Activity ID
Activity Name
Original
Duration
Activity % Start
Complete
Finish
246
22-May-13
30-Apr-14
Energia Mayakan Pipeline Expansion Project - Detailed
E&D
- Revised
A
22-May-13 A 14-Mar-14
213
Milestones
BL1 Start
BL1 Finish
22-May-13 15-Oct-13
22-May-13 15-Oct-13
Limited Notice to Proceed (LNTP)
100% 22-May-13 A
A1010
Full Notice to Proceed (FNTP)
100% 17-Jun-13 A
A1020
Project Kick-off Meeting
100%
22-May-13 A
22-May-13
A1030
LNTP Deliverables Issued
100%
14-Jun-13 A
14-Jun-13
A1040
Detail Engineering & Design Schedule
100%
11-Jul-13 A
11-Jul-13
A1050
Receive 100% Survey Data for Pipeline Cooridor
0%
03-Dec-13*
19-Jul-13
A1060
Issue Drawings for Client Review - EM#2
100%
12-Nov-13 A
24-Sep-13
A1070
Issue for Construction Drawings - All Drawings
0%
14-Mar-14*
15-Oct-13
A1080
Issue SCADA Specification
100%
23-Jul-13 A
31-Jul-13
A1090
Issue Preliminary Plot Plans
100%
18-Jul-13 A
17-Jul-13
A1170
Issue Drawings for Client Review - Pipeline, MLV#1, MLV#2 0
0%
06-Mar-14
24-Sep-13
A1180
Issue Drawings for Client Review - EM#3
24-Oct-13 A
10-Sep-13
A1190
Issue Drawings for Client Review - Interconnect
Engineering, Design and Procurement
100%
100%
213
17-Jun-13
12-Nov-13 A
22-May-13 A 14-Mar-14
26
02
June
09 16
23
30
July
07 14
21
28
August
04 11 18
25
2013
September
01 08 15 22
17-Sep-13
22-May-13 15-Oct-13
-108
Design Basis Manual
17
100% 22-May-13 A 14-Jun-13 A 22-May-13 14-Jun-13
-1
Pipeline
A1110
Survey Specification
15
7
22-May-13 A 11-Jun-13 A 22-May-13 11-Jun-13
100% 22-May-13 A 31-May-13 A 22-May-13 31-May-13
0
-1
11
100% 22-May-13 A 06-Jun-13 A 22-May-13 06-Jun-13
-1
100% 03-Jun-13 A 11-Jun-13 A 03-Jun-13 11-Jun-13
18
17
22-May-13 A 14-Jun-13 A 22-May-13 14-Jun-13
100% 22-May-13 A 14-Jun-13 A 22-May-13 14-Jun-13
0
-1
Preliminary Pipe/Costing Requisition
Mechanical / Piping
A1140
Preliminary P&IDs
Full Notice to Proceed (FNTP)
General
Project Management (General)
A1220 Pipeline Cooridor Survey - By Arendal
23
30
06
April
13
20
27
May
04
30-Apr-14, Energia Mayakan Pi
Receive 100% Survey Data for Pipeline Cooridor
Issue Drawings for Client Review - EM#2
Issue for Construction Drawings - All Drawings
Issue SCADA Specification
Issue Preliminary Plot Plans
Issue Drawings for Client Review - Pipeline, MLV#1, MLV#2
Issue Drawings for Client Review - EM#3
Issue Drawings for Client Review - Interconnect
14-Mar-14, Engineering, Design and Procurement
14-Jun-13 A, Project Management / Project Engineering
Design Basis Manual
11-Jun-13 A, Pipel ine
Survey Specification
Preliminary Hydraulic Analysis
Preliminary Pipe/Costing Requisition
14-Jun-13 A, Mechanical / Piping
Preliminary P&IDs
-108
14-Mar-14, Full Notice to Proceed (FNTP)
201
201
11
07-Jun-13 A 14-Mar-14
07-Jun-13 A 14-Mar-14
90.91% 07-Jun-13 A 03-Dec-13
07-Jun-13 14-Oct-13
07-Jun-13 09-Aug-13
07-Jun-13 21-Jun-13
-109
-155
-117
14-Mar-14, General
14-Mar-14, Project Management (General)
100% 07-Jun-13 A 11-Jul-13 A
07-Jun-13 03-Jul-13
-6
A1380
Facilities Survey
15
100% 07-Jun-13 A 19-Jul-13 A
A1440
Site Visit
A1790
A1800
A1860
Internal HAZOP
07-Jun-13 27-Jun-13
-16
100% 24-Jun-13 A 28-Jun-13 A 24-Jun-13 28-Jun-13
Formal Client HAZOP
100% 05-Aug-13 A 06-Aug-13 A 30-Jul-13
Review IFC Package
21
0% 14-Feb-14
100% 16-Jul-13 A
146
135
16
31-Jul-13
14-Mar-14
29-Jul-13
09-Aug-13
16-Jul-13 A
16-Jul-13
16-Jul-13
07-Jun-13 A 30-Dec-13
24-Jun-13 A 30-Dec-13
0% 03-Dec-13* 27-Dec-13
Pipeline Cooridor Survey - By Arendal
Detail Engineering and Design Schedule
Facilities Survey
Site Visit
Formal Client HAZOP
-11
0
07-Jun-13 14-Oct-13
24-Jun-13 14-Oct-13
01-Aug-13 30-Aug-13
-55
-55
3
24-Jun-13 15-Jul-13
-1
Review IFC Package
Internal HAZOP
30-Dec-13, Engineering (General)
30-Dec-13, Mechanical/Piping (General)
Stress Analysis
A1990 Filters/Separator Skids Requisition
15
100% 24-Jun-13 A 16-Jul-13 A
A2010 Meter Skid Requisition
16
100% 15-Jul-13 A
01-Aug-13
A2030 Condensate Tank Requi sition
15
100% 16-Aug-13 A 27-Aug-13 A 05-Aug-13 23-Aug-13
Condensate Tank Requi sition
100% 02-Aug-13 A 21-Aug-13 A 22-Jul-13
09-Aug-13
Instrument Gas Posts Requisition
05-Aug-13 A 11-Jul-13
A3040 Ball Valves Requisition
15
100% 08-Jul-13 A
30-Jul-13 A
29-Jul-13
16-Aug-13
-1
A3060 Plug Valves Requisition
100% 26-Jul-13 A
31-Jul-13 A
15-Jul-13
02-Aug-13
12
A3080 Large Pipe and Fittings Requisition
15
100% 19-Aug-13 A 18-Oct-13 A 19-Aug-13 09-Sep-13
-30
A3400 Pressure Safety Valves Requisition
15
100% 20-Aug-13 A 23-Oct-13 A 26-Aug-13 16-Sep-13
-31
A3420 Restriction Orifices Requisition
15
100% 20-Aug-13 A 19-Nov-13 A 26-Aug-13 16-Sep-13
