ANNEXURE- I (TPSI)
Annexure I SH 1/3
Actual annual performance/operational data for the lignite based thermal
generating stations of NLC for the 5-year period from 2002-03 to 2006-07
1
Name of Company
Name of Station
Neyveli Lignite Corporation Limited
Thermal Power Station 1
Installed Capacity: 600 MW
Configuration: 6 units of 50 MW each and 3 units of 100 MW
each.
Installed Capacity (MW) and Configuration
12 identical Boilers of 50 MW capacity each with each 50 MW
Turbine is being fed by one Boiler and each 100 MW Turbine is
being fed by two Boilers.
Rated Steam Pressure : 89 Kg / cm
Rated Steam Temperature : 535 C
Type of Steam Turbine : Non Reheat, Regenerative,
Rated Steam Parameters (Also state the
Condensing, Impulse-Reaction Turbine of Single Cylinder (50
type of Steam turbine and Boiler)
MW) and Double Cylinder (100 MW)
Type of Boiler : Natural Circulation, Front wall fired, Dry bottom,
Water tube, type Boiler
Type of BFP
Electrical Driven
Circulating water system
Closed Cycle
Any other Site specific feature
-------------
Fuels
8.1
Main Fuel
Lignite
8.1.1 Annual Allocation / Requirement
5.7 million tonnes (at 75 % PLF)
8.1.2 Sources of supply
Mine I
8.1.3
Distance of the station from the sources of
Pit Head Power Station
supply
8.1.4 Mode of Transport
Conveyor
8.1.5
Maximum Station capability to stock main
fuel
Mines Stock yard : 198000 Tonnes
TPS 1 Bunkers : 9000 Tonnes
8.2
Secondary Fuel
Furnace Oil and LDO
Furnace Oil : 12000 KL (corresponding to 3 ml / KWhr)
LDO : 210 KL
From Chennai terminal of M/S BPCL and M/S HPCL
8.2.1 Annual Allocation / Requirement
8.2.2 Sources of supply
8.2.3
Distance of the station from the sources of
240 Km (approx)
supply
8.2.4 Mode of Transport
8.2.5
9
9.1
9.2
Maximum Station capability to stock
secondary fuels
Cost of Spares
Cost of Spares capitalized in the books
(Rs. Lakhs)
Cost of spares included in capital cost for
the purpose of tariff (Rs. Lakhs)
Road
Furnace Oil : 4000 KL
LDO : 100 KL
Not ascertainable for TPS I
Annexure I SH 2/3
Period
2002-03
2003-04
2004-05
2005-06
2006-07
Generation (MU)
10
10.1
-Actual Gross Generation at generator
terminals
4378.516
4400.140
4259.054
3990.194
3989.028
10.2
-Actual Net Generation Ex-bus
3871.827
3893.671
3772.884
3540.330
3528.427
10.3
-Scheduled Generation Ex-bus
Station came under ABT from 01-01-2007
11
Average Declared Capacity (DC) (MW)
Station came under ABT from 01-01-2007
12
Actual Auxiliary Energy Consumption
excluding colony consumption (MU)
13
Actual Energy supplied to Colony from
the station (MU)
506.689
506.469
486.17
449.864
460.601
262
286
306
311
335
6301482
6303582
6103319
5731242
5755178
Main Fuel
14
14.1
Consumption (MT)
14.2
Weighted Average Gross Calorific value
(As fired) (kCal /Kg)
2701
2735
2756
2754
2692
14.3
Weighted Average Price (Rs per MT)
747 *
747 *
747 *#
747 *#
747 *#
14.4
Actual Average stock maintained (MT)
8200
8400
8150
8250
8500
14.5
Actual Transit & Handling Losses for
coal / Lignite (%)
----
----
----
----
----
Secondary Fuel Oil
15
15.1
Consumption (KL)
15.1.1
Furnace Oil (KL)
15.1.2
LDO (KL)
15.2
15735
6135
12746
13609
13414
126
127
167
208
272
Weighted Average Gross Calorific value
(As fired) (kcal /Kg or L)
10461
10462
10461
10461
10462
15.3
Weighted Average Price (Rs per KL)
12100
12016
13680
17470
19792
15.4
Actual Average stock maintained (KL)
1500
1450
1360
1470
1490
45
40
48
46
50
227
370
269
332
320
82
59
204
182
253
Furnace Oil (KL)
LDO (KL)
16
Weighted average duration of outages
16.1
Scheduled Outages ( Boiler Days)
16.2
Forced Outages (Boiler Days)
Excluding Royalty and Income Tax Reimbursement
Provisional
Given Values are the total NLC Schemes Consumption which includes the
Consumption for NLC Mine 1 and Township
Annexure I SH 3/3
19.1
Period
Cost of spares actually consumed
in Rs. Lakhs
Average stock of spares (Rs.
