Typical Segments - 25 X 32.5 X 7.4

The document provides information on the typical cycle time and activities required to construct a tunnel structure with typical segments measuring 25m x 32.5m x 7.4m. It details the tasks, activities, productivity rates, and duration required for preparatory works, constructing the base slab, internal kickers, walls consisting of 12 pours, and slab. It estimates a total duration of 336 days to construct 7 typical segments if using 2 sets of shutters, working fortnightly with pours.

Uploaded by

Ankit Chawla
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
78 views7 pages

Typical Segments - 25 X 32.5 X 7.4

The document provides information on the typical cycle time and activities required to construct a tunnel structure with typical segments measuring 25m x 32.5m x 7.4m. It details the tasks, activities, productivity rates, and duration required for preparatory works, constructing the base slab, internal kickers, walls consisting of 12 pours, and slab. It estimates a total duration of 336 days to construct 7 typical segments if using 2 sets of shutters, working fortnightly with pours.

Uploaded by

Ankit Chawla
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 7

Typical Cycle Time

Typical Segments - 25 x 32.5 x 7.4


Task

Dimensions

Preparatory Works

12.5 * 32.5

12.0

24 NA

Base Slab

12.5 m long & 2 m thk

12.0

24

Kickers

12.5*0.3

4.0

Wall - 12 pours

(6 X 12.5)

6.0

24

Slab

(32.5 x 12.5 x 1.7)

24.0

24

Preparatory Works

12.5 * 32.5
Activities

Days / Pour

Total Duration

Days

Compaction 2 layers
Test
Blinding
Curing
HDPE
Test
Geotextile & Protection
screed
Curing
Total

1.0
1.0
1.0
3.0
3.0
1.0
1.0
1.0
12.0

Rebar
Shuttering
External Kicker
Pour
Total

6.0
2.0
1.0
1.0
10.0

Base Slab

Internal Kickers

Shutters
Pouring

1.0
1.0

Curing & Treatment to


joint & WPF
Total

1.0
3.0

Bar Fixing / Scaffolding


Shuttering
WPF
WPF & Pouring
Deshuttering
Total

1.0
1.0
1.0 3 pours / week
1.0
2.0
6.0

Wall - 12.5 X 4.8 X 1.3 or 0.7

Slab - 12.5 X 32.5 X 1.7

2 Sets of shutter with one gang of Manpower


Scaffolding / Shuttering
2.0
Rebar
7.0
Side Shutters
2.0
Pouring
1.0
Deshutter
12.0
Total
24.0
Total pours for 7
segments

14.0

Total Days

336.0

For 2 sets

168.0

Months
Pour / Fortnight with 2 Shutters

6.5

Nos of Shutter Sets

Tunnel Structure - Typical Segments

Tasks

Activities

Unit

Total Qty

Productivity / day

shutter

m2

180

making
Total MH
Duration
Carpenter

4 Mh/Sqm
720
6 days
13 11 hr / day

fixing
Total MH
Duration
Carpenter
labour

4 Mh/Sqm
720
6 days
13 11 hr / day
10

165

days

Typical Segments - 25 x 32.5 x 7.4

Base Slab ( 12.5+32.5)2

steel

SF
Duration
SF
C.H
concrete

m3
Mason
Labour
C.H

Preparatory Works

12.5 * 32.5
Formation

40 MH / T
6600 Hrs
10 days
60
4
815
14
24
4

406 Sqm
Labour

Mason

Labour

8 1 MH / Sqm

Mason

C.H

Carpenter
labour
SF
C.H

4
4
5
1

Blinding
WPF / Geotextile

Screed

Kickers / Inserts / Upstands

Wall 12.5x4.8x1.3 / 0.7 - 6 Nos


Scaffolding /
shutter
Steel
For one wall

m2
T

772
65

Scaffolder

4 2 days

SF

6 for 8 days

Shuttering
Carpenter
WPF
Labour

10 3 days

pour
mason
Labour
For 6 walls

3 Pours / week
SF
C.H
Carpenter
C.H

2
2

36 1T/Gang/Day
4 fixers in a gang
4
40
4

Available on both works

Tasks

Activities

Unit
Mason
Labour
C.H

Total Qty

Productivity / day

days

10
10
2

steel
concrete

T
m3

65
324

shutter
steel
concrete

m2
T
m3

235
150
753

slab (32.5x12.5x1.7) + side shutter

Scaffolding / Formwork
Shutter
Days
Hrs/Day
MH/Sqm
Total Hrs
Hrs/Day
Carpenter
Scoffolder
Steel
Fixing Duration

