Schedule 3: Erection P
Name of Work: Strengthening Of Distribution Network in Bi
Phase-I for 17 districts and Phase-II-Part-C for all 21 Distri
Districts: Saran, Siwa
Bidder's Name & Address:
NIT No
Sr. No.
Description
Unit
33/11 KV Substation Works - Partly outdoor type
substation ( 2x 10 MVA ) (with 33 KV outdoor type
bay 2 nos. and 11 KV bay indoor type 8 Nos.)
Civil works: Design, supply of all material, T&P,
labour etc for the following civil works complete as
per TS
1
Soil Investigation & Contour Survey of Substation
area as per Technical Specification
Earth Filling & Site Levelling
PER S/S
Earth work in PSS site with ordinary soil (vide
classification of soil item - A) obtained from borrow
pits free from logs, stumps, roots, rubbish or any
other ingredients likely to deteriorate or affect the
stability of the (1.00 meter filling considered size
60*40) site surface including breaking the clods
maximum to 60 mm. cube, placing the earth in
layers not exceeding 225 mm in loose thickness,
rough dressing including cost of cutting and
removing shrubs, roots falling in borrow area all
complete as per approved design & technical
specification and as per direction of Engineer in
Charge (payment will be made as per actual
requirement per cubic meter)
Cubic
Meters
Antiweded treatment and stone spreading in
switchyard area excluding road, Cable trench,
Drainage etc (Stone Spreading 6 inches over 4
inches lean cement concrete layer as per technical
specification, approved desgn and drawing and as
per directon of Engineer in Charge. (payment will be
made as per actual requirement per Square meter)
Sq. m
Construction of Boundary Wall including Barbed Wire
Fencing on MS angle over the Boundary Wall and
one Gate per Substation, including Supply,
Fabrication, Fixing, Painting all complete as per
approved Drawing & Technical Specification and as
per directon of Engineer in Charge in all 33/11 kV
new sub-stations (payment will be made as per
actual requirement per meter)
Mtr
Security fencing along with one switchyard gate per
Substation as per Technical specifications in all 33/11
kV new sub-stations - to isolate electrical yard and as
per directon of Engineer in Charge in all 33/11 kV
new sub-stations (payment will be made as per
actual requirement per meter)
Mtr
Design, engineering and construction of Control
Room Building ( Hall of control room building -16 x 8
Mtr. (size may vary as per availability of land) and
Guard room, store room, Battery room, Incharge
room & Wash room etc.) including supply of T&P,
Labour, Cement, Reinforcement Steel, Form Work,
Excavation etc, all complete as per Technical
Specification and Approved Drawing and as per
directon of Engineer in Charge in all 33/11 kV new
sub-stations (payment will be made as per actual
requirement per Sq. meter plinth area)
Sqm
Design, engineering and construction of Cable Trench
of 0.75 Mtr wide , 1.0 Mtr. depth, precast RCC Trench
Cover, Water stops, Brick Work wherever required
including supply of T&P, Labour, Cement, Sand,
Reinforcement Steel, Steel Angles, Flats, Form Work,
Excavation and providingcement plaster (1:4)
including floating coat of cement punning (1.5 MM)
with clean pores sand etc, all complete as per
Technical Specification, approved Drawing and as per
directon of Engineer in Charge in all 33/11 kV new
sub-stations (payment will be made as per actual
requirement per meter)
Mtr
Design, engineering and construction of Drainage
System in the Substation premises including supply
of T&P, Labour, Cement, , bricks, Form Work,
Excavation etc, all complete as per design, Technical
Specification and Tender Drawings in all 33/11 kV
new sub-stationas as per directon of Engineer in
Charge in all 33/11 kV new sub-stations (payment
will be made as per actual requirement per meter)
Design, engineering and construction of PCC road,
footpath including supply of T and P, labour, brick,
stone and stonechips, earth, and excavation,
compaction etc. all complete as per Technical
specifications.
width of PCC road 3.75 m- in M20, 200 mm Thick
over compacted WBM in three layers (Grade-I-100
mm thick, Grade-II-75 mm thick, Grade - III - 75mm
thick) etc as per PWD Specification and direction of
Engineer In Charge. (payment will be made as per
actual requirement per meter)
Mtr
width of footpath 1.5 m-PCC in M15, 150 mm Thick
over Brick on edge soling over 75 mm thick local
sand filling etc as per PWD Specification and
direction of Engineer In Charge. (payment will be
made as per actual requirement per meter)
Mtr
10
Mtr
Stone pitching over sloping including supply of stone
and surface preparation as per drawing and as per
Sq. Meter
direction of Engineer in charge.(payment will be
made as per actual requirement per Sq. meter)
11
Sinking of tube well and installation of motor
operated submersible pump of suitable capacity with
1000 ltr. Sintex or reputed make water tank including
GI Pipe(heavy duty) pipe line and sanitary fittings
complete in all respect for toilets , drinking water
and providing water tap near the power transformer
for watering the earth pit as per requirement. The
depth of Tube-Well should be minimum 80 mtr.
12
Design, Engineering and construction of transformer
foundation, erection, filtration, testing and
commissioning of 33/11 kV, 3 ph, 50 Hz, ONAN, Cu
Wound, Outdoor Conventional type Power
Transformer along with transformer oil, Buchholtz
relay, breather, OTI & WTI, Marshalling Box,
Conservator tank, oil level indicator, valves, 2 sets of
50x8 mm GS Neutral Earthing strips with braided
conductor on bushing end supported with insulators,
OTI & WTI Indicators, Vent explosion plug, control
wiring / cabling, cable supporting tray on the body,
transformer wheels, bushing and extended copper
connector made of 50x10 mm copper flat for
connection of 11 KV side bushing with suitable bolts
nuts and washers of Brass etc as required . 2 sets of
body earthing with 50x8 mm GS Strip as per TS ,
approved drawing and direction of Engineer in
Charge.
10 MVA with off load tap changer
Per PSS
Set
13
Design, Engineering, providing and construction of
transformer support/foundation, erection, testing and
commissioning of 100 KVA, 11/0.433 kV, 3 ph, 50 Hz,
ONAN, aluminium would outdoor type (three star
rated) Station Transformer on double pole structure
alongwith HG Fuse set, AB Switch/ Isolator, LA,
Earthing, etc complete to complete the erection
testing & commissioning of SST as required as per
specifications, approved drawing and direction of
Engineer in Charge complete in all respect.
Set
14
Excavation, erection, cement concrete foundation,
erection, testing and commissioning of all type of
structures i.e. Gantry/Swing
bus/isolator/CT/PT/PI/S.S.T structures etc. made of
joist / channel / angle / flat of different sections as
per approved drawings and direction of Engineer in
Charge complete in all respect
MT
15
Design, Engineering and construction of foundation ,
erection, testing and commissioning of 36kV, 1250A,
25kA for 3 seconds, 3-ph, Outdoor type Vacuum
Circuit breaker along with 36kV, 1-Phase, 25kA for 3
seconds, 800-400-200/1-1-1 Amp.or 800-400-200/11, Amps outdoor type Current Transformer along with
junction box (1 no junction box for 3 no of 1-phase
CTs)], Jumpers, earthing, supporting structures,
maintenance platform, marshalling box, control &
Power cabling between VCB and indoor control panel
and required accessories complete as per approved
drawings, technical specifications and direction of
Engineer in Charge and scope of the work.
Set
16
Design, Engineering providing and installation of
ISMC 75 channel on top of indoor trench, erection of
panels on ISMC 75 channels, welding, testing and
commissioning of 33kV indoor Control & Relay panel
along with E/F & O/C relays, control and power supply
cabling in trench between field equipment and
panels, Mimic Diagram, Voltmeter, Ammeter,
Annunciation Windows with annunciation relays and
other components etc as per approved drawings,
technical specifications and scope of the work for
controlling complete in all respect
33 kV feeder Panel (without diffirential relays) with
DLMS (modem compactible ) Trivector Static Energy
Meter complete
No
33 kV Transformer Panel (with diffirential relays) with
DLMS (modem compactible ) Trivector Static Energy
Meter complete
No
17
Design, Engineering and construction , Erection,
testing and commissioning of 36kV, 800 A, 25kA , 3ph double break center rotating type (DBCR), Gang
Operated, isolator along with Support Insulators,
Operating Mechanism, Base Channel down Pipe and
all required accessories complete as per approved
drawings, technical specifications and scope of the
work,(with and without Earth Switch)
Set
18
Design, Engineering , Erection, testing and
Commissioning of 30 kV, 10kA, 1-ph Station Class
Lightening Arresters with mounting on erected
structures, jumpering from bus bar, earthing
connection using 50x6mm GS flat, hardware etc as
required, as per approved drawings, technical
specifications and scope of the work complete in all
respect (1 Set= 3 Nos)
Set
19
Design, Engineering, Erection, testing and
Commissioning of 9kV, 10kA, 1-ph Station Class
Lightening Arrester with mounting on erected
structure, jumpering from bus bar, earthing
connection using 50x6mm GS flat, hardware, etc as
required as per approved drawings, technical
specifications and scope of the work. (1 Set=3 Nos)
Set
20
Design, Engineering and construction , Erection,
testing and Commissioning of 36 kV, 1-Phase,
33kV/110 volt, Single core outdoor type Potential
transformer along with junction box (1 no junction
box for 3 no of 1-phase PTs) including control and
power supply cabling, earthing connection using
50x6mm GS flat and required accessories etc.,
complete as per as per approved drawings, technical
specifications and scope of the work,
Set
21
Design, Engineering and construction , erection,
wiring, testing and commissioning of 12 kV, 1250
A/630 A , 25kA, 3-ph, indoor type Vacuum Circuit
breaker along with 12 kV, 1-Phase, 25kA for 3
seconds, 600-300-150/5-5 A and 1200-600-300/1-1-1
A CT , PT, and along with control and relay panel
consisting of Ammeter, volt-meter, E/F, O/C ,diff.
Relay and 3 Phase Energy meter & accessories
complete cabling between VCB and indoor control
panel and required accessories complete as per
approved drawings, technical specifications and
scope of the work,
For Transformer Protection
No
For Feeder Protection
No
For Bus Coupler
No
22
Installation, initial charging, cabling, interconnection
cabling, testing and commissioning of 30 V, 100 AH
Pb Acid battery on battery stand made of teak wood
duly painted with anti acid resistive paint, battery
insulators, inter-battery wiring using 30 sqm copper
single core multi strand cable, terminal connectors, &
all other accessories and connectors as per as per
approved drawings, technical specifications and
scope of the work complete in all respect,
Set
23
Design, engineering, construction , Installation,
interconnection cabling, testing and commissioning
of 30V, 40 Amp. Float-Cum-Boost Battery Charger
with full wave rectification for 230 V, 1 phase, 50 Hz
AC Input Supply with DCDB (as per supply schedule)
as per approved drawings, technical specifications
and scope of the work complete in all respect
No
24
Design, engineering, construction , Installation,
interconnection cabling, testing and commissioning
of 30V Supply DCDB as per approved drawings,
technical specifications and scope of the work &
supply schedule complete in all respect.
No
25
Design, engineering, construction , Installation,
interconnection cabling, testing and commissioning
of 433V, ACDB as per approved drawings, technical
specifications and scope of the work,
No
25
Excavation, laying, welding, refilling, earthing &
grounding of MS Flat as per Approved drawing and
erection of riser up to various equipment/structures
as per scope of the work, specifications and
approved drawings,
75 x 8 mm MS flat for ground mat
MT
50 x 6 mm Galvanized GS flat (risers)
MT
25 mm dia MS Rod 3 m long for earth mat
MT
26
Excavation, erection, testing and commissioning of
40 mm dia., 3000 mm long GI pipe earth electrode
by providing test link, RCC pit, RCC cover, placed on
GI frame, Charcoal & Salt in alternate layer as per
REC Specification and other accessories complete as
per approved drawings, technical specifications and
scope of the work for power transformer neutral,
station transformer neutral, lightening arresters
direct earthing.
Set
27
Erection, testing and commissioning of Bus Bar,
jumpering and Dropper (Zebra Conductor), by using
all types of insulators, clamps and connectors (by
providing & using) etc. with all accessories complete
in all respect.
Per PSS
28
Erection, testing and commissioning of Sub-Station
Lighting System (External+Internal) with proper
illumination levels complete for Switchyard, Control
Room building, Main gate and Sub station boundary
including all associated materials etc complete in all
respect as per applicable TS and approved drawing.
Per PSS
29
Erection, testing and commissioning of Fire Fighting
Equipment as per Supply Schedule
Set
30
Design, engineering,Erection, testing and
commissioning ofFully automatic Capacitor bank with
automatic control panel, isolator,indoor type suitable
Vacuum Circuit Breaker, mounting structures, All
types of cable (11 KV grade 185 sqmm, XLPE &
control cable etc.) & its accessories complete ,
earthing etc as required as per technical
specifications, approved drawings, scope of the
works of following capacities: (Banks in Muiltiple of
600 KVAR as per REC Specification)
1200 KVAr
Set
3600 KVAr
Set
31
Erection, testing and commissioning of All types
control cable and LT power cable required for the
commissioning of sub-station
32
Laying & termination, Testing and commissioning of
11 KV grade, XLPE, power cable armored, aluminium
conductor, stranded complete in all respect as per
Technical Specification.
Per PSS
1Cx 630 sqmm (Un -armoured)
km
3Cx 185 sqmm (armoured)
km
3Cx35 Sqmm (Un -armoured)
km
33
Design, Engineering and construction , Erection,
testing and commissioning of 12 kV, 630 A, 25 kA, 3ph double break center rotating type (DBCR), Gang
Operated, isolator along with Support Insulators,
Operating Mechanism, Base Channel down Pipe and
all required accessories complete as per approved
drawings, technical specifications and scope of the
work, (with and without earth Switch)
Set
34
Erection, testing & commissioning of pipe bus by
using IPS Aluminium Pipe 65 mm. dia.with all types of
Clamps and Connectors and insulator as per TS &
approved drawings
Mtr.
Sub Total
33/11 KV Substation Works - Partly outdoor type
substation ( 2x 5 MVA ) (with 33 KV outdoor type
bay 2 nos. and 11 KV bay indoor type 4 Nos.)
Civil works: Design, supply of all material, T&P,
labour etc for the following civil works complete as
per TS
Soil Investigation & Contour Survey of Substation
area as per Technical Specification
Earth Filling & Site Levelling
Earth work in PSS site with ordinary soil (vide
classification of soil item - A) obtained from borrow
pits free from logs, stumps, roots, rubbish or any
other ingredients likely to deteriorate or affect the
stability of the (1.00 meter filling considered size
60*40) site surface including breaking the clods
maximum to 60 mm. cube, placing the earth in
layers not exceeding 225 mm in loose thickness,
rough dressing including cost of cutting and
removing shrubs, roots falling in borrow area all
complete as per approved design & technical
specification and as per direction of Engineer in
Charge (payment will be made as per actual
requirement per cubic meter)
Cubic
Meters
Antiweded treatment and stone spreading in
switchyard area excluding road, Cable trench,
Drainage etc (Stone Spreading 6 inches over 4
inches lean cement concrete layer as per technical
specification, approved desgn and drawing and as
per directon of Engineer in Charge. (payment will be
made as per actual requirement per Square meter)
Sq. m
Construction of Boundary Wall including Barbed Wire
Fencing on MS angle over the Boundary Wall and
one Gate per Substation, including Supply,
Fabrication, Fixing, Painting all complete as per
approved Drawing & Technical Specification and as
per directon of Engineer in Charge in all 33/11 kV
new sub-stations (payment will be made as per
actual requirement per meter)
Mtr
PER S/S
Security fencing along with one switchyard gate per
Substation as per Technical specifications in all 33/11
kV new sub-stations - to isolate electrical yard and as
per directon of Engineer in Charge in all 33/11 kV
new sub-stations (payment will be made as per
actual requirement per meter)
Mtr
Design, engineering and construction of Control
Room Building ( Hall of control room building -16 x 8
Mtr. (size may vary as per availability of land) and
Guard room, store room, Battery room, Incharge
room & Wash room etc.) including supply of T&P,
Labour, Cement, Reinforcement Steel, Form Work,
Excavation etc, all complete as per Technical
Specification and Approved Drawing and as per
directon of Engineer in Charge in all 33/11 kV new
sub-stations (payment will be made as per actual
requirement per Sq. meter plinth area)
Sqm
Design, engineering and construction of Cable Trench
of 0.75 Mtr wide , 1.0 Mtr. depth, precast RCC Trench
Cover, Water stops, Brick Work wherever required
including supply of T&P, Labour, Cement, Sand,
Reinforcement Steel, Steel Angles, Flats, Form Work,
Excavation and providingcement plaster (1:4)
including floating coat of cement punning (1.5 MM)
with clean pores sand etc, all complete as per
Technical Specification, approved Drawing and as per
directon of Engineer in Charge in all 33/11 kV new
sub-stations (payment will be made as per actual
requirement per meter)
Mtr
Design, engineering and construction of Drainage
System in the Substation premises including supply
of T&P, Labour, Cement, , bricks, Form Work,
Excavation etc, all complete as per design, Technical
Specification and Tender Drawings in all 33/11 kV
new sub-stationas as per directon of Engineer in
Charge in all 33/11 kV new sub-stations (payment
will be made as per actual requirement per meter)
Design, engineering and construction of PCC road,
footpath including supply of T and P, labour, brick,
stone and stonechips, earth, and excavation,
compaction etc. all complete as per Technical
specifications.
width of PCC road 3.75 m- in M20, 200 mm Thick
over compacted WBM in three layers (Grade-I-100
mm thick, Grade-II-75 mm thick, Grade - III - 75mm
thick) etc as per PWD Specification and direction of
Engineer In Charge. (payment will be made as per
actual requirement per meter)
Mtr
width of footpath 1.5 m-PCC in M15, 150 mm Thick
over Brick on edge soling over 75 mm thick local
sand filling etc as per PWD Specification and
direction of Engineer In Charge. (payment will be
made as per actual requirement per meter)
Mtr
10
Mtr
Stone pitching over sloping including supply of stone
and surface preparation as per drawing and as per
Sq. Meter
direction of Engineer in charge.(payment will be
made as per actual requirement per Sq. meter)
11
Sinking of tube well and installation of motor
operated submersible pump of suitable capacity with
1000 ltr. Sintex or reputed make water tank including
GI Pipe(heavy duty) pipe line and sanitary fittings
complete in all respect for toilets , drinking water
and providing water tap near the power transformer
for watering the earth pit as per requirement. The
depth of Tube-Well should be minimum 80 mtr.