Lakhs)
Number of employees deployed in
O&M
- Executive
19.2
- Non Executive
17
18
19
2002-03
2003-04
2004-05
2005-06
2006-07
648.71
848.17
889.69
988.46
904.36
1196.40
1263.04
1264.18
1315.46
1188.82
1497
1576
1558
1557
1525
444
464
446
490
406
1053
1112
1112
1067
1119
ANNEXURE - I (TPSI EXPANSION)
Annexure I SH 1/3
Actual annual performance / operational data for the Lignite based Thermal generating
Stations for the 5 Year Period from 2002-03 to 2006-07
1 Name
of the Company
M/s NEYVELI LIGNITE CORPORATION LTD
2 Name
of the Station
TPS I EXPANSION
3 Installed
Capacity( MW) and Configuration
2 x 210 MW
SH Steam:158 Bar, 540 Deg C; 690 T/hr ; RH Steam 32 Bar,
540 Deg C
Rated Steam Parameters (Also State the type of Steam
Radiant Tower, Natural Circulation type Boiler
Turbine and Boiler)
Tandem compound, Double cylinder Reaction Turbine
5 Type
of BFP
6 Circulating
7 Any
water System
other Site specific feature
Electrical Driven
Closed cycle
-----
8 Fuels
8.1 Main
Lignite
Fuel
8.1.1 Annual
allocation /Requirement
2.82 Mill.Ton for 75% PLF
8.1.2 Sources
of supply
Mine I Expansion
8.1.3 Distance
from the station from the sources of supply
Pithead Power Station
8.1.4 Mode
of transport
8.1.5 Maximum
Station capablity to stock main fuel
8.2 Secondary
8.2.1 Annual
allocation / Requirement
8.2.2 sources
of supply
8.2.3 Distance
8.2.4 Mode
from the station from the sources of supply
of transport
8.2.5 Maximum
9 Cost
9.1 Cost
9.2
fuel
Station capablity to stock Secondary Fuel
Conveyor
Bunker:10000 Tonnes; Mines Stock Yard: 132000 Tonnes
LDO/FO
Requirement :8280 KL
HPCL/BPCL, Chennai.
