LABOUR OUTPUT RATES PER HOUR FOR BUILDING WORK
Sr.
No.
Description of Work
Unit
Resource
Recommended Constant
in Hrs
Other resources
required
i) Exacavation & Earthworks
a) Excavation over areas
(Hard/dense soil), depth
for 1
upto 5 feet and removal
cu.ft
(upto 3 feet away from
edge).
1 Mazdoor
0.14
b) Excavation in
trenches (Soft/loose
soil) for founadtion not
exceeding 5 feet in
width and for shafts,
wells, cesspits and the
like, not exceeding 100
sft on plan, depth upto
5 feet and removal (upto
3 feet away from edge).
for 1
cu.ft
1 Mazdoor
0.12
c) Extra over item (a)
for an additional depth
of 5 feet to 10 feet
for 1
cu.ft
1 Mazdoor
0.025
d) Extra over item (b)
for an additional depth
of 5 feet to 10 feet
for 1
cu.ft
1 Mazdoor
0.02
e) Extra over item (a)
and (b) for an
additional lead of 150
feet in any soil beyond
3 feet
for 1
cu.ft
1 Mazdoor
5.5
f) Returning, filling
and ramming of
excavated earth in
layers not exceeding 6
inches in depth,
watering, well ramming
and levelling, lead upto
150 feet
for 1
cu.ft
1 Mazdoor
0.055
Mate
Mate
Mate
Mate
Mate
Mate
Water Carrier
Reference: All the labour output constants have been taken from Indian Standard IS: 7272 (Part-I)-1974 , NORTH ZONE.
LABOUR OUTPUT RATES PER HOUR FOR BUILDING WORK
Sr.
No.
Description of Work
Unit
Resource
for 1
cu.ft
1 Mazdoor
for 1
cu.ft
1 Mazdoor
Recommended Constant
in Hrs
Other resources
required
ii) Concrete Works
a) Mixing by hand at
banker, cement concrete
(with 1.5 inches graded
coarse aggregate) Lead
of concrete mix from
the place of mix to
place of deposit of
concrete is assumed up
to 100 feet where not
otherwise mentioned
0.23
Water Carrier
b) Mixing by hand at
banker, lime concrete
(with 1.5 graded brick
0.4
Water Carrier
Bullock with
Driver
ballast)
c) Mixing with mixer
machine at banker,
cement concrete (with
3/4" graded coarse
aggregate)
for 1
cu.ft
1 Mazdoor
for 1
cu.ft
1 Mazdoor
0.12
Water Carrier
Mixer Operator
Mixer Machine
d) Unreinforced concrete
in foundations
including mixing,
pouring, consolidating
and curing
i) Hand mixed cement
concrete
0.48
ii) Mixer mixed cement
concrete
for 1
cu.ft
1 Mazdoor
0.4
Mason
Water carrier
Mason
Water Carrier
Mixer Operator
Mixer Machine
Reference: All the labour output constants have been taken from Indian Standard IS: 7272 (Part-I)-1974 , NORTH ZONE.
LABOUR OUTPUT RATES PER HOUR FOR BUILDING WORK
Sr.
No.
Description of Work
Unit
Resource
Recommended Constant
in Hrs
Other resources
required
ii) Concrete Works
iii) Hand mixed lime
concrete
for 1
cu.ft
1 Mazdoor
0.64
Mason
Water Carrier
Bullock with
Driver
for 1
cu.ft
1 Mazdoor
0.56
Mason
Water Carrier
e) Unreinforced concrete
under floors including
mixing, pouring,
consolidating and
curing:
i) Hand mixed cement
concrete
ii) Mixer mixed cement
concrete
for 1
cu.ft
iii) Hand mixed lime
concrete
f) Reinforced cement
concrete in-situ in
foundations, footings,
bases for columns, etc.,
excluding formwork and
reinforcement
for 1
cu.ft
for 1
cu.ft
1 Mazdoor
1 Mazdoor
1 Mazdoor
0.40
0.64
0.48
Mason
Water Carrier
Mixer Operator
Mixer Machine
Mason
Water Carrier
Bullock with
Driver
Mason
Water Carrier
Mixer Operator
Mixer Machine
Reference: All the labour output constants have been taken from Indian Standard IS: 7272 (Part-I)-1974 , NORTH ZONE.
LABOUR OUTPUT RATES PER HOUR FOR BUILDING WORK
Sr.
No.