-50
A3440 Valves (6" and Smaller) Requisition
15
100% 15-Aug-13 A 07-Oct-13 A 08-Aug-13 28-Aug-13
-22
A3470 Filters/Separator Skid TBE
100% 20-Aug-13 A 27-Aug-13 A 08-Oct-13 14-Oct-13
A3480 Check Valves Requisition
15
100% 05-Aug-13 A 20-Aug-13 A 29-Jul-13
16-Aug-13
100% 20-Aug-13 A 13-Sep-13 A 03-Sep-13 09-Sep-13
-14
A3500 Globe Valves Requisition
March
09 16
07-Jun-13 15-Oct-13
19
A3490 Ball Valves TBE
02
07-Jun-13 A 14-Mar-14
Detail Engineering and Design Schedule
A3010 Instrument Gas Posts Requisition
23
201
A1230
Engineering (General)
Mechanical/Piping (General)
A1980 Stress Analysis
26
Detail Engineering & Design Schedule
Mobilization of Project Team Personnel and famil iari zati on of F EED documents
A1150
29
LNTP Deliverables Issued
0
0
Preliminary Hydraulic Analysis
01
February
02 09 16
Full Notice to Proceed (FNTP)
A1130
24
January
05 12 19
Project Kick-off Meeting
22-May-13 A 14-Jun-13 A 22-May-13 14-Jun-13
A1120
27
December
08 15 22
14-Mar-14, Milestones
18
22-May-13 A 14-Jun-13 A 22-May-13 14-Jun-13
Project Management / Project Engineering
A1100
Mobilization of Project Team Personnel and famil iari zati on of F3EED documents
100% 22-May-13 A 24-May-13 A 22-May-13 24-May-13
18
29
November
03 10 17
Limited Notice to Proceed (LNTP)
14-Jun-13 A, Limited Notice to Proceed (LNTP)
Limited Notice to Proceed (LNTP)
2014
October
06 13 20
-108
A1000
22-May-13
Variance BL1
Duration19
-141
15
100% 05-Aug-13 A 20-Aug-13 A 29-Jul-13
16-Aug-13
A3510 Meter Skid TBE
100% 26-Aug-13 A 30-Aug-13 A 03-Sep-13 09-Sep-13
A3520 Plug Valves TBE
100% 30-Aug-13 A 06-Sep-13 A
-6
A3530 Instrument Gas Post TBE
100% 01-Oct-13 A 28-Oct-13 A
-19
A3540 Condensate Tank TBE
A3550 Check Valves TBE
100% 26-Sep-13 A 02-Oct-13 A
A3560 Globe Valves TBE
A3570 Valves (2"-6") TBE
16.67% 26-Sep-13 A 09-Dec-13
Primary Baseline
Critical Remaining Work
Actual Work
Milestone
Remaining Work
Summary
Filters/Separator Skids Requisition
Meter Skid Requisition
Ball Valves Requisition
Plug Valves Requisition
Large Pipe and Fittings Requisition
Pressure Safety Valves Requisition
Restriction Orifices Requisition
Valves (6" and Smaller) Requisition
Filters/Separator Skid TBE
Check Valves Requisition
Ball Valves TBE
Globe Valves Requisition
Meter Skid TBE
Plug Valves TBE
Instrument Gas Post TBE
Condensate Tank TBE
-53
-5
Check Valves TBE
100% 26-Sep-13 A 02-Oct-13 A
-5
Globe Valves TBE
0% 28-Oct-13 A 16-Dec-13
-36
Valves (2"-6") TBE
Activity ID
Activity Name
Original
Duration
Activity % Start
Complete
Finish
27.27% 25-Nov-13 A 12-Dec-13
BL1 Start
BL1 Finish
19-Aug-13 30-Aug-13
Variance BL1
Duration19
-4
26
02
June
09 16
23
30
July
07 14
21
28
August
04 11 18
2013
September
01 08 15 22
25
A3580 Large Pipe and Fittings TBE
11
A3590 Gate Valve
19
100% 09-Aug-13 A 06-Sep-13 A 09-Sep-13 09-Sep-13
A4960 Wall Thickness Calculations
33
100% 01-Jul-13 A
26-Jul-13 A
01-Jul-13
15-Aug-13
13
Wall Thickness Calculations
A4970 Facility Piping Specification
29
100% 08-Jul-13 A
30-Jul-13 A
08-Jul-13
15-Aug-13
13
Facility Piping Specification
A4980 Tie-in List
12
100% 12-Sep-13 A 07-Oct-13 A 15-Jul-13
01-Oct-13
39
-20
A4990 Pressure Safety Valves TBE
0% 03-Dec-13
12-Dec-13
01-Aug-13 14-Aug-13
A5110 Restriction Orifices TBE
0% 25-Nov-13 A 30-Dec-13
03-Sep-13 09-Sep-13
-21
27-Sep-13
15-Aug-13
-17
-8
100% 26-Sep-13 A 23-Oct-13 A 23-Sep-13 27-Sep-13
-14
117
38
07-Jun-13 A 16-Dec-13
100% 07-Jun-13 A 23-Jul-13 A
07-Jun-13 07-Oct-13
07-Jun-13 31-Jul-13
-50
6
A1960 Telecommunications Specification
38
100% 07-Jun-13 A 30-Jul-13 A
08-Jul-13
28-Aug-13
A2200 Leak Detection Specification
38
100% 07-Jun-13 A 01-Aug-13 A 08-Jul-13
28-Aug-13
-1
A2410 Instrument Skid Specification
100% 08-Jul-13 A
10-Jul-13
-4
A2960 Analyzer Control Building TBE
12
A3140 RTU Requisition
20
100% 01-Aug-13 A 05-Sep-13 A 22-Aug-13 22-Aug-13
100% 16-Oct-13 A 22-Oct-13 A 26-Aug-13 09-Sep-13
Electrical (General)
A1520 Thermoelectric Generators Requisition
A2450 Thermoelectric Generators TBE
Instrumentation (General)
A1710 SCADA Specification
A3150 RTU TBE
50
15
6
26-Jul-13 A
100% 26-Jul-13 A
23-Oct-13 A 26-Jul-13
28-Aug-13 A 26-Jul-13
16-Jul-13 A
09-Jul-13
75% 24-Oct-13 A 05-Dec-13
11-Sep-13 A 15-Jul-13
06-Sep-13
-6
A4380 Instruments Requisitions
24
100% 08-Jul-13 A
26-Sep-13 A 08-Jul-13
08-Aug-13
-35
A4390 SCADA TBE
100% 03-Sep-13 A 10-Sep-13 A 12-Aug-13 07-Oct-13
35
A4400 Leak Detection TBE
100% 03-Sep-13 A 10-Sep-13 A 29-Jul-13
25
100% 03-Sep-13 A 10-Sep-13 A 07-Oct-13 07-Oct-13
09-Sep-13
RTU TBE
Analyzer Control Building Requisition
Instruments Requisitions
