STAMP DUTY PAID
ERECTION ALL RISKS POLICY
WHEREAS the Insured named in the Schedule hereto has made to the PROGRESSIVE INSURANCE BHD (hereinafter called the Insurers) a written proposal by completing a questionnaire which, together with any other statements made in writing by the Insured for the purpose of this Policy is deemed to be incorporated herein. Now this Policy of insurance witnesseth that subject to the Insured having paid to the Insurers the premium mentioned in the Schedule and subject to the terms, exclusions, provisions and conditions contained herein or endorsed hereon the Insurers will indemnify the Insured in the manner and to the extent hereinafter provided. GENERAL EXCLUSIONS The Insurers will not indemnify the Insured in respect of loss, damage or liability directly or indirectly caused by or arising out of or aggravated by: a) war, invasion, act of foreign enemy, hostilities (whether war be declared or not), civil war, rebellion, revolution, insurrection, mutiny, riot, strike, lockout, civil commotion, military or usurped power, a group of malicious persons or persons acting on behalf of or in connection with any political organisation, conspiracy, confiscation, commandeering, requisition or destruction or damage by order of any government de jure or de facto or by any public authority; nuclear reaction, nuclear radiation or radioactive contamination; wilful act or wilful negligence of the Insured or of his representatives; cessation of work whether total or partial.
b) c) d)
In any action, suit or other proceeding where the Insurers allege that by reason of the provisions of Exclusion a) above any loss, destruction, damage or liability is not covered by this insurance the burden of proving that such loss, destruction, damage or liability is covered shall be upon the Insured. PERIOD OF COVER The liability of the Insurers shall commence notwithstanding any date to the contrary specified in the Schedule, directly upon commencement of work or after the unloading of the items entered in the Schedule at the site and shall continue until immediately after taking over or after the first test operation or test loading is completed whatever is the earlier, but not beyond four weeks (unless otherwise agreed in writing) from the date of commencement of the test. If, however, a part of a plant or one or several machine(s) is/are tested and/or put into operation or taken over, the cover for that particular part of the plant or machine(s) and any liability resulting therefrom ceases whereas the cover continues for the remaining parts. In the case of second-hand items, the insurance hereunder shall, however, cease immediately on the commencement of the test. At the latest the insurance shall expire on the date specified in the Schedule. Any extension of the Period of Insurance is subject to the prior written consent of the Insurers. GENERAL CONDITIONS 1. The due observance and fulfillment of the terms of this Policy in so far as they relate to anything to be done or complied with by the Insured and the truth of the. statements and answers in the questionnaire and proposal made by the Insured shall be a condition precedent to any liability of the Insurers. The Schedule and the Section(s) shall be deemed to be incorporated in and form part of this Policy and the expression this Policy wherever used in this contract shall be read as including the Schedule and the Section(s). Any word or expression to which a specific meaning has been attached in any part of this Policy or of the Schedule or of the Section(s) shall bear such meaning wherever it may appear. The Insured shall at his own expense take all reasonable precautions and comply with all reasonable recommendations of the Insurers to prevent loss, damage or liability and comply with statutory requirements and manufacturersrecommendations. a) b) Representatives of the Insurers shall at any reasonable time have the right to inspect and examine the risk and the Insured shall provide the representatives of the Insurers with all details and information necessary for the assessment of the risk The Insured shall immediately notify the Insurers by telegram and in writing of any material change in the risk and cause at his own expense such additional precautions to be taken as circumstances may require, and the scope of cover and/or premium shall, if necessary, be adjusted accordingly.
2.
3. 4.
No material alteration shall be made or admitted by the Insured whereby the risk is increased, unless the continuance of the insurance is confirmed in writing by the Insurers.
pib/hr/ear/09/08/el
Page 1
5.
In the event of any occurrence which might give rise to a claim under this Policy, the insured shall: a) b) c) d) e) immediately notify the Insurers by telephone or telegram as well as in writing, giving an indication as to the nature and extent of loss or damage; take all steps within his power to minimize the extent of the loss or damage; preserve the parts affected and make them available for inspection by a representative or surveyor of the Insurers; furnish all such information and documentary evidence as the Insurers may require; inform the police authorities in case of loss or damage due to theft or burglary.