Description of Work
Unit
Resource
Recommended Constant
in Hrs
Other resources
required
ii) Concrete Works
g) Reinforced cement
concrete in situ in
suspended floors/roofs
excluding formwork and
reinforcement
h) Reinforced cement
concrete in situ in
chajjas up to 6 inches
in thickness excluding
formwork and
reinforcement
i) Reinforced cement
concrete in situ in
beams excluding
formwork and
reinforcement
j) Reinforced cement
concrete in situ in
columns, pillars in
ground floor excluding
formwork and
reinforcement
k) Reinforced cement
concrete in situ in
columns, pillars in
ground floor excluding
formwork and
reinforcement
for 1
cu.ft
for 1
cu.ft
for 1
cu.ft
for 1
cu.ft
for 1
cu.ft
1 Mazdoor
1 Mazdoor
1 Mazdoor
1 Mazdoor
1 Mazdoor
0.56
0.80
0.68
0.80
0.80
Mason
Water Carrier
Mixer Operator
Mixer Machine
Mason
Water Carrier
Mixer Operator
Mixer Machine
Mason
Water Carrier
Mixer Operator
Mixer Machine
Mason
Water Carrier
Mixer Operator
Mixer Machine
Mason
Water Carrier
Mixer Operator
Mixer Machine
Reference: All the labour output constants have been taken from Indian Standard IS: 7272 (Part-I)-1974 , NORTH ZONE.
LABOUR OUTPUT RATES PER HOUR FOR BUILDING WORK
Sr.
No.
Description of Work
Unit
Resource
Recommended Constant
in Hrs
Other resources
required
ii) Concrete Works
l) Reinforced cement
concrete in situ in
stairs excluding
formwork and
reinforcement
for 1
cu.ft
1 Mazdoor
0.96
Mason
Water Carrier
Mixer Operator
Mixer Machine
iii) Brick Work (Straight walls) including scaffolding
a) Brickwork in walls
exceeding one brick
thick, in cement/lime
mortar
for 1
cu.ft
1 Mazdoor
0.40
Mason
Water Carrier
b) Brickwork in walls,
one brick thick, in
cement/lime mortar
for 1
s.ft
1 Mazdoor
0.32
Mason
Water Carrier
c) Half-brick walls
(with or without hoop
iron reinforcement) in
cement mortar
for 1
s.ft
1 Mazdoor
0.15
Mason
Water Carrier
d) Tile work in superstructure in cement
mortar
for 1
cu.ft
1 Mazdoor
0.40
Mason
Water Carrier
iv) Formwork
a) Fabrication and
erection with all
supports, struts, braces,
etc., and dressing with
oil as cleaning of
formwork
1) Rectangular columns
and walls
for 1
cu.ft
1 Carpenter
0.06
Mazdoor
Reference: All the labour output constants have been taken from Indian Standard IS: 7272 (Part-I)-1974 , NORTH ZONE.
LABOUR OUTPUT RATES PER HOUR FOR BUILDING WORK
Sr.
No.
Description of Work
Unit
Resource
Recommended Constant
in Hrs
Other resources
required
iv) Formwork
a) Fabrication and
erection with all
supports, struts, braces,
etc., and dressing with
oil as cleaning of
formwork
2) Suspended
floors/roofs
3) Sides and soffits of
beams
for 1
s.ft
for 1
s.ft
1 Carpenter
0.17
Mazdoor
1 Carpenter
0.22
Mazdoor
v) Reinforcement
Bar reinforcement
including cutting to
length, hooked ends,
cranking or bending,
hoisting and placing in
any position, binding
with binding wire and
holding firmly so as
not to be disturbed
while placing and
ramming of concrete
for
1
Ton
1 Ironworker
80
a) 1/2" thick cement
plaster to ceiling
including mixing of
mortar
for 1
s.ft
1 Mason
0.06
Mazdoor
Water Carrier
b) 1/2" thick cement
plaster on brick walls
(exterior) including
mixing of mortar
for 1
s.ft
1 Mason
0.045
Mazdoor
Water Carrier
Mazdoor
vi) Plastering and Pointing
Reference: All the labour output constants have been taken from Indian Standard IS: 7272 (Part-I)-1974 , NORTH ZONE.
LABOUR OUTPUT RATES PER HOUR FOR BUILDING WORK
Sr.
No.
Description of Work
Unit
Resource
Recommended Constant
in Hrs
Other resources
required
for 1
s.ft
1 Mason
0.06
Mazdoor
Water Carrier
1 Mason
0.06
Mazdoor
Water Carrier
for 1
s.ft
1 Mason
0.07
Mazdoor
Water Carrier
for 1
cu.ft
1 Mazdoor
0.16
for 1
s.ft
1 Mazdoor
0.09
Mason
Water Carrier
for 1
s.ft
1 Mazdoor
0.07
Mason
Water Carrier
vi) Plastering and Pointing
c) 1/2" thick cement
plaster on brick walls
(interior) including
mixing of mortar
d) Struck pointing to
for 1
brick work in cement
mortar including mixing s.ft
of mortar
e) Tuck pointing to
random rubble masonry
in cement mortar
including mixing of
mortar
vii) Mortars
a) Mixing by hand,
cement mortar of any
mix proportions
Water Carrier
viii) Flooring works
a) Laying of 1-1/2" to 2"
thick PCC in alternate
panels with side forms
and templates and
finished smooth
b) Laying of 1" to 1-1/2"
thick PCC in alternate
panels with side forms
and templates and
finished smooth
Reference: All the labour output constants have been taken from Indian Standard IS: 7272 (Part-I)-1974 , NORTH ZONE.