SCADA TBE
Leak Detection TBE
-5
Telecommunications T BE
100% 07-Jun-13 A 19-Aug-13 A
-51
Leak Detection Requisition
100% 07-Jun-13 A 19-Aug-13 A
-51
A1430 Monolithic Isolation Joint Requisition
24
A1460 Cathodic Protection Calculations
46
A1620 Monolithic Isolation Joint TBE
100% 17-Jun-13 A 18-Jul-13 A
0% 22-Jul-13 A
14-Mar-14
17-Jun-13 19-Jul-13
08-Jul-13
-108
-123
-123
-2
1
24-Sep-13
-114
100% 19-Aug-13 A 20-Aug-13 A 13-Aug-13 19-Aug-13
A1640 Hinged Closures TBE
12
A1650 Review IFC Package
A1660 Pig Sig Passage Indicator Requisition
100% 30-Sep-13 A 01-Oct-13 A 30-Jul-13
12-Aug-13
100% 16-Oct-13 A 26-Nov-13 A 19-Aug-13 19-Aug-13
-29
A1670 Pig Sig Passage Indicator TBE
A5300 Hinged Closures Requisition
Mechanical/Piping (PL, MLV1, MLV2)
A3600 Small Pipe and Fittings Requisition
A3620 Large Pipe and Fittings TBE
A5480 Review IFC Package
A5560 Small Pipe & Fitting TBE
A5590 Large Pipe and Fittings Requisition
100% 29-Aug-13 A 20-Sep-13 A 29-Jul-13
0% 07-Mar-14
14-Mar-14
-6
-6
13
100% 08-Jul-13 A
82
5
19-Aug-13 A 14-Mar-14
19-Aug-13 30-Aug-13
100% 18-Nov-13 A 26-Nov-13 A 19-Aug-13 30-Aug-13
11-Jul-13 A
09-Aug-13
16-Aug-13 16-Aug-13
25-Jun-13 12-Jul-13
0% 25-Nov-13 A 12-Dec-13
-14
0% 03-Dec-13
14-Mar-14
-74
0% 03-Dec-13
12-Dec-13
-8
100% 19-Aug-13 A 19-Nov-13 A
20-Aug-13 A 14-Mar-14
0% 20-Aug-13 A 20-Dec-13
01-Jul-13 30-Aug-13
26-Aug-13 30-Aug-13
A1610 Review IFC Package
34
0% 07-Oct-13 A 14-Mar-14
01-Jul-13
Electrical (PL, MLV1, MLV2)
A5490 Review IFC Package
36
34
07-Oct-13 A 14-Mar-14
0% 07-Oct-13 A 14-Mar-14
23-Aug-13
20-Sep-13
17-Jul-13
A5370 I/O List
13
100% 16-Jul-13 A
18-Jul-13 A
16-Jul-13
01-Aug-13
11
A5380 Review IFC Package
34
0% 07-Oct-13 A 14-Mar-14
09-Sep-13 20-Sep-13
-105
195
190
65
17-Jun-13 A 14-Mar-14
24-Jun-13 A 14-Mar-14
0% 24-Jun-13 A 06-Mar-14
17-Jun-13 15-Oct-13
24-Jun-13 15-Oct-13
24-Jun-13 24-Sep-13
-108
-108
-119
0% 08-Jul-13 A
08-Jul-13
24-Sep-13
-118
01-Aug-13 24-Sep-13
-64
06-Mar-14
01-Aug-13 24-Sep-13
-126
10-Jul-13 A
02-Jul-13
12-Jul-13
A1410 Typical Pipeline Drawings/Details
28
A1420 Site Location Maps
28
0% 22-Jul-13 A
100% 02-Jul-13 A
A1480 Geotech Testing Locati on Drawi ngs
06-Mar-14
35.71% 12-Aug-13 A 31-Dec-13
Mainline Pipe / Coating Requisition
Monolithic Isolation Joint Requisition
Cathodic Protection Calculations
Monolithic Isolation Joint TBE
Hinged Closures TBE
Review IFC Package
Pig Sig Passage Indicator Requisition
Pig Sig Passage Indicator TBE
Hinged Closures Requisition
14-Mar-14, Mechanical/Piping (PL, MLV1, MLV2)
Small Pipe and Fittings Requisition
Large Pipe and Fittings TBE
Review IFC Package
Small Pipe & Fitting TBE
Large Pipe and Fittings Requisition
14-Mar-14, Civil/Structural (PL, MLV1, MLV2)
MLV Foundation Calculations
-76
08-Jul-13
08-Jul-13
46
14-Mar-14, Pipeline, MLV#1, MLV#2
14-Mar-14, Engineering (PL, MLV1, MLV2)
14-Mar-14, Pipeline (PL, MLV1, MLV2)
Review IFC Package
14-Mar-14, Electrical (PL, MLV1, MLV2)
Review IFC Package
-115
-115
14-Mar-14
18-Jul-13 A
A1400 HDD Drawings
SCADA Network Architectural Diagram
-66
03-Jul-13 A
100% 03-Jul-13 A
Design (PL, MLV1, MLV2)
Pipeline (PL, MLV1, MLV2)
A1360 Construction Alignment Sheets
Telecommunications Requisition
23-Jul-13 A, Design (General)
23-Jul-13 A, Instrumentation (General)
-104
-84
108
8
Instrumentation (PL, MLV1, MLV2)
A5360 Instrument Index
Instruments TBE
-140
4
71
73
5
Civil/Structural (PL, MLV1, MLV2)
A1550 MLV Foundation Calculations
10
-128
-3
14-Mar-14, Instrumentation (PL, MLV1, MLV2)
Instrument Index
I/O List
Review IFC Package
14-Mar-14, Design (PL, MLV1, MLV2)
14-Mar-14, Pipeline (PL, MLV1, MLV2)
Construction Alignment Sheets
HDD Drawings
Typical Pipeline Drawings/Details
Site Location Maps
Geotech Testing Locati on Drawi ngs
A1490 Crossing Drawings
36
0% 01-Aug-13 A 06-Mar-14
15-Jul-13
24-Sep-13
-105
Crossing Drawings
A1510 Class Location Study
64
0% 25-Jun-13 A 06-Mar-14
25-Jun-13 24-Sep-13
-119
Class Location Study
A1600 Finalize IFC Drawings
0% 07-Mar-14
25-Sep-13 15-Oct-13
17-Jun-13 15-Oct-13
17-Jun-13 10-Jul-13
-108
-9
14-Mar-14
Finalize IFC Drawings
14-Mar-14, Mechanical/Piping (PL, MLV1, MLV2)
Mechanical/Piping (PL, MLV1, MLV2)
A1450 PFD/P&ID (IFCA)
195
17
A1570 Piping Sections and Details
41
100% 02-Jul-13 A
12-Nov-13 A 15-Jul-13
24-Sep-13
-45
Piping Sections and Details
A1580 MLV Assembly Drawing
51
100% 15-Jul-13 A
12-Nov-13 A 15-Jul-13
24-Sep-13
-35
MLV Assembly Drawing
A1760 Finalize IFC Drawings
71
25-Sep-13 15-Oct-13
-59
A1820 Piping Plot Plan
22
Civil/Structural (PL, MLV1, MLV2)
176
17-Jun-13 A 14-Mar-14
