Electrical Installation Guide

This document outlines the standards for inspecting, testing, and commissioning electrical installations. It describes the necessary performance criteria and knowledge, including safely preparing the work area, interpreting specifications, conducting inspections and required tests using calibrated equipment, ensuring the installation meets regulations, and documenting the results. The goal is to commission the installation according to specifications and parameters while following applicable health, safety, and regulatory requirements.

Uploaded by

zalziza
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
387 views6 pages

Electrical Installation Guide

This document outlines the standards for inspecting, testing, and commissioning electrical installations. It describes the necessary performance criteria and knowledge, including safely preparing the work area, interpreting specifications, conducting inspections and required tests using calibrated equipment, ensuring the installation meets regulations, and documenting the results. The goal is to commission the installation according to specifications and parameters while following applicable health, safety, and regulatory requirements.

Uploaded by

zalziza
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

ECIICESE03

Inspection, testing and commissioning of electrical


installations (plant)


ECIICESE03 Inspection, testing and commissioning of electrical installations (plant) 1
Overview

This standard is about the inspecting, commissioning and testing of electrical
installations (plant) in engineering construction.

You will need to be able to perform the appropriate tests, ensure that the
installation is in accordance with regulations and prepare a test record using
the correct tools and techniques and adhering to Health and safety legislation,
regulations and safe working practices.

In the context of this standard, your responsibility is to interpret and work within
given specifications, selecting techniques and making variations to achieve the
best possible result. In some cases, you may still be expected to refer to
others for final authorisation, even though you remain responsible for
identifying and implementing decisions.

This standard is for
Electrical installation engineers and others that install electrical systems and
equipment.


ECIICESE03
Inspection, testing and commissioning of electrical installations (plant)

ECIICESE03 Inspection, testing and commissioning of electrical installations (plant) 2
Performance
criteria


You must be able to:




P1 work safely at all times, complying with health and safety and other
relevant legislation, regulations, guidelines and local rules or procedures
P2 ensure that the work environment, material, equipment and tools are
suitably prepared for the activities to be undertaken
P3 identify the people that need to be provided with technical and functional
information
P4 obtain and interpret the required information and specification for the job
to be done
P5 identify accurately the means of electrical isolation and carry out
isolation
P6 confirm that your test instruments are
P6.1 appropriate
P6.2 fit for purpose
P6.3 calibrated
P7 plan and agree the schedule for inspecting and testing procedures
P8 conduct an inspection
P9 conduct the required tests
P10 confirm the installation meets the required regulations and standards
P11 prepare a formal record of testing which confirms the safety and integrity
of the installation
P12 commission the installation according to specification and defined
parameters
P13 reinstate the work area
P14 deal promptly and effectively with problems within your control and report
those that cannot be solved




ECIICESE03
Inspection, testing and commissioning of electrical installations (plant)

ECIICESE03 Inspection, testing and commissioning of electrical installations (plant) 3
Knowledge and
understanding


You need to know and
understand:





K1 relevant legislative, regulatory and local requirements or procedures and
safe working practices
K2 preparation and reinstatement requirements in respect of the work area,
material, and equipment, and the possible consequences of incorrect
actions in these areas
K3 how to identify people that need to be supplied with technical and
functional information relating to the task
K4 risk assessments and method statements (RAMs) and other related
documentation and procedures
K5 safe isolation procedures
K6 engineering drawings and related specifications
K7 the tools, terminology and techniques for inspecting, testing and
commissioning electrical installations including
K7.1 identification of inspection requirements
K7.2 selection of appropriate calibrated testing equipment
K7.3 sequencing of tests for fault identification
K7.4 setting up of equipment to predetermined parameters
K7.5 releasing of equipment into service
K8 your responsibilities for ensuring care and security of tools and
equipment used
K9 reporting and documentation procedures
K10 your responsibilities with regard to reporting lines and procedures in your
working environment


ECIICESE03
Inspection, testing and commissioning of electrical installations (plant)

ECIICESE03 Inspection, testing and commissioning of electrical installations (plant) 4
Additional Information

Scope/range


Work environment
Typical work environments could include:
1 at height
2 confined spaces
3 controlled operational and offshore installations
4 designated work areas
5 engineering construction sites
6 existing plants and structures
7 fabrication workshops
8 nuclear sites
9 onshore and offshore installations
10 potential explosive atmospheres
11 shafts
12 shipyards
13 tunnels
14 working inside plant and systems
15 working on access structures (scaffold)

Electrical isolation
This could include:
1 getting appropriate authorisation including Permit to Work
2 identifying the correct isolations and disconnections required
3 correct sequence of isolations and disconnections
4 safety methods for maintaining isolations and disconnections

Testing procedures
These could include testing:
1 continuity
2 earth fault loop impedance
3 insulation resistance
4 operation of electrical components
5 polarity
ECIICESE03
Inspection, testing and commissioning of electrical installations (plant)

ECIICESE03 Inspection, testing and commissioning of electrical installations (plant) 5

Reinstate the work area
This term could include:
1 returning the work area to a safe condition
2 correctly disposing of waste materials
3 storage of re-usable materials, consumables and equipment in
accordance with appropriate procedures
4 completion of all necessary documentation

Information relating to the task
This could include knowledge and understanding about:
1 sources of technical and functional information
2 who should receive what information
3 the type of information to supply
4 when to supply information
5 checking relevant people understand those aspects of information that
have a bearing on health and safety

Engineering drawings and related specifications
Engineering drawings could include:
1 assembly instruction
2 general arrangement (GAs)
3 isometrics
4 schematics
5 schedules

Specifications could include:
6 method statements
7 manufacturers instructions
8 product worksheets




ECIICESE03
Inspection, testing and commissioning of electrical installations (plant)

ECIICESE03 Inspection, testing and commissioning of electrical installations (plant) 6

Developed by Engineering Construction Industry Training Board

Version number 2

Date approved February 2013

Indicative review
date

February 2017

Validity Current

Status Original

Originating
organisation

Engineering Construction Industry Training Board

Original URN NETI06SS45

Relevant
occupations

Electrical Engineer; Electrical Fitter; Electrical Maintenance Technician;
Electrical supervisor; Electrician; Electrical Installation Engineer; Lead
Technician

Suite Installation, Testing and Commissioning of Electrical Systems and Equipment
(Plant)

Key words Engineering; testing; inspection; isolation; construction; calibrate; test
equipment; wiring; cabling; electrical installation; commissioning; electrical;
construction