1. When subcontractor reach the site, what should subcontractor do?
Subcontractor must inform PM/HW engineer/RSC & NOC/TOC before enter the site.
2. When doing the operation onsite, the scenario is different with SOW, what should
subcontractor do?
B. Stop the operation and call to TD/TL within 5minutes to get help and assistance
3. The board can be use as interface for environment alarm?
C. UPEU
4. The function not supported WDT during commissioning BTS?
D. Check Balance
5. What cable need when do commissioning use WDT?
C. USB type C to USB
6. Which one is NOT required for tagging netgear MOS?
A. Account ISDP
7. At which level the task ID are ready to be reviewed by vendor on tagging dismantle
A. Need Approval L0
8. What is the next step in Netgear dismantle after creating task ID?
C. Assign Team Member/Team Group to Task ID Dismantle/MVC
9. Which status that is applicable if the materials were plugged and on air while tagging
dismantle:
B. Active
10. Below is not abnormal condition for material
A. Good Packaging for Dismantle Material from Site
11. What is determination of SS & SV?
D. Site Sign & Site Verify
12. Which material doesn't need to package using ESD bag?
D. Coupler
13. Definisi dari Resiko adalah
B. Peluang/kemungkinna terpaparnya sesorang terhadap bahaya. Contoh: Terjatuh, kejatuhan,
tersetrum
14. Manakah dibawah ini yang bukan termasuk tipe cabinet Huawei?
D. BTA3900
15. Satuan untuk besaran “Arus Listrik"" adalah:
A. Ampere
16. Fungsi site verify di ISDP
C.Sebagai bukti bahwa instalasi sudah selesai
17. Foto yang harus diupload pada saat Clock In :
D. Semua benar
18. Fungsi dari Clock In :
C. Sebagai absen team di lapangan dan pemeriksaan EHS tahap awal
19. Fungsi site sign di ISDP
C. Sebagai bukti bahwa site tersebut MOS
20. Fungsi dari toolboxmeeting:
D. Semua benar
21. Aplikasi ISDP mobile dapat di download(unduh) di browser handphone melalui situs?
C.W3m.huawei.com
22. Mengapa EHS wajib dikerjakan terlebih dahulu saat kita berada di site
B.Semuanya benar
23. Related to network security, what certificate subcontractor pic (team leader) must have
before do any activity on site?
D. Pass ID certificate
24. Berikut yang tidak merupakan sumber listrik DC
C.DG
25. Rectifier A memiliki tegangan 54 VDC dan rectifier B memiliki tegangan 51VDC. Jika
suatu perangkat terkoneksi secara dual source di rectifier A dan rectifier B, maka
berdasarkan besar tegangan, supply beban mengarah ke arah …
A.Rectifier A
26. Which one is purpose for tagging netgear MOS?
B.Inventory material on site in customer system
27. At which level the task ID are ready to be reviewed by PM ND IOH:
A. Need Approval L1
28. Workers should moving cargo...
A.Carefully
29. Which a tool is needed to prepare before start packaging?
B. Gloves
30. Sebelum mulai bekerja, apa yang perlu dipersiapkan
D.Semua benar
31. Kabel Grounding pada BTS, seharusnya dikoneksikan ke :
B.Bus Bar
32. Pemasangan Waterproof untuk kabel jumper harus memenuhi spesifikasi berikut
D.3 kali isolation tape, 3 x rubber, 3x isolatioan tape, lalu gunakan tie wrap warna hitam pada kedua
ujung nya
33. Kabel power, ground cable harus didistribusikan dengan kabel sinyal secara terpisah
dengan diberi jarak:
A. 3 Cm
34. Berikut ini merupakan alur Tugas yang benar dilakukan tim saat bekerja di site, di dalam
DUID/Site ISDP mobile
A. EHS-Clock in-Task-Clock out
35. Fungsi dari menu Clock in / Clock out adalah, Kecuali
C. Penanda tim berada di site Penanda tim sudah melakukan Tugas EHS,Site sign(SS) &Site
verify(SV)
36. The CPRI connection from BBU to RRU use which board ?
A.UBBP
37. Sistem output DC rectifier Huawei dibedakan menjadi BLVD dan LLVD. Jika terdapat
perangkat yang terkoneksi pada BLVD dan LLVD, saat PLN off dan terbackup baterai,
output manakah yang akan off lebih dahulu seiring dengan penurunan kapasitas baterai?