235
7
11
4
940
134
8 Use them for Scoffolding also
8
150 T
9 Days

T/Day

17

Productivity

40 MH/T
667

S.F
C.H

61
56
5

Mason
Labour
C.H

14
24
4

Tunnel Structure - Shaft

Tasks

Activities

Unit

Total Qty

Productivity / day

shutter

m2

223

making
Total MH
Duration
Carpenter

4 Mh/Sqm
892
7 days
12 11 hr / day

fixing
Total MH
Duration
Carpenter
labour

4 Mh/Sqm
892
7 days
12 11 hr / day
10

264

days

Base Slab -16.98+38.85

steel

40 MH / T
10552 Hrs
14 days
69
7

SF
Duration
SF
C.H
concrete

m3

1319

Mason
Labour
C.H

Preparatory Works

14
24
4

16.98*38.85
Formation

660 Sqm
Labour

Mason

Labour

8 1 MH / Sqm

Mason

C.H

Carpenter
labour
SF
C.H

4
4
5
1

Blinding
WPF / Geotextile

Screed

Kickers / Inserts / Upstands

Wall 12.5x4.8x1.3 / 0.7 - 6 Nos


steel
concrete
For one wall

T
m3

400
1998
Days

Shuttering
Rebar
Casting
Deshutteing
Climbing System
Total
Total Pours
Duration for the wal
Buy 4 Shutters

1
1
1
2
1
6
33
198
50

Idle period for TC Installation

Total Period

56

Avg Tonne / Day /Pour

12

SF
C.H
Carpenter
C.H

48 1T/Gang/Day
4 fixers in a gang
4
40
4

Available on both works

Tasks

slab

Activities

Unit
Mason
Labour
C.H

Total Qty

Productivity / day

days

10
10
2

38.85*16.4*.3
shutter
steel
concrete

m2
T
m3

Scaffolding / Formwork
Shutter
Days
Hrs/Day
MH/Sqm
Total Hrs
MDAYS
Carpenter
Scoffolder
Steel
Fixing Duration
T/Day
Productivity

637
38
191

637
9
11
4
2548
222
25 Use them for Scoffolding also
8
38 T
12 Days
3
40 MH/T
127

S.F
C.H

12
11
1

Mason
Labour
C.H

10
10
4

Shaft Room
shutter
steel
concrete

m2
T
m3

Scaffolding / Formwork
Shutter
Days
Hrs/Day
MH/Sqm
Total Hrs
MDAYS
Carpenter
Scoffolder
Steel
Fixing Duration
T/Day
Productivity

1062
57
287

1062
10
11
4
4246
369
37 Use them for Scoffolding also
8
57 T
12 Days
5
40 MH/T
191

S.F
C.H

17
16
1

Mason
Labour
C.H

10
10
4

Earthworks & Rock Protection

Activities

Unit

Total Qty

Productivity / day

days

Reqd Plant

Open Cut Excavation


Stage 1

Above WTL

34000

3000

11 2 Exc

Upto segment 2

0.00 TO -3.00

10833

3000

4 2 Exc

FROM -3.00 TO -15.00

45090

1800

25 3 Exc

Complete Excavation upto Segment 2

Complete Excavation

29

0.00 TO -3.00
FROM -3.00 TO -15.00

26167

3000

9 2 Exc

108910

2400

45 4 exc

Complete Balance Excavation

54 programme ok

Overall Bulk Excavation Duration

83

Total Working Days for Dewatering

89

Required Dewatering only for Excavation

3.4 Months

Excavation
Plant

Nos

Days

Avg Output

PC 400
PC 400
PC 400

2
3
4

14.94
30.81
45.38

D-8

76.19

Shovel

Tippers

Loading
Inside the tunnel
Outside the tunnel
Unload
Return Outside
Inside the tunnel

4
5
3
2
3
3

20 Mins / Trip

Nos of Trips / day / Tipper

33

429 13 Cum / Trip

Tipper

No

Day

Tipper
Tipper
Tipper

7
6
6

15
31
45

Backfilling With Compaction


with grader
Area
15*226

Depth
at 300 mm layer
Total Layers

mins
mins
mins
mins
mins
mins

Total

Compacted Fill / Day /


Tippeer

Output / Day

3000 Cum / Day


2400 Cum / Day
2400 Cum / Day

3390 Sqm
1800 Sqm
10 m
0
33 Nos

Activities

Unit
Total Area

Total Qty

Productivity / day
113000 Sqm

Nos of Days available

90

Required output / day


Days for 1800 sqm

1256
63

days

Roller 10T
Water bowser
Grader
tipper
shovel
D-6

1
1
1
4
2 1 for stockpiling double handling
1

labr
gradecheckr

5
1

Backfilling With Compaction


with JCB
Qty

Ht
Nos of Layers
Total Area
Available days
Output / Day
JCB
Plate Compactor

226 * 3
678 Sqm
10 m
33
22374 Sqm
60
373 Sqm
1
1

No Additional Plant
Labour
Grade Checker

4
1

Spread and Fill


Total Fill

200000

Spread in
Output / Day
D-6

30 days
6667
1 No

Rock Protection
10-50MM
50-150
Req Output

550
1685
2235
56

10-60 kg

2885 Cum

Total

5120

Req Production
Use Shovel

Cum
Cum
Cum
Cum

128 Cum
1 No

11 Hr

Reqd Plant