240 KM
ROAD
2200 KL
of spares
of spares capitalised in the books (Rs.Lakh)
8419.9
Cost of Spares included in capital cost for the purpose of
8419.9
tariff (Rs.Lakh)
Annexure I SH 2/3 and 3/3
S.No
Period
2002-03
2003-04
2004-05
2005-06
2006-07
10 GENERATION
10.1 Actual Generation at generator terminals in MU
86.87
1983.25
3237.92
3082.32
3265.71
10.2 Actual Net Generation Ex-bus in MU
66.31
1789.33
2944.84
2802.57
2989.18
10.3 Scheduled Generation Ex-bus in MU
--
1554.15
2915.43
2783.81
2967.63
11 Average Declared Capacity(DC) MW
--
265.36
333.53
366.03
382.58
193.93
293.09
279.75
276.54
--
--
--
--
12 Actual Auxiliary Consumption excluding colony consumption(MU)
13 Actual energy supplied to colony (MU)
20.56
--
14 Main Fuel
LIGNITE
14.1 Consumption in Tonnes
74450
2155589
3446769
3155068
3310799
14.2 Weighted average calorific value (as fired) Kcal/kg
--
2710
2661
2692
2703
14.3 Weighted average price Rs.per MT
--
977
977
977
977
14.4 Actual Average Stock maintained (MT) Bunker Stock only
--
5464
5099
8256
6368
14.5 Actual Transit & handling losses for coal/Lignite (%)
----
----
----
----
LDO/ FO
15 Secondary fuel
15.1 Consumption in KL
----
10421.93
10746.95
5095.42
4243.39
3487.6
10000
10000
10000
10090
10190
15954
13606
16342
21193
1092.2
1605.16
1564.67
1652.42
1530.69
16.1 Scheduled outages (Days)
51.88
93
32.86
57.63
25.59
16.2 Forced outages (Days)
61.53
31.4
19.1
18.75
29.55
15.2 Weighted average colorific value (as fired) Kcal/L
15.3 Weighted average price Rs.per KL
15.4 Actual Average Stock maintained (KL)
12000
16 Weighted average duration of outages
17 Cost of Spares actually consumed in Rs.Lakhs
--
8.75
130.59
204.56
428.34
18 Average stock of spares Rs.Lakhs
--
19.47
30.18
288.76
536.27
19.1 Executive
--
170
168
169
165
19.2 Non Executive
--
119
127
149
147
19 Number of employees deployeed in O &M
ANNEXURE-I (TPS-II - STAGE-I)
Annexure 1 SH 1/3
Actual annual performance/operational data for the lignite based thermal generating
stations for the 5 year period from 2002-03 to 2006-07
Name of the company
NEYVELI LIGNITE CORPORATION LIMITED
Name of the Station
THERMAL POWER STATION - II / STAGE - I
Installed Capacity (MW) and configuration
630 MW ( 3 x 210 MW )
Rated Steam parameters (Also state the type
of Steam Turbine and boiler)
Super Heated:690 T/hr, 158 Kg/cm2 (g) / 540C Reheated:594
T/hr, 33 Kg/cm2 (g) / 540C
Type of Boiler
Out door, single drum, natural circulation, radiant, dry bottom,
single reheat, pulverised lignite fired, tower type.
Type of Steam Turbine
Double Cylinder, Double Casing, Double Exhaust, Condensing,
Regenerative Cum Single Reheat, Tandem Compound, Axial
Flow, Impulse-Reaction Type.
Type of BFP
Electrical Driven
Circulating water system
Closed Cycle
Any other Site specific feature
----------------
Fuels
8.1
Main fuel
Lignite
8.1.1.
Annual Allocation/ Requirement
4.54 MT for 75%
8.1.2
Sources of supply
Mine II and supplemented from other NLC Mines
8.1.3
Distance of the station from the sources of
supply
Pit head Power Station
8.1.4
Mode of Transport
Road/Conveyor
8.1.5
64,000 Tonnes (common facility of 1,50,000 Tonnes capacity for
Stage I and Stage II units)This is supplemented by Mine II Ground
Maximum Station capability to stock main fuel
Storage bunker to the extent of 3,00,000 Tonnes common for
both stage I and stage II
8.2
Secondary fuel
LSHS/FO/LDO
8.2.1
Annual Allocation/Requirement
12420 KL
8.2.2
Sources of supply
HPCL, BPCL, IOC
8.2.3
Distance of the station from the sources of
supply
About 240 Kms
8.2.4
Mode of Transport
Road
8.2.5
Maximum Station capability to stock
Secondary fuels
Furnace Oil 2 x 1900 KL and 1 x 100 KL (Common for both Stage
I and Stage II)
9
9.1
9.2
Cost of spares
Cost of spares capitalized in the books (Rs.