12
Design, Engineering and construction of transformer
foundation, erection, filtration, testing and
commissioning of 33/11 kV, 3 ph, 50 Hz, ONAN, Cu
Wound, Outdoor Conventional type Power
Transformer along with transformer oil, Buchholtz
relay, breather, OTI & WTI, Marshalling Box,
Conservator tank, oil level indicator, valves, 2 sets of
50x8 mm GS Neutral Earthing strips with braided
conductor on bushing end supported with insulators,
OTI & WTI Indicators, Vent explosion plug, control
wiring / cabling, cable supporting tray on the body,
transformer wheels, bushing and extended copper
connector made of 50x10 mm copper flat for
connection of 11 KV side bushing with suitable bolts
nuts and washers of Brass etc as required . 2 sets of
body earthing with 50x8 mm GS Strip as per TS and
as per direction of Engineer in Charge
5 MVA with off load tap changer
Per PSS
Set
13
Design, Engineering, providing and construction of
transformer support/foundation, erection, testing and
commissioning of 100 KVA, 11/0.433 kV, 3 ph, 50 Hz,
ONAN, aluminium would outdoor type (three star
rated) Station Transformer on double pole structure
alongwith HG Fuse set, AB Switch/ Isolator, LA,
Earthing, etc complete to complete the erection
testing & commissioning of SST as required as per
specifications & drawings complete in all respect.as
per direction of Engineer in Charge
Set
14
Excavation, erection, cement concrete foundation,
erection, testing and commissioning of all type of
structures i.e. Gantry/Swing
bus/isolator/CT/PT/PI/S.S.T structures etc. made of
joist / channel / angle / flat of different sections as
per approved drawings complete in all respect as per
direction of Engineer in Charge
MT
15
Design, Engineering and construction of foundation ,
erection, testing and commissioning of 36kV, 1250A,
25kA for 3 seconds, 3-ph, Outdoor type Vacuum
Circuit breaker along with 36kV, 1-Phase, 25kA for 3
seconds, 800-400-200/1-1-1 Amp.or 800-400-200/11, Amps outdoor type Current Transformer along with
junction box (1 no junction box for 3 no of 1-phase
CTs)], Jumpers, earthing, supporting structures,
maintenance platform, marshalling box, control &
Power cabling between VCB and indoor control panel
and required accessories complete as per approved
drawings, technical specifications and scope of the
work. as per direction of Engineer in Charge
Set
16
Design, Engineering providing and installation of
ISMC 75 channel on top of indoor trench, erection of
panels on ISMC 75 channels, welding, testing and
commissioning of 33kV indoor Control & Relay panel
along with E/F & O/C relays, control and power supply
cabling in trench between field equipment and
panels, Mimic Diagram, Voltmeter, Ammeter,
Annunciation Windows with annunciation relays and
other components etc as per approved drawings,
technical specifications and scope of the work for
controlling complete in all respect
33 kV feeder Panel (without diffirential relays) with
DLMS (modem compactible ) Trivector Static Energy
Meter complete
No
33 kV Transformer Panel (with diffirential relays) with
DLMS (modem compactible ) Trivector Static Energy
Meter complete
No
17
Design, Engineering and construction , Erection,
testing and commissioning of 36kV, 800 A, 25kA , 3ph double break center rotating type (DBCR), Gang
Operated, isolator along with Support Insulators,
Operating Mechanism, Base Channel down Pipe and
all required accessories complete as per approved
drawings, technical specifications and scope of the
work,(with and without Earth Switch)
Set
18
Design, Engineering , Erection, testing and
Commissioning of 30 kV, 10kA, 1-ph Station Class
Lightening Arresters with mounting on erected
structures, jumpering from bus bar, earthing
connection using 50x6mm GS flat, hardware etc as
required, as per approved drawings, technical
specifications and scope of the work complete in all
respect (1 Set= 3 Nos)
Set
19
Design, Engineering, Erection, testing and
Commissioning of 9kV, 10kA, 1-ph Station Class
Lightening Arrester with mounting on erected
structure, jumpering from bus bar, earthing
connection using 50x6mm GS flat, hardware, etc as
required as per approved drawings, technical
specifications and scope of the work. (1 Set=3 Nos)
Set
20
Design, Engineering and construction , Erection,
testing and Commissioning of 36 kV, 1-Phase,
33kV/110 volt, Single core outdoor type Potential
transformer along with junction box (1 no junction
box for 3 no of 1-phase PTs) including control and
power supply cabling, earthing connection using
50x6mm GS flat and required accessories etc.,
complete as per as per approved drawings, technical
specifications and scope of the work,
Set
21
Design, Engineering and construction , erection,
wiring, testing and commissioning of 12 kV, 1250
A/630 A , 25kA, 3-ph, indoor type Vacuum Circuit
breaker along with 12 kV, 1-Phase, 25kA for 3
seconds, 600-300-150/5-5 A and 1200-600-300/1-1-1
A CT , PT, and along with control and relay panel
consisting of Ammeter, volt-meter, E/F, O/C ,diff.
Relay and 3 Phase Energy meter & accessories
complete cabling between VCB and indoor control
panel and required accessories complete as per
approved drawings, technical specifications and
scope of the work,
For Transformer Protection
No
For Feeder Protection
No
For Bus Coupler
No
22
Installation, initial charging, cabling, interconnection
cabling, testing and commissioning of 30 V, 100 AH
Pb Acid battery on battery stand made of teak wood
duly painted with anti acid resistive paint, battery
insulators, inter-battery wiring using 30 sqm copper
single core multi strand cable, terminal connectors, &
all other accessories and connectors as per as per
approved drawings, technical specifications and
scope of the work complete in all respect,
Set
23
Design, engineering, construction , Installation,
interconnection cabling, testing and commissioning
of 30V, 40 Amp. Float-Cum-Boost Battery Charger
with full wave rectification for 230 V, 1 phase, 50 Hz
AC Input Supply with DCDB (as per supply schedule)
as per approved drawings, technical specifications
and scope of the work complete in all respect
No
24
Design, engineering, construction , Installation,
interconnection cabling, testing and commissioning
of 30V Supply DCDB as per approved drawings,
technical specifications and scope of the work &
supply schedule complete in all respect.
No
25
Design, engineering, construction , Installation,
interconnection cabling, testing and commissioning
of 433V, ACDB as per approved drawings, technical
specifications and scope of the work,
No
25
Excavation, laying, welding, refilling, earthing &
grounding of MS Flat as per Approved drawing and
erection of riser up to various equipment/structures
as per scope of the work, specifications and
approved drawings,
75 x 8 mm MS flat for ground mat
MT
50 x 6 mm Galvanized GS flat (risers)
MT
25 mm dia MS Rod 3 m long for earth mat
MT
26
Excavation, erection, testing and commissioning of
40 mm dia., 3000 mm long GI pipe earth electrode
by providing test link, RCC pit, RCC cover, placed on
GI frame, Charcoal & Salt in alternate layer as per
REC Specification and other accessories complete as
per approved drawings, technical specifications and
scope of the work for power transformer neutral,
station transformer neutral, lightening arresters
direct earthing.
Set
27
Erection, testing and commissioning of Bus Bar,
jumpering and Dropper (Zebra Conductor), by using
all types of insulators, clamps and connectors etc.
with all accessories complete in all respect.
Per PSS
28
Erection, testing and commissioning of Sub-Station
Lighting System (External+Internal) with proper
illumination levels complete for Switchyard, Control
Room building, Main gate and Sub station boundary
including all associated materials etc complete in all
respect as per applicable TS and approved drawing.
Per PSS
29
Erection, testing and commissioning of Fire Fighting
Equipment as per Supply Schedule
Set
30
Design, engineering,Erection, testing and
commissioning ofFully automatic Capacitor bank with
automatic control panel, isolator,indoor type suitable
Vacuum Circuit Breaker, mounting structures, All
types of cable (11 KV grade 185 sqmm, XLPE &
control cable etc.) & its accessories complete ,
earthing etc as required as per technical
specifications, approved drawings, scope of the
works of following capacities: (Banks in Muiltiple of
600 KVAR as per REC Specification)
1200 KVAr
Set
3600 KVAr
Set
31
Erection, testing and commissioning of All types
control cable and LT power cable required for the
commissioning of sub-station
32
Laying & termination, Testing and commissioning of
11 KV grade, XLPE, power cable armored, aluminium
conductor, stranded complete in all respect as per
Technical Specification.
Per PSS
1Cx 630 sqmm (Un -armoured)
km
3Cx 185 sqmm (armoured)
km
3Cx35 Sqmm (Un -armoured)
km
33
Design, Engineering and construction , Erection,
testing and commissioning of 12 kV, 630 A, 25 kA, 3ph double break center rotating type (DBCR), Gang
Operated, isolator along with Support Insulators,
Operating Mechanism, Base Channel down Pipe and
all required accessories complete as per approved
drawings, technical specifications and scope of the
work, (with and without earth Switch)
Set
34
Erection, testing & commissioning of pipe bus by
using IPS Aluminium Pipe 65 mm. dia.with all types of
Clamps and Connectors and insulator as per TS &
approved drawings
Mtr.
Sub Total
Additional/Augmentation of Power Transformers
No
Additional/Augmentation of Power Transformers
No
Civil works: Design, supply of all material, T&P,
labour etc for the following civil works complete as
per TS
Earth Filling & Site Levelling
Cu.m
Gravel filling in switchyard area excluding road and
footpath as per TS.
Sq. m
Design, engineering and construction of Cable Trench
of 0.75 Mtr wide , 1.0 Mtr. depth, precast RCC Trench
Cover, Water stops, Brick Work wherever required
including supply of T&P, Labour, Cement, Sand,
Reinforcement Steel, Steel Angles, Flats, Form Work,
Excavation and providingcement plaster (1:4)
including floating coat of cement punning (1.5 MM)
with clean pores sand etc, all complete as per
Technical Specification, approved Drawing and as per
direction of Engineer in Charge. (Payment will be
made as per actual requirement per Mtr.)
Mtr
Design, engineering and construction of Drainage
System in the Substation premises including supply
of T&P, Labour, Cement, , bricks, Form Work,
Excavation etc, all complete as per design, Technical
Specification and Tender Drawings in all 33/11 kV
new sub-station as per direction of Engineer in
Charge. (Payment will be made as per actual
requirement per Mtr.)
Substation works
Design, Engineering and construction of transformer
foundation, erection, filtration, testing and
commissioning of 33/11 kV, 3 ph, 50 Hz, ONAN, Cu
Wound, Outdoor Conventional type Power
Transformer along with transformer oil , Buchholtz
relay, breather, OTI & WTI, Marshalling Box,
Conservator tank, oil level indicator, valves, 2 sets of
50x8 mm GS Neutral Earthing strips with braided
conductor on bushing end supported with insulators,
OTI & WTI Indicators, Vent explosion plug, control
wiring / cabling, cable supporting tray on the body,
transformer wheels, bushing and extended copper
connector made of 50x10 mm copper flat for
connection of 11 KV side bushing with suitable bolts
nuts and washers of Brass etc as required . 2 sets of
body earthing with 50x8 mm GS Strip as per TS and
as per direction of Engineer in Charge.
5 MVA
Set
10 MVA
Set
Mtr
Dismantaling, Transportation from existing site to
proposed site, Installation, Erection, Testing and
Commisiioning of 5 MVA released Power Transformers
with suitable Clamps, Connectors, bolts nuts and
washers of Brass etc as required with 2 sets each of
body & neutral earthing with 50x8 mm GS Strip as
per TS completely required for commissioning.
Set
Modification of existing Power Transformer foundation
required for installation and commissionig of
augmented 5/10 MVA Power Transformers completely
as per TS. (As per requirement)
Nos
Design, Engineering , erection, testing and
commissioning of 36kV, 1250A, 25kA for 3 seconds,
3-ph, Outdoor type Vacuum Circuit breaker along
with 36kV, 1-Phase, 25kA for 3 seconds, 800-400200/1-1-1 Amp.or 800-400-200/1-1, Amps outdoor
type Current Transformer along with junction box (1
no junction box for 3 no of 1-phase CTs)], Jumpers,
earthing, supporting structures, maintenance
platform, marshalling box, control & Power cabling
between VCB and indoor control panel and required
accessories complete as per approved drawings,
technical specifications, scope of the work and as per
direction of Engineer in Charge. (For released Power
Transformers)
Nos
Excavation, erection, cement concrete foundation,
erection, testing and commissioning of all type of
structures i.e. Swing bus/isolator/VCB/CT/PT/PI
structure etc. made of joist / channel / angle / flat of
different sections as per approved drawings
MT
10
Design, Engineering and construction of VCB
foundation , erection, testing and commissioning of
36kV, 1250A, 25kA for 3 seconds, 3-ph, Outdoor
type Vacuum Circuit breaker along with 36kV, 1Phase, 25kA for 3 seconds, 800-400-200/1-1-1
Amp.or 800-400-200/1-1, Amps outdoor type Current
Transformer along with junction box (1 no junction
box for 3 no of 1-phase CTs)], Jumpers, earthing,
supporting structures, maintenance platform,
marshalling box, control & Power cabling between
VCB and indoor control panel and required
accessories complete as per approved drawings,
technical specifications and scope of the work.
11
Design, Engineering providing and installation of
ISMC 75 channel on top of indoor trench, erection of
panels on ISMC 75 channels, welding, testing and
commissioning of 33kV indoor Control & Relay panel
along with E/F & O/C relays, control and power supply
cabling in trench between field equipment and
panels, Mimic Diagram, Voltmeter, Ammeter,
Annunciation Windows with annunciation relays and
other components etc as per approved drawings,
technical specifications and scope of the work for
controlling:
12
33 kV Transformer VCB (with diffirential relays)
Design, Engineering and construction , Erection,
testing and commissioning of 36kV,800 A, 25kA, 3-ph
double break center rotating type (DBCR), Gang
Operated, isolator along with Support Insulators,
Operating Mechanism, Base Channel down Pipe and
all required accessories complete as per approved
drawings, technical specifications and scope of the
work, (with and without Earth Switch)
Set
No
Set
13
Design, Engineering and construction , erection,
testing and commissioning of 12kV, 1250A, 25kA for
3 seconds, 3-ph, Outdoor type Vacuum Circuit
breaker along with 12kV, 1-Phase, 25kA for 3
seconds, 1200-600-300/1-1-1 Amp.(having 3
secondary core), outdoor type Current Transformer
along with junction box (1 no junction box for 3 no of
1-phase CTs)], Jumpers, earthing, supporting
structures, maintenance platform, marshalling box,
control & Power cabling between VCB and indoor
control panel and required accessories complete as
per approved drawings, technical specifications and
scope of the work.
Set
14
12 KV Control & Relay panel for 12 KV VCB (suitable
for 30 V DC tripping/closing coil and associated
control Circuitry) alongwith, ElF & O/C relays, Static
energy meter (class 0.5 with communication port) ,
Mimic Diagram, Voltmete, Ammeter, etc complete as
per REC
No
15
Excavation, laying, welding, refilling, earthing &
grounding of conductor as per Approved Electrical
Layout for each sub station with ten no of treated
40mm dia, 3000 mm long GI pipe (Medium gauge)
earth electode by providing test link, RCC pit, RCC
cover, placed on GI frame, Charcoal & Salt in
alternate layer as per REC Specification and other
accessories complete as per approved drawings,
technical specifications and scope of the work for
power transformer neutral, station transformer
neutral up to various equipment/structures as per
scope of the work, specifications and approved
drawings etc (treated earthing)
Set per
Power
Transform
er bay
16
Erection, testing and commissioning of Bus Bar,
jumpering and Dropper (Zebra conductor), by using
all types of insulators, clamps and connectors etc.
with all accessories complete in all respect.
17
Design, Engineering and construction , Erection,
testing and commissioning of 12 kV, 630 A, 25 kA , 3ph double break center rotating type (DBCR), Gang
Operated, isolator along with Support Insulators,
Operating Mechanism, Base Channel down Pipe and
all required accessories complete as per approved
drawings, technical specifications and scope of the
work,
Set
18
Dismentling of existing dismentled materials and
devolution of the dismantled materials including
storage, handling, insurance, loading, unloading,
transportation to store of Utility as per the direction
of Engineer-in-charge with propoer accounting as per
the inventory.
Per
Transformer
Per Power
Transform
er Bay
Sub Total
Erection, testing commissioning of NEW 33 KV Line
on rail pole with ACSR wolf Conductor
Survey, route alignment & pole spotting, preparation
of survey report after approval of Engineer-in-charge
& redressal of ROW issues.
Excavation of pit, foundation, erection of following
Support for 33 KV overhead line (by installing danger
board and barbed Wires on DP/TP/FP Structures) and
pole numbering as per scope of work, approved
drawings and Technical specifications:
CKm
13 m long 52 Kg/mtr. Rail Pole (Painted with 2 coat
Red oxide, 2 coat Al-Paint and 1/6th part of the Rail
pole from bottom with Black enamel paint cf
Reputed make) including fixing of (RCC Base Plate
of size 500x500x100 mm./Stone Base Plate of Size
450x450x50mm) with cement concreting foundation
and top mopping (1:4:8) (0.65 cmt per pole).
No.
Erection of galvanised fabricated steel materialsChannels, angle, flats for over head line structures by
using Bolts, Nuts, Washer etc as per approved
drawing and TS
Kg
Erection, testing and commissioning of ACSR Wolf
Conductor including mid point jointing sleeves fixing
and jumpering, binding of conductor with pin
insulator and disc insulator by providing and using
Aluminium tape at DP and all cut-points and angle
points by using PG Clamp etc. including fixing &
fitting of Danzer board, barbed wire at DP/TP/FP as
required (1 CKm= 1 km line length of 3 phase
conductor)
CKM
Erection, testing and commissioning of 33 KV
porcelain Disc insulator assembly (1 set DI= 3 nos
DI) 70 KN along with HW fittings complete by
providing Al. Tape in all respect as per TS & approved
drawings.
Set
Erection, Testing and Commissioning of 33 KV
porcelain Pin Insulators with GI PIN complete in all
respect as per TS & approved drawings.
Set
Earthing
a)
Excavation, Erecting, Testing and Commissioning of
Pipe type untreated earthing by providing & using 8
SWG GI wire for connections complete in all respect
and approved drawing as per TS.
Set
b)
Excavation, Erecting, Testing and Commissioning of
Coil type untreated earthing by providing & using 8
SWG GI wire for connections complete in all respect
and approved drawing as per TS.
Set
Excavation, Foundation and erection of galvanised
Stay Set complete in all respect as per supply
schedule by providing 0.2 cum cement concrete
(1:4:8) PCC foundations as per scope of work,
specifications and approved drawings.
Set
Design, Engineering and construction , Erection,
testing and commissioning of 36kV, 800 A, 25kA , 3ph double break center rotating type (DBCR), Gang
Operated, isolator along with Support Insulators,
Operating Mechanism, Base Channel down Pipe and
all required accessories complete as per approved
drawings, technical specifications and scope of the
work,(with and without Earth Switch)
Set
Sub-Total
Erection, testing commissioning of Reconductoring
of 33 KV Line By ACSR Wolf Conductorr
Survey, route alignment & pole spotting, preparation of
survey report , Inventory after approval of Engineer-incharge & redressal of ROW issues.
