0% found this document useful (0 votes)
95 views12 pages

May Monthly Report Sanitation

This document summarizes garbage collection operations for Orange Walk Town. It details the vehicles used, routes, volumes collected, fuel usage, maintenance of the dump site, and construction of market stalls. The main vehicles are the blue Volvo compactor, yellow compactor A3003, and open box truck A3691. Together they collect approximately 332 cubic yards of garbage per week. The document also outlines the process for cleaning the dump site and proposals to improve the road access.

Uploaded by

OWTC
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
95 views12 pages

May Monthly Report Sanitation

This document summarizes garbage collection operations for Orange Walk Town. It details the vehicles used, routes, volumes collected, fuel usage, maintenance of the dump site, and construction of market stalls. The main vehicles are the blue Volvo compactor, yellow compactor A3003, and open box truck A3691. Together they collect approximately 332 cubic yards of garbage per week. The document also outlines the process for cleaning the dump site and proposals to improve the road access.

Uploaded by

OWTC
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 12

Sanitation

Compactor = A3003

Eimer Toloza Alberto Uh Victor Mex

A3691 Carlos Thompson Carlos Reyes Guillermo Cruz Eduardo Hernndez

Blue Compactor Volvo Armando Novelo Wayne Robinson Wilfrido Jimnez

Garbage Collection Commercial and Domestic Garbage

Garbage Pit (25 acres) IN USE The council has the full responsibility of the maintenance of the pit so Mr. Gilbert Barojona do the monitoring of vehicle and small fee is collected for the maintenance of the pit. The pit is approximately 5 miles away from town. (Every 3 months) The maintenance of the pit is done by the council when the Ministry of Works equipment is not available. Private bulldozer is 125.00 per hour and it takes approximately 22 hours to clean the entire pit. 125.00 x 22 hours = $2,750.00 Trucks Approximate trips per week Blue Compactor Volvo - 20 cubic yards x 7 trips per week (Monday to Friday) = 140 cubic yards Open Box truck A3691- 8 cubic yards x 8 trips per day (Monday to Friday) = 64 cubic yards Yellow Compactor A3003 16 cubic yards x 7 trips per week (Monday to Friday) =112 cubic yards Hours of work Each truck worked 9 hours per day x 5 days = 45 hours of work Vehicle Failure B230 (open box truck) as standby to assist the disposal of garbage until the truck that is undergoing repair is on serviceable condition. Approximate Volume of garbage per week A 3691- 64 cubic yards Volvo compactor 140 cubic yards Yellow compactor 112 cubic yards Total = 332 cubic yards per week Approximate Grass Disposal 10 cubic yard per day x 5 = 50 cubic yards per week Approximate Disposal of tires from tire shop 1 trip x 4 weeks = 4 trips x 3 main places (Caribbean Tires, Perez Tire and Salos at times) When these places have large tires it takes more space and time to dispose of. I think that the fees for these places should be revised.

Approximate Garbage receptacles Square dirt boxes= 35% Drums= 40% Loose Garbage= 25% Type of Garbage Grass disposal Branches Construction material Derelict vehicles Domestic garbage

- Council responsibility (street side chopping) - Council responsibility collect small fee - Council responsibility collect small fee - Council responsibility- collect small fee - Council responsibility

Orange Walk Town has approximately 3,446 dwelling units and 689 businesses Commercial garbage is divided into Small businesses Warehouse businesses Medium businesses Big businesses Fast food vendors Governmental sectors hospital ect. Restaurants Revision of latest trade License should be done to get concise amount. NOTE: Every time a truck is undergoing repairs there is a standby truck that would replace the other truck. When there are branches, it would take space in the open box truck in which it lowering the volume of garbage that is disposed. More drums are being placed in areas that citizens have problems with garbage disposal.

Approximate Trips per Truck A3691 Open Box Truck


May 2 to 4 May 7 to 13 May 14 to 18 May 22 to 25 May 28 to 31 TOTAL 5 trips 6 trips 9 trips 8 trips 8 trips 36 trips x 08 cubic yard 288 cubic yards

Blue Compactor Volvo


May 2 to 4 May 7 to 13 May 14 to 18 May 22 to 25 May 28 to 31 TOTAL 7 trips 7 trips 6 trips 4 trips 4 trips 28 trips x 20 cubic yards 560 cubic yards

A3003- Yellow Compactor


May 2 to 4 May 7 to 13 May 14 to 18 May 22 to 25 May 28 to 31 TOTAL 5 trips 7 trips 9 trips 2 trips 8 trips 31 trips x 16 cubic yards 496 cubic yards

B230 Standby Truck


May 23 to 25 7 trips NOTE: B230 is replacing the Yellow compactor truck until compactor truck is fixed. Jack fell so mechanics are doing repairs.