100% 17-Jun-13 A 23-Jul-13 A
0% 03-Dec-13
14-Mar-14
100% 17-Jun-13 A 18-Jul-13 A
24-Jun-13 A 14-Mar-14
08-Jul-13
06-Aug-13
-1
12-Jul-13
15-Oct-13
-122
May
04
Analyzer Control Building TBE
15-Oct-13
24-Sep-13
24-Sep-13
29-Jul-13
27
RTU Requisition
17-Jun-13
17-Jun-13
17-Jun-13
17-Jun-13
20
Leak Detection Specification
A5420 Telecommunications Requisition
14-Mar-14
14-Mar-14
14-Mar-14
31-Jul-13 A
April
13
Instrument Skid Specification
A5410 Leak Detection Requisition
17-Jun-13 A
17-Jun-13 A
17-Jun-13 A
100% 17-Jun-13 A
06
Telecommunications Specification
SCADA Requisition
195
195
195
30
30
16-Dec-13, Instrumentation (General)
-53
9
9
9
23
SCADA Specification
-51
31-Jul-13
31-Jul-13
31-Jul-13
March
09 16
Thermoelectric Generators TBE
100% 07-Jun-13 A 19-Aug-13 A
08-Jul-13
08-Jul-13
08-Jul-13
02
Thermoelectric Generators Requisition
23-Jul-13 A
23-Jul-13 A
23-Jul-13 A
23
Restriction Orifices TBE
A5400 SCADA Requisition
10-Jul-13 A
10-Jul-13 A
100% 10-Jul-13 A
26
23-Oct-13 A, Electrical (General)
50% 26-Sep-13 A 16-Dec-13
18
18
18
01
Pressure Safety Valves TBE
20
Pipeline, MLV#1, MLV#2
Engineering (PL, MLV1, MLV2)
Pipeline (PL, MLV1, MLV2)
A1390 Mainline Pipe / Coating Requisition
23-Sep-13 27-Sep-13
24
February
02 09 16
Tie-in List
100% 10-Jul-13 A
Design (General)
Instrumentation (General)
A3020 SCADA Network Architectural Diagram
27
December
January
08 15 22 29 05 12 19
Large Pipe and Fittings TBE
Gate Valve
-25
39
A4420 Instruments TBE
29
November
03 10 17
-31
A4010 Analyzer Control Building Requisition
A4410 Telecommunications T BE
2014
October
06 13 20
PFD/P&ID (IFCA)
Finalize IFC Drawings
Piping Plot Plan
14-Mar-14, Civil/Structural (PL, MLV1, MLV2)
Activity ID
Activity Name
Original
Duration
Activity % Start
Complete
Finish
BL1 Start
26
02
June
09 16
23
30
July
07 14
21
28
August
04 11 18
25
2013
September
01 08 15 22
2014
29
October
November
December
06 13 20 27 03 10 17 24 01 08 15 22
Soil Erosion & Sediments and Control Details
51
100% 15-Jul-13 A
A1530 Foundation Plans & Details
16
100% 24-Jun-13 A 07-Oct-13 A 26-Aug-13 17-Sep-13
-59
Foundation Plans & Details
A1560 Fencing/Grading Details
52
100% 08-Jul-13 A
24-Sep-13
-13
Fencing/Grading Details
A1750 Finalize IFC Drawings
71
25-Sep-13 15-Oct-13
-59
Electrical (PL, MLV1, MLV2)
A1590 Electrical Plans & Details
A1770 Finalize IFC Drawings
Instrumentation (PL, MLV1, MLV2)
A1780 Finalize IFC Drawings
A2480 Wiring Diagrams
CPG Nuevo Pemex Interconnect
Engineering (Interconnect)
Mechanical/Piping (Interconnect)
A2210 Flow Control Valves Skid Requisition
A2330 Flow Control Valves Skid TBE
185
60
03-Jul-13 A
100% 03-Jul-13 A
07-Oct-13 A 12-Jul-13
14-Mar-14
14-Mar-14
01-Jul-13
07-Oct-13 A 01-Jul-13
24-Sep-13
Variance BL1
Duration19
-9
A1470 Soil Erosion & Sediments and Control Details
0% 03-Dec-13
07-Oct-13 A 15-Jul-13
BL1 Finish
15-Oct-13
24-Sep-13
-106
-8
71
0% 03-Dec-13
14-Mar-14
25-Sep-13 15-Oct-13
-59
160
71
24-Jul-13 A
0% 03-Dec-13
14-Mar-14
14-Mar-14
08-Jul-13 27-Sep-13
09-Sep-13 27-Sep-13
-108
-59
24
100% 24-Jul-13 A
07-Oct-13 A 08-Jul-13
06-Sep-13
-9
195
185
185
15
17-Jun-13 A
01-Jul-13 A
01-Jul-13 A
100% 01-Jul-13 A
14-Mar-14
14-Mar-14
14-Mar-14
26-Jul-13 A
15-Oct-13
16-Sep-13
16-Sep-13
22-Jul-13
-108
-129
-129
-4
100% 28-Aug-13 A 30-Aug-13 A 10-Sep-13 16-Sep-13
A2380 Review IFC Package
71
Civil/Structural (Interconnect)
A5500 Review IFC Package
108
71
21-Oct-13 A 14-Mar-14
0% 03-Dec-13 14-Mar-14
-105
-74
A5510 Flow Control Valve Skid Foundation Calculation
0% 21-Oct-13 A 20-Dec-13
-45
A5520 Engineered Pipe Supports Requisition
0% 18-Nov-13 A 17-Dec-13
-22
0% 06-Jan-14
A5530 Engineered Pipe Supports TBE
A5540 Vault Foundation Calculation
10
0% 03-Dec-13
14-Mar-14
17-Jun-13
01-Jul-13
01-Jul-13
01-Jul-13
15-Jul-13
06-Sep-13
10-Jan-14
-5
-45
Engineered Pipe Supports TBE
Vault Foundation Calculation
14-Mar-14, Design (Interconnect)
14-Mar-14, Mechanical/Piping (Interconnect)
27
100% 19-Aug-13 A 12-Nov-13 A 08-Aug-13 17-Sep-13
A1870 Piping Isometric Drawings
71
0% 03-Dec-13
14-Mar-14
18-Sep-13 01-Oct-13
-64
A1920 Finalize IFC Drawings
71
0% 03-Dec-13
14-Mar-14
18-Sep-13 15-Oct-13
-54
A5090 Finalize Piping Plot Plan
15
Civil/Structural (Interconnect)
A5430 Site Fence & Grading Plan
122
1
19-Aug-13 A 14-Mar-14
100% 19-Aug-13 A 12-Nov-13 A
-150
-62
A5440 Pipe Support Details
100% 19-Aug-13 A 12-Nov-13 A
-62
Pipe Support Details
A5450 Hot Tap Vault Details
100% 19-Aug-13 A 11-Nov-13 A
-61
Hot Tap Vault Details
100% 19-Aug-13 A 12-Nov-13 A
-62
Typical Details
17-Jun-13 A
27-Jun-13 A
01-Jul-13 A