Excavation of pit, foundation, erection of following
Support for 33 KV overhead line by providing and
installing danger board and barbed Wires on DP/TP/FP
Structures and pole numbering as per scope of work,
approved drawings and Technical specifications:
CKm
11 m long 52 Kg/mtr. Rail Pole (Painted with 2 coat Red
oxide, 2 coat Al-Paint and 1/6th part of the Rail pole from
bottom with Black enamel paint cf Reputed make)
including fixing of (RCC Base Plate of size 500x500x100
mm./Stone Base Plate of Size 450x450x50mm) with
cement concreting foundation and top mopping (1:4:8)
(0.54 cmt per pole).
No.
13 m long 52 Kg/mtr. Rail Pole (Painted with 2 coat Red
oxide, 2 coat Al-Paint and 1/6th part of the Rail pole from
bottom with Black enamel paint cf Reputed make)
including fixing of RCC/Stone Base plate (500X500X100
mm) with cement concreting foundation and top mopping
(1:4:8) (0.65 cmt per pole).
Kg
PSC Pole 9 Mtr 400 Kg including fixing of RCC Base plate
(500x500x100 mm) with brick blast or boulder refilling
(50% depth of pole pit) and ramming foundation with
excavated soil with pouring water as required as per
scope of work , approved drawing & technical
specification. Fixing of Danger Board on DP/TP/FP & Pole
numbering.
Nos
Erection of galvanised fabricated steel materialsChannels, angle, flats for over head line structures by
providing and using Bolts, Nuts, Washer etc as per
approved drawing and TS
Kg
Erection, testing and commissioning of ACSR Wolf
Conductor including mid point jointing sleeves fixing and
jumpering, binding of conductor with pin insulator and
disc insulator by providing and using Aluminium tape at
DP and all cut-points and angle points by using PG Clamp
etc. as required (1 CKm= 1 km line length of 3 phase
conductor)
CKM
Erection, testing and commissioning of 33 KV porcelain
Disc insulator 70 KN along with HW fittings complete in all
respect as per TS & approved drawings.
Set
Erection, Testing and Commissioning of 33 KV porcelain
Pin Insulators with GI PIN complete in all respect as per TS
& approved drawings.
Set
Earthing
a)
Excavation, Erecting, Testing and Commissioning of Pipe
type untreated earthing by providing & using 8 SWG GI
wire for connections complete in all respect and approved
drawing as per TS.
Set
b)
Excavation, Erecting, Testing and Commissioning of Coil
type untreated earthing by providing & using 8 SWG GI
wire for connections complete in all respect and
approved drawing as per TS.
Set
Excavation, Foundation and erection of galvanised Stay
Set complete in all respect as per supply schedule by
providing 0.2 cum cement concrete (1:4:8) PCC
foundations as per scope of work, specifications and
approved drawings.
Set
Dismentling of existing defective/damaged polesupport (Rail/joist/tubular),conductor and other
dismantled line materials from existing line and
devolution of the dismentled pole, structure,
conductor and other line materials including storage,
handling, insurance, loading, unloading,
transportation to designated store of Utility as per
the direction of Engineer-in-charge and handing over
the pole and other dismentled material to the store
of Utility with propoer accounting as per the
inventory.
Ckm
Sub Total
33 KV Bay Extension
Excavation, erection, cement concrete foundation,
erection, testing and commissioning of all type of
structures i.e. Gantry/Swing bus/isolator/VCB/CT/PT/PI
structures etc. made of Lattice structures of equal
angles sections, flat as per approved drawings.
MT
Design, Engineering and construction , erection,
testing and commissioning of 36kV, 1250A, 25kA for
3 seconds, 3-ph, Outdoor type Vacuum Circuit
breaker along with 36kV, 1-Phase, 25kA for 3
seconds, 800-400-200/1-1-1 Amp. outdoor type
Current Transformer along with junction box (1 no
junction box for 3 no of 1-phase CTs)], Jumpers,
earthing, supporting structures, maintenance
platform, marshalling box, control & Power cabling
between VCB and indoor control panel and required
accessories complete as per approved drawings,
technical specifications and scope of the work.
Set
Design, Engineering providing and installation of
ISMC 75 channel on top of indoor trench, erection of
panels on ISMC 75 channels, welding, testing and
commissioning of 33kV indoor Control & Relay panel
along with E/F & O/C relays, control and power supply
cabling in trench between field equipment and
panels, Mimic Diagram, Voltmeter, Ammeter,
Annunciation Windows with annunciation relays and
other components etc as per approved drawings,
technical specifications and scope of the work for
controlling:
33 kV VCB (without diffirential relays) and DLMS
Trivector Static Energy Meter complete.
No
Design, Engineering and construction , Erection,
testing and commissioning of 36kV, 800 A, 25kA 3ph double break center rotating type (DBCR), Gang
Operated, isolator along with Support Insulators,
Operating Mechanism, Base Channel down Pipe and
all required accessories complete as per approved
drawings, technical specifications and scope of the
work,
Set
Erection, testing and commissioning of Bus Bar,
jumpering and Dropper (Zebra Conductor), by using
all types of insulators, clamps and connectors, Al
tape etc. with all accessories complete in all respect.
Per Bay
Design, Engineeringi , Erection, testing and
Commissioning of 30 kV, 10kA, 1-ph Station Class
Lightening Arresters with mounting on erected
structures, jumpering from bus bar, earthing
connection using 50x6mm GS flat, hardware etc as
required, as per approved drawings, technical
specifications and scope of the work,
3a
Set
Excavation, laying, welding, refilling, earthing &
grounding of MS Flat as per Approved drawing and
erection of riser up to various equipment/structures
as per scope of the work, specifications and
approved drawings,
Excavation, erection, testing and commissioning of
40 mm dia., 3000 mm long GI pipe earth electrode
by providing test link, RCC pit, RCC cover, placed on
GI frame, Charcoal & Salt in alternate layer as per
REC Specification and other accessories complete as
per approved drawings, technical specifications and
scope of the work for power transformer neutral,
station transformer neutral, lightening arresters
direct earthing.
Set
Design, engineering and construction of Cable Trench
of 0.75 Mtr wide , 1.0 Mtr. depth, precast RCC Trench
Cover, Water stops, Brick Work wherever required
including supply of T&P, Labour, Cement, Sand,
Reinforcement Steel, Steel Angles, Flats, Form Work,
Excavation and providingcement plaster (1:4)
including floating coat of cement punning (1.5 MM)
with clean pores sand etc, all complete as per
Technical Specification, approved Drawing and as per
direction of Engineer In Charge (payment will be
made as per actual requirement per Mtr.)
Mtr
Sub Total
33 KV Railway Crossing (Double Circuit)
LS per
bay
Laying,termination, Erection, Testing &
commissioning of 33 KV grade 3-core 400 Sqmm
XLPE power cable (Double Circuit) for underground
Railway Crossing including using jointing/Termination
Kit, GI pipe, CI pipe, clamps, conectors bolts, nuts,
fixing and fitting of barbed wire, pipe earthing etc.
with all accessories complete in all respect as per
TS/ approved drawing
Mtr
Sub Total
H
33 KV Metering System
Erection, testing, commissioning of 33 kV Metering
system along with DLMS Static Trivector Energy
Meter alongwith combined CT- PT metering unit
33KV/110 V, CT ratio-800-400/1A with bimetalic
connectors and DLMS Static Trivector feeder meter
with communication port of 33 KV/110 v of CT ratio400/1 A with 12cx2.5 Sqmm Control Cable complete
alongwith earthing and all associated accessories
complete in all respest
No
Sub Total
I
Construction of Single Circuit 11 KV Line with
ACSR Dog Conductor on Rail Pole :
Survey, route alignment & pole spotting, preparation
of survey report after approval of Engineer-in-charge
& redressal of ROW issues.
Excavation of pit, foundation, erection of following
Support for 11 KV overhead line by installing danger
board and barbed wire on DP/TP/FP structure and
pole numbering as per scope of work, approved
drawings and technical specifications:
CKm
13 m long 52 Kg/mtr. Rail Pole (Painted with 2 coat
Red oxide, 2 coat Al-Paint and 1/6th part of the Rail
pole from bottom with Black enamel paint cf
Reputed make) including fixing of (RCC Base Plate of
size 500x500x100 mm./Stone Base Plate of Size
450x450x50mm) with cement concreting foundation
and top mopping (1:4:8) (0.65 cmt per pole).
No.
Erection of galvanised fabricated steel materialsChannels, angle, flats for over head line structures by
using Bolts, Nuts, Washer etc as per approved
drawing and TS
Kg
Erection, testing and commissioning of ACSR Dog
Conductor including mid point jointing sleeves fixing
and jumpering by using PG clamp, binding of
conductor (by providing & using Al. tape) with pin
insulator and disc insulator at DP and all cut-points
and angle points etc. as required (1 CKm= 1 km line
length of 3 phase conductor)
CKM
Erection, testing and commissioning of 11 KV
porcelain Disc insulator 45 KN along with HW fittings
complete in all respect as per TS & approved
drawings.
Set
Erection, Testing and Commissioning of 11 KV
porcelain Pin Insulators with GI PIN complete in all
respect as per TS & approved drawings.
Set
Earthing
a)
Excavation, Erecting, Testing and Commissioning of
Pipe type untreated earthing by providing & using 8
SWG GI wire, pipe clamp, bolts& Nuts etc. for
connections as per TS/ REC construction standard.
Set
b)
Excavation, Erecting, Testing and Commissioning of
Coil type untreated earthing by providing & using 8
SWG GI wire, pipe clamp, bolts& Nuts etc. for
connections as per TS/ REC construction standard.
Set
Excavation and erection of galvanised Stay Set as
per supply schedule by providing 0.2 cum cement
concrete (1:4:8) PCC foundations as per scope of
work, specifications and approved drawings.
Set
Erection, Testing and Commissioning of 12 kV AB
Switch along with Support Insulators, Base Channel
down Pipe, Arcing Horns etc. complete as per
technical specifications, scope of works and
approved drawings
Set
Sub-Total
J
11 KV Lines on 13 M 52 Kg /M Rail Pole with ACSR
Dog Conductor (Double Circuit)
Survey, route alignment & pole spotting, preparation
of survey report after approval of Engineer-in-charge
& redressal of ROW issues.
Excavation of pit, foundation, erection of following
Support for 11 KV overhead line by installing danger
board and barbed wire on DP/TP/FP structure and
pole numbering as per scope of work, approved
drawings and technical specifications:
13 m long 52 Kg/mtr. Rail Pole (Painted with 2 coat
Red oxide, 2 coat Al-Paint and 1/6th part of the Rail
pole from bottom with Black enamel paint cf
Reputed make) including fixing of (RCC Base Plate
of size 500x500x100 mm./Stone Base Plate of Size
450x450x50mm) with cement concreting foundation
and top mopping (1:4:8) (0.65 cmt per pole).
No.
Erection of galvanised fabricated steel materialsChannels, angle, flats for over head line structures by
using Bolts, Nuts, Washer etc as per approved
drawing and TS
Kg
CKm
Erection, testing and commissioning of ACSR Dog
Conductor including mid point jointing sleeves fixing
and jumpering, binding of conductor with pin
insulator and disc insulator by providing and using
Aluminium tape at DP and all cut-points and angle
points by using PG Clamp etc. including fixing &
fitting of Danzer board, barbed wire at DP/TP/FP as
required (1 CKm= 1 km line length of 3 phase
conductor)
CKM
Erection, testing and commissioning of 11 KV
porcelain Disc insulator 45 KN along with HW fittings
complete in all respect as per TS & approved
drawings.
Set
Erection, Testing and Commissioning of 11 KV
porcelain Pin Insulators with GI PIN complete in all
respect as per TS & approved drawings.
Set
Earthing
a)
Excavation, Erecting, Testing and Commissioning of
Pipe type untreated earthing by providing & using 8
SWG GI wire, pipe clamp, bolts& Nuts etc. for
connections as per TS/ REC construction standard.
Set
b)
Excavation, Erecting, Testing and Commissioning of
Coil type untreated earthing by providing & using 8
SWG GI wire, pipe clamp, bolts& Nuts etc. for
connections as per TS/ REC construction standard.
Set
Excavation and erection of galvanised Stay Set as
per supply schedule by providing 0.2 cum cement
concrete (1:4:8) PCC foundations as per scope of
work, specifications and approved drawings.
Set
Sub-Total
K
Construction of Single Circuit 11 KV Line with ACSR
Dog Conductor on 9 M, 400 Kg PSC Pole :
Survey, route alignment & pole spotting, preparation
of survey report after approval of Engineer-in-charge
& redressal of ROW issues.
Excavation of pit, foundation, erection of following
Support for 11 KV overhead line by installing danger
board and barbed wire on DP/TP/FP structure and
pole numbering as per scope of work, approved
drawings and technical specifications:
PSC Pole 9 Mtr 400 Kg including fixing of (RCC Base
Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work , approved drawing &
technical specification. Fixing of Danger Board on
DP/TP/FP & Pole numbering.
No.
Erection of galvanised fabricated steel materialsChannels, angle, flats for over head line structures by
using Bolts, Nuts, Washer etc as per approved
drawing and TS
Kg
Erection, testing and commissioning of ACSR Dog
Conductor including mid point jointing sleeves fixing
and jumpering, binding of conductor with pin
insulator and disc insulator by providing and using
Aluminium tape at DP and all cut-points and angle
points by using PG Clamp etc. including fixing &
fitting of Danzer board, barbed wire at DP/TP/FP as
required (1 CKm= 1 km line length of 3 phase
conductor)
CKM
Erection, testing and commissioning of 11 KV
porcelain Disc insulator 45 KN along with HW fittings
complete in all respect as per TS & approved
drawings.
Set
Erection, Testing and Commissioning of 11 KV
porcelain Pin Insulators with GI PIN complete in all
respect as per TS & approved drawings.
Set
CKm
Earthing
Excavation, Erecting, Testing and Commissioning of
Pipe type untreated earthing by providing & using 8
SWG GI wire, pipe clamp, bolts& Nuts etc. for
connections as per TS/ REC construction standard.
Set
Excavation, Erecting, Testing and Commissioning of
Coil type untreated earthing by providing & using 8
SWG GI wire, pipe clamp, bolts& Nuts etc. for
connections as per TS/ REC construction standard.
Set
Excavation and erection of galvanised Stay Set as
per supply schedule by providing 0.2 cum cement
concrete (1:4:8) PCC foundations as per scope of
work, specifications and approved drawings.
Set
Erection, Testing and Commissioning of 12 kV AB
Switch along with Support Insulators, Base Channel
down Pipe, Arcing Horns etc. complete as per
technical specifications, scope of works and
approved drawings
Set
Sub-Total
L
11 KV Lines on 9 mtr./400 kgs PSC pole with ACSR
Rabbit conductor
Survey, route alignment & pole spotting, preparation
of survey report after approval of Engineer-in-charge
& redressal of ROW issues.
Excavation of pit, foundation, erection of following
Support for 11 KV overhead line by installing danger
board and barbed wire on DP/TP/FP structure and
pole numbering as per scope of work, approved
drawings and technical specifications:
CKm
PSC Pole 9 Mtr 400 Kg including fixing of (RCC Base
Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work , approved drawing &
technical specification. Fixing of Danger Board on
DP/TP/FP & Pole numbering.
No.
Erection of galvanised fabricated steel materialsChannels, angle, flats for over head line structures by
using Bolts, Nuts, Washer etc as per approved
drawing and TS
Kg
Erection, testing and commissioning of ACSR Rabbit
Conductor including mid point jointing sleeves fixing
and jumpering, binding of conductor with pin
insulator and disc insulator by providing and using
Aluminium tape at DP and all cut-points and angle
points by using PG Clamp etc. including fixing &
fitting of Danzer board, barbed wire at DP/TP/FP as
required (1 CKm= 1 km line length of 3 phase
conductor)
CKM
Erection, testing and commissioning of 11 KV
porcelain Disc insulator 45 KN along with HW fittings
complete in all respect as per TS & approved
drawings.
Set
Erection, Testing and Commissioning of 11 KV
porcelain Pin Insulators with GI PIN complete in all
respect as per TS & approved drawings.
Set
Earthing
Excavation, Erecting, Testing and Commissioning of
Pipe type untreated earthing by providing & using 8
SWG GI wire, pipe clamp, bolts& Nuts etc. for
connections as per TS/ REC construction standard.
Set
Excavation, Erecting, Testing and Commissioning of
Coil type untreated earthing by providing & using 8
SWG GI wire, pipe clamp, bolts& Nuts etc. for
connections as per TS/ REC construction standard.
Set
Excavation and erection of galvanised Stay Set as
per supply schedule by providing 0.2 cum cement
concrete (1:4:8) PCC foundations as per scope of
work, specifications and approved drawings.
Set
Erection, Testing and Commissioning of 12 kV AB
Switch along with Support Insulators, Base Channel
down Pipe, Arcing Horns etc. complete as per
technical specifications, scope of works and
approved drawings
Set
Sub-Total
M
11 KV Lines on 8 m/ 200 kgs PSC pole with Rabbit
conductor
Survey, route alignment & pole spotting, preparation
of survey report after approval of Engineer-in-charge
& redressal of ROW issues.
Excavation of pit, foundation, erection of following
Support for 11 KV overhead line by installing danger
board and barbed wire on DP/TP/FP structure and
pole numbering as per scope of work, approved
drawings and technical specifications:
PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base
Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work , approved drawing &
technical specification. Fixing of Danger Board on
DP/TP/FP & Pole numbering.
CKm
No.
Erection of galvanised fabricated steel materialsChannels, angle, flats for over head line structures by
using Bolts, Nuts, Washer etc as per approved
drawing and TS
Kg
Erection, testing and commissioning of ACSR Rabbit
Conductor including mid point jointing sleeves fixing
and jumpering, binding of conductor with pin
insulator and disc insulator by providing and using
Aluminium tape at DP and all cut-points and angle
points by using PG Clamp etc. including fixing &
fitting of Danzer board, barbed wire at DP/TP/FP as
required (1 CKm= 1 km line length of 3 phase
conductor)
CKM
Erection, testing and commissioning of 11 KV
porcelain Disc insulator 45 KN along with HW fittings
complete in all respect as per TS & approved
drawings.
Set
Erection, Testing and Commissioning of 11 KV
porcelain Pin Insulators with GI PIN complete in all
respect as per TS & approved drawings.
Set
Earthing
Excavation, Erecting, Testing and Commissioning of
Pipe type untreated earthing by providing & using 8
SWG GI wire, pipe clamp, bolts& Nuts etc. for
connections as per TS/ REC construction standard.