Lakh)
Cost of spares included in capital cost for the
purpose of tariff (Rs. Lakh)
1376
1376
Annexure 1 SH 2/3 & 3/3
Period
2002-03
10
2003-04
2004-05
2005-06
2006-07
Generation (MU)
10.1
Actual Gross Generation at
generator terminals
4605.421
4110.096
3948.095
3855.934
3136.381
10.2
Actual Net Generation Ex-bus
4158.743
3711.946
3559.378
3482.795
2841.593
10.3
Scheduled Generation Ex-bus
4131.166
3704.595
3531.145
3453.696
2589.826
472.247
421.919
404.243
408.781
299.718
446.678
398.150
388.717
373.139
294.788
11
12
13
Average Declared Capacity
(DC) MW
Actual Auxiliary Energy
Consumption excluding colony
consumption (MU)
Actual Energy supplied to
Colony from the station (MU)
14
14.1
14.2
14.3
14.4
14.5
Main Fuel (Lignite)
Consumption (MT)
Weighted Average Gross
calorific value (As fired)
(kcal/kg)
Weighted Average Price (Rs
per MT)
Actual Average stock
maintained (MT)
Actual Transit & Handling
Losses for coal/Lignite (%)
15
15.1
15.2
15.3
15.4
16.2
17
18
4,612,326
4,262,348
4,214,636
3,417,182
2676
2676
2662
2630
2643
691
977
977
977
977
37,193
29,529
18,246
30,974
21,101
----
----
----
----
----
Secondary Fuel oil (LSHS,LDO,FO)
Consumption (KL)
Weighted average gross
calorific value (As fired)
(kcal/kg or L)
Weighted average price (Rs
per MT or KL)
Actual average stock
maintained (KL)
16
16.1
5,152,509
16847.2483
3266.3485
4775.0944
3551.8634
4801.0149
10,237
10,265
10,423
10,351
10,324
12335
9865
13384
14947
20769
866.1849
784.5329
740.9541
1045.3584
1018.1024
Weighted Average duration of outages
Scheduled Outage (Hrs:Mts)
910:51
4019:21
1679:41
1148:58
2612:06
Scheduled Outage (Days)
38
167
70
48
109
Forced outages (Hrs:Mts)
1286:26
1386:58
4006:03
4429:05
6682:32
Forced outages (Days)
54
58
167
185
278
753.17
690.5
751.81
699.64
964.29
3497.58
3388.69
3189.92
3317.14
3306.3
Cost of spares actually
consumed in Rs. Lakhs
Average stock of spares
(Rs.Lakhs)
19
Number of employees deployed in O&M
19.1
Executive
316
321
333
332
327
19.2
Non-Executive
685
729
696
681
725
ANNEXURE - I (TPS-II - STAGE - II)
Annexure 1 SH 1/3
Actual annual performance/operational data for the lignite based thermal generating
stations for the 5 year period from 2002-03 to 2006-07
Name of the company
NEYVELI LIGNITE CORPORATION LIMITED
Name of the Station
THERMAL POWER STATION - II / STAGE - II
Installed Capacity (MW) and configuration
840 MW ( 4 x 210 MW )
Rated Steam parameters (Also state the type
of Steam Turbine and boiler)
Super Heated:690 T/hr, 157 Kg/cm2 (g) / 540C Reheated:
596.7 T/hr, 36.01 Kg/cm2 (g) / 540C
Type of Boiler
Out door, single drum, natural circulation, radiant, dry bottom,
single reheat, pulverised lignite fired, tower type.
Type of Steam Turbine
Triple Cylinder, Double Casing, Double Exhaust, Condensing,
Regenerative Cum Single Reheat, Tandem Compound, Reaction
Type.
Type of BFP
Electrical Driven
Circulating water system
Closed Cycle
Any other Site specific feature
----------------
Fuels
8.1
Main fuel
Lignite
8.1.1.
Annual Allocation/ Requirement
6.06 Mill.Ton for 75%
8.1.2
Sources of supply
Mine II and supplemented from other NLC Mines
8.1.3
Distance of the station from the sources of
supply
Pit head Power Station
8.1.4
Mode of Transport
Road/Conveyor
8.1.5
86,000 Tonnes (common facility of 1,50,000 Tonnes capacity for
Stage I and Stage II units) This is supplemented by Mine II Ground
Maximum Station capability to stock main fuel Storage bunker to the extent of 3,00,000 Tonnes common for
both stage I and stage II
8.2
Secondary fuel
LSHS/FO / LDO
8.2.1
Annual Allocation/Requirement
16560 KL
8.2.2
Sources of supply
HPCL, BPCL, IOC
8.2.3
Distance of the station from the sources of
supply
About 240 Kms
8.2.4
Mode of Transport
Road
8.2.5
Maximum Station capability to stock
Secondary fuels
FO 2 x 1900 KL and 1 x 100 KL (Common for both stage I and
stage II), LDO 1 x 100 KL
9
9.1
9.2
Cost of spares
Cost of spares capitalized in the books (Rs.