100% 10-Jul-13 A
A1890 Cathodic Protection Design
69
A1950 Valve List
56
Piping Isometric Drawings
Finalize IFC Drawings
Finalize Piping Plot Plan
14-Mar-14, Civil/Structural (Interconnect)
Site Fence & Grading Plan
Finalize IFC Drawings
-74
17-Jun-13
01-Jul-13
01-Jul-13
08-Jul-13
15-Oct-13
15-Oct-13
07-Oct-13
13-Aug-13
-108
-110
-114
-5
0% 01-Jul-13 A
14-Mar-14
01-Jul-13
07-Oct-13
-116
91.07% 15-Jul-13 A
09-Dec-13
15-Jul-13
01-Oct-13
-50
100% 31-Oct-13 A 26-Nov-13 A 09-Sep-13 09-Sep-13
-18
A3630 Large Pipe and Fittings Requisition
100% 19-Aug-13 A 18-Nov-13 A
-65
0% 25-Nov-13 A 12-Dec-13
-14
Piping Plans, Sections, Details
-5
A3610 Small Pipe & Fittings Requisition
A3640 Large Pipe and Fittings TBE
PFD / P&IDs (IFCA)
Piping Plot Plan (IFCA)
-33
14-Mar-14
14-Mar-14
14-Mar-14
23-Aug-13 A
14-Mar-14, Nuevo Pemex Meter Station - EM#2
14-Mar-14, Engineering (EM#2)
14-Mar-14, Mechanical/Piping (EM#2)
Line Sizing Calculations
Cathodic Protection Design
Valve List
Small Pipe & Fittings Requisition
Large Pipe and Fittings Requisition
Large Pipe and Fittings TBE
A5000 Restriction Orifice Sizing Calculation
13
100% 16-Aug-13 A 19-Nov-13 A 01-Aug-13 21-Aug-13
-52
A5010 Equipment List
41
87.8% 29-Jul-13 A
09-Dec-13
15-Jul-13
01-Oct-13
-40
Equipment List
A5020 Line List
41
87.8% 16-Aug-13 A 09-Dec-13
15-Jul-13
01-Oct-13
-26
Line List
A5160 Review IFC Package
71
24-Sep-13 30-Sep-13
-69
A5570 Small Pipe & Fittings TBE
0% 03-Dec-13
14-Mar-14
Restriction Orifice Sizing Calculation
Review IFC Package
Small Pipe & Fittings TBE
60% 18-Nov-13 A 06-Dec-13
154
5
20-Aug-13 A 14-Mar-14
0% 20-Aug-13 A 20-Dec-13
10-Jul-13 11-Oct-13
07-Oct-13 11-Oct-13
-81
-84
Analyzer Building Foundation Calculation
A5120 Filter/Scrubber Skid Foundation Calculation
0% 20-Aug-13 A 20-Dec-13
13-Aug-13 19-Aug-13
-84
Filter/Scrubber Skid Foundation Calculation
A5130 Meter Skid Foundation Calculation
0% 20-Aug-13 A 20-Dec-13
30-Aug-13 06-Sep-13
-84
Meter Skid Foundation Calculation
10
0% 20-Aug-13 A 20-Dec-13
18-Sep-13 01-Oct-13
-79
Misc. Equipment Foundation Calculations
A5150 Emergeny Generator Foundation Calculation
0% 20-Aug-13 A 20-Dec-13
30-Sep-13 04-Oct-13
-84
Emergeny Generator Foundation Calculation
A5240 Engineered Pipe Supports TBE
0% 20-Dec-13
23-Dec-13
10-Jul-13
A5270 Review IFC Package
71
0% 03-Dec-13
14-Mar-14
20-Aug-13 20-Aug-13
-74
A5310 Engineered Pipe Supports Requisition
41
80.49% 20-Aug-13 A 12-Dec-13
12-Aug-13 16-Aug-13
-78
175
15
27-Jun-13 A 14-Mar-14
15-Jul-13 15-Oct-13
100% 01-Aug-13 A 29-Aug-13 A 09-Aug-13 29-Aug-13
-120
-5
A2230 Distribution Panel / MCC Requisition
15
100% 13-Aug-13 A 11-Sep-13 A 16-Aug-13 06-Sep-13
-6
A2250 Transformer Requisition
15
100% 01-Aug-13 A 22-Aug-13 A 04-Sep-13 24-Sep-13
A2260 UPS Requisition
15
100% 20-Aug-13 A 11-Sep-13 A 16-Aug-13 06-Sep-13
-2
A2270 ATS Requisition
15
100% 08-Aug-13 A 29-Aug-13 A 16-Aug-13 06-Sep-13
A2280 200 A Breakers Requisition
15
100% 20-Aug-13 A 11-Sep-13 A 16-Aug-13 06-Sep-13
-2
A2300 SKM Calculations
11
100% 11-Jul-13 A
Civil/Structural (EM#2)
A5100 Analyzer Building Foundation Calculation
A5140 Misc. Equipment Foundation Calculations
Electrical (EM#2)
A2220 Emergency Generator Requisition
A2310 Load Study
A2320 Cable Sizing
A2340 Emergency Generator TBE
A2440 Review IFC Package
-15
11-Oct-13 A 25-Jul-13
100% 27-Jun-13 A 22-Jul-13 A
15-Jul-13
30-Jul-13
-56
23-Jul-13
-10
21
100% 20-Aug-13 A 17-Oct-13 A 26-Aug-13 24-Sep-13
-21
100% 26-Sep-13 A 26-Nov-13 A 15-Aug-13 21-Aug-13
-38
71
A2470 Distribution Panel / MCC TBE
A2680 UPS TBE
A2690 ATS TBE
0% 03-Dec-13
14-Mar-14, Civil/Structural (EM#2)
13
08-Aug-13
14-Mar-14
16-Aug-13 06-Sep-13
-59
0% 02-Oct-13 A 09-Dec-13
27-Sep-13 27-Sep-13
-49
0% 02-Oct-13 A 09-Dec-13
15-Jul-13
02-Aug-13
-34
100% 26-Sep-13 A 23-Oct-13 A 19-Aug-13 23-Aug-13
-14
May
04
Flow Control Valve Skid Foundation Calculation
A1850 Piping Plans, Sections, Details
195
185
185
27
27
Engineered Pipe Supports Requisition
-1
Nuevo Pemex Meter Station - EM#2
Engineering (EM#2)
Mechanical/Piping (EM#2)
A1880 Line Sizing Calculations
20
Review IFC Package
14-Mar-14, Civil/Structural (Interconnect)
Review IFC Package
17-Jun-13 17-Jul-13
14-Mar-14
April
13
Flow Control Valves Skid TBE
100% 17-Jun-13 A 18-Jul-13 A
0% 03-Dec-13
06
Flow Control Valves Skid Requisition
22
71
30
14-Mar-14, CPG Nuevo Pemex Interconnect
14-Mar-14, Engineering (Interconnect)
14-Mar-14, Mechanical/Piping (Interconnect)
A1840 Piping Plot Plan (IFCA)
A5470 Finalize IFC Drawings
23
Finalize IFC Drawings
-108
-108
4
A5460 Typical Details
March
09 16
