CHEM TECH CONSULTANTS
Dealing in:
FILTRATION
PURIFICATION
ULTRA FILTRATION MEMBRANE
ULTRA VIOLET STERILIZATION
Products:
Anti scaling Agent Flocon 260 (USA,UK,TAIWAN)
Biocides (Food/Non food graded)
Membrane Cleaners (Acid/Alkaline)
Community Water Purification Plants.
R.O Systems.
Waste Water Treatment Plants.
Mix Beds.
Deionizer.
Water Softeners.
Swimming Pool Equipments (Algaecides for summer and winter shield)
Filtration System for Whole Office Building.
Overhead Tank Filtration System.
Filtration System for Whole House.
Kitchen Filtration System.
Consultancy Services:
We provide:
A)
B)
C)
Consultancy on designing, selection of equipments, accessories and
maintenance guidelines for the Quality control Laboratory.
Consultancy on Bottle Selection, Quality Assurance Manual preparation and
advanced training of man power related to Mineral Water Bottling Plants.
Consultancy to industrial clients for selection of filtration cartridges and
softener resins.
We assure you best after sale services.
206-0pp.Evernew studio, Multan Road ,Lahore Chemist543@yahoo.com
Page 1
CHEM TECH CONSULTANTS
LIST OF EQUIPMENTS FOR
SYSTEM
S. No.
Description
Qty. Installed
01*
Repressureizing Pump
1 No.
02*
RO System
1500 GPD
03*
Online TDS/Cond.
1No
04*
Flow meter (Permeate & Rejection)
2No
05*
Pressure Gauges (SS Liquid Filled)
2N0
06*
High Pressure RO Pump
1No
07*
Skid M.S
1NO
08*
UPVC Fitting
As required
(*Details Given Below )
206-0pp.Evernew studio, Multan Road ,Lahore Chemist543@yahoo.com
Page 2
CHEM TECH CONSULTANTS
FEED PUMP
Designed Specifications:
Electrical data
220-240 volts, 1 phase, 4.5 Amps., 60 Hz, , ,
1000W,1 HP, TEFC motor. Includes 6' electrical cord
Maximum water temperature
Type of pump
Pump construction
Inlet & outlet
Make
150 degrees Fahrenheit
Single stage, self-priming centrifugal
304 Stainless steel
1" MNPT X 1" MNPT (male pipe thread)
Italy/USA
Membrane Element BW-30 400 -4040
Performance
Configuration
Membrane Polymer
Membrane Active Area
Application Data*
Salt Rejection : 99.5 % (99.2% minimum)
Spiral Wound
Composite Polyamide
85 ft2 (7.9 m2)
Maximum Applied Pressure: 600 psig
Maximum Chlorine Concentration: < 0.1 PPM
Maximum Operating Temperature: 113 F (45 C)
pH Range, Continuous (Cleaning): 2-10 (1-12)*
Maximum Feed water Turbidity: 1.0 NTU
Maximum Feed water SDI (15 mins): 5.0
Maximum Feed Flow: 16 GPM
Minimum Ratio of Concentrate to
Permeate Flow for any Element: 5:1
Maximum Pressure Drop: 10 psi
RO PUMP
Designation Materials
Motor stool
Cast iron. Stainless steel on request.
3 Pump head Stainless steel (AISI 304).
206-0pp.Evernew studio, Multan Road ,Lahore Chemist543@yahoo.com
Page 3
CHEM TECH CONSULTANTS
RO PLANT
: TECHNICAL SPECIFICATIONS FOR R.O SYSTEM
Brand Name
Membrane
Membrane Size
Membrane Quantity
Membrane Casing
Model
Voltage
Water Rejection
T.D.S Rejection
Membrane Out
System operating pressure
Auto flushing
Cleaning System
: Water PAK
: Film Tech/Hydro-U.S.A
: (4040)
: 1No
: Hi Grade S.S 1No
: BW 30-400 4040
: 220- 50 Hz
: 25% to 40%
: 95 to 97 %
: 0.0005 Micron
: 150 to 200 psi
: Built in
: 1No
206-0pp.Evernew studio, Multan Road ,Lahore Chemist543@yahoo.com
Page 4
CHEM TECH CONSULTANTS
QUOTATION
Description:
Supply and Installation of RO system
Price
Rs.
Buyers Responsibility
110,000/=
Transportation , Inlet/Out let water Point, Electricity at
Room & Parts
TERMS OF PAYMENT
Advance @ Agreement Confirmation
50%
Delivery
35%
Installation and commissioning
15%
Note:
(All Prices Are Without All Taxes)
ABDUL SAMAD
ASST Manager Sales
0300 4772499
206-0pp.Evernew studio, Multan Road ,Lahore Chemist543@yahoo.com
Page 5
CHEM TECH CONSULTANTS
Taxes:
Offered price does not include sales tax, which shall be paid by client where
applicable.
Income tax @ 3.5% shall be additionally included in the offered price for the
supply of equipment & plant.
Any additional duty/Tax levied upon during the course of subsequent
legislation shall be payable by Client at per actual.
Warranty:
The system shall be warranted in workmanship for 12-months from the date
of commissioning or 18-months from the date of delivery, whichever comes
earlier.
Delivery:
The delivery period shall be 15 days. depending upon items remaining
unsold at the time of ordering of equipment.
Inclusions:
The design, fabrication, assembling, supply, installation & commissioning of
the plant.
The delivery of equipment & materials as per specifications & bill of
quantities mentioned in the proposal. Any additional item or changes in
specifications shall lead to the revision of price.
Training of your operational staff during installation & commissioning of the
plant.
One-year after sales technical backup services for equipment & material
supplied.
206-0pp.Evernew studio, Multan Road ,Lahore Chemist543@yahoo.com
Page 6
CHEM TECH CONSULTANTS
Exclusions:
Electro-mechanical scope beyond battery limit
Civil Work related to building, foundations or any other
Reject water disposal system
Storage tanks except mentioned & specified
Chemicals, consumables, spares for commissioning as well as for operation
Operation & maintenance of the Plant
Easy approach of the site
Unloading & security of supplied equipment at site
Site Clearance
Rigging arrangement, if required
Any service or item not specified in our scope of work in the offer.
206-0pp.Evernew studio, Multan Road ,Lahore Chemist543@yahoo.com
Page 7