Lakh)
Cost of spares included in capital cost for the
purpose of tariff (Rs. Lakh)
7530
7530
Annexure 1 SH 2/3 & 3/3
Period
2002-03
10
2003-04
2004-05
2005-06
2006-07
Generation (MU)
10.1
Actual Gross Generation at
generator terminals
5897.613
5894.741
5300.341
5318.156
5401.372
10.2
Actual Net Generation Ex-bus
5329.440
5340.431
4784.345
4799.647
4876.030
10.3
Scheduled Generation Ex-bus
5230.742
5213.878
4670.274
4679.893
4510.048
607.275
611.615
550.023
568.186
523.923
568.173
554.310
515.996
518.509
525.342
11
12
13
Average Declared Capacity
(DC) MW
Actual Auxiliary Energy
Consumption excluding colony
consumption (MU)
Actual Energy supplied to
Colony from the station (MU)
14
14.1
14.2
14.3
14.4
14.5
Main Fuel (Lignite)
Consumption (MT)
Weighted Average Gross
calorific value (As fired)
(kcal/kg)
Weighted Average Price (Rs
per MT)
Actual Average stock
maintained (MT)
Actual Transit & Handling
Losses for coal/Lignite (%)
15
15.1
15.2
15.3
15.4
16.2
Consumption (Kl.)
Weighted average gross
calorific value (As fired)
(kcal/Kg.or L.)
Weighted average price (Rs
per MT or KL)
Actual average stock
maintained (KL)
18
5,672,699
5,789,266
5,888,959
2676
2676
2662
2630
2643
599
977
977
977
977
49,591
39,372
24,328
41,299
28,135
----
----
----
----
----
16087.5541
2407.7780
5561.0201
5742.3292
4816.3000
10,237
10,265
10,423
10,351
10,324
12335
9865
13384
14947
20769
1154.9133
1046.0438
987.9388
1393.8112
1357.4698
Weighted Average duration of outages
Scheduled Outage (Hrs:Mts)
3348:47
1941:50
2707:55
2860:39
2372:48
Scheduled Outage (Days)
140
81
113
119
99
Forced outages (Hrs:Mts)
1378:59
3146:02
4307:53
3123:11
2989:45
57
131
179
130
125
1004.22
920.67
1002.41
932.85
1285.72
4663.44
4518.25
4253.22
4422.86
4408.39
Forced outages (Days)
17
6,342,244
Secondary Fuel oil (LSHS,LDO,FO)
16
16.1
6,284,082
Cost of spares actually
consumed in Rs. Lakhs
Average stock of spares
(Rs.Lakhs)
19
Number of employees deployed in O&M
19.1
Executive
421
429
443
442
437
19.2
Non-Executive
913
971
929
909
966
ANNEXURE V (TPSI)
Details of Operation and Maintenance Expenses
Name of the Company:
Neyveli Lignite Corporation Limited
Name of the Power Station: Thermal Power Station I
600 MW
(Rs. in Lakhs)
Items
Sl.No.
