The document outlines a project proposal for designing two air conditioning rooms for an FM 200 fire suppression system. It involves civil and structural engineering as well as electrical work. The scope of services includes architectural drawings, structural drawings, calculations reports, and electrical lighting and power layouts. Exclusions are cad drawings of existing infrastructure and authority approvals. The proposal provides estimated hours and costs for engineers, designers, and draftsmen to complete the work.

Uploaded by

netsavy71
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
249 views5 pages

Daleel CTR

The document outlines a project proposal for designing two air conditioning rooms for an FM 200 fire suppression system. It involves civil and structural engineering as well as electrical work. The scope of services includes architectural drawings, structural drawings, calculations reports, and electrical lighting and power layouts. Exclusions are cad drawings of existing infrastructure and authority approvals. The proposal provides estimated hours and costs for engineers, designers, and draftsmen to complete the work.

Uploaded by

netsavy71
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 5

Project: Provision for 2 AC VALDEL LLC, Muscat, Sultanate of Oman Rooms A/C Oman Methanol Company Discipline: Civil

& Structures and Electrical Statement of Work: Design Engineering of 2 AC Rooms for FM 200 System Design Engineering Services for 2 AC Rooms with the following dimensions: 1. Room 1 - size 5ft x 10ft 2. Room 2 - size 5ft x 23ft Scope of Services include the following: a. Civil & Structural Work b. Electrical Work (Lighting & Split ACs)

CTR No: 001

Inputs: 1.0 Soil Report 2.0 Wind Force 3.0 Building Co-ordinates 4.0 Existing as-built drawings for interfaces for electrical 5.0 Existing Client specifications to be provided at beginning of project.

Deliverables: 1.0 Architectural Drawing 2.0 Structural Drawing including Bar Bending Schedule 3.0 Calculation Report 4.0 Electrical Lighting layout, cable routing drawings

Exclusions: 1.0 Cadding of any existing drawings, Client to provide all required plant drawings in Auto-Cad format 2.0 Authority approvals, design deliverables included in the scope 3.0 Electrical feeder modification works, tie-ins will be within existing spare feeders 4.0 Any services related to mechanical, piping, process, utilities, F&G system engineering and C&A

Resource Lead Engineer Engineer Designer Draftsman Software Cost Travel Cost Total Cost: RO

Location Muscat Muscat Muscat

Man-hours 20 390 560 970

Cost in RO

Amount in RO -

Total

Total

Revision: 0 CTR Originator: Kannappan Contractor Valdel LLC Proposal No 009/2012

Date: Client

4/10/2012

Special Technical Services LLC

Project: Provision for 2 AC VALDEL LLC, Muscat, Sultanate of Oman Rooms A/C Oman Methanol Company Discipline: Civil & Structures Statement of Work: Design Engineering of 2 AC Rooms for FM 200 System Design Engineering Services for 2 AC Rooms with the following dimensions: 1. Room 1 - size 5ft x 10ft 2. Room 2 - size 5ft x 23ft

CTR No: 001

Inputs: 1.0 Soil Report 2.0 Wind Force 3.0 Building Co-ordinates Deliverables: 1.0 Architectural Drawing 2.0 Structural Drawing including Bar Bending Schedule 3.0 Calculation Report Exclusions:

Resource Lead Engineer Engineer Designer Draftsman Software Cost Travel Cost Total Cost:

Location

Man-hours 90 160 0 250

Cost in RO

Amount in RO

Total

Total

Revision: 0 CTR Originator: Kannappan Contractor Valdel LLC Proposal No 009/2012

Date: Client Special Technical Services LLC

4/8/2012

Project: Provision of EPC for Power Supply to Daleel Camp

VALDEL LLC, Muscat, Sultanate of Oman

CTR No:

Discipline: Electrical Statement of Work: Design Engineering of EPC Power Supply to Old and New Camp Design Engineering of EPC Power Supply to Old and New Camp 1, 2 Nos Electrical Switchroom buildings (One for Old camp & One for New Camp) 2. 3 Nos of Indoor switchboards (New Camp + Old Camp & Common Switchboards) 3. Two power transformers of 1.6 mVA, 33/0.433kV 4. Feeder Pillers 2 Nos 5. HV power cables 100mts (33kV) 6. LV power cables 2500 Mtrs 7. Relay Coordination Inputs: Refer the Bid document D-12-083 from STS

Deliverables: Single Line diagram RFQ for LV Switchboards, Feeder Pillers, transformer, DC and UPS system, HV system Cable sizing and Cable routing layouts Electrical room layouts Transformer Yard layouts Lighting calculations & Lighting layouts Earthing Calculations and Earthing and lightning protection layouts Relay setting calculations Demolition drawings Exclusions: Site Surveys

Resource Lead Engineer Engineer Designer Draftsman Software Cost Travel Cost Total Cost: Revision: 0 CTR Originator: CVV Contractor Valdel LLC

Location

Man-hours 300

Cost in RO

Amount in RO

CTR No: 001 380

Total

680

Total

Date: Client Proposal No 009/2012 Special Technical Services LLC

4/8/2012

Project: Provision for 2 AC VALDEL LLC, Muscat, Sultanate of Oman Rooms A/C Oman Methanol Company Discipline: Project management Statement of Work: Design Engineering of 2 AC Rooms for FM 200 System Design Engineering Services for 2 AC Rooms with the following dimensions: 1. Room 1 - size 5ft x 10ft 2. Room 2 - size 5ft x 23ft

CTR No: 001

Inputs: Refer RFQ

Deliverables:

Exclusions: Statutory approvals

Resource Project Manager Engineer / Planning Designer Document controller Software Cost Travel Cost Total Cost: Revision: 0 CTR Originator: CVV Contractor Valdel LLC

Location

Man-hours 20

Cost in RO

Amount in RO

20

Total

40

Total

Date: Client Proposal No 009/2012 Special Technical Services LLC

4/8/2012

39.9783

31.54524