Section:Rawmill(10th to 16th June)
S.No Description of works Work Type Estimated Hours Actual Hours 16 18 6 2 8 11 11 30 12.5 15 129.5 Job Completed Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Raw mill-2 Outlet HLPC Conditioning pump oil seal replacement and Conditioning pump motor replacement work. Raw mill-1 Low grade weigh feeder venting pipeline Transition piece 2 welding work and connected to bagfilter 3 Stacker Spare drive bogie wheel bearings dismantling work. 1 4 BC-12 Damaged Self aligning return idler frames replacement work. 5 RM-1 High grade weigh feeder calibration work 6 Dump hopper Unit bag filter compressor air leakages arresting work. 7 Bridge reclaimer damaged buckets(2nos)repairing work. Raw mill-1 Vent bag filter air pipe line Header to Solenoid valve air 8 leakages arresting work. Raw mill-1&2 Girth gear grease spray system strainers cleaning work 9 and Spray pattern checking work. 10 Rawmill area check list & general maintenance works
PM Repair Repair Repair PM Repair Repair Repair PM PM
15 17 6 2 8 11 11 28 12.5 15
Section:Rawmill(17th to 23rd June)
1 2 3 4 5 6 7 8 9 400mm Dia Roller Fabrication for BC-1 Curved portion area to positioning the belt. Dump Hopper area bag filter-2 Solenoid valves Compressor air line leakages arresting work. BC-5 Discharge area bag filter fan alignment checking and coupling membrane replacement work. BC-12 area bag filter fan coupling replacement with F-80 Coupling in place of resilience coupling. BC-1 carrying side curved area roller fixing work. Storage weigh feeder calibration work (weighing Zone roller adjustment). Raw mill-2 Inlet double flap valve bearings inspection and greasing work. BC-12 Unit bag filter fan Tyre coupling membrane fixing work. Repair Repair PM Repair PM PM PM Repair Repair PM 24 15 12 22 8.5 10 11 4 85 16
25.5 17 12 22 9.5 11.5 12 4 34 16 Yes Yes Yes Yes Yes Yes Yes Yes No Yes
Blending Silo Bucket Elevator-2 Gear box Out put coupling shaft oil seal replacement work ( Gear box removing from the head pulley shaft) . 10 Raw mill area General check list checking work.
Labour Utilization(For Week)
24th Sl. No 1 2 3 4 5 6 7 8 9 Names Sandeep Singh Firoz Khan Bhanu prathap Ramana Reddy Hanumantha Reddy Ali Koya Hasan Salim Naresh rawat
Available hours Actual Hours
25th
Available hours Actual Hours
26th
Available hours Actual Hours
27th
Available hours Actual Hours
28th
Available hours Actual Hours
29th
Available hours Actual Hours
30th
Available hours Actual Hours
8.5 8.5 8.5
8.5 8.5 8.5 8.5 8.5
8.5 8.5 8.5 8.5 8.5 8.5 8.5
5.5 5.5 5.5 5.5
8.5
8.5
8.5 8.5 8.5 8.5 8.5
Labour Utilization(For Week)
Sl. No 1 2 3 4 5 6 Names Sandeep Singh Firoz Khan Bhanu prathap Ramana Reddy Hanumantha Reddy Naresh rawat 1st
Available hours Actual Hours
2nd
Available hours Actual Hours
3rd
Available hours Actual Hours
4th
Available hours Actual Hours
5th
Available hours Actual Hours
6th
Available hours Actual Hours
7th
Available hours Actual Hours
8.5
8.5 8.5 8.5 8.5 8.5
8.5 8.5 8.5 8.5 8.5
5.5 5.5 5.5 5.5
3 1 6 5 14.5 14.5
12.5 12.5 12.5 12.5 12.5
Labour Utilization(For Week)
8th Sl. No 1 2 3 4 5 6 Names Sandeep Singh Firoz Khan Bhanu prathap Ramana Reddy Hanumantha Reddy Naresh rawat
Available hours Actual Hours
9th
Available hours Actual Hours
10th
Available hours Actual Hours
11th
Available hours Actual Hours
12th
Available hours Actual Hours
13th
Available hours Actual Hours
14th
Available hours Actual Hours
14 14 14 14 14 14
16.5 16.5 16.5 16.5
17 17 17 17 18
Labour Utilization(For Week)
15th Sl. No 1 2 3 4 5 Names Sandeep Singh Firoz Khan Bhanu prathap Ramana Reddy Hanumantha Reddy
Available hours Actual Hours
16th
Available hours Actual Hours
17th
Available hours Actual Hours
18th
Available hours Actual Hours
19th
Available hours Actual Hours
20th
Available hours Actual Hours
21st
Available hours Actual Hours
8.5 8.5 8.5 8.5 8.5
8.5 8.5 8.5 8.5
5.5 5.5 5.5 5.5 5.5
6 6 6 6 6
Labour Utilization(For Week)
22nd Sl. No 1 2 3 4 5 Names Sandeep Singh Firoz Khan Bhanu prathap Ramana Reddy Hanumantha Reddy
Available hours Actual Hours
23rd
Available hours Actual Hours
24th
Available hours Actual Hours
25th
Available hours Actual Hours
26th
Available hours Actual Hours
27th
Available hours Actual Hours
28th
Available hours Actual Hours
6 6 6 6 6
6 6 6 6 6
6 6
6 6 6 6 6