The Insurers shall not in any case be liable for loss, damage or liability of which no notice has been received by the Insurers within 14 days of its occurrence. Upon notification being given to the Insurers under this condition, the Insured may carry out the repairs or replacement of any minor damage; in all other cases a representative of the Insurers shall have the opportunity of inspecting the loss or damage before any repairs or alterations are effected. If a representative of the Insurers does not carry out the inspection within a period of time which could be considered as adequate under the circumstances the Insured is entitled to proceed with the repairs or replacement. The liability of the Insurers under this Policy in respect of any item sustaining damage shall cease if said item is not repaired properly without delay. 6. The Insured shall at the expense of the Insurers do and concur in doing and permit to be done all such acts and things as may be necessary or required by the Insurers in the interest of any rights or remedies, or of obtaining relief or indemnity from parties (other than those insured under this Policy) to which the Insurers shall be or would become entitled or subrogated upon their paying for or making good any loss or damage under this Policy, whether such acts and things shall be or become necessary or required before or after the Insureds indemnification by the Insurers. If any difference shall arise as to the amount to be paid under this Policy (liability being otherwise admitted), such difference shall be referred to the decision of an Arbitrator to be appointed in writing by the parties in difference or if they cannot agree upon a single Arbitrator to the decision of two Arbitrators, one to be appointed in writing by each of the parties, within one calendar month after having been required in writing so to do by either of the parties, or, in case the Arbitrators do not agree, of an Umpire to be appointed in writing by the Arbitrators before entering upon the reference. The Umpire shall sit with the Arbitrators and preside at their meetings. The making of an award shall be a condition precedent to any right of action against the Insurers. If a claim is in any respect fraudulent, or if any false declaration is made or used in support thereof, or if any fraudulent means or devices are used by the Insured or anyone acting on his behalf to obtain any benefit under this Policy, or if a claim is made and rejected and no action or suit is commenced within three months after such rejection or, in the case of arbitration taking place as provided herein, within three months after the Arbitrator or Arbitrators or Umpire have made their award, all benefit under this Policy shall be forfeited. If at the time any claim arises under the Policy there be any other insurance covering the same loss, damage or liability, the Insurers shall not be liable to pay or contribute more than their rateable proportion of any claim for such loss, damage or liability.
7.
8.
9.
SECTION 1- MATERIAL DAMAGE The Insurers hereby agree with the Insured that if at any time during the period of cover the items or any part thereof entered in the Schedule shall suffer any unforeseen and sudden physical loss or damage from any cause, other than those specifically excluded, in a manner necessitating repair or replacement, the Insurers will indemnify the Insured in respect of such loss or damage as hereinafter provided by payment in cash, replacement or repair (at their own option) up to an amount not exceeding in respect of each of the items specified in the Schedule the sum set opposite thereto and not exceeding in any one event the limit of indemnity where applicable and not exceeding in all the total sum expressed in the Schedule as insured hereby. The Insurers will also reimburse the Insured for the cost of clearance of debris following upon any event giving rise to a claim under this Policy provided a separate sum therefor has been entered in the Schedule. Special Exclusions to Section 1 The Insurers shall not, however, be liable for: a) b) c) d) e) f) the deductible stated in the Schedule to be borne by the Insured in any one occurrence; consequential loss of any kind or description whatsoever including penalties, losses due to delay, lack of performance, loss of contract; loss or damage due to faulty design, defective material or casting, bad workmanship other than faults in erection; wear and tear, corrosion, oxidation, incrustation; loss of or damage to files, drawings, accounts, bills, currency, stamps, deeds, evidences of debt, notes, securities, cheques, packing materials such as cases, boxes, crates; loss discovered only at the time of taking an inventory
Page 2
pib/hr/ear/09/08/el
Provisions Applying to Section 1 Memo 1 - Sums Insured It is a requirement of this insurance that the sums insured stated in the Schedule (under items 1 and 2) shall not be less than the full value of each item at the completion of the erection, inclusive of freight, customs duties, dues, erection cost, and the Insured undertakes to increase or decrease the amounts of insurance in the event of any material fluctuation in the level of wages or prices provided always that such increase or decrease shall take effect only after the same has been recorded on the Policy by the Insurers. If, in the event of loss or damage, it is found that the sums insured are less than the amounts required to be insured, then the amount recoverable by the insured under this Policy shall be reduced in such proportion as the sums insured bear to the amounts required to be insured. Every object and cost item is subject to this condition separately. Memo 2 - Basis of Loss Settlement In the event of any loss or damage the basis of any settlement under this Policy shall be: a) b) in the case of damage which can be repaired the cost of repairs necessary to restore the items to their condition immediately before the occurrence of the damage less salvage, or in the case of a total loss - the actual value of the items immediately before the occurrence of the loss less salvage,