YEAR
2002-03 2003-04 2004-05 2005-06 2006-07
1
2
3
4
5
6
7
(A)
Breakup of O&M Expenses
1
Consumption of Stores and Spares
1284.61 1706.82 1705.19 1591.49 1341.22
2
Repairs and Maintenance
594.05 1188.42
662.77
792.18
698.74
3
Insurance
79.63
247.76
311.02
310.52
375.86
4
Security
5
Administrative Expenses
a
- Rent
28.62
45.06
40.10
40.54
18.15
b
- Electricity Charges
c
151.73
160.46
152.52
142.48
140.74
- Travelling and conveyance
d
- Communication expenses
1.69
1.95
2.39
1.57
1.47
e
- Advertising
5.47
9.73
12.21
10.43
7.86
f
- Foundation laying and inaguration
g
- Donations
h
- Entertainment
2.03
2.35
2.38
2.31
2.33
Sub - Total (Administrative Expenses)
189.55
219.56
209.60
197.34
170.55
6
Employee Cost
a
2897.59 3249.23 3424.50 3517.09 3826.05
- Salaries, wages amd allowances
b
- Staff welfare expenses
665.49
657.47
631.04
572.16
737.06
c
- Productivity linked incentive
209.00
135.61
156.74
223.35
140.53
d
- Expenditure on VRS **
112.51
36.65
131.85
6.37
100.82
e
169.67
165.52
168.65
160.56
162.71
- Ex - gratia
Sub - Total (Employee Cost)
4054.27 4244.48 4512.78 4479.53 4967.16
7
loss of Store
8
Provisions
9
Corporate office expenses allocation
2041.80 1876.44 1860.76 1979.48 2022.43
10
- Others (specify items)
Training Expenses
1.55
0.99
1.20
0.10
0.00
Service Charges
665.41
642.36
651.61
755.19
844.75
Stationery & Printing
0.88
1.83
1.61
3.01
2.36
Others
56.93
59.48
51.62
48.80
47.86
11
Total ( 1 to 10)
8968.69 10188.12 9968.16 10157.64 10470.93
12
Revenue/Recoveries, if any
241.98
89.04
67.41
72.66
55.94
13
Net Expenses
8726.71 10099.08 9900.74 10084.97 10414.99
No. of employees opted for VRS
27
15
9
** Note: Outflow of employees on VRS was during 2002-'03, 2003-'04 and 2005-'06. Expenditure
at actuals was made on VRS during all the above years.
ANNEXURE V (TPSI EXPANSION)
Details of Operation and Maintenance Expenses
Neyveli Lignite Corporation Limited
Name of the Company:
420 MW
Name of the Power Station: Thermal Power Station I Expn
(Rs. in Lakhs)
Sl. No.
Items
Year
2003-04
2005-06
2006-07
1
(A)
2004-05
Breakup of O&M Expenses
Consumption of Stores and Spares
72.24
354.23
540.34
786.93
Repairs and Maintenance
103.62
302.59
455.79
511.54
Insurance
171.14
312.83
275.65
312.44
Security
Administrative Expenses
- Rent
4.76
27.97
22.72
23.14
- Electricity Charges
- Travelling and conveyance
23.55
38.67
46.09
60.51
- Communication expenses
1.72
2.45
2.75
3.11
- Advertising
0.14
2.02
6.08
8.83
- Foundation laying and inaguration
- Donations
- Entertainment
0.52
0.90
1.18
1.52
30.69
72.01
78.82
97.12
Sub - Total (Administrative Expenses)
6
Employee Cost
- Salaries, wages amd allowances
526.27
773.62
861.82
995.75
- Staff welfare expenses
262.70
167.60
142.67
180.69
- Productivity linked incentive
22.90
29.91
48.09
30.62
- Expenditure on VRS **
0.00
18.90
0.00
28.09
- Ex - gratia
20.21
31.78
33.74
35.69
832.08
1021.81
1086.33
1270.85
310.66
431.75
499.46
555.51
0.27
0.08
0.05
0.00
473.78
220.27
218.15
358.84
0.64
1.26
1.25
0.73
246.24
577.08
525.06
493.94
2241.35
3293.90
3680.88
4387.90
31.25
117.45
98.67
107.93
2210.10
3176.45
3582.21
4279.97
Sub - Total (Employee Cost)
7
loss of Store
Provisions
Corporate office expenses allocation
10
- Others (specify items)
Training Expenses
Service Charges
Stationery & Printing
Others
11
Total ( 1 to 10)
12
Revenue/Recoveries, if any
13
Net Expenses
2002-'03
No. of employees opted for VRS
2003-'04 2005-'06
1
4
** Note: Outflow of employees on VRS was during 2002-'03, 2003-'04 and 2005-'06 but
expenditure at actuals was made on VRS during 2004-'05 & 2006-'07
ANNEXURE V (TPSII - Stage I)
Details of Operation and Maintenance Expenses
Name of the Company:
Name of the Power Station: Thermal Power Station II - Stage I
Sl.No.