LABOUR OUTPUT RATES PER HOUR FOR BUILDING WORK
Sr.
No.
Unit
Resource
1) Laying
for 1
s.ft
1 Mason
0.2
2) Cutting, Grinding
and Polishing
for 1
s.ft
1 Mazdoor
0.40
1) Laying
for 1
s.ft
1 Mason
0.2
2) Cutting, Grinding
and Polishing
for 1
s.ft
1 Mazdoor
0.5
Description of Work
Recommended Constant
in Hrs
Other resources
required
viii) Flooring works
c) Laying of 2" thick in
situ terrazo flooring,
under layer 1-1/4" thick
cement concrete and top
layer of 3/4" thick
marble chips laid in
cement with divider
strips of glass/marble
to form panels/bays
including cutting,
grinding and polishing:
Mazdoor
Water Carrier
Grinding Machine
d) Laying of 3/4" thick
in situ terrazo
skirting/dado
underlayer 1/2" thick
cement plaster and top
layer 1/4" thick marble
chips laid in cement
including rounding of
junctions with cutting,
grinding and polishing:
Mazdoor
Water Carrier
Grinding Machine
Reference: All the labour output constants have been taken from Indian Standard IS: 7272 (Part-I)-1974 , NORTH ZONE.
LABOUR OUTPUT RATES PER HOUR FOR BUILDING WORK
Sr.
No.
Unit
Resource
1) Laying
for 1
s.ft
1 Mazdoor
0.15
2) Cutting, Grinding
and Polishing
for 1
s.ft
1 Mazdoor
0.40
1 Painter
0.01
Description of Work
Recommended Constant
in Hrs
Other resources
required
viii) Flooring works
e) Laying of 3/4" thick
terrazo/marble tile
flooring laid over 3/8"
thick cement mortar:
Mason
Water Carrier
Grinding Machine
ix) Paint works
a) White washing with
lime 3 coats on new
surface
for 1
s.ft
b) Two coats of color
wash over an undercoat
of white wash on new
surface
for 1
s.ft
1 Painter
c) Distempering with dry
distemper per 3 coats on
new surface including
Mazdoor
0.02
Mazdoor
1 Painter
0.06
for 1
s.ft
Mazdoor
priming coat of washing
d) Cement Based paint 2
or more coats on new
surface
for 1
s.ft
1 Painter
0.11
e) Cement wash 1 coat on
new surface
for 1
s.ft
1 Painter
0.015
Fixing of glass panes on
for 1
steel or wood work
s.ft
bedded with putty
1 Glazier
0.15
Mazdoor
Mazdoor
x) Glazing works
Mazdoor
Reference: All the labour output constants have been taken from Indian Standard IS: 7272 (Part-I)-1974 , NORTH ZONE.
10
LABOUR OUTPUT RATES PER HOUR FOR BUILDING WORK
Sr.
No.
Description of Work
Unit
Resource
Recommended Constant
in Hrs
Other resources
required
xi) Roofing
a) 3-4 inches thick
(average) mud phuska of
clay mixed with bhusa
at 1.5 kg/sft of clay on
roof laid to slope and
consolidated
for 1
s.ft
b) 3-4 inches thick mud
plaster and gobri
leaping with mud gobri
mortar over mud phuska
for 1
s.ft
c) One layer of brick
tile laid over gobri
leaping and grouted
with cement mortar
including mixing and
finished neat
for 1
s.ft
1 Mazdoor
0.15
Mason
Water Carrier
1 Mazdoor
0.007
1 Mazdoor
0.11
Mason
Water Carrier
CALCULATIONS
I.
Man-days =
(Quantity of work to be performed) X (Man-Hours from above table)
8 hrs per day
II. Resource required =
Man-days
Planned Duration (in days)
III. Resource output rate per day =
(Quantity of work to be performed)
Resource required X Planned Duration (in days)
Example: 1/2" thick cement plaster on brick walls (interior) including mixing of mortar.
Labour required = 1 Mason require 0.06 hrs to do 1 sft; for 70,000 sft:
I.
Mandays =
(70,000 sft X 0.06 hrs/sft)/8 = 525 man-days
II.
Masons required =
525 man-days / 45 planned days = 11.67 Nos = Say 12 Masons.
III. Mason output rate/day =
(70,000 sft)/(45 planned days X 12 Masons) = 130 sft per day
..
Reference: All the labour output constants have been taken from Indian Standard IS: 7272 (Part-I)-1974 , NORTH ZONE.