B.LLVD
38. At which level the task ID are ready to be planned for the material inbound:
X Approved by manager
39. Which one is not point for material management?
D. MOS management
40. When is the right time to do SS?
B.After material handover at site with receiver
41. How many IOH AMG Warehouse in national wide?
X7
X 11
42. When dismantling Antenna MW with diameter more than 0.6M what material need to
check and packing together?
D. Antenna + OMT + fix strut + bracket + u-bolt
43. Jika terjadi kecelakaan, dampak apa saja yang dapat ditimbulkan di lihat dari sisi
ekonomi, kecuali
C. Perusahaan harus berurusan dengan pihak berwenang
44. Kepanjangan dari P3K adalah
C. Pertolongan Pertama Pada Korban
45. APJP (Alat penahan jatuh perorangan) berfungsi untuk
D. Sebagai alat penahan jatuh ketika pekerja terlepas ditower
46. Berapa maksimal panjang tali ganda dengan peredam kejut dan pengunci otomatis yang
diijinkan oleh permenaker no.9 tahun 2016 :
C.1.8 meter
47. Apa Fungsi utama dari eCertificate di ISDP mobile
B. Pengganti kartu PASS ID fisik
48. The LAN cable or optical cable for transmission need to connect to board in BTS5900
B. UMPT
49. Tugas yang wajib harus di lakukan saat kita akan bekerja di site
D. EHS
50. Tugas yang harus di lakukan saat kita menerima material di site
X Clock in
51. Akun Yang di gunakan untuk log in/masuk ke ISDP mobile adalah akun
A.Uniportal
52. Dalam mengerjakan QC Task(Tugas QC) anggota dalam tim dapat membantu
mengerjakannya melalui menu ........ ,di ISDP mobile V3
C. Visitor Mode
53. Dalam mengerjakan QC Task(Tugas QC) anggota dalam tim dapat membantu
mengerjakannya melalui menu ........ ,di ISDP mobile V3
X Task
54. Subcontractor must call Huawei PM/CTM/TD if encounter any problem such as abnormal
during operation within …....minutes
ABC
A.1 minutes
B.3 minutes
C.5 minutes
D.10 minutes
E.15 minutes
55. What the following flows For Activity On site are Correct?
AC
A.Subcontractor must inform Huawei PM/Engineer before enter and leave the sites
B.Do the activity without follow the SOW
C.Take picture for existing installation, hardware and surrounding sites as evidence