Week Route
A3003 / B230 E. Toloza A. Uh U.Mex Driver loader loader Zone C Monday Wednesday Friday Zone E Thursday Tuesday Friday

Belize Rd and Oil Rig chan Pine Ridge Rd= Monday , Wednesday and Friday

A3691 C. Thompson E. Hernandez G. Cruz C. Reyes

Driver Loader Loader Loader

Zone A Monday Wednesday Friday

Zone B Tuesday Thrusday Friday

Muffles High School and Trial Farm School = Friday

Volvo Compactor A. Novelo W. Jimenez W. Robinson

Zone D Monday Wednesday Friday

Zone F Tuesday Thrusday Friday

Lousiana School and Come&Dine = Friday

Weekend Route for Garbage Collection Am Shift


All Park Area Market Area Main St People Store SP Ware house Zeta Hotel Del La Fuente Saint Christopher Hotel Sugar City Dickerson Super Market Banquitas House of Cultures Belize Road Chinese (ALL) Muffles College Hospital Other Chinese hot spot Bridge Area

PM shift Park Area Market Area Belize Road to Shell One stop La Inmaculada Church Mercy Kitchen Sun Luck Picame Happy Valley White House Yigens Store

Note: Garbage Collection Route may change upon orders by supervisor By collecting garbage in weekends it improves and shortens the volume of garbage for the coming week. Driver and loaders change every weekend

Approximate Fuel Usage for Trucks

Vehicle Maintenance B 230 Date Invoice # 28/05/12 240217 Total

P.O # 1647

Amount Fuel 34 34 gallons

Amt Valued 353.33 $ 353.33

Vehicle Maintenance A 3691 C. Thompson Date Invoice # P.O # 10/05/12 239167 1609 16/05/12 239554 1646 22/05/12 239944 1677 28/05/12 240228 1694 31/05/12 240447 1716 Total

Amount Fuel 34 34 34 34 34 170 gallons

Amt Valued 368.90 368.90 368.90 353.26 353.26 $ 1813.22 Amt Valued 368.90 368.90 368.90 368.90 353.26 $1828.86 Amt Valued 432.80 434.00 368.90 434.00 434.00 415.60 415.60 $ 2934.90

Vehicle Maintenance A 3003 (compactor truck) Eimer Toloza Date Invoice # P.O # Amount Fuel 07/05/12 238891 1595 34 10/05/12 239169 1617 34 15/05/12 239386 1639 34 21/05/12 239912 1666 34 30/05/12 240419 1707 34 Total 170 gallons Vehicle Maintenance Volvo (blue compactor truck) Date Invoice # P.O # Amount Fuel 03/05/12 238760 1575 40 08/05/12 238963 1604 40 14/05/12 239366 1623 34 16/05/12 239540 1645 40 22/05/12 239936 1676 40 24/05/12 239993 1691 40 29/05/12 240357 1700 40 Total 274 gallons

DUMP SITE

This Picture shows cleaning of dump site. I propose that the road of the dump site needs urgent fix due to heavy rain. You can see the pot holes in the center of the road. This is the effect of the first rain. The trucks have trouble entering the dump site and causes delay on the garbage collection.

This picture shows the pile of dirt that the oil rig is dumping, it comes from drilling. It may have some use for back filling for road base.

Proposed Dump Site arrangement

Garbage Collection

Supervising Chopping in Little England

MARKET EXTENSION

The removal of 5 stalls from St. Peters St stalls. Four were rebuilt at Market extension area on Arthur St. The four stalls are in place but need final touch, such as, more screws on roof, final work on fisher board and cleaning. Also remaining is the pouring of a 3 floor slab and the building of platforms for products etc. work took about 1 month with a crew of 4 people: 2 skilled and 2 helpers to perform this task. The area was refilled with white marl: the total of 3 trips which totals of 30 cubic yards.

You might also like