0% found this document useful (0 votes)
183 views2 pages

Weather Conditions: Daily Progress Report

This daily progress report summarizes construction activities on a project from August 1, 2014. It provides details on: 1) Work completed to date including earthwork, concrete work, and waterproofing. Significant work remains outstanding. 2) Labor resources with a shortage of 58 workers from the plan. 3) Construction materials on site including cement, reinforcement steel, plywood, and runners. Consumption and balances are reported. 4) Plant and machinery available including bar bending/cutting machines, vibrators, vehicles, and a total station.

Uploaded by

bishu70
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
183 views2 pages

Weather Conditions: Daily Progress Report

This daily progress report summarizes construction activities on a project from August 1, 2014. It provides details on: 1) Work completed to date including earthwork, concrete work, and waterproofing. Significant work remains outstanding. 2) Labor resources with a shortage of 58 workers from the plan. 3) Construction materials on site including cement, reinforcement steel, plywood, and runners. Consumption and balances are reported. 4) Plant and machinery available including bar bending/cutting machines, vibrators, vehicles, and a total station.

Uploaded by

bishu70
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Description Days

Previous Days 2.5


WEATHER CONDITIONS Good Today
Cumulative Days 2.5
26-Jan-14 Date of Handing Over 29-Jan-16
668 Days completed 187 Days Left 481
A DAY'S ACTIVITIES
Sr. Description Unit Total scope Completed Planned Qty Achieved Qty Planned for 02.08.14 Balance Qty
1 Earthwork excavation cum 12949 400 504 500 -12949
2 PCC cum 158 -158
3 Waterproofing sqm 1276.5 50 95 50 -1276.5
4 Anti-termite treatment sqm
5 Plum concrete cum
6 Backfilling cum
7 Footing concrete cum 212.6 98 99.5 145 -212.6
8
9
10
B MANPOWER DETAILS
Sr. Description Unit Planned Actual Short fall
1 MASONS nos 8 5 -3
2 HELPERS nos 5 4 -1
3 BARBENDERS nos 15 10 -5
4 HELPERS nos 15 10 -5
5 WELDER nos 2 1 -1
6 CARPENTERS nos 17 7 -10
7 HELPERS nos 17 11 -6
8 FEMALE COOLIES nos 5 6 1
9 WATER PROOFING MASON nos
10 HELPER nos
11 UNSKILLED LABOUR nos 70 42 -28
12 HOUSEKEEPING nos
13 SECURITY nos 2 2
14 OTHERS nos 4 4
Total Nos 160 102 -58
STAFF
1 Project In-Charge 1
2 PM 1
3 APM 1
4 Engineers 10
5 Safety 1
6 Store 3
7 Mechanic 3
8 Electrician 2
9 Supervisor 3
10 Surveyor 2
11 Others
Total Nos 27
Remarks
Date of Commencement
Total Days
Remarks
A. Civil work
DAILY PROGRESS REPORT
PROJECT :
DAILY PROGRESS REPORT DATE : 1-Aug-14
No of days loss (Raining)
Page 1 of 2
C MATERIAL STATUS AT SITE
Today Cumulative Today Cumulative
1 Cement Bag 800.000 400.000 400.000
2 Reinforcement Steel MT
a 8mm MT 82.490 0.200 2.300 80.190
b 10mm MT 53.850 0.250 2.950 50.900
c 12mm MT 55.680 1.950 53.730
d 16mm MT 108.360 1.000 16.950 91.410
e 20mm MT 50.860 2.250 48.610
f 25mm MT 40.640 - 40.640
g 32mm MT 33.710 1.000 32.710
Total MT - 425.590 1.450 27.400 - 398.190
3 Plywood nos - 250.000 - 250.000 4'x8'
4 Runners Cft - 292.000 - 292.000 2"x4"x8'
F REMARKS / SITE INSTRUCTIONS / SITE VISITS / MEETINGS
1
2
3
G
1
2
3 03 Barbending machines
4 01 Poclain with 05 tippers
5 03 vibrators
6
7 Tough rider
8 01 JCB
9 01 Total station
H
1
2
3
I
1
2
3
PROJECT MANAGER
DATE
QUALITY ISSUES
01-Aug-14
03 Barcutting machines
5HP and 10HP motors with pump
SAFETY REPORT
82.5 KVA DG
Material Unit
Receipt Consumption
Balance Remarks
PLANT & MACHINERY
Sr.
Page 2 of 2

You might also like