Items
Neyveli Lignite Corporation Limited
(Rs. in Lakhs)
630 MW
YEAR
2002-03 2003-04 2004-05 2005-06 2006-07
2
1
(A)
Breakup of O&M Expenses
Consumption of Stores and Spares
Repairs and Maintenance
552.33
933.16
1051.90
772.83
665.63
Insurance
117.40
269.50
309.49
249.50
188.02
Security
Administrative Expenses
- Rent
12.61
26.47
33.85
27.86
24.58
- Electricity Charges
- Travelling and conveyance
122.19
113.57
115.15
114.39
116.82
- Communication expenses
1.28
1.52
1.14
1.20
1.32
- Advertising
5.60
6.47
12.39
6.78
10.11
- Foundation laying and inaguration
- Donations
- Entertainment
1.46
1.32
1.12
1.45
1.17
143.13
149.34
163.65
151.67
154.00
Sub - Total (Administrative Expenses)
1228.18 1316.14
1057.12 1129.59 1215.54
Employee Cost
- Salaries, wages amd allowances
- Staff welfare expenses
417.48
501.52
387.19
377.71
470.73
- Productivity linked incentive
135.82
92.39
88.95
150.24
94.74
- Expenditure on VRS **
7.99
1.70
12.16
0.00
27.78
- Ex - gratia
115.40
109.95
105.92
95.94
94.98
Sub - Total (Employee Cost)
7
loss of Store
Provisions
Corporate office expenses allocation
10
- Others (specify items)
Training Expenses
Service Charges
Stationery & Printing
Others
11
Total ( 1 to 10)
12
Revenue/Recoveries, if any
13
Net Expenses
No. of employees opted for VRS in TPSII
1888.17 2154.42
2254.17 2364.77 2601.96
2564.85 2859.98
2848.39 2988.65 3290.19
1288.41 1231.92
1186.20 1316.87 1339.44
0.77
1.68
0.18
0.21
0.11
412.04
400.37
405.22
426.21
427.13
0.63
1.32
1.37
1.25
0.59
96.94
2.24
257.43
11.18
14.55
6404.68 7165.66
287.75
16.70
6116.93 7148.96
5
7280.95 7047.95 7295.20
101.11
50.16
10.69
7179.84 6997.80 7284.51
6
** Note: Outflow of employees on VRS was during 2002-'03, 2003-'04 and 2005-'06 but
expenditure at actuals was made on VRS during all the above years.
ANNEXURE V (TPSII - Stage II)
Details of Operation and Maintenance Expenses
Name of the Company:
Name of the Power Station: Thermal Power Station II - Stage II
Sl.No.
