Concrete Checklist: Structural and Design Check

The document provides a checklist for concrete structural checks at various stages of construction. It lists checks to be performed for structural design, site engineers, site superintendents, and during and after casting. Checks include approval of construction details, mix designs, steel placement, formwork, cleanliness, safety provisions, and curing arrangements. The goal is to ensure quality and structural integrity of the concrete work at each phase.

Uploaded by

Stephen Agyin
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
317 views8 pages

Concrete Checklist: Structural and Design Check

The document provides a checklist for concrete structural checks at various stages of construction. It lists checks to be performed for structural design, site engineers, site superintendents, and during and after casting. Checks include approval of construction details, mix designs, steel placement, formwork, cleanliness, safety provisions, and curing arrangements. The goal is to ensure quality and structural integrity of the concrete work at each phase.

Uploaded by

Stephen Agyin
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 8

CONCRETE CHECKLIST

Structural and Design Check


Advance Check
YES NO

Shutter Design Approval of construction joints details Approval of mix to be used Approval of bending schedules

Site Engineers check

Line and level check including alignment of starter bars Steel content Check Mix design check Other adjacent works check Safety Check Extra such as boxouts, painting expansion joints, inserts, dowels, starters, gate guides, rebates, chamfers, splays etc. Provision of kickers, grout checks and floating markers

Moisture in aggrates and adjustment to water to be added Provisioon of adequate cover

YES

NO

Site Superintendent's Check


Steel fixing; firm and in proper place Cover to steel underneath, sides, ends and top. Fixing of shutters so they won't move during casting Cleanliness of shutters, floor, steel etc. Closing of holes and potential leakage points Removal of all loose items Cover to all steel

Final Check before handing over permission to proceed


Mixer working At least two working vibrators available Cube moulds on site Access for workers Safety Adequate final cleaning Last look around

During and After Casting


Concrete observed quality Cube management Stability of steel and shutters Curing arrangements

Preparation of construction joints Support shutters not to be removed before specified time

YES