Wiring Diagrams
17-Jun-13 15-Oct-13
17-Jun-13 15-Oct-13
17-Jun-13 29-Jul-13
07-Aug-13
02
Finalize IFC Drawings
14-Mar-14, Instrumentation (PL, MLV1, MLV2)
17-Jun-13 A 14-Mar-14
17-Jun-13 A 14-Mar-14
100% 17-Jun-13 A 23-Jul-13 A
15-Aug-13 A 18-Jul-13
23
Electrical Plans & Details
-35
0% 21-Oct-13 A 20-Dec-13
100% 18-Jul-13 A
26
February
02 09 16
Finalize IFC Drawings
14-Mar-14, Electrical (PL, MLV1, MLV2)
195
195
30
Design (Interconnect)
Mechanical/Piping (Interconnect)
A1830 PFD / P&IDs (IFCA)
29
January
05 12 19
Engineered Pipe Supports TBE
Review IFC Package
Engineered Pipe Supports Requisition
14-Mar-14, Electrical (EM#2)
Emergency Generator Requisition
Distribution Panel / MCC Requisition
Transformer Requisition
UPS Requisition
ATS Requisition
200 A Breakers Requisition
SKM Calculations
Load Study
Cable Sizing
Emergency Generator TBE
Review IFC Package
Distribution Panel / MCC TBE
UPS TBE
ATS TBE
Activity ID
Activity Name
Original
Duration
Activity % Start
Complete
Finish
BL1 Start
BL1 Finish
Variance BL1
Duration19
-44
A2710 200 A Breakers TBE
0% 02-Oct-13 A 09-Dec-13
09-Oct-13 15-Oct-13
A2720 Lighting Requisition
0% 26-Sep-13 A 12-Dec-13
03-Sep-13 09-Sep-13
A2950 Transformer TBE
100% 26-Sep-13 A 18-Oct-13 A
Instrumentation (EM#2)
A2350 Instrument Index
183
8
03-Jul-13 A
100% 03-Jul-13 A
14-Mar-14
18-Jul-13 A
03-Jul-13
03-Jul-13
20-Sep-13
15-Jul-13
A2360 I/O List
13
100% 16-Jul-13 A
18-Jul-13 A
16-Jul-13
01-Aug-13
11
A2460 Review IFC Package
71
14-Mar-14
09-Sep-13 20-Sep-13
-64
0% 03-Dec-13
26
02
June
09 16
23
30
July
07 14
21
28
August
04 11 18
-125
-3
01
PFD / P&IDs (IFCA)
-1
Piping Plot Plan (IFCA)
A1930 Piping Plans, Sections, Details
28
100% 19-Aug-13 A 12-Nov-13 A 15-Aug-13 24-Sep-13
A1940 Piping Isometric Drawings
10
0% 22-Oct-13 A 14-Mar-14
25-Sep-13 08-Oct-13
-94
A2570 Finalize IFC Drawings
71
0% 03-Dec-13
25-Sep-13 15-Oct-13
-59
A5070 Finalize Piping Plot Plan
20
-34
24-Jun-13 A 14-Mar-14
08-Jul-13
100% 24-Jun-13 A 12-Nov-13 A 08-Jul-13
15-Oct-13
16-Aug-13
-118
-72
-44
Steel Plans & Details
12-Nov-13 A 29-Jul-13
24-Sep-13
-36
Sedimentation and Erosion Control Details
A2070 Site Plan
51
100% 02-Jul-13 A
12-Nov-13 A 15-Jul-13
24-Sep-13
-45
Site Plan
A2080 Grading & Drainage Plan
35
100% 15-Jul-13 A
12-Nov-13 A 15-Jul-13
30-Aug-13
-52
Grading & Drainage Plan
A2090 Typical Details
49
100% 24-Jun-13 A 12-Nov-13 A 09-Jul-13
16-Sep-13
-53
Typical Details
A2100 Foundation Location Plan
36
100% 19-Aug-13 A 12-Nov-13 A 01-Aug-13 24-Sep-13
-24
Foundation Location Plan
A2110 Finalize IFC Drawings
71
-119
-18
12-Nov-13 A 21-Aug-13 24-Sep-13
-71
A2390 Area Classification Plan & Details
24
100% 03-Jul-13 A
A2400 One Line Diagrams
54
100% 25-Jun-13 A 29-Jul-13 A
A2420 Electrical Details
46
100% 03-Jul-13 A
A2430 Electrical Plans
31
A2490 Finalize IFC Drawings
71
Instrumentation (EM#2)
A2500 Wiring Diagrams
167
31
-59
15-Oct-13
24-Sep-13
Conduit & Cable Schedule
Area Classification Plan & Details
24-Sep-13
30
12-Nov-13 A 22-Jul-13
24-Sep-13
-49
Electrical Details
100% 19-Aug-13 A 12-Nov-13 A 22-Jul-13
24-Sep-13
-16
Electrical Plans
25-Sep-13 15-Oct-13
-59
25-Jul-13 A
100% 25-Jul-13 A
14-Mar-14
14-Mar-14
30-Jul-13
12-Nov-13 A 30-Jul-13
15-Oct-13
24-Sep-13
-111
-39
14-Mar-14
25-Sep-13 15-Oct-13
-59
14-Mar-14
14-Mar-14
14-Mar-14
23-Aug-13 A
17-Jun-13
01-Jul-13
01-Jul-13
01-Jul-13
15-Oct-13
11-Oct-13
07-Oct-13
07-Oct-13
-108
-112
-114
30
One Line Diagrams
Finalize IFC Drawings
14-Mar-14, Instrumentation (EM#2)
Wiring Diagrams
A2930 Finalize IFC Drawings
71
0% 03-Dec-13
Macuspana Meter Station - EM#3
Engineering (EM#3)
Mechanical/Piping (EM#3)
A2520 Line Sizing Calculations
195
138
120
69
17-Jun-13 A
27-Jun-13 A
01-Jul-13 A
100% 01-Jul-13 A
A2530 Cathodic Protection Design
69
88.41% 01-Jul-13 A
12-Dec-13
01-Jul-13
07-Oct-13
-50
A2540 Valve List
56
89.29% 15-Jul-13 A
10-Dec-13
15-Jul-13
01-Oct-13
-51
A3370 Pressure Regulating Skid Requisition
16
100% 22-Jul-13 A
30-Jul-13 A
15-Jul-13
05-Aug-13
10
A5030 Restriction Orifice Sizing Calculation
13
100% 16-Aug-13 A 19-Nov-13 A 01-Aug-13 21-Aug-13
-52
A5040 Line List
41
82.93% 16-Aug-13 A 11-Dec-13
15-Jul-13
01-Oct-13
-28
A5050 Equipment List
41
82.93% 29-Jul-13 A
15-Jul-13
01-Oct-13
-42
2
Pressure Regulating Skid TBE
Fuel Gas Supply Package Requisition
11-Dec-13
A5250 Pressure Regulating Skid TBE
100% 28-Aug-13 A 30-Aug-13 A 14-Aug-13 20-Aug-13
A5260 Fuel Gas Supply Package Requisition
100% 12-Aug-13 A 21-Aug-13 A 31-Jul-13
13-Aug-13
A5320 Fuel Gas Supply Package TBE
0% 01-Oct-13 A 11-Dec-13
01-Aug-13 14-Aug-13
-42