Set
Excavation, Erecting, Testing and Commissioning of
Coil type untreated earthing by providing & using 8
SWG GI wire, pipe clamp, bolts& Nuts etc. for
connections as per TS/ REC construction standard.
Set
Excavation and erection of galvanised Stay Set as
per supply schedule by providing 0.2 cum cement
concrete (1:4:8) PCC foundations as per scope of
work, specifications and approved drawings.
Set
Erection, Testing and Commissioning of 12 kV AB
Switch along with Support Insulators, Base Channel
down Pipe, Arcing Horns etc. complete as per
technical specifications, scope of works and
approved drawings
Set
Sub-Total
N
11 KV Lines on 8 mtr./ 200 kgs PSC pole with ACSR
Weasel conductor
Survey, route alignment & pole spotting, preparation
of survey report after approval of Engineer-in-charge
& redressal of ROW issues.
Excavation of pit, foundation, erection of following
Support for 11 KV overhead line by installing danger
board and barbed wire on DP/TP/FP structure and
pole numbering as per scope of work, approved
drawings and technical specifications:
PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base
Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work , approved drawing &
technical specification. Fixing of Danger Board on
DP/TP/FP & Pole numbering.
No.
Erection of galvanised fabricated steel materialsChannels, angle, flats for over head line structures by
using Bolts, Nuts, Washer etc as per approved
drawing and TS
Kg
CKm
Erection, testing and commissioning of ACSR Weasel
Conductor including mid point jointing sleeves fixing
and jumpering, binding of conductor with pin
insulator and disc insulator by providing and using
Aluminium tape at DP and all cut-points and angle
points by using PG Clamp etc. including fixing &
fitting of Danzer board, barbed wire at DP/TP/FP as
required (1 CKm= 1 km line length of 3 phase
conductor)
CKM
Erection, testing and commissioning of 11 KV
porcelain Disc insulator 45 KN along with HW fittings
complete in all respect as per TS & approved
drawings.
Set
Erection, Testing and Commissioning of 11 KV
porcelain Pin Insulators with GI PIN complete in all
respect as per TS & approved drawings.
Set
Earthing
Excavation, Erecting, Testing and Commissioning of
Pipe type untreated earthing by providing & using 8
SWG GI wire, pipe clamp, bolts& Nuts etc. for
connections as per TS/ REC construction standard.
Set
Excavation, Erecting, Testing and Commissioning of
Coil type untreated earthing by providing & using 8
SWG GI wire, pipe clamp, bolts& Nuts etc. for
connections as per TS/ REC construction standard.
Set
Excavation and erection of galvanised Stay Set as
per supply schedule by providing 0.2 cum cement
concrete (1:4:8) PCC foundations as per scope of
work, specifications and approved drawings.
Set
Erection, Testing and Commissioning of 12 kV AB
Switch along with Support Insulators, Base Channel
down Pipe, Arcing Horns etc. complete as per
technical specifications, scope of works and
approved drawings
Set
Sub-Total
Reconductoring of 11 KV Line With ACSR Dog
Conductor on Rail pole
Survey, route alignment & pole spotting, preparation
of survey report , Inventory after approval of
Engineer-in-charge & redressal of ROW issues.
Excavation of pit, foundation, erection of following
Support for 11 KV overhead line by providing and
installing danger board and barbed Wires on
DP/TP/FP Structures and pole numbering as per
scope of work, approved drawings and Technical
specifications:
13 m long 52 Kg/mtr. Rail Pole (Painted with 2 coat
Red oxide, 2 coat Al-Paint and 1/6th part of the Rail
pole from bottom with Black enamel paint cf
Reputed make) including fixing of RCC/Stone Base
plate (500X500X100 mm) with cement concreting
foundation and top mopping (1:4:8) (0.65 cmt per
pole).
No.
11 m long 52 Kg/mtr. Rail Pole (Painted with 2 coat
Red oxide, 2 coat Al-Paint and 1/6th part of the Rail
pole from bottom with Black enamel paint cf
Reputed make) including fixing of (RCC Base Plate
of size 500x500x100 mm./Stone Base Plate of Size
450x450x50mm) with cement concreting foundation
and top mopping (1:4:8) (0.54 cmt per pole).
No.
Erection of galvanised fabricated steel materialsChannels, angle, flats for over head line structures by
using Bolts, Nuts, Washer etc as per approved
drawing and TS
Kg
CKm
Erection, testing and commissioning of ACSR Dog
Conductor including mid point jointing sleeves fixing
and jumpering, binding of conductor with pin
insulator and disc insulator by providing and using
Aluminium tape at DP and all cut-points and angle
points by using PG Clamp etc. including fixing &
fitting of Danzer board, barbed wire at DP/TP/FP as
required (1 CKm= 1 km line length of 3 phase
conductor)
CKM
Erection, testing and commissioning of 11KV
porcelain Disc insulator 45 KN along with HW fittings
complete in all respect as per TS & approved
drawings.
Set
Erection, Testing and Commissioning of 11 KV
porcelain Pin Insulators with GI PIN complete in all
respect as per TS & approved drawings.
Set
Earthing
a)
Excavation, Erecting, Testing and Commissioning of
Pipe type untreated earthing by providing & using 8
SWG GI wire, pipe clamp, bolts& Nuts etc. for
connections as per TS/ REC construction standard.
Set
b)
Excavation, Erecting, Testing and Commissioning of
Coil type untreated earthing by providing & using 8
SWG GI wire, pipe clamp, bolts& Nuts etc. for
connections as per TS/ REC construction standard.
Set
Excavation, Foundation and erection of galvanised
Stay Set complete in all respect as per supply
schedule by providing 0.2 cum cement concrete
(1:4:8) PCC foundations as per scope of work,
specifications and approved drawings.
Set
Dismentling of existing defective/damaged polesupport (Rail/joist/tubular),conductor and other
dismantled line materials from existing line and
devolution of the dismentled pole, structure,
conductor and other line materials including storage,
handling, insurance, loading, unloading,
transportation to designated store of Utility as per
the direction of Engineer-in-charge and handing over
the pole and other dismentled material to the store
of Utility with propoer accounting as per the
inventory.
Ckm
Sub-Total
P
Reconductoring of 11 KV Line With ACSR Dog
Conductor on 9 mtr. 400 kg PSC pole
Survey, route alignment & pole spotting, preparation
of survey report , Inventory after approval of
Engineer-in-charge & redressal of ROW issues.
Excavation of pit, foundation, erection of following
Support for 11 KV overhead line by providing and
installing danger board and barbed Wires on
DP/TP/FP Structures and pole numbering as per
scope of work, approved drawings and Technical
specifications:
PSC Pole 9 Mtr 400 Kg including fixing of (RCC Base
Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm)) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work , approved drawing &
technical specification. Fixing of Danger Board on
DP/TP/FP & Pole numbering.
CKm
No.
Erection of galvanised fabricated steel materialsChannels, angle, flats for over head line structures by
using Bolts, Nuts, Washer etc as per approved
drawing and TS
Kg
Erection, testing and commissioning of ACSR Dog
Conductor including mid point jointing sleeves fixing
and jumpering, binding (by providing & using Al.
tape) of conductor with pin insulator and disc
insulator at DP and all cut-points and angle points by
providing and using PG Clamp etc. as required (1
CKm= 1 km line length of 3 phase conductor)
CKM
Erection, testing and commissioning of 11KV
porcelain Disc insulator 45 KN along with HW fittings
complete in all respect as per TS & approved
drawings.
Set
Erection, Testing and Commissioning of 11 KV
porcelain Pin Insulators with GI PIN complete in all
respect as per TS & approved drawings.
Set
Earthing
a)
Excavation, Erecting, Testing and Commissioning of
Pipe type untreated earthing by providing & using 8
SWG GI wire, pipe clamp, bolts& Nuts etc. for
connections as per TS/ REC construction standard.
Set
b)
Excavation, Erecting, Testing and Commissioning of
Coil type untreated earthing by providing & using 8
SWG GI wire, pipe clamp, bolts& Nuts etc. for
connections as per TS/ REC construction standard.
Set
Excavation, Foundation and erection of galvanised
Stay Set complete in all respect as per supply
schedule by providing 0.2 cum cement concrete
(1:4:8) PCC foundations as per scope of work,
specifications and approved drawings.
Set
Dismentling of existing defective/damaged polesupport (Rail/joist/tubular),conductor and other
dismantled line materials from existing line and
devolution of the dismentled pole, structure,
conductor and other line materials including storage,
handling, insurance, loading, unloading,
transportation to designated store of Utility as per
the direction of Engineer-in-charge and handing over
the pole and other dismentled material to the store
of Utility with propoer accounting as per the
inventory.
Ckm
Sub-Total
Q
Reconductoring of 11 KV Line With ACSR
Rabbit Conductor on PSC Pole
Survey, route alignment & pole spotting, preparation
of survey report , Inventory after approval of
Engineer-in-charge & redressal of ROW issues.
Excavation of pit, foundation, erection of following
Support for 11 KV overhead line by providing and
installing danger board and barbed Wires on
DP/TP/FP Structures and pole numbering as per
scope of work, approved drawings and Technical
specifications:
PSC Pole 9 Mtr 400 Kg including fixing of (RCC Base
Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work , approved drawing &
technical specification. Fixing of Danger Board on
DP/TP/FP & Pole numbering.
CKm
No.
PSC Pole 8 Mtr 200 Kg including fixing of RCC Base
plate (500x500x100 mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work , approved drawing &
technical specification. Fixing of Danger Board on
DP/TP/FP & Pole numbering.
No
Erection of galvanised fabricated steel materialsChannels, angle, flats for over head line structures by
using Bolts, Nuts, Washer etc as per approved
drawing and TS
Kg
Erection, testing and commissioning of ACSR Rabbit
Conductor including mid point jointing sleeves fixing
and jumpering, binding (by providing & using Al.
tape) of conductor with pin insulator and disc
insulator at DP and all cut-points and angle points by
providing and using PG Clamp etc. as required (1
CKm= 1 km line length of 3 phase conductor)
CKM
Erection, testing and commissioning of 11KV
porcelain Disc insulator 45 KN along with HW fittings
complete in all respect as per TS & approved
drawings.
Set
Erection, Testing and Commissioning of 11 KV
porcelain Pin Insulators with GI PIN complete in all
respect as per TS & approved drawings.
Set
Earthing
a)
Excavation, Erecting, Testing and Commissioning of
Pipe type untreated earthing by providing & using 8
SWG GI wire, pipe clamp, bolts& Nuts etc. for
connections as per TS/ REC construction standard.
Set
b)
Excavation, Erecting, Testing and Commissioning of
Coil type untreated earthing by providing & using 8
SWG GI wire, pipe clamp, bolts& Nuts etc. for
connections as per TS/ REC construction standard.
Set
Excavation, Foundation and erection of galvanised
Stay Set complete in all respect as per supply
schedule by providing 0.2 cum cement concrete
(1:4:8) PCC foundations as per scope of work,
specifications and approved drawings.
Dismentling of existing defective/damaged polesupport (Rail/joist/tubular),conductor and other
dismantled line materials from existing line and
devolution of the dismentled pole, structure,
conductor and other line materials including storage,
handling, insurance, loading, unloading,
transportation to designated store of Utility as per
the direction of Engineer-in-charge and handing over
the pole and other dismentled material to the store
of Utility with propoer accounting as per the
inventory.
Set
Ckm
Sub-Total
R
11 KV Metering System
Erection, testing, commissioning of 11 kV Metering
system along with Static Trivector Energy Meter
alongwith combined CT- PT metering unit 11KV/110
V, CT ratio-600-300/5 A with bimetalic connectors
and DLMS Static Trivector feeder meter with
communication port of 11 KV/110 v of CT ratio-300/5
A with 12cx2.5 Sqmm Control Cable, earthing and all
associated accessories complete in all respest
Sub total
S
11 KV Railway Crossing (Double Circuit)
No.
Laying,termination, Erection, Testing &
commissioning of 11 KV grade 3-core 300 Sqmm
XLPE power cable (Double Circuit) for underground
Railway Crossing including using jointing/Termination
Kit, GI pipe, CI pipe, clamps, conectors bolts, nuts,
fixing and fitting of anti-climbing device with all
accessories,Earthing in all respect etc. complete in
all respect as per TS, approved drawing
KMs
Sub Total
T
11 KV Bay Extension
Excavation, erection, cement concrete foundation,
erection, testing and commissioning of all type of
structures i.e. Gantry/Swing bus/isolator/VCB/CT/PT/PI
structures etc. made of Lattice structures of equal
angles sections, flat as per approved drawings.
MT
Design, Engineering and construction , erection,
testing and commissioning of 12 kV,630 A, 25kA for
3 seconds, 3-ph, Outdoor type Vacuum Circuit
breaker along with 12 kV, 1-Phase for 3 seconds ,
25kA, 600-300-150/5-5 Amp. outdoor type Current
Transformer along with junction box (1 no junction
box for 3 no of 1-phase CTs)], Jumpers, earthing,
supporting structures, maintenance platform,
marshalling box, control & Power cabling between
VCB and indoor control panel and required
accessories complete as per approved drawings,
technical specifications and scope of the work.
Set
Design, Engineering and construction, Erection,
testing and commissioning of 12 kV, 630 A, 25kA , 3ph double break center rotating type (DBCR), Gang
Operated, isolator along with Support Insulators,
Operating Mechanism, Base Channel down Pipe and
all required accessories complete as per approved
drawings, technical specifications and scope of the
work.
Set
Design, Engineeringi , Erection, testing and
Commissioning of 9 kV, 10kA, 1-ph Station Class
Lightening Arresters with mounting on erected
structures, jumpering from bus bar, earthing
connection using 50x6mm GS flat, hardware etc as
required, as per approved drawings, technical
specifications and scope of the work,
Set
12 KV Control & Relay panel for 12 KV VCB (suitable
for 30 V DC tripping/closing coil and associated
control) alongwith, ElF & O/C relays, Static energy
meter (class 0.5 with communication port) , Mimic
Diagram, Voltmete, Ammeter, etc complete as per
REC
Set
Erection, testing and commissioning of Bus Bar,
jumpering and Dropper (Zebra/wolf Conductor),with
using all type of insulator, Clamps and connectors,
Bolts, Nuts and Washers, Al. Tape etc with all
accessories complete in all respect.
Per Bay
Excavation, laying, welding, refilling, earthing &
grounding of MS Flat as per Approved drawing and
erection of riser up to various equipment/structures
as per scope of the work, specifications and
approved drawings.
LS per
bay
Excavation, erection, testing and commissioning of
40 mm dia, 3000 mm long GI pipe earth electrode by
providing test link, RCC pit, RCC cover, placed on GI
frame, Charcoal & Salt in alternate layer as per REC
Specification and other accessories complete as per
approved drawings, technical specifications and
scope of the work for power transformer neutral,
station transformer neutral, lightening arresters
direct earthing.
Design, engineering and construction of Cable Trench
of 0.5 Mtr wide , 1.0 Mtr. depth, precast RCC Trench
Cover, Water stops, Brick Work wherever required
including supply of T&P, Labour, Cement, Sand,
Reinforcement Steel, Steel Angles, Flats, Form Work,
Excavation and providingcement plaster (1:4)
including floating coat of cement punning (1.5 MM)
with clean pores sand etc, all complete as per
Technical Specification and approved Drawing and as
per direction of Engineer in charge (Payment will be
made as per actual requirement per Mtr.)
Set
Mtr
Sub-Total
U
Capacitor Banks
Design, engineering,Erection, testing and
commissioning of Fully automatic Capacitor bank
with automatic control panel, isolator, outdoor type
suitable Vacuum Circuit Breaker, mounting
structures, All types of cable & its accessories
complete , earthing etc as required as per technical
specifications, approved drawings, scope of the
works of following capacities: (Banks in Muiltiple of
600 KVAR as per REC Specification):
1200 KVAR
Set
3600 KVAr
Set
Sub Total
Distribution Transformer Substations ( 200
KVA) on Rail pole
Erection, Testing and Commissioning of 50 Hz,
11/0.433 KV, oil immersed naturally cooled,
Aluminium wound outdoor type (Three Star Rated)
Distribution Transformer Filled with Oil completely
with all accessories and fittings as per technical
specifications and approved Drawing.
Three Phase 200 KVA
No
Erection, testing and Commissioning of 3-pole,
Distribution Class 9 KV, 5 kA Lightening Arrester for
Distribution Transformer Substation by providing and
erecting Hot Dip galvanised stranded wire 7/3.15 mm
as per scope of work, approved drawings and
technical specifications. (1 Set= 3 Nos)
Set
Excavation of pit, foundation, erection of following
Support for DSS and installation with DT numbering
as per scope of work, approved drawings and
specifications:
13 m long 52 Kg/mtr. Rail Pole (Painted with 2 coat
Red oxide, 2 coat Al-Paint and 1/6th part of the Rail
pole from bottom with Black enamel paint of
Reputed make) including fixing of (RCC Base Plate
of size 500x500x100 mm./Stone Base Plate of Size
450x450x50mm)) with cement concreting foundation
and top mopping (1:4:8) (0.65 cmt per pole).
No
Erection, fixing and fitting of galvanised fabricated
steel materials- channel, angle, flats of various size
for DTstructures with bolts, nuts and washers etc.
complete in all respect as per TS and approved
drawing.
Kg
Erection, fixing and fitting, Testing and
Commissioning of Porcelain Insulators with mounting
hardware fittings etc. complete in all respect as per
TS and approved drawing.
11 KV 45 KN Disc Insulator with hardware fittings
Set
Erection, Testing and Commissioning of 12kV, 200A,
25kA, 3-ph, 3 Pin type, Horizontal Mounting type,
Gang Operated, AB Switch along with Support
Insulators, Base Channel down Pipe, Arcing Horns
etc. complete as per technical specifications
etc.complete as per technical specifications, scope
of works and approved drawings
Set
Erection, testing and commissioning of 3 pole, 12 KV
HG fuse set compleete on the DSS Structue complete
in all respect for 3-ph DTs
Sets
Erection, testing and Commissioning of LT
Distribution box with LTCT meter (CT Ratio 400/5 A )
with bar type CTs- 400/5 A metering, Al-Bus bar of
Adequate Size and LT control mechanism and
connections from LV Bushings to LTDB and LTDB to LT
line with Cables by providing and using Lugs,Washer
etc. complete in all respect with one no. Of TPMCCB
as per technical specifications for Three Phase 200
KVA Distribution Transformer.
No
10
Excavation, erection, testing and commissioning of a
set of 3 Nos pipe earthing using 40 mm dia GI pipe
3000 mm long, as per IS 1161 and as per REC
construction drawings complete with H/w and lugs
etc by providing charcoal, salt,/Bitumen Clay in
alternate layers and GI Wires 8 SWG for connections
as per scope of work, approved drawings and
technical specifications.(1 Set= 3 Nos earthing per
DT)
Per DSS
11
Erection, testing and commissioning of ACSR Dog
Conductor for jumpering by providing PG Clamps, bimetallic/Al connectors, hardware, Al Tape etc as
required complete in all respect for commissioning of
DSS.
