The document reports on site testing done to replace transformers, protection panels, and batteries at a substation. It details test results for current transformers on the high voltage and medium voltage sides of transformers, including injection points and monitoring points.

Uploaded by

gavinilaa
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
270 views2 pages

T202 NCT Sec Inj

The document reports on site testing done to replace transformers, protection panels, and batteries at a substation. It details test results for current transformers on the high voltage and medium voltage sides of transformers, including injection points and monitoring points.

Uploaded by

gavinilaa
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

SITE TEST REPORT

Replacement of 132/11kV Transformers, Transformer Protection Panels and 110 V Batteries at W13 Substation
(CONTRACT No. N6399) Consultant Main Contractor

ENERGO

Name of the Equipment Name of the Feeder Manufacturer Date

40MVA Power Transformer-T201 E03 Transformer Feeder-1 ABB 17.02.2013

Page 1 2

1.
CT Details

Transformer HV REF from NCT protection Core:- CT Ratio 300/1A


Phase Injected Sec Current (A)

Secondary Current [mA] Monitored at:


E03+R1, TB XA= 132kV Relay Panel 11 12 Test plug X64HV (RTXP18) 9A 10A Stabilizing Resistor RSHV A82 A83 Metrosil RMHV A82 A85

CT2 Tr. HV REF

Injection from Tr(201) MK box N(222,223) F64HV Display Io A

Secondary Current [mA]


F64HV (RET615) (TB X120) 13 14

2.
CT Details

Transformer HV NCT for SBEF protection Core:- CT Ratio 300/1A


Phase Injected Sec Current (A)

Secondary Current [mA] Monitored at:


E03+R1, TB XC= 132kV Relay Panel S1 S2 6 7 Test plug X51NHV (RTXP18) 9A 10A +F51NHV (REF615) (TB X120) 13 14 +F51NHV Display A Io

CT1 Tr. HV SBEF

Injection from Tr(201) MK box N(220,221)

3.
CT Details

Transformer Tertiary Wdg CT for SBEF protection Core:- CT Ratio 300/1A


Phase Injected Sec Current (A)

Secondary Current [mA] Monitored at:


E03+R1, TB XC= 132kV Relay Panel S1 S2 13 14 Test plug X51NT (RTXP18) 9A 10A +F51NT (REF615) (TB X120) 13 14 +F51NT Display A Io

CT9 Tr. Tertiary SBEF

Injection from Tr(201) MK box N(228,229)

Tested by ABB Transmission & Distribution Signature Name Date

Witnessed by ENERGO

Approved by

Mohammad Rasheed

SITE TEST REPORT

Replacement of 132/11kV Transformers, Transformer Protection Panels and 110 V Batteries at W13 Substation
(CONTRACT No. N6399) Consultant Main Contractor

ENERGO

Name of the Equipment Name of the Feeder Manufacturer Date

40MVA Power Transformer-T201 E03 Transformer Feeder-1 ABB 17.02.2013

Page 2 2

4.
CT Details

Transformer MV REF from NCT protection Core:- CT Ratio 2500/1A


Phase Injected Sec Current (A)

Secondary Current [mA] Monitored at:


E03+R1, TB XA= 132kV Relay Panel 18 19 Test plug X64MV (RTXP18) 9A 10A Stabilizing Resistor RSMV A182 A183 Metrosil RMMV A182 A185

CT5 MV REF 2500/1A

Injection from Tr(201) MK box N(226,227)

Secondary Current [mA]


F64MV (RET615) (TB X120) 13 14 F64MV Display Iob-A

5.
CT Details

Transformer MV NCT for SBEF protection Core:- CT Ratio 2500/1A


Phase Injected Sec Current (A)

Secondary Current [mA] Monitored at:


E03+R1, TB XC= 132kV Relay Panel 10 11 Test plug X51NMV (RTXP18) 9A 10A +F51NMV (REF615) (TB X120) 13 14 +F51NMV Display Io

CT4 Tr. MV SBEF

Injection from Tr(201) MK box N(224,225)

Remarks:- Single point Earthing confirmed before start of secondary injection. Single point Earthing is done at E03+R01 panel side for the above cores.

Tested by ABB Transmission & Distribution Signature Name Date

Witnessed by ENERGO

Approved by

Mohammad Rasheed