Earthing Calculation (DJS) - REV-1

The document provides calculations for designing an earthmat for a 33/11kV substation to achieve tolerable touch and step potentials with a grid resistance less than 1 ohm. It includes parameters for the system, environment, electrode details, preliminary calculations, tolerable and attainable potential calculations, and calculation of ground resistance. The results show the attainable potentials are less than tolerable limits and the combined grid and ground rod resistance is less than 1 ohm, meeting design requirements. The permissible conductor spacing is 2m.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
957 views7 pages

Earthing Calculation (DJS) - REV-1

The document provides calculations for designing an earthmat for a 33/11kV substation to achieve tolerable touch and step potentials with a grid resistance less than 1 ohm. It includes parameters for the system, environment, electrode details, preliminary calculations, tolerable and attainable potential calculations, and calculation of ground resistance. The results show the attainable potentials are less than tolerable limits and the combined grid and ground rod resistance is less than 1 ohm, meeting design requirements. The permissible conductor spacing is 2m.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

2 of 9

PREPARED CHECKED APPROVED DATE


DJS DJS DJS 15/07/2014
CALCULATI ONS ARE BASED ON I EEE Std 80- 2000
1.0.0 PURPOSE AND SCOPE
2.0.0 DESIGN INPUT
2.1.0 SYSTEM PARAMETERS
2.1.1 System Voltage = 33/11 kV
2.1.2 System Grounding = Solid
2.1.3 Maximum Fault Current I
f = 25000 A (As per OPTCL spec)
2.1.4 Duration of Fault Current t
s = 1 s (As per OPTCL spec)
2.2.0 ENVIRONMENTAL PARAMETERS
2.2.1 Soil Resistivity r =
2.2.2 Top Layer resistivity (Crushed rock) r
s
=
2.2.3 Length of switchyard Lx = 14 m (As per Layout)
2.2.4 Breadth of Switchyard Bx = 14 m (As per Layout)
2.3.0 OTHER DETAILS
2.3.1 Conductor diameter d = 0.031 m (31mm dia MS Rod)
~=
2.3.2 Conductor Area = (75 x 10 mm MS Flat)
2.3.3 Depth of burial (minimum) h = 0.6 m (As per OPTCL spec)
2.3.4 Depth of Top Layer h
s = 0.1 m (As per OPTCL spec)
2.3.5 No of electrodes
Transformer = 2 (2# Neutral)
Lightning Arrester = 3 (3 No. x 1)
PT/CVT = 3 (3 No. x 1)
Tower with Peak = 3 (3 No. x 1)
Outer Fence = 15 (4 No. x 1)
2.3.5 No of electrodes n
R = 26
2.3.6 Length of electrode L
R = 2 m
2.3.7 Diameter of electrode 2b = 25 mm
SWITCHGEAR AND CONTROL PVT. LTD.
PROJECT
The purpose of the document is to design the Earthmat for the 33/11kV AIS Substation. The important aspect is that the design should achieve
"Tolerable Touch and Step potential " with the Earth grid resistance less than 1 ohm.
33/11kV Substation Earthing Calculation (Infocity) TITLE
Substation Package-S1 for 33/11kV Infocity Susbstation (New) under OPTCL.
3000 ohm.m
750 Sq.mm
(As per soil resistivity
report)
(As per OPTCL spec)
9.00 ohm.m
3 of 9
PREPARED CHECKED APPROVED DATE
DJS DJS DJS 15/07/2014