Items
Neyveli Lignite Corporation Limited
(Rs. in Lakhs)
840 MW
YEAR
2002-03 2003-04 2004-05 2005-06 2006-07
2
1
(A)
Breakup of O&M Expenses
Consumption of Stores and Spares
Repairs and Maintenance
736.44 1244.21 1402.54 1030.44
887.51
Insurance
156.53
359.34
412.66
332.66
250.69
Security
Administrative Expenses
- Rent
16.81
35.29
45.13
37.15
32.78
- Electricity Charges
- Travelling and conveyance
162.91
151.42
153.54
152.52
155.76
- Communication expenses
1.70
2.03
1.52
1.60
1.76
- Advertising
7.47
8.62
16.52
9.04
13.48
1.95
1.76
1.49
1.93
1.56
190.84
199.13
218.19
202.23
205.34
- Foundation laying and inaguration
- Donations
- Entertainment
Sub - Total (Administrative Expenses)
1637.58 1754.85 1409.49 1506.11 1620.72
Employee Cost
- Salaries, wages amd allowances
- Staff welfare expenses
556.64
668.69
516.26
503.61
627.65
- Productivity linked incentive
181.09
123.18
118.60
200.32
126.32
- Expenditure on VRS
10.65
2.27
16.21
0.00
37.04
- Ex - gratia
153.87
146.60
141.22
127.92
126.64
Sub - Total (Employee Cost)
7
loss of Store
Provisions
Corporate office expenses allocation
10
- Others (specify items)
Training Expenses
Service Charges
Stationery & Printing
Others
11
Total ( 1 to 10)
12
Revenue/Recoveries, if any
13
Net Expenses
2517.56 2872.56 3005.56 3153.03 3469.27
3419.81 3813.31 3797.86 3984.87 4386.92
1717.88 1642.57 1581.60 1755.83 1785.92
1.03
2.24
0.24
0.28
0.14
549.38
533.83
540.30
568.28
569.51
0.84
1.76
1.82
1.66
0.79
129.25
2.99
343.24
14.91
19.40
8539.58 9554.21 9707.94 9397.27 9726.93
383.67
22.26
134.82
66.88
14.25
8155.91 9531.95 9573.12 9330.39 9712.68
Annexure VI
Details of Running Expenses (At Corporate Level)
Name of the Company: NEYVELI LIGNITE CORPORATION LTD
(Rs. in Lakhs)
Sl.No.
ITEMS
2002-03
2003-04
2004-05
2005-06
2006-07
(A)
Breakup of corporate expenses (Aggregate at Comp. Level)
- Employee expenses
- Salaries , wages and allowances
7008.80
7776.24
8332.97
8795.40
9896.77
- Staff welfare expenses
1297.09
2386.06
1656.50
1546.03
1656.83
- Productivity linked incentive
594.82
359.92
366.98
607.07
89.15
- Expenditure on VRS
114.51
51.36
170.76
19.87
129.06
- Ex-gratia
256.77
283.51
289.86
274.89
280.44
Administrative Expenses
- Repairs and Maintenace
1667.86
1267.07
1351.01
1391.88
1267.25
- Training and Recruitment
187.22
218.47
196.72
166.78
158.67
- Communication
41.27
37.79
53.78
57.56
77.29
- Travelling & Conveyance
446.23
462.19
468.34
524.62
568.23
- Rent
224.50
139.48
135.12
721.63
174.48
- Others (speicify items)
2567.08
2125.00
2204.97
2862.48
2245.93
0.00
0.00
0.00
0.00
0.00
21.00
0.00
199.55
100.00
27.00
Sub - Total (Administrative Expenses)
3
Security
Donations
Provisions
Others (speicify items)
3371.39
3309.04
3325.01
3646.50
3611.18
Consumption of Stores&Spares
1168.68
1210.52
1136.58
1386.06
1409.75
1.59
8.17
31.27
44.15
41.23
Insurance
7
Total (1 to 6)
Less recoveries (if any)
Net Corporate Expenses (Aggregate)
(B)
16401.73 17509.82 17714.45 19282.44 19387.32
2101.86
2500.92
2935.90
2816.61
2732.73
14299.87 15008.90 14778.56 16465.83 16654.59
Allocation of Corporate Expenses to various Functional Activities like
Thermal Power Station I
2041.80
1876.44
1860.76
1979.48
2022.43
Thermal Power Station I Epxn
0.00
310.66
431.75
499.46
555.51
Thermal Power Station II Stage I
1288.41
1231.92
1186.20
1316.87
1339.44
Thermal Power Station II Stage II
1717.88
1642.57
1581.60
1755.83
1785.92
Mines and others
9251.78
9947.31
9718.25 10914.19 10951.29
Basis of Allocation: based on salaries & wages
Thermal Power Station I
14.28
0.00
9.01
12.01
12.50
2.07
8.21
10.94
12.59
2.92
8.03
10.70
12.02
3.03
8.00
10.66
12.14
3.34
8.04
10.72
Thermal Power Station I Epxn
Thermal Power Station II Stage I
Thermal Power Station II Stage II
Mines and others
64.70
66.28
65.76
66.28
65.76