The document outlines a cost estimate of Rs. 1,81,38,000 for replacing a deteriorated steel overhead storage tank at BG colony with a 50,000-gallon RCC tank, as part of sanctioned works for 2024-25 and 2025-26. The existing tank has exceeded its lifespan and is leaking, causing water supply issues for approximately 800 quarters. The proposal includes a detailed estimate under Plan Head - 5100(CAP) for the necessary construction work.

Uploaded by

jedrg2022
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3 views2 pages

Outer Sheet

The document outlines a cost estimate of Rs. 1,81,38,000 for replacing a deteriorated steel overhead storage tank at BG colony with a 50,000-gallon RCC tank, as part of sanctioned works for 2024-25 and 2025-26. The existing tank has exceeded its lifespan and is leaking, causing water supply issues for approximately 800 quarters. The proposal includes a detailed estimate under Plan Head - 5100(CAP) for the necessary construction work.

Uploaded by

jedrg2022
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

N. F. Railway.

ABSTRACT OF COST OF WORK


(OUTER SHEET)
Department ENGINEERING___ Estimate No. _ /PNO of 2025-26_________ Framed by DEN/GHY

Designation DEN/GHY Region HQ. District DEN/GHY Station of Mileage MLG_______________________

Name of work: - At NGC - Replacement of pressed steel Overhead storage tank at BG colony by 50 thousand gallons RCC
OH tank including pipeline network.
Estimate Cost Allocation
Store
Store To be Original
Sub-Head of work Mate
Work In Purchas Total In case of revised HEAD Total
rial
Stock ed Estimate

Cash Store Total Plan Head – 5100(CAP)


Rs.1,81,38,000/- Nil Rs.1,81,38,000/- Project ID-08.00.51.25.3.55.001

Fund- under
Report and justification over leaf.
Signature __________________________
Designation DEN/GHY
___________________________________________________________________________________________________________________
Sanction registered as
No.____________________________________ Dated________________
Indices and allocation verified (Subject to be Check Note as attached)
No. _ ____________dated______________
This required the sanction of the __________________________________

DFM/GHY SR.DEN/C/LMG
Report & Justification

This is a sanctioned work under umbrella works of 2024-25 & 2025-26 against Plan Head:
5100(CAP).

The steel OH tank at BG colony was constructed prior to 1965. The Codal life of the tank has
already been over. Due to heavy deterioration of the components and leakage occurs in several
locations now it is beyond economical repairs. Filtered water from NGC Hilltop Filter House is
accumulated in BG & MG Storage tanks of capacity 20000 & 30000 Gals each respectively. However,
the BG Steel Overhead Tank is leaky and damaged resulting in huge loss of water making the water
supply irregular. This Overhead tank currently supplies to around 800 quarters of BG colony and is
currently running at 75 % capacity due to leakages. Hence this proposal has been prepared for
construction of a 50000 Gals Intze tank based on Based on PCE Plan No T/07/2010 by replacing the
damaged BG Steel Tank.

Accordingly, a detailed estimate has been prepared amounting Rs. 1,81,38,000/- under Plan
Head -5100(CAP).

Submitted for vetting please.