however, only to the extent the costs claimed had to be borne by the Insured and to the extent they are included in the sums insured and provided always that the provisions and conditions have been complied with. The Insurers will make payments only after being satisfied by production of the necessary bills and documents that the repairs have been effected or replacement has taken place, as the case may be. All damage which can be repaired shall be repaired, but if the cost of repairing any damage equals or exceeds the value of the items immediately before the occurrence of the damage, the settlement shall be made on the basis provided for in b) above. The cost of any provisional repairs will be borne by the Insurers if such repairs constitute part of the final repairs and do not increase the total repair expenses. The cost of any alterations, additions and/or improvements shall not be recoverable under this Policy. Memo 3 - Extension of Cover Extra charges for overtime, nightwork, work on public holidays, express freight are covered by this insurance only if previously and specially agreed upon in writing. Memo 4 - Surrounding Property Loss of or damage to property located on or adjacent to the site and belonging to or held in care, custody or control of the Principal(s) or the Contractor(s) shall only be covered if occurring in direct connection with the erection, construction or testing of the items Insured under Section 1 and happening during the Period of Cover, and provided that a separate sum therefor has been entered in the Schedule under Section 1, item 4. This cover does not apply to construction/erection machinery and construction/erection plant and equipment. SECTION 2 - THIRD PARTY LIABILITY The Insurers will indemnify the Insured up to but not exceeding the amounts specified in the Schedule against such sums which the Insured shall become legally liable to pay as damages consequent upon: a) b) accidental bodily injury to or illness of third parties (whether fatal or not), accidental loss of or damage to property belonging to third parties
occurring in direct connection with the erection, construction or testing of the items insured under Section 1 and happening on or in the immediate vicinity of the site during the Period of Cover. In respect of a claim for compensation to which the indemnity provided herein applies, the Insurers will in addition indemnify the Insured against a) b) all costs and expenses of litigation recovered by any claimant from the Insured, and all costs and expenses incurred with the written consent of the Insurers,
provided always that the liability of the Insurers under this Section shall riot exceed the limifs of indemnity stated in the Schedule.
pib/hr/ear/09/08/el
Page 3
Special Exclusions to Section 2 The Insurers will not indemnify the Insured in respect of: 1. 2. 3. the deductible stated in the Schedule to be borne by the Insured in any one occurrence; the expenditure incurred in doing or redoing or making good or repairing or replacing anything covered or coverable under Section 1 of this Policy; liability consequent upon: a) b) bodily injury to or illness of employees or workmen of the Contractors) or the Principal(s) or any other firm connected with the project which or part of which is insured under Section 1, or members of their families; loss of or damage to property belonging to or held in care, custody or control of the Contractors), the Principal(s) or any other firm connected with the project which or part of which is insured under Section 1, or an employee or workman of one of the aforesaid; any accident caused by vehicles licensed for general road use or by waterborne vessels or aircraft; any agreement by the Insured to pay any sum by way of indemnity or otherwise unless such liability would have attached also in the absence of such agreement.
c) d)
Special Conditions Applying to Section 2 1. No admission, offer, promise, payment or indemnity shall be made or given by or on behalf of the Insured without the written consent of the Insurers who shall be entitled, if they so desire, to take over and conduct in the name of the Insured the defence or settlement of any claim or to prosecute for their own benefit in the name of the Insured any claim for indemnity or damages or otherwise and shall have full discretion in the conduct of any proceedings or in the settlement of any claim and the Insured shall give all such information and assistance as the Insurers may require. The Insurers may so far as any accident is concerned pay to the Insured the limit of indemnity for any one accident (but deducting therefrom in such case any sum or sums already paid as compensation in respect thereof) or any lesser sum for which the claim or claims arising from such accident can be settled and the Insurers shall thereafter be under no further liability in respect of such accident under this Section.