34
0% 07-Oct-13 A 14-Mar-14
21-Aug-13 21-Aug-13
-115
A5340 Large Pipe and Fittings TBE
0% 25-Nov-13 A 12-Dec-13
15-Jul-13
A5550 Small Pipe & Fittings Requisition
100% 20-Aug-13 A 21-Nov-13 A
A5580 Small Pipe & Fittings TBE
A5600 Large Pipe and Fittings Requisition
A5330 Review IFC Package
Civil/Structural (EM#3)
A2700 Engineered Pipe Supports Requisition
A2970 Engineered Pipe Supports TBE
A3000 Review IFC Package
A5170 Filters/Scrubber Skid Foundation Calculation
A5190 Pressure Regulating Skid Foundation Calculation
107
15
3
0% 06-Dec-13
06-Sep-13
0% 06-Jan-14
Line Sizing Calculations
Cathodic Protection Design
Valve List
Pressure Regulating Skid Requisition
Restriction Orifice Sizing Calculation
Line List
Equipment List
Fuel Gas Supply Package TBE
Review IFC Package
25
Large Pipe and Fittings TBE
Small Pipe & Fittings Requisition
Small Pipe & Fittings TBE
-6
100% 19-Aug-13 A 10-Dec-13 A
20-Aug-13 A 14-Mar-14
26.67% 20-Aug-13 A 17-Dec-13
Finalize IFC Drawings
14-Mar-14, Macuspana Meter Station - EM#3
14-Mar-14, Engineering (EM#3)
14-Mar-14, Mechanical/Piping (EM#3)
-68
13-Dec-13
Large Pipe and Fittings Requisition
-81
06-Aug-13 11-Oct-13
04-Sep-13 24-Sep-13
-100
-71
08-Jan-14
14-Mar-14, Civil/Structural (EM#3)
Engineered Pipe Supports Requisition
Engineered Pipe Supports TBE
-3
22
0% 07-Oct-13 A 14-Mar-14
19-Aug-13 10-Sep-13
-99
0% 20-Aug-13 A 20-Dec-13
06-Aug-13 12-Aug-13
-84
Review IFC Package
Filters/Scrubber Skid Foundation Calculation
0% 20-Aug-13 A 10-Dec-13
04-Sep-13 10-Sep-13
-76
Pressure Regulating Skid Foundation Calculation
A5200 Misc. Equipment Foundation Calculations
10
0% 20-Aug-13 A 20-Dec-13
18-Sep-13 01-Oct-13
-79
Misc. Equipment Foundation Calculations
A5210 Emergency Generator Foundation Calculation
24
41.67% 20-Aug-13 A 20-Dec-13
16-Sep-13 20-Sep-13
-84
Emergency Generator Foundation Calculation
A5220 Analyzer Building Foundation Calculation
0% 20-Aug-13 A 20-Dec-13
07-Oct-13 11-Oct-13
-84
Analyzer Building Foundation Calculation
A5230 Meter Skid Foundation Calculation
0% 20-Aug-13 A 20-Dec-13
17-Sep-13 23-Sep-13
-84
Meter Skid Foundation Calculation
Electrical (EM#3)
A2740 Emergency Generator Requisition
108
15
27-Jun-13 A 14-Mar-14
08-Jul-13
100% 26-Jul-13 A 22-Aug-13 A 26-Jul-13
30-Sep-13
15-Aug-13
-126
-4
A2750 Distribution Panel / MCC Requisition
15
100% 30-Jul-13 A
11-Sep-13 A 16-Aug-13 06-Sep-13
-17
A2770 Transformer Requisition
15
100% 01-Aug-13 A 22-Aug-13 A 20-Aug-13 10-Sep-13
A2780 UPS Requisition
15
100% 07-Aug-13 A 11-Sep-13 A 16-Aug-13 06-Sep-13
-10
A2790 ATS Requisition
15
100% 07-Aug-13 A 27-Aug-13 A 16-Aug-13 06-Sep-13
A2800 100 A Breakers Requisition
15
100% 07-Aug-13 A 11-Sep-13 A 16-Aug-13 06-Sep-13
-10
A2820 SKM Calculations
11
100% 11-Jul-13 A
25-Jul-13
-56
16-Jul-13
-10
A2830 Load Study
A2840 Cable Sizing
20
A2880 Review IFC Package
34
11-Oct-13 A 11-Jul-13
100% 27-Jun-13 A 22-Jul-13 A
08-Jul-13
100% 12-Aug-13 A 08-Oct-13 A 12-Aug-13 09-Sep-13
0% 07-Oct-13 A 14-Mar-14
15-Jul-13
06-Sep-13
-21
-76
May
04
Finalize IFC Drawings
14-Mar-14, Electrical (EM#2)
10-Jul-13
0% 03-Dec-13
27
14-Mar-14, Civil/Structural (EM#2)
100% 29-Jul-13 A
25-Jun-13 A 14-Mar-14
10-Jul-13
100% 05-Aug-13 A 12-Nov-13 A 10-Jul-13
20
Foundation Plans & Details
100% 19-Aug-13 A 12-Nov-13 A 29-Aug-13 24-Sep-13
178
46
April
13
Finalize IFC Drawings
36
Electrical (EM#2)
A2370 Conduit & Cable Schedule
06
Finalize Piping Plot Plan
18
25-Sep-13 15-Oct-13
30
Piping Isometric Drawings
A2060 Sedimentation and Erosion Control Details
14-Mar-14
23
Piping Plans, Sections, Details
A2050 Steel Plans & Details
0% 03-Dec-13
March
09 16
Review IFC Package
14-Mar-14, Design (EM#2)
14-Mar-14, Mechanical/Piping (EM#2)
17-Jun-13 17-Jul-13
02
I/O List
100% 17-Jun-13 A 18-Jul-13 A
14-Aug-13
23
14-Mar-14, Instrumentation (EM#2)
22
15-Aug-13 A 18-Jul-13
26
February
02 09 16
Instrument Index
A1910 Piping Plot Plan (IFCA)
180
30
24
December
January
08 15 22 29 05 12 19
200 A Breakers TBE
Lighting Requisition
-108
-108
-9
Civil/Structural (EM#2)
A2040 Foundation Plans & Details
27
November
03 10 17
Transformer TBE
17-Jun-13 15-Oct-13
17-Jun-13 15-Oct-13
17-Jun-13 10-Jul-13
100% 18-Jul-13 A
29
-16
17-Jun-13 A 14-Mar-14
17-Jun-13 A 14-Mar-14
100% 17-Jun-13 A 23-Jul-13 A
14-Mar-14
2014
October
06 13 20
-51
195
195
17
Design (EM#2)
Mechanical/Piping (EM#2)
A1900 PFD / P&IDs (IFCA)
25
2013
September
01 08 15 22
14-Mar-14, Electrical (EM#3)
Emergency Generator Requisition
Distribution Panel / MCC Requisition
Transformer Requisition
UPS Requisition
ATS Requisition