12
Excavation and erection of galvanised Stay Set as
per supply schedule by providing 0.2 cum cement
concrete (1:4:8) PCC foundations as per scope of
work, specifications and approved drawings.
Per DT
Set
Sub-Total
Distribution Transformer Substations ( 200
KVA) on 9 Mtr. 400 Kg PSC Pole
Erection, Testing and Commissioning of 50 Hz,
11/0.433 KV, oil immersed naturally cooled,
Aluminium wound outdoor type (Three Star Rated)
Distribution Transformer Filled with Oil completely
with all accessories and fittings as per technical
specifications and approved Drawing.
Three Phase 200 KVA
No
Erection, testing and Commissioning of 3-pole,
Distribution Class 9 KV, 5 kA Lightening Arrester for
Distribution Transformer Substation by providing and
erecting Hot Dip galvanised stranded wire 7/3.15 mm
as per scope of work, approved drawings and
technical specifications. (1 Set= 3 Nos)
Set
Excavation of pit, foundation, erection of
following Support for DSS and installation with
DT numbering as per scope of work, approved
drawings and specifications:
PSC Pole 9 Mtr 400 Kg including fixing of (RCC Base
Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work as per approved
drawing & technical specification.
No
Erection, fixing and fitting of galvanised fabricated
steel materials- channel, angle, flats of various size
for DTstructures with bolts, nuts and washers etc.
complete in all respect as per TS and approved
drawing.
Kg
Erection, fixing and fitting, Testing and
Commissioning of Porcelain Insulators with mounting
hardware fittings etc. complete in all respect as per
TS and approved drawing.
11 KV 45 KN Disc Insulator with hardware fittings
Set
Erection, Testing and Commissioning of 12kV, 200A,
25kA, 3-ph, 3 Pin type, Horizontal Mounting type,
Gang Operated, AB Switch along with Support
Insulators, Base Channel down Pipe, Arcing Horns
etc. complete as per technical specifications
etc.complete as per technical specifications, scope
of works and approved drawings
Set
Erection, testing and commissioning of 3 pole, 12 KV
HG fuse set compleete on the DSS Structue complete
in all respect for 3-ph DTs
Sets
Erection, testing and Commissioning of LT
Distribution box with LTCT meter (CT Ratio 400/5 A )
with bar type CTs- 400/5 A metering, Al-Bus bar of
Adequate Size and LT control mechanism and
connections from LV Bushings to LTDB and LTDB to LT
line with Cables by providing and using Lugs,Washer
etc. complete in all respect with one no. Of TPMCCB
as per technical specifications for Three Phase 200
KVA Distribution Transformer.
No
10
Excavation, erection, testing and commissioning of a
set of 3 Nos pipe earthing using 40 mm dia GI pipe
3000 mm long, as per IS 1161 and as per REC
construction drawings complete with H/w and lugs
etc by providing charcoal, salt,/Bitumen Clay in
alternate layers and GI Wires 8 SWG for connections
as per scope of work, approved drawings and
technical specifications.(1 Set= 3 Nos earthing per
DT)
Per DSS
11
Erection, testing and commissioning of ACSR Dog
Conductor for jumpering by providing and using Al
tape PG Clamps, bi-metallic/Al connectors, hardware
etc as required complete in all respect for
commissioning of DSS.
Per DT
12
Excavation and erection of galvanised Stay Set as
per supply schedule by providing 0.2 cum cement
concrete (1:4:8) PCC foundations as per scope of
work, specifications and approved drawings.
Sub-Total
Distribution Transformer Substations 100 KVA
on 9 Mtr. 400 kg PSC Pole
Set
Erection, Testing and Commissioning of 50 Hz,
11/0.433 KV, oil immersed naturally cooled,
Aluminium wound outdoor type (Three Star Rated)
Distribution Transformer Filled with Oil completely
with all accessories and fittings as per technical
specifications and approved Drawing.
Three Phase 100 KVA
No
Erection, testing and Commissioning of 3-pole,
Distribution Class 9 KV, 5 kA Lightening Arrester for
Distribution Transformer Substation by providing and
erecting Hot Dip galvanised stranded wire 7/3.15 mm
as per scope of work, approved drawings and
technical specifications. (1 Set= 3 Nos)
Set
Excavation of pit, foundation, erection of
following Support for DSS and installation with
DT numbering as per scope of work, approved
drawings and specifications:
PSC Pole 9 Mtr 400 Kg including fixing of (RCC Base
Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm)) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work as per approved
drawing & technical specification.
No
Erection, fixing and fitting of galvanised fabricated
steel materials- channel, angle, flats of various size
for DTstructures with bolts, nuts and washers etc.
complete in all respect as per TS and approved
drawing.
Kg
Erection, fixing and fitting, Testing and
Commissioning of Porcelain Insulators with mounting
hardware fittings etc. complete in all respect as per
TS and approved drawing.
11 KV 45 KN Disc Insulator with hardware fittings
Set
Erection, Testing and Commissioning of 12kV, 200A,
25kA, 3-ph, 3 Pin type, Horizontal Mounting type,
Gang Operated, AB Switch along with Support
Insulators, Base Channel down Pipe, Arcing Horns
etc. complete as per technical specifications
etc.complete as per technical specifications, scope
of works and approved drawings
Set
Erection, testing and commissioning of 3 pole, 12 KV
HG fuse set compleete on the DSS Structue complete
in all respect for 3-ph DTs
Sets
Erection, testing and Commissioning of LT
Distribution box with LTCT meter (CT Ratio 200/5 A )
with bar type CTs- 200/5 A metering, Al-Bus bar of
Adequate Size and LT control mechanism and
connections from LV Bushings to LTDB and LTDB to LT
line with Cables by providing and using Lugs,Washer
etc. complete in all respect with one no. Of TPMCCB
as per technical specifications for Three Phase 100
KVA Distribution Transformer.
No
Excavation, erection, testing and commissioning of a
set of 3 Nos pipe earthing using 40 mm dia GI pipe
3000 mm long, as per IS 1161 and as per REC
construction drawings complete with H/w and lugs
etc by providing charcoal, salt,/Bitumen Clay in
alternate layers and GI Wires 8 SWG for connections
as per scope of work, approved drawings and
technical specifications.(1 Set= 3 Nos earthing per
DT)
Per DSS
Erection, testing and commissioning of ACSR Rabbit
Conductor for jumpering by providing and using Al
Tape PG Clamps, bi-metallic/Al connectors, hardware
etc as required complete in all respect for
commissioning of DSS.
Per DT
10
Excavation and erection of galvanised Stay Set as
per supply schedule by providing 0.2 cum cement
concrete (1:4:8) PCC foundations as per scope of
work, specifications and approved drawings.
Set
Sub-Total
Distribution Transformer Substations ( 100
KVA) on 8 Mtr. 200 kg PSC Pole
Erection, Testing and Commissioning of 50 Hz,
11/0.433 KV, oil immersed naturally cooled,
Aluminium wound outdoor type (Three Star Rated)
Distribution Transformer Filled with Oil completely
with all accessories and fittings as per technical
specifications and approved Drawing.
Three Phase 100 KVA
No
Erection, testing and Commissioning of 3-pole,
Distribution Class 9 KV, 5 kA Lightening Arrester for
Distribution Transformer Substation by providing and
erecting Hot Dip galvanised stranded wire 7/3.15 mm
as per scope of work, approved drawings and
technical specifications. (1 Set= 3 Nos)
Set
Excavation of pit, foundation, erection of
following Support for DSS and installation with
DT numbering as per scope of work, approved
drawings and specifications:
PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base
Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work as per approved
drawing & technical specification.
No
Erection, fixing and fitting of galvanised fabricated
steel materials- channel, angle, flats of various size
for DTstructures with bolts, nuts and washers etc.
complete in all respect as per TS and approved
drawing.
Erection, fixing and fitting, Testing and
Commissioning of Porcelain Insulators with mounting
hardware fittings etc. complete in all respect as per
TS and approved drawing.
11 KV 45 KN Disc Insulator with hardware fittings
Set
Erection, Testing and Commissioning of 12kV, 200A,
25kA, 3-ph, 3 Pin type, Horizontal Mounting type,
Gang Operated, AB Switch along with Support
Insulators, Base Channel down Pipe, Arcing Horns
etc. complete as per technical specifications
etc.complete as per technical specifications, scope
of works and approved drawings
Set
Erection, testing and commissioning of 3 pole, 12 KV
HG fuse set compleete on the DSS Structue complete
in all respect for 3-ph DTs
Sets
Erection, testing and Commissioning of LT
Distribution box with LTCT meter (CT Ratio 200/5 A )
with bar type CTs- 200/5 A metering, Al-Bus bar of
Adequate Size and LT control mechanism and
connections from LV Bushings to LTDB and LTDB to LT
line with Cables by providing and using Lugs,Washer
etc. complete in all respect with one no. Of TPMCCB
as per technical specifications for Three Phase 100
KVA Distribution Transformer.
No
Kg
Excavation, erection, testing and commissioning of a
set of 3 Nos pipe earthing using 40 mm dia GI pipe
3000 mm long, as per IS 1161 and as per REC
construction drawings complete with H/w and lugs
etc by providing charcoal, salt,/Bitumen Clay in
alternate layers and GI Wires 8 SWG for connections
as per scope of work, approved drawings and
technical specifications.(1 Set= 3 Nos earthing per
DT)
Per DSS
Erection, testing and commissioning of ACSR Rabbit
Conductor for jumpering by providing PG Clamps, bimetallic connectors, hardware etc as required
complete in all respect for commissioning of DSS.
Per DT
10
Excavation and erection of galvanised Stay Set as
per supply schedule by providing 0.2 cum cement
concrete (1:4:8) PCC foundations as per scope of
work, specifications and approved drawings.
Set
Sub-Total
Distribution Transformer Substations 63 KVA
on 8 Mtr. PSC pole
Erection, Testing and Commissioning of 50 Hz,
11/0.433 KV, oil immersed naturally cooled,
Aluminium wound outdoor type (Three Star Rated)
Distribution Transformer Filled with Oil completely
with all accessories and fittings as per technical
specifications and approved Drawing.
Three Phase 63 KVA
No
Erection, testing and Commissioning of 3-pole,
Distribution Class 9 KV, 5 kA Lightening Arrester for
Distribution Transformer Substation by providing and
erecting Hot Dip galvanised stranded wire 7/3.15 mm
as per scope of work, approved drawings and
technical specifications. (1 Set= 3 Nos)
Set
Excavation of pit, foundation, erection of
following Support for DSS and installation with
DT numbering as per scope of work, approved
drawings and specifications:
PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base
Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work as per approved
drawing & technical specification.
No
Erection, fixing and fitting of galvanised fabricated
steel materials- channel, angle, flats of various size
for DTstructures with bolts, nuts and washers etc.
complete in all respect as per TS and approved
drawing.
Kg
Erection, fixing and fitting, Testing and
Commissioning of Porcelain Insulators with mounting
hardware fittings etc. complete in all respect as per
TS and approved drawing.
11 KV 45 KN Disc Insulator with hardware fittings
Set
Erection, Testing and Commissioning of 12kV, 200A,
25kA, 3-ph, 3 Pin type, Horizontal Mounting type,
Gang Operated, AB Switch along with Support
Insulators, Base Channel down Pipe, Arcing Horns
etc. complete as per technical specifications
etc.complete as per technical specifications, scope
of works and approved drawings
Set
Erection, testing and commissioning of 3 pole, 12 KV
HG fuse set compleete on the DSS Structue complete
in all respect for 3-ph DTs
Sets
Erection, testing and Commissioning of LT
Distribution box with LTCT meter (CT Ratio 200/5 A )
with bar type CTs- 200/5 A metering, Al-Bus bar of
Adequate Size and LT control mechanism and
connections from LV Bushings to LTDB and LTDB to LT
line with Cables by providing and using Lugs,Washer
etc. complete in all respect with one no. Of TPMCCB
as per technical specifications for Three Phase 100
KVA Distribution Transformer.
No
Excavation, erection, testing and commissioning of a
set of 3 Nos pipe earthing using 40 mm dia GI pipe
3000 mm long, as per IS 1161 and as per REC
construction drawings complete with H/w and lugs
etc by providing charcoal, salt,/Bitumen Clay in
alternate layers and GI Wires 8 SWG for connections
as per scope of work, approved drawings and
technical specifications.(1 Set= 3 Nos earthing per
DT)
Per DSS
Erection, testing and commissioning of ACSR Rabbit
Conductor for jumpering by providing PG Clamps, bimetallic connectors, hardware etc as required
complete in all respect for commissioning of DSS.
Per DT
10
Excavation and erection of galvanised Stay Set as
per supply schedule by providing 0.2 cum cement
concrete (1:4:8) PCC foundations as per scope of
work, specifications and approved drawings.
Sub-Total
AA
Augmentation of 100 KVA Distribution
Transformer by 200 KVA new Distribution
Transformer
Set
Erection, Testing and Commissioning of 50 Hz,
11/0.433 KV, oil immersed naturally cooled,
Aluminium wound outdoor type (Three Star Rated)
Distribution Transformer Filled with Oil completely
with all accessories and fittings as per technical
specifications and approved Drawing.
Three Phase 200 KVA
Dismentling of existing dismentled Distt. Transformer
including storage, handling, loading, unloading,
transportation to designated store/proposed Site of
Utility as per the direction of Engineer-in-charge and
handing over the material to the authorised
representative of Utility with propoer accounting as
per the inventory.
No
per DT
Sub-Total
AB
Augmentation of 63 KVA Distribution
Transformer by 100 KVA Distribution
Transformer (NEW)
Erection, Testing and Commissioning of 50 Hz,
11/0.433 KV, oil immersed naturally cooled,
Aluminium wound outdoor type (Three Star Rated)
Distribution Transformer Filled with Oil completely
with all accessories and fittings as per technical
specifications and approved Drawing.
Three Phase 100 KVA
Dismentling of existing dismentled Distt. Transformer
including storage, handling, loading, unloading,
transportation to designated store/proposed Site of
Utility as per the direction of Engineer-in-charge and
handing over the material to the authorised
representative of Utility with propoer accounting as
per the inventory.
No
Sub-Total
AC
Augmentation of 63 KVA Distribution
Transformer by 100 KVA Released Distribution
Transformer (Released)
per DT
Erection, Testing and Commissioning of 50 Hz,
11/0.433 KV, oil immersed naturally cooled,
Aluminium wound outdoor type Distribution
Transformer filled with oil complete required for
proper commissioning of Distribution Transformers
with all accessories and fittings as per technical
specifications and approved Drawing.
Three Phase 100 KVA (released DT will be Utilised)
Dismentling of existing dismentled Distt. Transformer
including storage, handling, loading, unloading,
transportation to designated store/proposed Site of
Utility as per the direction of Engineer-in-charge and
handing over the material to the authorised
representative of Utility with propoer accounting as
per the inventory.
No
per DT
Sub-Total
AD
R & M of Existing Distribution Substations
Excavation of pit, foundation, erection of following
Support for 11 KV overhead line by providing and
installing danger board and barbed Wires on
DP/TP/FP Structures and DT numbering as per scope
of work, approved drawings and Technical
specifications: for
PSC Pole 9 Mtr 400 Kg including fixing of (RCC Base
Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work , approved drawing &
technical specification. Fixing of Danger Board on
DP/TP/FP & Pole numbering.
No.
PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base
Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work , approved drawing &
technical specification. Fixing of Danger Board on
DP/TP/FP & Pole numbering.
No.
Erection, testing and Commissioning of 3-pole,
Distribution Class 9 KV, 5 kA Lightening Arrester for
Distribution Transformer Substation by providing and
erecting Hot Dip galvanised stranded wire 7/3.15 mm
as per scope of work, approved drawings and
technical specifications.(1 Set = 3 Nos)
Set
Erection, fixing and fitting of galvanised prefabricated steel materials- channel, angle, flats of
various size for DT structures with bolts, nuts and
washers etc. complete in all respect as per TS and
approved drawing.
Kg
Erection, Testing and Commissioning of 12kV, 200A,
25kA, 3-ph, 3 Pin type, Horizontal Mounting type,
Gang Operated, AB Switch along with Support
Insulators, Base Channel down Pipe, Arcing Horns
etc. complete as per technical specifications
etc.complete as per technical specifications, scope
of works and approved drawings
Set
Erection, testing and commissioning of 3 pole, 12 KV
HG fuse set compleete on the DSS Structue complete
in all respect for 3-ph DTs
Sets
Excavation, erection, testing and commissioning of a
set of 3 Nos pipe earthing using 40 mm dia GI pipe
3000 mm long, as per IS 1161 and as per REC
construction drawings complete with H/w and lugs
etc by providing charcoal, salt,/Bitumen Clay in
alternate layers and GI Wires 8 SWG for connections
as per scope of work, approved drawings and
technical specifications.(1 Set= 3 Nos earthing per
DT)
Erection, testing and commissioning of LT bus bar
distribution system with kit-kat complete and
jumpering Connections of 11 KV side complete by
providing & using P G clamp/ connectors in all
respect for commssioning of DSS.
Per DT
Excavation and erection of galvanised Stay Set as
per supply schedule by providing 0.2 cum cement
concrete (1:4:8) PCC foundations as per scope of
work, specifications and approved drawings.
Set
Dismentling of existing dismentled materials and
devolution of the dismantled materials i.e
Transformer angle, channel, clamp, AB Switch, HG
fuse Set etc. including storage, handling, insurance,
loading, unloading, transportation to store of Utility
as per the direction of Engineer-in-charge with
propoer accounting as per the inventory.
Per DSS
Per DT
Sub Total
AE
1
Construction of 3 Phase 4 Wire LT Line on 8M,
200 Kg PSC with ACSR Weasel Conductor in
Vertical configuration
Route Survey
CKms
PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base
Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm)with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work as per approved
drawing & technical specification.
No
Erection, testing and commissioning of ACSR Weasel Conductor
including mid point jointing (by providing and using PG clamps, Al
Tape) and jumpering , binding of conductor with insulator, binding
wire, fixing and fitting of LT PVC phase spacers etc. complete in
all respect. (1 CKm= 1 km line length of 4 phase conductor)
CKM
Erection of galvanised fabricated steel materials- U clamp
& stay clamp by using Bolts, Nuts, Washer etc as per
approved drawing and TS
Kg
Excavation and erection of galvanised Stay Set with 50x10 mm
stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m
long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI
stranded wire by using Stone stay plate 450x450x50 mm Stay
plate foundations as per scope of work, specifications and
approved drawings.