2.
THE FOLLOWING CLAUSES AND ENDORSEMENTS SHALL APPLY TO THE WHOLE POLICY PROPERTY DAMAGE CLARIFICATION AGREEMENT Property damage covered under this policy shall mean physical damage to the substance of property. Physical damage to the substance of property shall not include damage to data or software, in particular any detrimental change in data, software or computer programs that is caused by a deletion, a corruption or a deformation of the original structure. Consequently, the following are excluded from this Policy: A. Loss or damage to data or software, in particular any detrimental change in data, software or computer programs that is caused by a deletion, a corruption or a deformation of the original structure and any business interruption losses resulting from such loss or damage. Notwithstanding this exclusion, loss of or damage to data or software which is the direct consequence of insured physical damage to the substance of property shall be covered. Loss or damage resulting from an impairment in the function, availability, range of use or accessibility of data, software or computer programs and any business interruption losses resulting from such loss or damage.
B.
ELECTRONIC DATE RECOGNITION EXCLUSION CLAUSE A. The Insurers will not pay for any loss or damage including loss of use with or without physical damage, injury (including bodily injury), expenses incurred or any consequential loss directly or indirectly caused by, consisting of, or arising from, the failure or inability of any computer, data processing equipment, media microchip, operating systems, microprocessors (computer chip), integrated circuit or similar device, or any computer software, whether the property of the Insured or not, and whether occurring before, during or after the year 2000 that results from the failure or inability of such device and/or software as listed above to: 1. 2. 3. correctly recognize any date as its true calendar date; capture, save, or retain, and/or correctly manipulate, interpret or process any data or information or command or instruction as a result of treating any date other than as its true calendar date; and/or capture, save, retain or correctly process any data as a result of the operation of any command which has been programmed into any computer software, being a command which causes the loss of data or the inability to capture, save, retain or correctly process such data on or after any date.
B. C.
It is further understood that the Insurers will not pay for the repair or modification of any part of any electronic data processing system or any part of any device and/or software as listed above in A. It is further understood that the Insurers will not pay for any loss or damage including loss of use with or without physical damage, injury (including bodily injury) expenses incurred or any consequential loss directly or indirectly arising from any advice, consultation, design, evaluation, inspection, installation, maintenance, repair or supervision done by the Insured or for the Insured or by or for others to determine, rectify or test, any potential or actual failure, malfunction or inadequacy described in A above. It is further understood that the Insurers will not pay for any consequential loss resulting from any continuing inability of the
D.