100 A Breakers Requisition
SKM Calculations
Load Study
Cable Sizing
Review IFC Package
Activity ID
Activity Name
Original
Duration
Activity % Start
Complete
Finish
BL1 Start
BL1 Finish
Variance BL1
Duration19
-43
A2980 Emergency Generator TBE
100% 26-Sep-13 A 26-Nov-13 A
A3030 Distribution Panel / MCC TBE
0% 02-Oct-13 A 09-Dec-13
26-Aug-13 30-Aug-13
-44
A3050 UPS TBE
0% 02-Oct-13 A 09-Dec-13
12-Aug-13 16-Aug-13
-44
A3070 ATS TBE
100% 26-Sep-13 A 31-Oct-13 A 19-Aug-13 23-Aug-13
-21
A3090 100 A Breakers TBE
0% 02-Oct-13 A 09-Dec-13
A3100 Transformer TBE
100% 26-Sep-13 A 18-Oct-13 A
A3110 Lighting Requisition
24-Sep-13 30-Sep-13
02
23
30
July
07 14
21
28
August
04 11 18
29-Jul-13
-24
03-Jul-13 A
100% 03-Jul-13 A
14-Mar-14
18-Jul-13 A
03-Jul-13
03-Jul-13
01-Aug-13
15-Jul-13
-161
-3
A2860 I/O List
13
100% 16-Jul-13 A
18-Jul-13 A
16-Jul-13
01-Aug-13
A2940 Review IFC Package
34
0% 07-Oct-13 A 14-Mar-14
29
11
21
100% 19-Aug-13 A 07-Oct-13 A 01-Aug-13 10-Sep-13
A2590 Piping Isometric Drawings
56
0% 27-Dec-13
14-Mar-14
11-Sep-13 24-Sep-13
-46
A5060 Finalize IFC Drawings
31
0% 07-Oct-13 A 14-Mar-14
11-Sep-13 15-Oct-13
-90
A5080 Finalize Piping Plot Plan
10
-7
-10
Finalize IFC Drawings
Finalize Piping Plot Plan
14-Mar-14, Civil/Structural (EM#3)
-112
-58
A2610 Steel Plans & Details
18
100% 19-Aug-13 A 24-Oct-13 A 15-Aug-13 10-Sep-13
-31
A2620 Sedimentation and Erosion Control Details
41
100% 15-Jul-13 A
10-Sep-13
-19
Sedimentation and Erosion Control Details
A2630 Site Plan
51
100% 28-Jun-13 A 07-Oct-13 A 28-Jun-13 10-Sep-13
-20
Site Plan
A2640 Grading & Drainage Plan
41
100% 10-Jul-13 A
07-Oct-13 A 15-Jul-13
10-Sep-13
-22
Grading & Drainage Plan
A2650 Typical Details
49
100% 24-Jun-13 A 24-Oct-13 A 02-Jul-13
10-Sep-13
-39
A2660 Foundation Location Plan
26
100% 19-Aug-13 A 07-Oct-13 A 18-Jul-13
10-Sep-13
11-Sep-13 15-Oct-13
-90
25-Jun-13 A 14-Mar-14
25-Jun-13 15-Oct-13
100% 19-Aug-13 A 07-Oct-13 A 10-Jul-13 10-Sep-13
-108
9
A2890 Area Classification Plan & Details
24
100% 03-Jul-13 A
A2900 One Line Diagrams
54
100% 25-Jun-13 A 29-Jul-13 A
A2910 Electrical Details
46
100% 03-Jul-13 A
07-Oct-13 A 08-Jul-13
10-Sep-13
-22
A2920 Electrical Plans
26
100% 19-Aug-13 A 07-Oct-13 A 22-Jul-13
10-Sep-13
A5280 Finalize IFC Drawings
31
11-Sep-13 15-Oct-13
-90
14-Mar-14
12-Aug-13 15-Oct-13
07-Oct-13 A 12-Aug-13 10-Sep-13
-125
-36
A5290 Finalize IFC Drawings
Construction / Commissioning
Commissioning
A5610
Pre-Commissioning / Commissioning Plan
80
21
31
18-Jul-13 A
100% 18-Jul-13 A
0% 07-Oct-13 A 14-Mar-14
11-Sep-13 15-Oct-13
May
04
Piping Isometric Drawings
24-Jun-13 A 14-Mar-14
28-Jun-13 15-Oct-13
100% 24-Jun-13 A 24-Oct-13 A 30-Jul-13 10-Sep-13
Instrumentation (EM#3)
A2990 Wiring Diagrams
27
Piping Plans, Sections, Details
109
30
0% 07-Oct-13 A 14-Mar-14
20
14-Mar-14, Design (EM#3)
14-Mar-14, Mechanical/Piping (EM#3)
A2580 Piping Plans, Sections, Details
25-Jun-13 10-Sep-13
April
13
Review IFC Package
PFD / P&IDs (IFCA)
07-Oct-13 A 07-Aug-13 10-Sep-13
06
I/O List
Piping Plot Plan (IFCA)
0% 07-Oct-13 A 14-Mar-14
30
-115
-1
22
23
14-Mar-14, Instrumentation (EM#3)
17-Jun-13 17-Jul-13
112
26
March
09 16
Instrument Index
100% 17-Jun-13 A 18-Jul-13 A
A2670 Finalize IFC Drawings
02
Lighting Requisition
22
Electrical (EM#3)
A2870 Conduit & Cable Schedule
23
100 A Breakers TBE
A2560 Piping Plot Plan (IFCA)
07-Oct-13 A 15-Jul-13
26
February
02 09 16
Transformer TBE
-108
-108
-9
Civil/Structural (EM#3)
A2600 Foundation Plans & Details
January
05 12 19
UPS TBE
17-Jun-13 15-Oct-13
17-Jun-13 15-Oct-13
17-Jun-13 10-Jul-13
31-Jul-13
December
24 01 08 15 22 29
Emergency Generator TBE
ATS TBE
17-Jun-13 A 14-Mar-14
17-Jun-13 A 14-Mar-14
100% 17-Jun-13 A 23-Jul-13 A
15-Aug-13 A 18-Jul-13
27
November
03 10 17
Distribution Panel / MCC TBE
195
195
17
100% 18-Jul-13 A
2014
October
06 13 20
-17
100% 26-Sep-13 A 12-Nov-13 A 16-Jul-13
Design (EM#3)
Mechanical/Piping (EM#3)
A2550 PFD / P&IDs (IFCA)
25
2013
September
01 08 15 22
-44
111
8
Instrumentation (EM#3)
A2850 Instrument Index
26
June
09 16
Foundation Plans & Details
Steel Plans & Details
Typical Details
Foundation Location Plan
Finalize IFC Drawings
14-Mar-14, Electrical (EM#3)
Conduit & Cable Schedule
-44
30
-90
Area Classification Plan & Details
One Line Diagrams
Electrical Details
Electrical Plans
Finalize IFC Drawings
14-Mar-14, Instrumentation (EM#3)
Wiring Diagrams
Finalize IFC Drawings
12
15-Apr-14
30-Apr-14
-12
30-Apr-14, Construction / Comm
12
15-Apr-14
30-Apr-14
-12
30-Apr-14, Commissioning
30-Apr-14
-12
Pre-Commissioning / Commiss
12
0% 15-Apr-14*