Set
Spiral type earthing as per REC construction drawing J-1 including
supply of all materials like 8 SWG G.I. wire closely wound having
115 turns, 50mm dia & 450mm long coil (untreated without
charcoal & salt) in all type of soil including excavation, refilling with
earth, fixing of bolts, nuts, washers for connection with pole
support/ metalic part all complete as per TS & direction of
Engineer-in charge (individual pole earthing)
Set
Sub-Total
AF
1
Construction of 3 Phase 4 Wire LT Line on 8M,
200 Kg PSC with ACSR Weasel Conductor in
Horizontal configuration
Route Survey
CKms
PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base
Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work as per approved
drawing & technical specification.
No
Erection, testing and commissioning of ACSR Weasel
Conductor including mid point jointing (by providing
and using PG clamps, Al Tape) and jumpering ,
binding of conductor with insulator, binding wire,
fixing and fitting of LT PVC phase spacers etc.
complete in all respect. (1 CKm= 1 km line length of
4 phase conductor)
CKM
Erection of galvanised fabricated steel materialsangle, flats for over head line structures by using
Bolts, Nuts, Washer etc as per approved drawing and
TS
Kg
Excavation and erection of galvanised Stay Set with 50x10 mm
stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m
long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI
stranded wire by using Stone stay plate 450x450x50 mm Stay
plate foundations as per scope of work, specifications and
approved drawings.
Set
Spiral type earthing as per REC construction drawing
J-1 including supply of all materials like 8 SWG G.I.
wire closely wound having 115 turns, 50mm dia &
450mm long coil (untreated without charcoal & salt)
in all type of soil including excavation, refilling with
earth, fixing of bolts, nuts, washers for connection
with pole support/ metalic part all complete as per TS
& direction of Engineer-in charge (individual pole
earthing)
Nos.
Sub-Total
Construction of 3 Phase 4 Wire LT Line on 8M,
200 Kg PSC with ACSR Rabbit Conductor in
Horizontal configuration
AG
1
Route Survey
Kms
PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base
Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work as per approved
drawing & technical specification.
No
Erection, testing and commissioning of ACSR Rabbit Conductor
including mid point jointing (by providing and using PG clamps, Al
Tape) and jumpering , binding of conductor with insulator, binding
wire, fixing and fitting of LT PVC phase spacers etc. complete in
all respect. (1 CKm= 1 km line length of 4 phase conductor)
CKM
Erection of galvanised fabricated steel materials- angle, flats for
over head line structures by using Bolts, Nuts, Washer etc as per
approved drawing and TS
Kg
Excavation and erection of galvanised Stay Set with 50x10 mm
stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m
long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI
stranded wire by using Stone stay plate 450x450x50 mm Stay
plate foundations as per scope of work, specifications and
approved drawings.
Set
Spiral type earthing as per REC construction drawing J-1 including
supply of all materials like 8 SWG G.I. wire closely wound having
115 turns, 50mm dia & 450mm long coil (untreated without
charcoal & salt) in all type of soil including excavation, refilling with
earth, fixing of bolts, nuts, washers for connection with pole
support/ metalic part all complete as per TS & direction of
Engineer-in charge (individual pole earthing)
Nos.
Sub-Total
R&M of 3-Ph, 4 Wire LT line with ACSR Rabbit
conductor
AH
1
Route Survey
CKms
PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base
Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work as per approved
drawing & technical specification.
No
Erection, testing and commissioning of ACSR Rabbit Conductor
including mid point jointing (by providing and using PG clamps, Al
Tape) and jumpering , binding of conductor with insulator, binding
wire, fixing and fitting of LT PVC phase spacers etc. complete in
all respect. (1 CKm= 1 km line length of 4 phase conductor)
CKM
Erection of galvanised fabricated steel materials- angle, flats for
over head line structures by using Bolts, Nuts, Washer etc as per
approved drawing and TS
Kg
Excavation and erection of galvanised Stay Set with 50x10 mm
stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m
long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI
stranded wire by using Stone stay plate 450x450x50 mm Stay
plate foundations as per scope of work, specifications and
approved drawings.
Set
Spiral type earthing as per REC construction drawing J-1 including
supply of all materials like 8 SWG G.I. wire closely wound having
115 turns, 50mm dia & 450mm long coil (untreated without
charcoal & salt) in all type of soil including excavation, refilling with
earth, fixing of bolts, nuts, washers for connection with pole
support/ metalic part all complete as per TS & direction of
Engineer-in charge (individual pole earthing)
Nos.
Dismentling of existing defective/damaged polesupport (Rail/joist/tubular),conductor and other
dismantled line materials from existing line and
devolution of the dismentled pole, structure,
conductor and other line materials including storage,
handling, insurance, loading, unloading,
transportation to designated store of Utility as per
the direction of Engineer-in-charge and handing over
the pole and other dismentled material to the store
of Utility with propoer accounting as per the
inventory.
Ckm
Sub-Total
R&M of 3-Ph, 4 Wire LT line with ACSR Weasel
conductor
AI
1
Route Survey
CKms
PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base
Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work as per approved
drawing & technical specification.
No
Erection, testing and commissioning of ACSR Weasel Conductor
including mid point jointing (by providing and using PG clamps, Al
Tape) and jumpering , binding of conductor with insulator, binding
wire, fixing and fitting of LT PVC phase spacers etc. complete in
all respect. (1 CKm= 1 km line length of 4 phase conductor)
CKM
Erection of galvanised fabricated steel materials- angle, flats for
over head line structures by using Bolts, Nuts, Washer etc as per
approved drawing and TS
Kg
Excavation and erection of galvanised Stay Set with 50x10 mm
stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m
long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI
stranded wire by using Stone stay plate 450x450x50 mm Stay
plate foundations as per scope of work, specifications and
approved drawings.
Set
Spiral type earthing as per REC construction drawing J-1 including
supply of all materials like 8 SWG G.I. wire closely wound having
115 turns, 50mm dia & 450mm long coil (untreated without
charcoal & salt) in all type of soil including excavation, refilling with
earth, fixing of bolts, nuts, washers for connection with pole
support/ metalic part all complete as per TS & direction of
Engineer-in charge (individual pole earthing)
Nos.
Dismentling of existing defective/damaged polesupport (Rail/joist/tubular),conductor and other
dismantled line materials from existing line and
devolution of the dismentled pole, structure,
conductor and other line materials including storage,
handling, insurance, loading, unloading,
transportation to designated store of Utility as per
the direction of Engineer-in-charge and handing over
the pole and other dismentled material to the store
of Utility with propoer accounting as per the
inventory.
Ckm
Sub-Total
AJ
R&M of existing Single phase & 2 phase line
with Conversion in to Three Phase , 4 wire Line
by ACSR Weasel conductor
Route Survey
PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base Plate of size
500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with
brick blast or boulder refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as required as
per scope of work as per approved drawing & technical
specification.
CKms
No
Erection, testing and commissioning of ACSR Weasel Conductor
with fixing & fitting of shackle/ pin insulator including mid point
jointing (by providing and using PG clamps, Al Tape) and
jumpering , binding of conductor with insulator, binding wire, fixing
and fitting of LT PVC phase spacers etc. complete in all respect.
(1 CKm= 1 km line length of 4 phase conductor )
CKM
Erection of galvanised fabricated steel materials- angle, flats for
over head line structures by using Bolts, Nuts, Washer etc as per
approved drawing and TS
Kg
Excavation and erection of galvanised Stay Set with 50x10 mm
stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m
long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI
stranded wire by using Stone stay plate 450x450x50 mm Stay
plate foundations as per scope of work, specifications and
approved drawings.
Set
Spiral type earthing as per REC construction drawing J-1 including
supply of all materials like 8 SWG G.I. wire closely wound having
115 turns, 50mm dia & 450mm long coil (untreated without
charcoal & salt) in all type of soil including excavation, refilling with
earth, fixing of bolts, nuts, washers for connection with pole
support/ metalic part all complete as per TS & direction of
Engineer-in charge (individual pole earthing)
Nos.
Dismentling of existing defective/damaged polesupport (Rail/joist/tubular),conductor and other
dismantled line materials from existing line and
devolution of the dismentled pole, structure,
conductor and other line materials including storage,
handling, insurance, loading, unloading,
transportation to designated store of Utility as per
the direction of Engineer-in-charge and handing over
the pole and other dismentled material to the store
of Utility with propoer accounting as per the
inventory.
Ckm
Sub-Total
AK
Erection, testing commissioning of New LT Line
on 3 phase ABC [3 X95Sq mm {Phase}+{1x70
Sq mm Messenger cum Neutral wire}]
Survey, route alignment & pole spotting,
preparation of survey report , Inventory after
approval of Engineer-in-charge & redressal of
ROW issues.
Excavation of pit, foundation, erection of
following Support for LT line and pole
numbering as per scope of work, approved
drawings and Technical specifications:
PSC Pole 8 Mtr 200 Kg including fixing of
(RCC Base Plate of size 500x500x100
mm./Stone Base Plate of Size
450x450x50mm)) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring
water as required as per scope of work ,
approved drawing & technical specification.
No
Excavation and erection of galvanised Stay Set with 50x10 mm
stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m
long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI
stranded wire by using Stone stay plate 450x450x50 mm Stay
plate foundations as per scope of work, specifications and
approved drawings.
Set
CKm
Installation, testing and commissioning of
Coil Earthing by providing GI wire no.-8SWG
for connections with nuts, bolts and washers
as per scope of work, technical specifications
and approved drawings and REC
Specification(untreated).
Erection, testing and Commissioning of LT
Line on AB Cables: (average span 40 to 45 m
approx.) including all erection accessories
required for successful erection of AB Cable
Complete in all respect as per approved
drawing and Technical Specification etc as
required as per scope for work for
Branching/termination etc.
3 phase ABC [3 X95Sq mm {Phase}+{1x70
Sq mm Messenger cum Neutral wire}]
Set
Ckm
Sub Total
AL
Erection, testing commissioning of New LT Line
on 3 phase ABC [3 X70Sq mm {Phase}+{1x50
Sq mm Messenger cum Neutral wire}]
Survey, route alignment & pole spotting,
preparation of survey report , Inventory after
approval of Engineer-in-charge & redressal of
ROW issues.
Excavation of pit, foundation, erection of
following Support for LT line and pole
numbering as per scope of work, approved
drawings and Technical specifications:
CKm
PSC Pole 8 Mtr 200 Kg including fixing of
(RCC Base Plate of size 500x500x100
mm./Stone Base Plate of Size
450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring
water as required as per scope of work ,
approved drawing & technical specification.
No
Excavation and erection of galvanised Stay Set with 50x10 mm
stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m
long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI
stranded wire by using Stone stay plate 450x450x50 mm Stay
plate foundations as per scope of work, specifications and
approved drawings.
Set
Installation, testing and commissioning of
Coil Earthing by providing GI wire no.-8SWG
for connections with nuts, bolts and washers
as per scope of work, technical specifications
and approved drawings and REC
Specification(untreated).
Set
Erection, testing and Commissioning of LT
Line on AB Cables: (average span 40 to 45 m
approx.) including all erection accessories
required for successful erection of AB Cable
Complete in all respect as per approved
drawing and Technical Specification etc as
required as per scope for work for
Branching/termination etc.
3 phase ABC [3 X70Sq mm {Phase}+{1x50
Sq mm Messenger cum Neutral wire}]
Ckm
Sub Total
AM
Erection, testing commissioning of New LT Line
on 3 phase ABC [3 X50 Sq mm {Phase}+{1x35
Sq mm Messenger cum Neutral wire}]
Survey, route alignment & pole spotting,
preparation of survey report , Inventory after
approval of Engineer-in-charge & redressal of
ROW issues.
Excavation of pit, foundation, erection of
following Support for LT line and pole
numbering as per scope of work, approved
drawings and Technical specifications:
PSC Pole 8 Mtr 200 Kg including fixing of
(RCC Base Plate of size 500x500x100
mm./Stone Base Plate of Size
450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring
water as required as per scope of work ,
approved drawing & technical specification.
No
Excavation and erection of galvanised Stay Set with 50x10 mm
stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m
long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI
stranded wire by using Stone stay plate 450x450x50 mm Stay
plate foundations as per scope of work, specifications and
approved drawings.
Set
CKm
Installation, testing and commissioning of
Coil Earthing by providing GI wire no.-8SWG
for connections with nuts, bolts and washers
as per scope of work, technical specifications
and approved drawings and REC
Specification(untreated).
Erection, testing and Commissioning of LT
Line on AB Cables: (average span 40 to 45 m
approx.) including all erection accessories
required for successful erection of AB Cable
Complete in all respect as per approved
drawing and Technical Specification etc as
required as per scope for work for
Branching/termination etc.
3 phase ABC [3 X50Sq mm {Phase}+{1x35
Sq mm Messenger cum Neutral wire}]
Set
Ckm
Sub Total
AN
New LT Line on 1 phase ABC [1X16 Sq mm
{Phase} + {1x25 Sq mm Messenger cum
Neutral wire}]
Survey, route alignment & pole spotting,
preparation of survey report , Inventory after
approval of Engineer-in-charge & redressal of
ROW issues.
Excavation of pit, foundation, erection of
following Support for LT line and pole
numbering as per scope of work, approved
drawings and Technical specifications:
CKm
PSC Pole 8 Mtr 200 Kg including fixing of
(RCC Base Plate of size 500x500x100
mm./Stone Base Plate of Size
450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring
water as required as per scope of work ,
approved drawing & technical specification.
No
Excavation and erection of galvanised Stay Set with 50x10 mm
stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m
long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI
stranded wire by using Stone stay plate 450x450x50 mm Stay
plate foundations as per scope of work, specifications and
approved drawings.
Set
Installation, testing and commissioning of
Coil Earthing by providing GI wire no.-8SWG
for connections with nuts, bolts and washers
as per scope of work, technical specifications
and approved drawings and REC
Specification(untreated).
Set
Erection, testing and Commissioning of LT
Line on AB Cables: (average span 40 to 45 m
approx.) including all erection accessories
required for successful erection of AB Cable
Complete in all respect as per approved
drawing and Technical Specification etc as
required as per scope for work for
Branching/termination etc.
1 phase ABC [1 X 16 Sq mm {Phase}+{1x35
Sq mm Messenger cum Neutral wire}]
Ckm
Sub Total
Total
BALANCE PART
BA
Augmentation of 100 KVA Distribution
Transformer by 200 KVA new Distribution
Transformer
Erection, Testing and Commissioning of 50 Hz,
11/0.433 KV, oil immersed naturally cooled,
Aluminium wound outdoor type (Three Star Rated)
Distribution Transformer Filled with Oil completely
with all accessories and fittings as per technical
specifications and approved Drawing.
Three Phase 200 KVA
Dismentling of existing dismentled Distt. Transformer
including storage, handling, loading, unloading,
transportation to designated store/Proposed site of
Utility as per the direction of Engineer-in-charge and
handing over the material to the authorised
representative of Utility with propoer accounting as
per the inventory.
No
per DT
Sub-Total
BB
Augmentation of 63 KVA Distribution
Transformer by 100 KVA released Distribution
Transformer
Erection, Testing and Commissioning of 50 Hz,
11/0.433 KV, oil immersed naturally cooled,
Aluminium wound outdoor type (Three Star Rated)
Distribution Transformer Filled with Oil completely
with all accessories and fittings as per technical
specifications and approved Drawing.
Three Phase 100 KVA
No
Dismentling of existing dismentled Distt. Transformer
including storage, handling, loading, unloading,
transportation to designated store/Proposed site of
Utility as per the direction of Engineer-in-charge and
handing over the material to the authorised
representative of Utility with propoer accounting as
per the inventory.
per DT
Sub-Total
BC
Distribution Transformer Substations ( 63 KVA )
on 8 Mtr. PSC pole (New)
Erection, Testing and Commissioning of 50 Hz,
11/0.433 KV, oil immersed naturally cooled,
Aluminium wound outdoor type (Three Star Rated)
Distribution Transformer Filled with Oil completely
with all accessories and fittings as per technical
specifications and approved Drawing.
Three Phase 63 KVA
No
Erection, testing and Commissioning of 3-pole,
Distribution Class 9 KV, 5 kA Lightening Arrester for
Distribution Transformer Substation by providing and
erecting Hot Dip galvanised stranded wire 7/3.15 mm
as per scope of work, approved drawings and
technical specifications. (1 Set= 3 Nos)
Set
Excavation of pit, foundation, erection of
following Support for DSS and installation with
DT numbering as per scope of work, approved
drawings and specifications:
PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base
Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work as per approved
drawing & technical specification.
No
Erection, fixing and fitting of galvanised fabricated
steel materials- channel, angle, flats of various size
for DTstructures with bolts, nuts and washers etc.
complete in all respect as per TS and approved
drawing.
Erection, fixing and fitting, Testing and
Commissioning of Porcelain Insulators with mounting
hardware fittings etc. complete in all respect as per
TS and approved drawing.
11 KV 45 KN Disc Insulator with hardware fittings
Set
Erection, Testing and Commissioning of 12kV, 200A,
25kA, 3-ph, 3 Pin type, Horizontal Mounting type,
Gang Operated, AB Switch along with Support
Insulators, Base Channel down Pipe, Arcing Horns
etc. complete as per technical specifications
etc.complete as per technical specifications, scope
of works and approved drawings
Set
Erection, testing and commissioning of 3 pole, 12 KV
HG fuse set compleete on the DSS Structue complete
in all respect for 3-ph DTs
Sets
Erection, testing and Commissioning of LT
Distribution box with LTCT meter (CT Ratio 200/5 A )
with bar type CTs- 200/5 A metering, Al-Bus bar of
Adequate Size and LT control mechanism and
connections from LV Bushings to LTDB and LTDB to LT
line with Cables by providing and using Lugs,Washer
etc. complete in all respect with one no. Of TPMCCB
as per technical specifications for Three Phase 63
KVA Distribution Transformer.
No
Kg
Excavation, erection, testing and commissioning of a
set of 3 Nos pipe earthing using 40 mm dia GI pipe
3000 mm long, as per IS 1161 and as per REC
construction drawings complete with H/w and lugs
etc by providing charcoal, salt,/Bitumen Clay in
alternate layers and GI Wires 8 SWG for connections
as per scope of work, approved drawings and
technical specifications.(1 Set= 3 Nos earthing per
DT)
Per DSS
Erection, testing and commissioning of ACSR Rabbit
Conductor for jumpering by providing PG Clamps, bimetallic connectors, hardware etc as required
complete in all respect for commissioning of DSS.
Per DT
10
Excavation and erection of galvanised Stay Set as
per supply schedule by providing 0.2 cum cement
concrete (1:4:8) PCC foundations as per scope of
work, specifications and approved drawings.
Set
Sub-Total
BD
Distribution Transformer Substations 100 KVA
on 8 Mtr. 200 kg PSC Pole by Released DT
Erection, Testing and Commissioning of 50 Hz,
11/0.433 KV, oil immersed naturally cooled,
Aluminium wound outdoor type Distribution
Transformer Filled with Oil completely with all
accessories and fittings as per technical
specifications and approved Drawing.