Page 4
pib/hr/ear/09/08/el
computer and equipment described in A above to correctly recognize any date as its true calendar date after the lost or damaged property has been replaced or repaired. Such loss or damage, injury (including bodily injury), expenses incurred or any consequential loss referred to in A, B, C or D above, is excluded regardless of any other cause that contributed concurrently or in any other sequence in the same. TERRORISM EXCLUSION ENDORSEMENT Notwithstanding any provision to the contrary within this Policy or any endorsement thereto it is agreed that this Policy excludes loss. damage, cost or expense of whatsoever nature directly or indirectly caused by, resulting from or in connection with any act of terrorism regardless of any cause or event contributing concurrently or in any other sequence to the loss; For the purpose of this endorsement an act of terrorism means an act, including but not limited to the use of force or violence and/or the threat thereof, of any person or group(s) of persons, whether acting alone or on behalf of or in connection with any organisation(s) or government(s), committed for political, religious, ideological or similar purposes including the intention to influence any government and/ or to put the public, or any section of the public, in fear. This endorsement also excludes loss, damage, cost or expense of whatsoever nature directly or indirectly caused by, resulting from or in connection with any action taken in controlling, preventing, suppressing or in any way relating to any act of terrorism. If the Insurers allege that by reason of this exclusion, any loss, damage, cost or expense is not covered by this Policy the burden of proving the contrary shall be upon the Insured. In the event any portion of this endorsement is found to be invalid or unenforceable, the remainder shall remain in full force and effect. THE FOLLOWING ENDORSEMENTS AND WARRANTIES SHALL APPLY IF SPECIFICALLY MENTIONED IN THE POLICY SCHEDULE OR ENDORSED THERETO. ENDORSEMENT 001 - COVER FOR LOSS OR DAMAGE DUE TO STRIKE, RIOT AND CIVIL COMMOTION (SRCC) It is agreed and understood that otherwise subject to the terms, exclusions, provisions and conditions contained in the Policy or endorsed thereon, and subject to the Insured having paid the agreed extra premium, this Policy shall be extended to cover loss or damage due to strike, riot and civil commotion which for the purpose of this endorsement shall mean (subject always to the special conditions hereinafter contained) loss of or damage to the property insured directly caused by: 1. 2. 3. 4. the act of any person taking together with others in any disturbance of the public peace (wether in connection with a strike or lockout or not) not being an occurrence mentioned in item 2 of the special conditions hereof, the action of any lawfully constituted authority in suppressing or attempting to suppress any such disturbance or in minimizing the consequences of any such disturbance, the wilful act of any striker or locked-out worker performed in furtherance of a strike or in resistance to a lockout, the action of any lawfully constituted authority in preventing or attempting to prevent any such act or in minimizing the consequences of any such act. all the terms, exclusions, provisions and conditions of the Policy shall apply in all respects to the insurance granted by this extension, save in so far as the same are expressly varied by the following special conditions, and any reference to loss or damage in the wording of the Policy shall be deemed to include the perils hereby insured against, the following special conditions shall apply only to the insurance granted by this extension, and the wording of the policy shall apply in all respects to the insurance granted by the Policy as if this Endorsement had not been made thereon.
Provided that it is hereby further expressly agreed and declared that: 1.
2.
Special Conditions 1. This insurance shall not cover a) b) c) d) loss or damage resulting from total or partial cessation of work or the retarding, interruption or cessation of any process or operation, loss or damage occasioned by permanent or temporary dispossession resulting from confiscation, commandeering or requisition by any lawfully constituted authority, loss or damage occasioned by permanent or temporary dispossession of any building resulting from the unlawful occupation by any person of such building, consequential loss or liability of any kind or description, any payments over and above the indemnity for the material damage as provided herein,
provided nevertheless that the Insurers are not relieved under b) or c) above of any liability to the Insured in respect of physical damage to the property insured occurring before dispossession or during temporary dispossession. 2. This insurance shall not cover any loss or damage occasioned by or through or in consequence, directly or indirectly, of any of the following occurrences, namely: a) war, invasion, act of foreign enemy, hostilities or warlike operations (whether war be declared or not), civil war,
pib/hr/ear/09/08/el
Page 5
b) c)
mutiny, civil commotion assuming the proportion of or amounting to a popular rising, military rising, insurrection, rebellion, revolution, military or usurped power, any act of any person acting on behalf of or in connection with any organization with activities directed toward the overthrow by force of the government de jure or de facto or to the influencing of it by terrorism or violence.
