Phase II was under
progress.
11 June 2024: As told to Projects Today (PT), the civil work on the project was underway.
Go Top
https://www.projectstoday.com/Projects/ProjectPrint.aspx?news=1&token=aa82235169faa95ab7bbb0ae4fc624d5a4ba807ad3c69dc6c67b01d8… 22/42
5/21/25, 3:43 PM PToday
https://www.projectstoday.com/Projects/ProjectPrint.aspx?news=1&token=aa82235169faa95ab7bbb0ae4fc624d5a4ba807ad3c69dc6c67b01d8… 23/42
5/21/25, 3:43 PM PToday
Promoter Offices
Company Name : Bhumi Tex Industries Pvt. Ltd.
Contact :
Mr. Sanjay R Shah (MD)
Mobile No : 09324506767
Email :sanjay@bhumitex.com
Unknown: Undisclosed
India
https://www.projectstoday.com/Projects/ProjectPrint.aspx?news=1&token=aa82235169faa95ab7bbb0ae4fc624d5a4ba807ad3c69dc6c67b01d8… 24/42
5/21/25, 3:43 PM PToday
Progress:
01 January 2024:
Work on the project has commenced.
24 July 2024:
As told to Projects Today (PT), Bhumi Tex Industries still awaiting for Central/State
Government Approval.
Go Top
https://www.projectstoday.com/Projects/ProjectPrint.aspx?news=1&token=aa82235169faa95ab7bbb0ae4fc624d5a4ba807ad3c69dc6c67b01d8… 25/42
5/21/25, 3:43 PM PToday
- Khurda Odisha
Promoter Offices
Company Name : Odisha Textile Manufacturing Pvt Ltd
Contact :
Mr. Chirag Mohanty (Director)
Mobile No : 09937099700
Email :hi@otmyarns.com
https://www.projectstoday.com/Projects/ProjectPrint.aspx?news=1&token=aa82235169faa95ab7bbb0ae4fc624d5a4ba807ad3c69dc6c67b01d8… 26/42
5/21/25, 3:43 PM PToday
Progress:
09 August 2024:
As told to Projects Today (PT), work on the project was expected to commence by
October 2024.
Go Top
- Khurda Odisha
https://www.projectstoday.com/Projects/ProjectPrint.aspx?news=1&token=aa82235169faa95ab7bbb0ae4fc624d5a4ba807ad3c69dc6c67b01d8… 27/42
5/21/25, 3:43 PM PToday
Socks - -
Promoter Offices
Company Name : B. K. International Pvt. Ltd.
Contact :
Mr. Praveen Agarwal (Director)
Mobile No : 09810106606
https://www.projectstoday.com/Projects/ProjectPrint.aspx?news=1&token=aa82235169faa95ab7bbb0ae4fc624d5a4ba807ad3c69dc6c67b01d8… 28/42
5/21/25, 3:43 PM PToday
Progress:
25 July 2023: The State Level Single Window Clearance Authority (SLSWCA) has
accorded approval for the project.(more)
02 August 2023:
As told to Projects Today (PT), the project was under initial stage.
18 March 2024: As told to Projects Today (PT), B. K. International awaiting for land
allotment letter from government and expected to receive by April 2024.
Go Top
https://www.projectstoday.com/Projects/ProjectPrint.aspx?news=1&token=aa82235169faa95ab7bbb0ae4fc624d5a4ba807ad3c69dc6c67b01d8… 29/42
5/21/25, 3:43 PM PToday
Cotton yarn - -
Promoter Offices
Company Name : Pallavaa Group
Contact :
Ms. Abhinaya (---PA to MD)
Mobile No : 09843232070
Email :info@pallavaagroup.com
Unknown: Undisclosed
India
https://www.projectstoday.com/Projects/ProjectPrint.aspx?news=1&token=aa82235169faa95ab7bbb0ae4fc624d5a4ba807ad3c69dc6c67b01d8… 30/42
5/21/25, 3:43 PM PToday
https://www.projectstoday.com/Projects/ProjectPrint.aspx?news=1&token=aa82235169faa95ab7bbb0ae4fc624d5a4ba807ad3c69dc6c67b01d8… 31/42
5/21/25, 3:43 PM PToday
Progress:
23 November 2021: Pallaava Group has signed an memorandum of understanding
(MoU) with the state government for the project.(more)
11 December 2021: As told to Projects Today (PT), work on the project was expected to
commence by March 2022.
12 May 2022:
As told to Projects Today (PT), land allotment and paper work for the same was
underway.
31 August 2022:
As told to Projects Today (PT), land allotment and paper work for the same was
completed.
31 December 2022:
As told to Projects Today (PT), work on the project was commenced.
08 September 2023:
As told to Projects Today (PT), construction work on the project was in process
(Percentage wise not disclosed).
19 January 2024:
As told to Projects Today (PT), around 20 percent work on the project was
completed.
https://www.projectstoday.com/Projects/ProjectPrint.aspx?news=1&token=aa82235169faa95ab7bbb0ae4fc624d5a4ba807ad3c69dc6c67b01d8… 32/42
5/21/25, 3:43 PM PToday
Go Top
Industry Apparels
Promoter Offices
Company Name : Arundhati Bandhakala LLP
Contact :
Mr. Saroj Kumar Pradhan (Project Engineer)
Mobile No : 09090053633
Email :sarojpk3@gmail.com
https://www.projectstoday.com/Projects/ProjectPrint.aspx?news=1&token=aa82235169faa95ab7bbb0ae4fc624d5a4ba807ad3c69dc6c67b01d8… 33/42
5/21/25, 3:43 PM PToday
Progress:
18 March 2024: As told to Projects Today (PT), work on the project was expected to
commence by May 2024.