SWITCHGEAR AND CONTROL PVT. LTD.
PROJECT
33/11kV Substation Earthing Calculation (Infocity) TITLE
Substation Package-S1 for 33/11kV Infocity Susbstation (New) under OPTCL.
3.0.0 CALCULATIONS
3.1.0 CALCULATIONS - PRELIMINARY
L
x
3.1.1 Area of Switchyard A
g = Lx*Bx
= 14 x 14
B
x
=
3.1.2 Spacing of Conductors D
s = 2.0 m
3.1.3 No: of grids in X direction N
x = (Lx/D
s
)+1
= 014/2+1
= 8
3.1.4 No: of grids in Y direction N
y = (Bx/D
s
)+1
= 014/2+1
= 8
3.1.5 Total length of conductors L
c = Nx * Bx + Ny * Lx
= 224
3.1.6 Total length of electrodes L
r = 26 x 2
= 52 m
3.1.7 Peripheral length of Grid L
p = 2 x (Lx + Bx)
= 2 x ( 14 + 14 )
= 56 m
3.1.8 Maximum distance between two points on grid D
m = (Lx
2
+ Bx
2
)
= ( 14 + 14 )
= 20 m
3.1.5 Geometric factor n
n
a = 2.L
c
/L
p (Eqn. 85 in page 93)
= 2 x 224 / 56
= 8.0
196 Sq.m
4 of 9
PREPARED CHECKED APPROVED DATE
DJS DJS DJS 15/07/2014
SWITCHGEAR AND CONTROL PVT. LTD.
PROJECT
33/11kV Substation Earthing Calculation (Infocity) TITLE
Substation Package-S1 for 33/11kV Infocity Susbstation (New) under OPTCL.
n
b = 1.0 (Eqn. 86 in page 93)
= 1.0
n
c = 1 (Eqn. 87 in page 93)
= 1.0
n
d = 1 (Eqn. 88 in page 93)
= 1.0
n = n
a
. n
b
. n
c
. n
d (Eqn. 84 in page 93)
= 8.0 x 1.0 x 1.0 x 1.0
= 8.0
3.2.0 TOLERABLE TOUCH POTENTIAL
E
touch = ( 1000 + 1.5 C
s
r
s
) * 0.116 / t
s (Eqn. 32 in page 27)
C
s = 1 - 0.09 ( 1- r/r
s
) / ( 2 h
s
+ 0.09) (Eqn. 27 in page 23)
= 1-0.09*(1-009/3000)/(2*0.10+0.09)
= 0.6906
E
touch = ( 1000 + 1.5 C
s
r
s
) * 0.116 / t
s
= (1000 + 1.5 * 0.6906 * 3000 ) * 0.116 / 1.0
= 476.49 V
3.3.0 TOLERABLE STEP POTENTIAL
E
step = ( 1000 + 6.0 *C
s
* r
s
) * 0.116 / t
s (Eqn. 30 in page 27)
= (1000 + 6.0 * 0.6906 * 3000 ) * 0.116 / 1.0
= 1557.94 V
5 of 9
PREPARED CHECKED APPROVED DATE
DJS DJS DJS 15/07/2014
SWITCHGEAR AND CONTROL PVT. LTD.
PROJECT
33/11kV Substation Earthing Calculation (Infocity) TITLE
Substation Package-S1 for 33/11kV Infocity Susbstation (New) under OPTCL.
3.4.0 TOUCH POTENTIAL ATTAINABLE
E
mesh = r K
m
K
i
I / L
m (Eqn. 80 in page 91)
L
m = L
c
+ L
r (Eqn.90 in page 94)
= 224+52
= 276 m
K
m = 1 . ln D
s
2
+ (D
s
+ 2h )
2
- h + K
ii
ln 8
2p 16 hd 8 D
s
d 4d K
h
p (2n-1)
(Eqn. 81 in page 93)
1.00 for grids with ground rods in perimeter / all along the grid
K
ii =
1/(2n)
2/n
for grids with no ground round rods or grids with only a few ground rods
Here we consider grids with ground rods in perimeter
h
o = 1.00 m ( reference depth of grid)
K
h = (1+h/h
o
) (Eqn. 83 in page 93)
= ( 1 + 0.6 / 1.0 )
= 1.2649
K
m = 1 Ln 2.0 + (2.0 + 2*0.60 ) -0.60 +1 8
2 8*2.0*0.03 4*0.03 1.26 9 (2*8.0-1)
= 0.3147
K
i = 0.644 + 0.148 * n (Eqn 89 in page 94)
= 0.644 + 0.148 *8.0
= 1.8280
E
mesh = r K
m
K
i
I / L
m (Eqn 80 in page 91)
= 009 * 0.3147 * 1.8280 * 25000 / 276.00
= V
16*0.6*0.03
468.91
6 of 9
PREPARED CHECKED APPROVED DATE
DJS DJS DJS 15/07/2014
SWITCHGEAR AND CONTROL PVT. LTD.
PROJECT
33/11kV Substation Earthing Calculation (Infocity) TITLE