In any action, suit or other proceeding, where the Insurers allege that by reason of the provisions of this condition any loss or damage is not covered by this insurance, the burden of proving that such loss or damage is covered shall be upon the Insured. 3. This insurance may at any time be terminated by the Insurers on notice to that effect being given by registered post at the Insureds last known address, in which case the Insurers shall be liable to repay a rateable proportion of the premium for the unexpired terms from the date of termination. The limit of indemnity any one occurrence as stated below shall be understood to limit the indemnity for all loss or damage covered by this Endorsement during a consecutive period of 168 hours. The aggregate liability of the Insurers during the period of cover of this Policy shall be limited by twice the limit of indemnity as stated in the Schedule in respect of any one occurrence. Limit of indemnity any one occurrence: as specified in the schedule. ENDORSEMENT 002 - COVER FOR CROSS LIABILITY It is agreed and understood that otherwise subject to the terms, exclusions, provisions and conditions contained in the Policy or endorsed thereon and subject to the Insured having paid the agreed extra premium, the third party liability cover of the Policy shall apply to the insured parties named in the Schedule as if a separate policy had been issued to each party, provided that the Insurers shall not indemnify the Insured under this Endorsement in respect of liability for: a) b) loss of or damage to items insured or insurable under Section 1 of the Policy, even if not recoverable due to an excess or any limit, fatal or non-fatal injury or illness of employees or workmen who are or could have been insured under workmens compensation and/or employers liability insurance.
4.
The Insurers total liability in respect of the insured parties shall not however exceed in the aggregate for any one accident or series of accidents arising out of one event the limit of indemnity stated in the Schedule. ENDORSEMENT 003 - MAINTENANCE VISITS COVER It is agreed and understood that otherwise subject to the terms, exclusions, provisions and conditions contained in the Policy or endorsed thereon and subject to the Insured having paid the agreed extra premium, this insurance shall be extended for the maintenance period specified hereunder to cover solely loss of or damage to the contract works caused by the insured contractor(s) in the course of the operations carried out for the purpose of complying with the obligations under the maintenance provisions of the contract. Period of maintenance cover: as specified in the Schedule. ENDORSEMENT 004 - EXTENDED MAINTENANCE COVER It is agreed and understood that otherwise subject to the terms, exclusions, provisions and conditions contained in the Policy or endorsed thereon and subject to the Insured having paid the agreed extra premium, this insurance shall be extended for the maintenance period specified hereunder to cover loss or damage to the contract works caused by the insured contractor(s) in the course of the operations carried out for the purpose of complying with the obligations under the maintenance provisions of the contract, occurring during the maintenance period provided such loss or damage was caused on the site during the erection period before the certificate of completion for the lost or damaged section was issued.
Period of Maintenance cover: as specified in the Schedule. ENDORSEMENT 005 - SPECIAL CONDITIONS CONCERNING THE CONSTRUCTION AND/OR ERECTION TIME SCHEDULE It is agreed and understood that otherwise subject to the terms, exclusions, provisions and conditions contained in the Policy or endorsed thereon, the following shall apply to this insurance: The construction and/or erection time schedule together with any other statements made in writing by the Insured for the purpose of obtaining cover under the Policy as well as technical information forwarded to the Insurers is deemed to be incorporated herein. The Insurers shall not indemnify the Insured in respect of loss or damage caused by or arising out of or aggravated by deviations from the construction and/or erection time schedule exceeding the number of weeks stated below unless the Insurers had agreed in writing to such a deviation before the loss occurred.
Page 6
pib/hr/ear/09/08/el
Deviation from time schedule: as specified in the Schedule. ENDORSEMENT 006 - COVER OF EXTRA CHARGES FOR OVERTIME, NIGHT WORK, WORK ON PUBLIC HOLIDAYS, EXPRESS FREIGHT It is agreed and understood that otherwise subject to the terms, exclusions, provisions and conditions contained in the Policy or endorsed thereon and subject to the Insured having paid the agreed extra premium, this insurance shall be extended to cover extra charges for overtime, night work, work on public holidays and express freight (excluding airfreight). Provided always that such extra charges are incurred in connection with any loss of or damage to the insured item recoverable under this policy. If the sum(s) insured of the damaged item(s) is/are less than the amount(s) required to be insured, the amount payable under this Endorsement for such extra charges shall be reduced in the same proportion. Limit of Indemnity any one occurrence: as specified in the Schedule. ENDORSEMENT 206 - SPECIAL CONDITIONS CONCERNING FIRE-FIGHTING FACILITIES It is agreed and understood that otherwise subject to the terms, exclusions, provisions and conditions contained in the Policy or endorsed thereon, the Insurers shall only indemnify the Insured for loss or damage resulting directly or indirectly from fire and/or explosion if the following requirements are fulfilled: 1. 2. 3. Adequate fire-fighting equipment and extinguishing agents of sufficient capacity must always be available at the site and ready for immediate use. A sufficient number of workmen must be fully trained in the use of such equipment and must be available for immediate intervention at all times. If storage of material for the construction or erection of the contract works is necessary, storage must be subdivided into storage units not exceeding the equivalent value as stated in the schedule per storage unit. The individual storage units must either be at least 50 m apart or separated by fire-proof walls. All inflammable material (such as shuttering material not fitted for concreting, litter, etc) and especially all inflammable liquids and gases must be stored at a sufficiently large distance from the property under construction or erection and any hot work. 4. 5. Welding, soldering or the use of an open flame in the vicinity of combustible material is only permitted if at least one workman suitably equipped with extinguishers and well trained in fire-fighting is present. At the beginning of testing all fire-fighting facilities designed for the operation of the plant must be installed and serviceable.
