Doc No: HT/COPI/0002
JOB SAFETY ANALYSIS
DATE ISSUED:
LAST REVIEWED DATE:
Job Description: Cable Disconnect & Termination
REVIEWED BY:
Area/Unit: Main Deck Area, Control Room and Switchgear room
SIGNATURE OF SUPERVISOR.
Tag No/Equipment Description: SCU , SPCU , UPS , PHPU and TUTU etc
Page: 1 OF3.
References:
PPE Required doing this Job: STANDARD PPE AND SAFETY HARNESSES AS REQUIRED.
IF YOU DONT MEET THE REQUIREMENTS AS STATED IN THIS PROCEDURE DO NOT PROCEED WITH PERFORMING THE JOB
Machine/Equipment/Tool
involved in each step
JOB STEP
Planning & permit
Personnel
Potential Hazard/Loss
Risk
Level
before
Mitigate
(H,M,L)
Control Statement
Untrained personnel
New personnel
Asset Damage
Non Certification of people
Permits not in place
Incorrect information
Weather conditions
Preparation material and
tools.
Materials
[Cable]
Safety harness in poor or
damaged condition
Safety harness
Tools damaged or broken
Hand tools
Work vest
Risk
Level
after
Mitigate
Ensure personnel undergo
appropriate HSE Training and PTW
training prior to mobilization.
Qualified & certified personnel for
all tasks.
Supervisor to attend daily PTW / tool
box meetings.
Obtain FM/OIM Approval for
critical procedures
Raise PTW, JSAs, & any related
documents-:check lists
Ensure all tools and material safe for
use.
Correct PPE to be used
Wrong tool for job
Ensure that scaffolding safe
Manual handling
Unsafe scaffold materials
Use safety harness with double
lanyard. Retractor reels can be used if
required.
Check all your equipment for
damage
Ensure all tools and material safe for
use
Work vest in poor or damaged
condition
M
M
Cable Pulling
Cable dressing
Working over the side.
Working at height
Replaced MCT
Cable glanding
Cable termination
Cable insulation resistance
check
Cable continuity test
Working at height
Manual labor
Hand tools
Safety harness
Manual labor
Hand tools
Megger
Continuity tester
Safety harness
Falling from height
Unauthorized Access to Site
Barricade area as required put up
signage
Sprains & strains, pinch points
Beware of loose objects or tools
falling use restraints if at all possible
Damage to plant
Poor access/ egress
Working in live plant
Be aware of working around live
equipment watch small Stainless
Steel tubing
Falling objects
Have good access/ egress
No scaffold tag
Use scaffold tags
Man overboard.
All personnel over the side to wear
Work Vest.
Ships master informed and location
workboats informed in case rescue
required.
M
M
Standby person on watch at all times.
Electrical shock
Falling from height
Barricade area as required put up
signage
Unauthorized Access to Site
Beware of loose objects or tools
falling use restraints if at all possible
Sprains & strains, pinch points
Have good access/ egress
Damage to plant
Use scaffold tags
Poor access/ egress
Working in live plant
All personnel over the side to wear
Work Vest.
Falling objects
Standby person on watch at all times.
No scaffold tag
L
L
L
L
House keeping area
Manual labour
Chain block
Scaffold trolley
Tripping hazards
Waste materials laying around
Transfer material using correct lifting
techniques
Clips left at height on ledges
help one another
Tools left at height on ledges
Clean & tidy area
Good housekeeping and clear path to
& from work site.
Check around site for tools &
equipment left sitting on ledges
Follow waste management procedures
L
L
WORK LEADER AND WORK TEAM TO CONFIRM PJSM, JSA REVIEW HAS BEEN HELD, DISCUSSED AND UNDERSTOOD
Work Team Member
Form No. COPI-HS-FR-00016
Rev. 2
Issue Sept. 200
Signature (1)
Start Date
Work Permit Duration max 8 periods
5
6