Substation Package-S1 for 33/11kV Infocity Susbstation (New) under OPTCL.
3.5.0 STEP POTENTIAL ATTAINABLE
E
step = r K
s
K
i
I / L
s (Eqn 92 in page 94)
L
s = 0.75 L
c
+ 0.85 L
r (Eqn 93 in page 94)
= 0.75 *224.00+ 0.85* 52.00
=
n = 8
K
s = 1* 1 + 1 + 1 (1- 0.5
(n-2)
) (Eqn. 94 in page 94)
p 2h D
s
+ h D
s
= ( 1 / 3.14 ) * { 1 / (2 * 0.6 ) + 1 / ( 2.0 + 0.6 ) + 1 / 2.0 * ( 1 - 0.5^(8 - 2 ) }
= 0.5444
E
step = r K
s
K
i
I / L
s
= ( 9.00 * 0.5444 * 1.8280 * 25000 ) / 212.2
= 1055.10 V
4.0.0 CALCULATION OF GROUNDING RESISTANCE
4.1.0 RESISTANCE OF GROUND RODS
R
e = r ln (4 L
R
/b ) - 1 + 2 K
1
L
R
(n
R
-1)
2
2p n
R
L
R Ag (Eqn. 55 in page 66)
K
1 = 1.41-0.04x for H = 0 (Eqn. 55 in page 66)
1.20-0.05x for H = 1/10 A
g
1.13-0.05x for H = 1/6 A
g (Fig 25(a) in page 67)
H = 0.6 m
K
1 = 1.41-0.04x
= 1.41-0.04(L/B)
= 1.41-0.04*14.00/14.00
= 1.3700
R
e = 9.00 / (2 * 26 * 3.14 * 2.0 ) * [ ln (4 * 2.0 / 0.0309) - 1 + 2 * 1.370 *
(2 / sqrt(196)) * (sqrt (26)-1)^2 ]
= 0.3258 ohm
212.2 m
7 of 9
PREPARED CHECKED APPROVED DATE
DJS DJS DJS 15/07/2014
SWITCHGEAR AND CONTROL PVT. LTD.
PROJECT
33/11kV Substation Earthing Calculation (Infocity) TITLE
Substation Package-S1 for 33/11kV Infocity Susbstation (New) under OPTCL.
4.2.0 RESISTANCE OF GROUND GRID
R
s = r ln (2 L
c
/ h') + K
1
L
c
- K
2
(Eqn. 54 in page 66)
p L
c
A
g
K
2 = 5.50+0.15x for H = 0
4.68+0.10x for H = 1/10 A
g
4.40-0.05x for H = 1/6 A
g (Fig 25(b) in page 67)
K
2 = 4.68+0.10x
= 4.68+0.10(L/B)
= 4.68+0.10*14.00/14.00
= 4.78
h' = (d . h) (Page 66)
= (0.03 * 0.6)
= 0.136 m
R
s = ( 9.00 / (3.14 * 224)) * [ ln ( 2 * 224 / 0.1362 ) + 1.370 *
( 224 / sqrt (196.00 )) - 4.780 ]
= 0.3227 Ohms
4.3.0 MUTUAL RESISTANCE BETWEEN GROUND GRID AND GROUND RODS
R
se = r ln (2 L
c
/ L
r
) + K
1
L
c
- K
2
+1
p L
c
A
g (Eqn 56 in page 66)
= 9.00 / (3.14 * 224) * [ln (2 * 224 / 2.0 ) + 1.370 *
( 224.00 / sqrt (196.00 )) - 4.780 + 1]
= 0.3011 ohms
4.4.0 COMBINED RESISTANCE OF GROUND GRID AND GROUND RODS
R
g = R
e
. R
s
- R
se
2
(Eqn. 53 in page 66)
R
e
+ R
s
- 2R
se
= 0.3258 * 0.3227 - 0.3011
0.3258 * 0.3227 - 2 * 0.3011
= 0.3126 Ohm
THIS IS LESS THAN THE RECOMMENDED VALUE OF LESS THAN 1.0 OHM
8 of 9
PREPARED CHECKED APPROVED DATE
DJS DJS DJS 15/07/2014
SWITCHGEAR AND CONTROL PVT. LTD.
PROJECT
33/11kV Substation Earthing Calculation (Infocity) TITLE
Substation Package-S1 for 33/11kV Infocity Susbstation (New) under OPTCL.
5.0.0 RESULTS
5.1.1 Permissible Spacing of conductors D
s = 2 m
5.1.2 Total length of mainmat conductors L
c = 224 m
5.1.3 Attainable step potential = 1055.10 V
5.1.4 Attainable touch potential = 468.91 V
5.1.5 Tolerable step potential = 1557.94 V
5.1.6 Tolerable touch potential = 476.49 V
Thus Attainable Emesh is less than Tolerable Etouch and
Attainable Estep is less than Tolerable Estep
5.1.7 Combined resistance of Grid & ground rods = 0.3126 ohm < 1.0 ohm
6 CONCLUSION
Permissible Spacing of conductors for the present layout is 2m. Hence, Earthmat layout shall be prepared with spacing
lesser or equal to 2m.