ENDORSEMENT 207 - WARRANTY CONCERNING CAMPS AND STORES It is agreed and understood that otherwise subject to the terms, exclusions, provisions and conditions contained in the Policy or endorsed thereon, the Insurers shall only indemnify the Insured for loss, damage or liability directly or indirectly caused to camps and stores by fire, flood or inundation if these camps and stores are located above the highest water level recorded anywhere on the site during the last 20 years and the individual storage units are either at least 50 m apart or separated by fire walls. It is also agreed that the Insurers shall indemnify the Insured for any one occurrence only up to a limit of indemnity as stated in the Schedule. ENDORSEMENT 208 - WARRANTY CONCERNING UNDERGROUND CABLES AND PIPES It is agreed and understood that otherwise subject to the terms, exclusions, provisions and conditions contained in the Policy or endorsed thereon, the Insurers shall only indemnify the insured in respect of loss of or damage to existing underground cables and/or pipes or other underground facilities if, prior to the commencement of works, the insured has inquired with the relevant authorities about the exact position of such cables, pipes or other underground facilities. The indemnity shall in any case be restricted to the repair costs of such cables, pipes or other underground facilities, any consequential damage being excluded from the cover.
pib/hr/ear/09/08/el
Page 7
ENDORSEMENT 221 - SPECIAL CONDITIONS CONCERNING SAFETY MEASURES WITH RESPECT TO PRECIPITATION, FLOOD AND INUNDATION It is agreed and understood that otherwise subject to the terms, exclusions, provisions and conditions contained in the Policy or endorsed thereon, the Insurers shall only indemnify the Insured for loss, damage or liability caused directly or indirectly by precipitation, flood or inundation if adequate safety measures have been taken in designing and executing the project involved. Adequate safety measures shall mean that allowance is made for precipitation, flood and inundation up to a return period of 20 years for the location insured and the entire policy period on the basis of the statistics prepared by the meteorological agencies. Loss, damage or liability resulting from the insureds not immediately removing obstructions (eg sand, trees) from watercourses within the construction site, whether carrying water or not, in order to maintain free waterflow shall not be indemnifiable. PREMIUM WARRANTY It is fundamental and absolute special conditions of this contract of insurance that the premium due must be paid and received by the Insurers within 60 (sixty) days from the inception date of this policy/endorsement/renewal certificate. If this condition is not complied with then this contract is automatically cancelled and the Insurers shall be entitled to the pro-rata premium for the period they have been on risk. Where the premium payable pursuant to this warranty is received by an Authorised agent of the Insurers, the payment shall be deemed to be received by the Insurers for the purpose of this warranty and the onus of proving that the premium payable was received by a person, including an Insurance Agent, who was not authorised to receive such premium lie on the Insurers. Subject otherwise to the terms and conditions of this policy.
IMPORTANT We would remind you that you must disclose to us, fully and faithfully, the facts you know or ought to know, otherwise you may not receive any benefit from your Policy. The Insured is requested to read this Policy. If any error or misdescription be found, the Policy should be returned to the issuing office for correction.
Page 8
pib/hr/ear/09/08/el