Go Top
Industry Apparels
1 35.26 07-Apr-2025
0 26.24 30-Dec-2024
- Muzaffarpur Bihar
https://www.projectstoday.com/Projects/ProjectPrint.aspx?news=1&token=aa82235169faa95ab7bbb0ae4fc624d5a4ba807ad3c69dc6c67b01d8… 34/42
5/21/25, 3:43 PM PToday
Promoter Offices
Company Name : Gogreen Apparel Ltd.
Contact :
Mr. Prakash Kant Mishra (Manager)
Mobile No : 09570220292
Email :prakashkant.mishra@pearlglobal.co.in
https://www.projectstoday.com/Projects/ProjectPrint.aspx?news=1&token=aa82235169faa95ab7bbb0ae4fc624d5a4ba807ad3c69dc6c67b01d8… 35/42
5/21/25, 3:43 PM PToday
Progress:
01 April 2024: All Build Construct Solutions bagged the contract for providing civil
construction services for the project.
30 December 2024:
Gogreen Apparel is still awaiting for Bihar State Investment Promotion Board
(SIPB) approval for the project.
10 January 2025: Gogreen Apparel has received consent to establish (CTE) from the
Bihar State Pollution Control Board.
16 January 2025:
As communicated to Projects Today by an official from Gogreen Apparel Ltd., the
project is currently in the completion stage.
07 April 2025:
Gogreen Apparel is still awaiting for Bihar State Investment Promotion Board (SIPB)
approval for the project.
Go Top
https://www.projectstoday.com/Projects/ProjectPrint.aspx?news=1&token=aa82235169faa95ab7bbb0ae4fc624d5a4ba807ad3c69dc6c67b01d8… 36/42
5/21/25, 3:43 PM PToday
- Jhajjar Haryana
Promoter Offices
Company Name : Resol Vinyls & Chlorides Ltd.
Contact :
Mr. Krishan Agarwal (Director)
Mobile No : 09811342560
https://www.projectstoday.com/Projects/ProjectPrint.aspx?news=1&token=aa82235169faa95ab7bbb0ae4fc624d5a4ba807ad3c69dc6c67b01d8… 37/42
5/21/25, 3:43 PM PToday
Progress:
26 March 2025: Resol Vinyls & Chlorides has received consent to establish (CTE) from
the Haryana State Pollution Control Board.
21 April 2025:
As communicated to Projects Today by an official from Resol Vinyls & Chlorides Ltd.,
contractor appointment process is in progress.
Go Top
https://www.projectstoday.com/Projects/ProjectPrint.aspx?news=1&token=aa82235169faa95ab7bbb0ae4fc624d5a4ba807ad3c69dc6c67b01d8… 38/42
5/21/25, 3:43 PM PToday
Promoter Offices
Company Name : Shreedhar Spinners Pvt. Ltd.
Contact :
Mr. D C Hiremath (General Manager -
Operations)
Mobile No : 09764851015
Civil Contractor Company Name : Amar Shakti Techno Estate Pvt. Ltd.
https://www.projectstoday.com/Projects/ProjectPrint.aspx?news=1&token=aa82235169faa95ab7bbb0ae4fc624d5a4ba807ad3c69dc6c67b01d8… 39/42
5/21/25, 3:43 PM PToday
Progress:
06 May 2024:
Amar Shakti Group bagged a contract to provide civil construction services for the project.
(Order Details)
15 August 2024:
Work on the project was commenced.
13 November 2024: As per information available with Projects Today (PT), RCC structure
was underway.
14 April 2025:
As communicated to Projects Today by an official from Shreedhar Spinners Pvt. Ltd., the
project is progressing slowly.
Go Top
https://www.projectstoday.com/Projects/ProjectPrint.aspx?news=1&token=aa82235169faa95ab7bbb0ae4fc624d5a4ba807ad3c69dc6c67b01d8… 40/42
5/21/25, 3:43 PM PToday
Deferred 08-Jul-2024
Spinning Mill - -
Promoter Offices
Company Name : Kautilya Industries Pvt. Ltd.
Contact :
Mr. Satyadev Chaudhary (MD)
Mobile No : 09810070846
Email :satyadev@kautilyaipl.com
Unknown: Undisclosed
India
https://www.projectstoday.com/Projects/ProjectPrint.aspx?news=1&token=aa82235169faa95ab7bbb0ae4fc624d5a4ba807ad3c69dc6c67b01d8… 41/42
5/21/25, 3:43 PM PToday
Progress:
01 May 2023:
Work on the project was commenced.
22 November 2023:
As per information available with Projects Today (PT), currently work on the project
was kept on hold due to air pollution in region as per instructions by MoEF in Delhi
NCR.
08 July 2024: As told to Projects Today (PT), the project was kept on hold.
19 December 2024: As per information available with Projects Today (PT), RCC structure
was underway.
Go Top
https://www.projectstoday.com/Projects/ProjectPrint.aspx?news=1&token=aa82235169faa95ab7bbb0ae4fc624d5a4ba807ad3c69dc6c67b01d8… 42/42