Three Phase 100 KVA (Released DT will be utilised)
No
Erection, testing and Commissioning of 3-pole,
Distribution Class 9 KV, 5 kA Lightening Arrester for
Distribution Transformer Substation by providing and
erecting Hot Dip galvanised stranded wire 7/3.15 mm
as per scope of work, approved drawings and
technical specifications. (1 Set= 3 Nos)
Set
Excavation of pit, foundation, erection of
following Support for DSS and installation with
DT numbering as per scope of work, approved
drawings and specifications:
PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base
Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work as per approved
drawing & technical specification.
No
Erection, fixing and fitting of galvanised fabricated
steel materials- channel, angle, flats of various size
for DTstructures with bolts, nuts and washers etc.
complete in all respect as per TS and approved
drawing.
Kg
Erection, fixing and fitting, Testing and
Commissioning of Porcelain Insulators with mounting
hardware fittings etc. complete in all respect as per
TS and approved drawing.
11 KV 45 KN Disc Insulator with hardware fittings
Set
Erection, Testing and Commissioning of 12kV, 200A,
25kA, 3-ph, 3 Pin type, Horizontal Mounting type,
Gang Operated, AB Switch along with Support
Insulators, Base Channel down Pipe, Arcing Horns
etc. complete as per technical specifications
etc.complete as per technical specifications, scope
of works and approved drawings
Set
Erection, testing and commissioning of 3 pole, 12 KV
HG fuse set compleete on the DSS Structue complete
in all respect for 3-ph DTs
Sets
Erection, testing and Commissioning of LT
Distribution box with LTCT meter (CT Ratio 200/5 A )
with bar type CTs- 200/5 A metering, Al-Bus bar of
Adequate Size and LT control mechanism and
connections from LV Bushings to LTDB and LTDB to LT
line with Cables by providing and using Lugs,Washer
etc. complete in all respect with one no. Of TPMCCB
as per technical specifications for Three Phase 100
KVA Distribution Transformer.
No
Excavation, erection, testing and commissioning of a
set of 3 Nos pipe earthing using 40 mm dia GI pipe
3000 mm long, as per IS 1161 and as per REC
construction drawings complete with H/w and lugs
etc by providing charcoal, salt,/Bitumen Clay in
alternate layers and GI Wires 8 SWG for connections
as per scope of work, approved drawings and
technical specifications.(1 Set= 3 Nos earthing per
DT)
Per DSS
Erection, testing and commissioning of ACSR Rabbit
Conductor for jumpering by providing PG Clamps, bimetallic connectors, hardware etc as required
complete in all respect for commissioning of DSS.
Per DT
10
Excavation and erection of galvanised Stay Set as
per supply schedule by providing 0.2 cum cement
concrete (1:4:8) PCC foundations as per scope of
work, specifications and approved drawings.
Sub-Total
BE
Distribution Transformer Substations 63 KVA
on 8 Mtr. PSC pole by Release DT
Set
Erection, Testing and Commissioning of 50 Hz,
11/0.433 KV, oil immersed naturally cooled,
Aluminium wound outdoor type Distribution
Transformer Filled with Oil completely with all
accessories and fittings as per technical
specifications and approved Drawing.
Three Phase 63 KVA (release DT will be utilised)
No
Erection, testing and Commissioning of 3-pole,
Distribution Class 9 KV, 5 kA Lightening Arrester for
Distribution Transformer Substation by providing and
erecting Hot Dip galvanised stranded wire 7/3.15 mm
as per scope of work, approved drawings and
technical specifications. (1 Set= 3 Nos)
Set
Excavation of pit, foundation, erection of
following Support for DSS and installation with
DT numbering as per scope of work, approved
drawings and specifications:
PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base
Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work as per approved
drawing & technical specification.
No
Erection, fixing and fitting of galvanised fabricated
steel materials- channel, angle, flats of various size
for DTstructures with bolts, nuts and washers etc.
complete in all respect as per TS and approved
drawing.
Kg
Erection, fixing and fitting, Testing and
Commissioning of Porcelain Insulators with mounting
hardware fittings etc. complete in all respect as per
TS and approved drawing.
11 KV 45 KN Disc Insulator with hardware fittings
Set
Erection, Testing and Commissioning of 12kV, 200A,
25kA, 3-ph, 3 Pin type, Horizontal Mounting type,
Gang Operated, AB Switch along with Support
Insulators, Base Channel down Pipe, Arcing Horns
etc. complete as per technical specifications
etc.complete as per technical specifications, scope
of works and approved drawings
Set
Erection, testing and commissioning of 3 pole, 12 KV
HG fuse set compleete on the DSS Structue complete
in all respect for 3-ph DTs
Sets
Erection, testing and Commissioning of LT
Distribution box with LTCT meter (CT Ratio 200/5 A )
with bar type CTs- 200/5 A metering, Al-Bus bar of
Adequate Size and LT control mechanism and
connections from LV Bushings to LTDB and LTDB to LT
line with Cables by providing and using Lugs,Washer
etc. complete in all respect with one no. Of TPMCCB
as per technical specifications for Three Phase 63
KVA Distribution Transformer.
No
Excavation, erection, testing and commissioning of a
set of 3 Nos pipe earthing using 40 mm dia GI pipe
3000 mm long, as per IS 1161 and as per REC
construction drawings complete with H/w and lugs
etc by providing charcoal, salt,/Bitumen Clay in
alternate layers and GI Wires 8 SWG for connections
as per scope of work, approved drawings and
technical specifications.(1 Set= 3 Nos earthing per
DT)
Per DSS
Erection, testing and commissioning of ACSR Rabbit
Conductor for jumpering by providing PG Clamps, bimetallic connectors, hardware etc as required
complete in all respect for commissioning of DSS.
Per DT
10
Excavation and erection of galvanised Stay Set as
per supply schedule by providing 0.2 cum cement
concrete (1:4:8) PCC foundations as per scope of
work, specifications and approved drawings.
Set
Sub-Total
BF
R & M of Existing Distribution Substations
Excavation of pit, foundation, erection of following
Support for 11 KV overhead line by providing and
installing danger board and barbed Wires on
DP/TP/FP Structures and DT numbering as per scope
of work, approved drawings and Technical
specifications: for
PSC Pole 9 Mtr 400 Kg including fixing of (RCC Base
Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work , approved drawing &
technical specification. Fixing of Danger Board on
DP/TP/FP & Pole numbering.
No.
PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base
Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work , approved drawing &
technical specification. Fixing of Danger Board on
DP/TP/FP & Pole numbering.
No.
Erection, testing and Commissioning of 3-pole,
Distribution Class 9 KV, 5 kA Lightening Arrester for
Distribution Transformer Substation by providing and
erecting Hot Dip galvanised stranded wire 7/3.15 mm
as per scope of work, approved drawings and
technical specifications.(1 Set = 3 Nos)
Set
Erection, fixing and fitting of galvanised prefabricated steel materials- channel, angle, flats of
various size for DT structures with bolts, nuts and
washers etc. complete in all respect as per TS and
approved drawing.
Kg
Erection, Testing and Commissioning of 12kV, 200A,
25kA, 3-ph, 3 Pin type, Horizontal Mounting type,
Gang Operated, AB Switch along with Support
Insulators, Base Channel down Pipe, Arcing Horns
etc. complete as per technical specifications
etc.complete as per technical specifications, scope
of works and approved drawings
Set
Erection, testing and commissioning of 3 pole, 12 KV
HG fuse set compleete on the DSS Structue complete
in all respect for 3-ph DTs
Sets
Excavation, erection, testing and commissioning of a
set of 3 Nos pipe earthing using 40 mm dia GI pipe
3000 mm long, as per IS 1161 and as per REC
construction drawings complete with H/w and lugs
etc by providing charcoal, salt,/Bitumen Clay in
alternate layers and GI Wires 8 SWG for connections
as per scope of work, approved drawings and
technical specifications.(1 Set= 3 Nos earthing per
DT)
Per DSS
Erection, testing and commissioning of LT bus bar
distribution system with kit-kat complete and
jumpering Connections of 11 KV side complete by
providing & using P G clamp/ connectors in all
respect for commssioning of DSS.
Per DT
Excavation and erection of galvanised Stay Set as
per supply schedule by providing 0.2 cum cement
concrete (1:4:8) PCC foundations as per scope of
work, specifications and approved drawings.
Set
Dismentling of existing dismentled materials and
devolution of the dismantled materials i.e
Transformer angle, channel, clamp, AB Switch, HG
fuse Set etc. including storage, handling, insurance,
loading, unloading, transportation to store of Utility
as per the direction of Engineer-in-charge with
propoer accounting as per the inventory.
Per DT
Sub Total
BG
Erection, testing commissioning of New LT Line
on 3 phase ABC [3 X95Sq mm {Phase}+{1x70
Sq mm Messenger cum Neutral wire}]
Survey, route alignment & pole spotting, preparation
of survey report , Inventory after approval of
Engineer-in-charge & redressal of ROW issues.
Excavation of pit, foundation, erection of following
Support for LT line and pole numbering as per scope
of work, approved drawings and Technical
specifications:
PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base
Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work , approved drawing &
technical specification.
No
Excavation and erection of galvanised Stay Set with 50x10 mm
stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m
long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI
stranded wire by using Stone stay plate 450x450x50 mm Stay
plate foundations as per scope of work, specifications and
approved drawings.
Set
CKm
Installation, testing and commissioning of Coil
Earthing by providing GI wire no.-8SWG for
connections with nuts, bolts and washers as per
scope of work, technical specifications and approved
drawings and REC Specification(untreated).
Erection, testing and Commissioning of LT Line on AB
Cables: (average span 40 to 45 m approx.) including
all erection accessories required for successful
erection of AB Cable Complete in all respect as per
approved drawing and Technical Specification etc as
required as per scope for work for
Branching/termination etc.
3 phase ABC [3 X95Sq mm {Phase}+{1x70 Sq mm
Messenger cum Neutral wire}]
Set
Ckm
Sub Total
BH
Erection, testing commissioning of New LT Line
on 3 phase ABC [3 X70Sq mm {Phase}+{1x50
Sq mm Messenger cum Neutral wire}]
Survey, route alignment & pole spotting, preparation
of survey report , Inventory after approval of
Engineer-in-charge & redressal of ROW issues.
Excavation of pit, foundation, erection of following
Support for LT line and pole numbering as per scope
of work, approved drawings and Technical
specifications:
PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base
Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work , approved drawing &
technical specification.
CKm
No
Excavation and erection of galvanised Stay Set with 50x10 mm
stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m
long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI
stranded wire by using Stone stay plate 450x450x50 mm Stay
plate foundations as per scope of work, specifications and
approved drawings.
Set
Installation, testing and commissioning of Coil
Earthing by providing GI wire no.-8SWG for
connections with nuts, bolts and washers as per
scope of work, technical specifications and approved
drawings and REC Specification(untreated).
Set
Erection, testing and Commissioning of LT Line on AB
Cables: (average span 40 to 45 m approx.) including
all erection accessories required for successful
erection of AB Cable Complete in all respect as per
approved drawing and Technical Specification etc as
required as per scope for work for
Branching/termination etc.
3 phase ABC [3 X70Sq mm {Phase}+{1x50 Sq mm
Messenger cum Neutral wire}]
Ckm
Sub Total
BI
Erection, testing commissioning of New LT Line
on 3 phase ABC [3 X50 Sq mm {Phase}+{1x35
Sq mm Messenger cum Neutral wire}]
Survey, route alignment & pole spotting, preparation
of survey report , Inventory after approval of
CKm
Engineer-in-charge & redressal of ROW issues.
Excavation of pit, foundation, erection of following
Support for LT line and pole numbering as per scope
of work, approved drawings and Technical
specifications:
PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base
Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
No
foundation with excavated soil with pouring water as
required as per scope of work , approved drawing &
technical specification.
Excavation and erection of galvanised Stay Set with 50x10 mm
stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m
long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI
stranded wire by using Stone stay plate 450x450x50 mm Stay
plate foundations as per scope of work, specifications and
approved drawings.
Installation, testing and commissioning of Coil
Earthing by providing GI wire no.-8SWG for
connections with nuts, bolts and washers as per
Set
scope of work, technical specifications and approved
drawings and REC Specification(untreated).
Erection, testing and Commissioning of LT Line on AB
Cables: (average span 40 to 45 m approx.) including
all erection accessories required for successful
erection of AB Cable Complete in all respect as per
approved drawing and Technical Specification etc as
required as per scope for work for
Branching/termination etc.
3 phase ABC [3 X50Sq mm {Phase}+{1x35 Sq mm
Ckm
Messenger cum Neutral wire}]
Set
Sub Total
BJ
1
Construction of 3 Phase 4 Wire LT Line on 8M,
200 Kg PSC with ACSR Weasel Conductor in
Vertical configuration
Route Survey
Kms
PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base Plate of size
500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with
brick blast or boulder refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as required as
per scope of work as per approved drawing & technical
specification.
No
Erection, testing and commissioning of ACSR Weasel Conductor
including mid point jointing (by providing and using PG clamps, Al
Tape) and jumpering , binding of conductor with insulator, binding
wire, fixing and fitting of LT PVC phase spacers etc. complete in
all respect. (1 CKm= 1 km line length of 4 phase conductor)
CKM
Erection of galvanised fabricated steel materials- U clamp & stay
clamp by using Bolts, Nuts, Washer etc as per approved drawing
and TS
Kg
Excavation and erection of galvanised Stay Set with 50x10 mm
stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m
long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI
stranded wire by using Stone stay plate 450x450x50 mm Stay
plate foundations as per scope of work, specifications and
approved drawings.
Set
Spiral type earthing as per REC construction drawing J-1 including
supply of all materials like 8 SWG G.I. wire closely wound having
115 turns, 50mm dia & 450mm long coil (untreated without
charcoal & salt) in all type of soil including excavation, refilling with
earth, fixing of bolts, nuts, washers for connection with pole
support/ metalic part all complete as per TS & direction of
Engineer-in charge (individual pole earthing)
Set
Sub-Total
BK
1
Construction of 3 Phase 4 Wire LT Line on 8M,
200 Kg PSC with ACSR Weasel Conductor in
Horizontal configuration
Route Survey
Kms
PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base Plate of size
500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with
brick blast or boulder refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as required as
per scope of work as per approved drawing & technical
specification.
No
Erection, testing and commissioning of ACSR Weasel Conductor
including mid point jointing (by providing and using PG clamps, Al
Tape) and jumpering , binding of conductor with insulator, binding
wire, fixing and fitting of LT PVC phase spacers etc. complete in
all respect. (1 CKm= 1 km line length of 4 phase conductor)
CKM
Erection of galvanised fabricated steel materials- angle, flats for
over head line structures by using Bolts, Nuts, Washer etc as per
approved drawing and TS
Kg
Excavation and erection of galvanised Stay Set with 50x10 mm
stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m
long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI
stranded wire by using Stone stay plate 450x450x50 mm Stay
plate foundations as per scope of work, specifications and
approved drawings.
Set
Spiral type earthing as per REC construction drawing J-1 including
supply of all materials like 8 SWG G.I. wire closely wound having
115 turns, 50mm dia & 450mm long coil (untreated without
charcoal & salt) in all type of soil including excavation, refilling with
earth, fixing of bolts, nuts, washers for connection with pole
support/ metalic part all complete as per TS & direction of
Engineer-in charge (individual pole earthing)
Nos.
Sub-Total
BL
1
Construction of 3 Phase 4 Wire LT Line on 8M,
200 Kg PSC with ACSR Rabbit Conductor in
Horizontal configuration
Route Survey
Kms
PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base Plate of size
500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with
brick blast or boulder refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as required as
per scope of work as per approved drawing & technical
specification.
No
Erection, testing and commissioning of ACSR Rabbit Conductor
including mid point jointing (by providing and using PG clamps, Al
Tape) and jumpering , binding of conductor with insulator, binding
wire, fixing and fitting of LT PVC phase spacers etc. complete in
all respect. (1 CKm= 1 km line length of 4 phase conductor)
CKM
Erection of galvanised fabricated steel materials- angle, flats for
over head line structures by using Bolts, Nuts, Washer etc as per
approved drawing and TS
Kg
Excavation and erection of galvanised Stay Set with 50x10 mm
stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m
long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI
stranded wire by using Stone stay plate 450x450x50 mm Stay
plate foundations as per scope of work, specifications and
approved drawings.
Set
Spiral type earthing as per REC construction drawing J-1 including
supply of all materials like 8 SWG G.I. wire closely wound having
115 turns, 50mm dia & 450mm long coil (untreated without
charcoal & salt) in all type of soil including excavation, refilling with
earth, fixing of bolts, nuts, washers for connection with pole
support/ metalic part all complete as per TS & direction of
Engineer-in charge (individual pole earthing)
Nos.
Sub-Total
BM
Guarding of 33 &11 KV line
Erection, testing and commisiioning of Guarding & Lacing per
span by using Fabricated structure, Eye hook, G. I. Wire, Bolts,
nuts, washers etc. complete in all respect as per approved
drawing/REC standards.
per span
Sub Total
BN
New LT Line on 1 phase ABC [1X16 Sq mm
{Phase} + {1x25 Sq mm Messenger cum
Neutral wire}]
Survey, route alignment & pole spotting, preparation of survey
report , Inventory after approval of Engineer-in-charge &
redressal of ROW issues.
Excavation of pit, foundation, erection of following Support for LT
line and pole numbering as per scope of work, approved drawings
and Technical specifications:
PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base Plate of
size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm)
with brick blast or boulder refilling (50% depth of pole pit) and
ramming foundation with excavated soil with pouring water as
required as per scope of work , approved drawing & technical
specification.
No
Excavation and erection of galvanised Stay Set with 50x10 mm
stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m
long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI
stranded wire by using Stone stay plate 450x450x50 mm Stay
plate foundations as per scope of work, specifications and
approved drawings.
Set
Installation, testing and commissioning of Coil Earthing by
providing GI wire no.-8SWG for connections with nuts, bolts and
washers as per scope of work, technical specifications and
approved drawings and REC Specification(untreated).
Set
Erection, testing and Commissioning of LT Line on AB Cables:
(average span 40 to 45 m approx.) including all erection
accessories required for successful erection of AB Cable
Complete in all respect as per approved drawing and Technical
Specification etc as required as per scope for work for
Branching/termination etc.
1 phase ABC [1 X 16 Sq mm {Phase}+{1x35 Sq mm Messenger
cum Neutral wire}]
Sub Total
CKm
Ckm
Special Plan (BRGF
CA
R&M of existing overhead 11 KV Line by 3 phase ABC
3X120 + 1X 100 Sq.mm
Survey, route alignment & pole spotting, preparation
of survey report , Inventory after approval of
Engineer-in-charge & redressal of ROW issues.