D.Do activity on site directly without coordination with Huawei Engineer
56. Hal - Hal yang perlu diperhatikan saat sebelum power on rectifier
ABCD
A. Pastikan Installasi fisik kabel phasa, netral dan grouding sudah kuat/kencang
B.Pastikan Tidak ada short circuit dalam perangkat
C.Cek tegangan output saat kondisi MCB/breaker off
D.Pastikan seluruh MCB/breaker dalam posisi off
57. Berikut merupakan alarm yang wajib di test saat simulasi alarm setelah installasi rectifier:
ABCD FGH
A. Mains Fail
B.Arrester/SPD Fail
C.Rectifier Module Fail
D.Load Fuse Broken
E.Low Temp
F.Door Open
G.DC Undervoltage
H.Ambient High Temp
58. Below are consider as safety equipment / tools
ABCD
A. Safety Vest
B.Safety Shoes
C.Forklift
D.Helmet
E.Truck
59. What need to be consider for temporary storage management?
ACE
A. Inbound
B.Forklift Quantity
C.Outbound
D.Manpower
E.Inventory record
60. Good unloading requirement are...
ABCDE
A. Check before unload
B.Unload orderly
C.Forbidden throw
D.Gently put
E.Not unload open air when rain
61. What need to check of the vehicle before use?
ABCE
A. Size of truck
B.Inside truck must be clean
C.No water or oil inside
D.No fuel
E.No deformation inside truck
62. Which packaging material do we need to prepare?
ABD
A. Label
B.ESD bag
C.gloves
D.wooden packing
63. Below are list for java island PO submission
ABCD
A. Site distance <100 km
B.100 km < Site distance <= 200km
C.Site distance >400km
D.200 km < Site distance <= 400km
E.600 km < Site distance <= 800km
64. Which material need to package using ESD bag?
ABC
A.Board
B.IDU
C.RRU
D.Coupler
65. The power supply of BTS5900 is AC power
False
66. The PIC who support work at height must be have a valid certificate WAH
True
67. SPD (Surge Protector Device) dapat melindungi perangkat ketika terjadi short circuit
akibat sambaran petir
True
68. Salah satu perangkat yang menghasilkan sumber listrik AC adalah DG dan Solar Panel
FALSE
69. Pada saat kondisi baterai charging, tegangan output rectifier berada pada tegangan 48-51
V DC.
TRUE
70. Drop voltage pada system tegangan listrik dapat berefek kepada kinerja/ performa
rectifier.
TRUE
71. Saat PLN trip/off, perangkat yang di supply oleh rectifier akan ikut mati jika tidak
terdapat baterai pada system
TRUE
72. Backup time untuk 1 bank baterai dipengaruhi oleh total load perangkat yang di supply
TRUE
73. Sesuai dengan standar dari Huawei, kabel power DC menggunakan warna merah untuk
+48V (positive) dan warna biru untuk -48V (negative)
FALSE
74. When do commissioning BTS5900 we must use laptop?
FALSE
75. The SFP type and speed can be different between SFP on RRU and UBBP
FALSE
76. Jika sudah terdapat kabel Netral, maka kabel grounding boleh untuk tidak di install
FALSE
77. There are 3 steps approval for netgear
TRUE
78. Engineer account can also be utilized to create task ID
FALSE
79. Subcon can claim more than 1 PO for 1 DU
FALSE
80. All material needs same handling & packaging.
FALSE
81. We need to packing antenna using wooden packing for crossing island delivery
TRUE
82. Add 4G Module in Customer Live Network 3G Wireless site, No need RFC 3-Approvals
FALSE
83. Netgear MOS is one of requirement for ATP Submit in IOH Project
TRUE
84. The subcontractor must also be responsible for tagging task ID destination after inbound
FALSE
85. Only material type 2 and 3 can put in site when MOS
TRUE
86. Every port like on microwave antenna, ODU, waveguide / coupler, etc no need to be
covered by tape or similar protection
FALSE
87. Tegangan listrik standar di seluruh Indonesia umumnya adalah 230 V dengan frekuensi
standar 50 Hz
TRUE
88. Only material type 1 need tagging netgear MOS
FALSE
89. Inventory management is not important for CIAG
TRUE
90. Material volume <0.6 cbm consider as small PO submission
TRUE
91. Every port like on microwave antenna, ODU, waveguide / coupler, etc no need to be
covered by tape or similar protection
FALSE
92. During installation RF jumper to Antenna, we can install freely and not follow SOP
FALSE
93. Semakin kecil diameter kabel yang digunakan, maka semakin kuat daya hantar arus yang
dapat mengalir di kabel tersebut.
FALSE
94. Saat PLN trip/off, perangkat yang di supply oleh rectifier akan ikut mati jika tidak
terdapat baterai pada system
TRUE
95. Netgear is application system for Huawei security
FALSE
96. Site Plan (for Netgear dismantle/MVC) is registered/uploaded after tagging onsite
FALSE
97. Material needs to handle properly start from dismantle, until material inbound / Handover
to Huawei Customer
TRUE
98. For tagging netgear required account ISDP
FALSE
99. CCTV, Security and fire wall are instrument to prevent fire at Warehouse
FALSE
100. Inbound to AMG WH can directly proceed without customer/Huawei coordination and
confirmation
FALSE