Excavation of pit, foundation, erection of following
Support for 11 KV line and pole numbering as per
scope of work, approved drawings and Technical
specifications:
PSC Pole 9 Mtr 400 Kg including fixing of (RCC Base
Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work , approved drawing &
technical specification.
No
Excavation and erection of galvanised Stay Set with
50x10 mm stay clamp, stay guy insulator, nut bolts,
turn buckles, 1.8 m long, 16 mm diameter solid GS
stay rod & 7/12 SWG dia GI stranded wire by
providing 0.2 cum cement concrete (1:4:8) and
200x200x6 mm Stay plate foundations as per scope
of work, specifications and approved drawings.
Set
Installation, testing and commissioning of Coil
Earthing by providing GI wire no.-8SWG for
connections with nuts, bolts and washers as per
scope of work, technical specifications and approved
drawings and REC Specification.
Set
Erection, testing and Commissioning of 11 KV Line on
AB Cables including all erection accessories required
for successful erection of AB Cable Complete in all
respect as per approved drawing and Technical
Specification etc as required as per scope for work
for Branching/termination etc.
CKm
3 phase ABC [3 X 120 Sq mm {Phase}+{1 X 100
Sqmm]
Ckm
Dismentling of existing defective/damaged polesupport (Rail/joist/tubular),conductor and other
dismantled line materials from existing line and
devolution of the dismentled pole, structure,
conductor and other line materials including storage,
handling, insurance, loading, unloading,
transportation to designated store of Utility as per
the direction of Engineer-in-charge and handing over
the all dismentled material to the store of Utility with
propoer accounting as per the inventory.
Ckm
Sub Total
CB
R&M of existing overhead 11 KV Line by 3
phase ABC 3X70 + 1X 70 Sq.mm
Survey, route alignment & pole spotting, preparation
of survey report , Inventory after approval of
Engineer-in-charge & redressal of ROW issues.
Excavation of pit, foundation, erection of following
Support for 11 KV line and pole numbering as per
scope of work, approved drawings and Technical
specifications:
PSC Pole 9 Mtr 400 Kg including fixing of (RCC Base
Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work , approved drawing &
technical specification.
CKm
No
Excavation and erection of galvanised Stay Set with
50x10 mm stay clamp, stay guy insulator, nut bolts,
turn buckles, 1.8 m long, 16 mm diameter solid GS
stay rod & 7/12 SWG dia GI stranded wire by
providing 0.2 cum cement concrete (1:4:8) and
200x200x6 mm Stay plate foundations as per scope
of work, specifications and approved drawings.
Set
Installation, testing and commissioning of Coil
Earthing by providing GI wire no.-8SWG for
connections with nuts, bolts and washers as per
scope of work, technical specifications and approved
drawings and REC Specification.
Set
Erection, testing and Commissioning of 11 KV Line on
AB Cables including all erection accessories required
for successful erection of AB Cable Complete in all
respect as per approved drawing and Technical
Specification etc as required as per scope for work
for Branching/termination etc.
3 phase ABC [3 X 70 Sq mm {Phase}+{1 X 70
Sqmm]
Ckm
Dismentling of existing defective/damaged polesupport (Rail/joist/tubular),conductor and other
dismantled line materials from existing line and
devolution of the dismentled pole, structure,
conductor and other line materials including storage,
handling, insurance, loading, unloading,
transportation to designated store of Utility as per
the direction of Engineer-in-charge and handing over
the all dismentled material to the store of Utility with
propoer accounting as per the inventory.
Ckm
Sub Total
CC
R&M of existing overhead 11 KV Line by 3 phase ABC
3X35 + 1X70 Sq.mm
Survey, route alignment & pole spotting, preparation
of survey report , Inventory after approval of
Engineer-in-charge & redressal of ROW issues.
Excavation of pit, foundation, erection of following
Support for 11 KV line and pole numbering as per
scope of work, approved drawings and Technical
specifications:
PSC Pole 9 Mtr 400 Kg including fixing of (RCC Base
Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm)with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work , approved drawing &
technical specification.
No
Excavation and erection of galvanised Stay Set with
50x10 mm stay clamp, stay guy insulator, nut bolts,
turn buckles, 1.8 m long, 16 mm diameter solid GS
stay rod & 7/12 SWG dia GI stranded wire by
providing 0.2 cum cement concrete (1:4:8) and
200x200x6 mm Stay plate foundations as per scope
of work, specifications and approved drawings.
Set
Installation, testing and commissioning of Coil
Earthing by providing GI wire no.-8SWG for
connections with nuts, bolts and washers as per
scope of work, technical specifications and approved
drawings and REC Specification.
Set
Erection, testing and Commissioning of 11 KV Line on
AB Cables including all erection accessories required
for successful erection of AB Cable Complete in all
respect as per approved drawing and Technical
Specification etc as required as per scope for work
for Branching/termination etc.
3 phase ABC [3 X 35 Sq mm {Phase}+{1 X 70
Sqmm]
CKm
Ckm
Dismentling of existing defective/damaged polesupport (Rail/joist/tubular),conductor and other
dismantled line materials from existing line and
devolution of the dismentled pole, structure,
conductor and other line materials including storage,
handling, insurance, loading, unloading,
transportation to designated store of Utility as per
the direction of Engineer-in-charge and handing over
the all dismentled material to the store of Utility with
propoer accounting as per the inventory.
Ckm
Sub Total
CD
R & M of LT Line on 3 phase ABC [3 X95Sq mm
{Phase}+{1x70 Sq mm Messenger cum
Neutral wire}]
Survey, route alignment & pole spotting,
preparation of survey report , Inventory after
approval of Engineer-in-charge & redressal of
ROW issues.
Excavation of pit, foundation, erection of
following Support for LT line and pole
numbering as per scope of work, approved
drawings and Technical specifications:
PSC Pole 8 Mtr 200 Kg including fixing of
(RCC Base Plate of size 500x500x100
mm./Stone Base Plate of Size
450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring
water as required as per scope of work ,
approved drawing & technical specification.
CKm
No
Excavation and erection of galvanised Stay Set with 50x10 mm
stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m
long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI
stranded wire by using Stone stay plate 450x450x50 mm Stay
plate foundations as per scope of work, specifications and
approved drawings.
Set
Installation, testing and commissioning of
Coil Earthing by providing GI wire no.-8SWG
for connections with nuts, bolts and washers
as per scope of work, technical specifications
and approved drawings and REC
Specification(untreated).
Set
Erection, testing and Commissioning of LT
Line on AB Cables: (average span 40 to 45 m
approx.) including all erection accessories
required for successful erection of AB Cable
Complete in all respect as per approved
drawing and Technical Specification etc as
required as per scope for work for
Branching/termination etc.
3 phase ABC [3 X95Sq mm {Phase}+{1x70
Sq mm Messenger cum Neutral wire}]
Ckm
Dismentling of existing defective/damaged polesupport (Rail/joist/tubular),conductor and other
dismantled line materials from existing line and
devolution of the dismentled pole, structure,
conductor and other line materials including storage,
handling, insurance, loading, unloading,
transportation to designated store of Utility as per
the direction of Engineer-in-charge and handing over
the all dismentled material to the store of Utility with
propoer accounting as per the inventory.
Ckm
Sub Total
CE
R & M of LT Line on 3 phase ABC [3 X70Sq mm
{Phase}+{1x50 Sq mm Messenger cum
Neutral wire}]
Survey, route alignment & pole spotting,
preparation of survey report , Inventory after
approval of Engineer-in-charge & redressal of
ROW issues.
Excavation of pit, foundation, erection of
following Support for LT line and pole
numbering as per scope of work, approved
drawings and Technical specifications:
PSC Pole 8 Mtr 200 Kg including fixing of
(RCC Base Plate of size 500x500x100
mm./Stone Base Plate of Size
450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring
water as required as per scope of work ,
approved drawing & technical specification.
CKm
No
Excavation and erection of galvanised Stay Set with 50x10 mm
stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m
long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI
stranded wire by using Stone stay plate 450x450x50 mm Stay
plate foundations as per scope of work, specifications and
approved drawings.
Set
Installation, testing and commissioning of
Coil Earthing by providing GI wire no.-8SWG
for connections with nuts, bolts and washers
as per scope of work, technical specifications
and approved drawings and REC
Specification(untreated).
Set
Erection, testing and Commissioning of LT
Line on AB Cables: (average span 40 to 45 m
approx.) including all erection accessories
required for successful erection of AB Cable
Complete in all respect as per approved
drawing and Technical Specification etc as
required as per scope for work for
Branching/termination etc.
3 phase ABC [3 X70Sq mm {Phase}+{1x50
Sq mm Messenger cum Neutral wire}]
Ckm
Dismentling of existing defective/damaged polesupport (Rail/joist/tubular),conductor and other
dismantled line materials from existing line and
devolution of the dismentled pole, structure,
conductor and other line materials including storage,
handling, insurance, loading, unloading,
transportation to designated store of Utility as per
the direction of Engineer-in-charge and handing over
the all dismentled material to the store of Utility with
propoer accounting as per the inventory.
Ckm
Sub Total
CF
R &M of LT Line on 3 phase ABC [3 X50Sq mm
{Phase}+{1x35 Sq mm Messenger cum
Neutral wire}]
Survey, route alignment & pole spotting,
preparation of survey report , Inventory after
approval of Engineer-in-charge & redressal of
ROW issues.
Excavation of pit, foundation, erection of
following Support for LT line and pole
numbering as per scope of work, approved
drawings and Technical specifications:
PSC Pole 8 Mtr 200 Kg including fixing of
(RCC Base Plate of size 500x500x100
mm./Stone Base Plate of Size
450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring
water as required as per scope of work ,
approved drawing & technical specification.
CKm
No
Excavation and erection of galvanised Stay Set with 50x10 mm
stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m
long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI
stranded wire by using Stone stay plate 450x450x50 mm Stay
plate foundations as per scope of work, specifications and
approved drawings.
Set
Installation, testing and commissioning of
Coil Earthing by providing GI wire no.-8SWG
for connections with nuts, bolts and washers
as per scope of work, technical specifications
and approved drawings and REC
Specification(untreated).
Set
Erection, testing and Commissioning of LT
Line on AB Cables: (average span 40 to 45 m
approx.) including all erection accessories
required for successful erection of AB Cable
Complete in all respect as per approved
drawing and Technical Specification etc as
required as per scope for work for
Branching/termination etc.
3 phase ABC [3 X50Sq mm {Phase}+{1x35
Sq mm Messenger cum Neutral wire}]
Ckm
Dismentling of existing defective/damaged polesupport (Rail/joist/tubular),conductor and other
dismantled line materials from existing line and
devolution of the dismentled pole, structure,
conductor and other line materials including storage,
handling, insurance, loading, unloading,
transportation to designated store of Utility as per
the direction of Engineer-in-charge and handing over
the all dismentled material to the store of Utility with
propoer accounting as per the inventory.
Sub Total
Total Part C
Grand TOTAL
Ckm
Schedule 3: Erection Price Component
tion Network in Bihar Under Special Plan (BRGF) Phase-II, Balance W
t-C for all 21 Districts of North Bihar under Special Plan (BRGF) Sche
stricts: Saran, Siwan and Gopalganj
0
233 /PR/NBPDCL/2014
NIT No:-
Total
Quantity
Unit Price
for
Erection
8=5+6+7
Unit
Quantity
Qty. for
District
Saran
Qty. for
District
Siwan
Qty. for
District
Gopalganj
Qty. for
District
2400
2400
2400
600
600
600
200
200
200
40
40
40
160
160
160
120
120
120
50
50
50
60
60
60
10
10
10
50
50
50
16
16
16
0.5
0.5
0.5
40
40
40
0.5
0.5
0.5
0.9
0.9
0.9
0.1
0.1
0.1
50
50
50
2400
2400
2400
600
600
600
200
200
200
40
40
40
160
160
160
120
120
120
50
50
50
60
60
60
10
10
10
50
50
50
14
14
14
0.5
0.5
0.5
40
40
40
0.5
0.5
0.5
0.6
0.6
0.6
0.1
0.1
0.1
50
50
50
Addl. 5
MVA
Addl.10
MVA
5-10 MVA
3.15-10
MVA
3.15/1.65 MVA
3.15-5
MVA
(Released
)
1.6-5
MVA
(Released
)
Total
25
25
25
25
25
25
2.5
2.5
2.5
32
78
110
32
78
110
18
576
1404
1980
700
22400
54600
77000
32
78
110
192
468
660
51
1632
3978
5610
32
78
110
16
512
1248
1760
192
468
660
0.1
11
26
33
26
33
130
35
165
52
14
66
26
33
300
7800
2100
9900
26
33
156
42
198
30
780
210
990
26
33
208
56
264
156
42
198
26
33
2.5
2.5
7.5
12
18
10
15
115
115
115
11.33
17.8
29.13
11.33
17.8
29.13
16
181
285
466
425
4815.25
7565
12380.25
11.33
17.8
29.13
67.98
106.8
174.78
45
509.85
801
1310.85
11
18
29
14
159
249
408
68
107
175
0.1
11.33
17.8
29.13
11.33
17.8
29.13
20
227
356
583
1100
12463
19580
32043
22.66
35.6
58.26
12
136
214
350
114
1292
2029
3321
11
18
29
18
204
320
524
91
142
233
79.3
124.6
203.9
79.3
124.6
203.9
20
1586
2492
4078
365
28944.5
45479
74423.5
79.3
124.6
203.9
476
748
1223
57
4520
7102
11622
79
125
204
18
1427
2243
3670
476
748
1223
0.1
12
20
170.56
138.05
308.61
170.56
138.05
308.61
18
3070
2485
5555
365
62254.4
50388.25
112642.65
170.56
138.05
308.61
1023.36
828.3
1851.66
51
8698.56
7040.55
15739.11
0
0
171
138
309
16
2729
2209
4938
1023
828
1852
0.1
17
14
31
255.84
207.08
462.92
255.84
207.08
462.92
18
4605
3727
8333
365
93381.6
75584.2
168965.8
255.84
207.08
462.92
1535.04
1242.48
2777.52
51
13047.84
10561.08
23608.92
256
207
463
16
4093
3313
7407
1535
1242
2778
0.1
26
21
46
18
365
51
16
0.1
50
15
50
18
54
43
97
54
43
97
162
129
291
108
86
194
150
8100
6450
14550
54
43
97
162
129
291
15
810
645
1455
270
215
485
108
86
194
54
43
97
14
22
36
14
22
36
0.115
0.115
0.115
2.5
12.5
10
22.5
10
18
30
24
54
25
20
45
16
32
48
16
32
48
16
32
48
32
64
96
280
4480
8960
13440
48
96
144
16
32
48
16
32
48
16
32
48
16
32
48
16
32
48
32
64
96
37
75
112
37
75
112
37
75
112
74
150
224
265
9805
19875
29680
111
225
336
37
75
112
37
75
112
37
75
112
37
75
112
37
75
112
74
150
224
40
20
60
40
20
60
40
20
60
80
40
120
250
10000
5000
15000
120
60
180
40
20
60
40
20
60
40
20
60
40
20
60
40
20
60
80
40
120
40
21
61
40
21
61
40
21
61
80
42
122
250
10000
5250
15250
120
63
183
40
21
61
40
21
61
40
21
61
40
21
61
40
21
61
80
42
122
137
96
233
137
96
233
137
96
233
274
192
466
250
34250
24000
58250
411
288
699
137
96
233
137
96
233
137
96
233
137
96
233
137
96
233
274
192
466
42
41
83
42
41
83
42
41
83
77
75
152
77
75
152
77
75
152
36
35
71
36
35
71
36
35
71
187
356
543
18
27
0.05
0.05
18
27
187
356
543
30
5610
10680
16290
0.75
140
267
407
0.5
94
178
272
187
356
543
187
356
543
187
356
543
187
356
543
61.4
49.7
111.1
61.4
49.7
111.1
20
1228
994
2222
1.00
61.4
49.7
111.1
50
3070
2485
5555
307
249
556
10
614
497
1111
143.26
115.96
259.22
143.26
115.96
259.22
20
2865
2319
5184
1.00
143.26
115.96
259.22
200
28652
23192
51844
860
696
1555
10
1433
1160
2592
368.7
298.4
667.1
368.7
298.4
667.1
20
7374
5968
13342
1.00
368.7
298.4
667.1
200
73740
59680
133420
1843.5
1492
3335.5
10
3687
2984
6671
22.68
18.24
40.92
22.68
18.24
40.92
20
454
365
818
1.00
22.68
18.24
40.92
60
1360.8
1094.4
2455.2
45
36
82
113
91
205
22.68
18.24
40.92
52.92
42.56
95.48
52.92
42.56
95.48
20
1058
851
1910
1.00
52.92
42.56
95.48
60
3175.2
2553.6
5728.8
106
85
191
265
213
477
52.92
42.56
95.48
109.5
91.2
200.7
109.5
91.2
200.7
219
182
401
1.00
109.5
91.2
200.7
200
21900
18240
40140
219
182
401
548
456
1004
109.5
91.2
200.7
7.48
6.06
13.54
7.48
6.06
13.54
25
187
152
339
44.88
36
81
44.88
36
81
7.48
6.06
13.54
13.97
11.11
25.08
13.97
11.11
25.08
25
349.25
278
627
83.82
67
150
83.82
67
150
13.97
11.11
25.08
52.38
42.4
94.78
52.38
42.4
94.78
25
1309.5
1060
2370
314.28
254
569
314.28
254
569
52.38
42.4
94.78
25
25
25
50
12
12
ALANCE PART OF PHASE-I
41
33
74
41
33
74
41
33
74
21
11
32
21
11
32
11
32
250
14
15
14
15
14
15
28
30
250
3500
250
3750
42
45
14
15
14
15
14
15
14
15
14
15
28
30
250
850
750
1600
0.05
43
38
80
0.05
43
38
80
0.5
425
375
800
30
25500
22500
48000
0.75
638
563
1200
0.5
425
375
800
850
750
1600
850
750
1600
850
750
1600
850
750
1600
4.1
2.43
6.53
4.1
2.43
6.53
25
102.5
61
163
24.6
15
39
24.6
15
39
4.1
2.43
6.53
7.21
3.86
11.07
7.21
3.86
11.07
25
180.25
97
277
43.26
23
66
43.26
23
66
7.21
3.86
11.07
28.73
17.01
45.74
17.01
45.74
28.73
25
718.25
425
1144
172.38
102
274
172.38
102
274
28.73
17.01
45.74
12.93
7.65
20.58
12.93
7.65
20.58
20
259
153
412
1.00
12.93
7.65
20.58
50
646.5
382.5
1029
65
38
103
10
129
77
206
30.16
17.86
48.02
30.16
17.86
48.02
20
603
357
960
1.00
30.16
17.86
48.02
200
6032
3572
9604
181
107
288
10
302
179
480
18.47
10.94
29.41
18.47
10.94
29.41
20
369
219
588
1.00
18.47
10.94
29.41
200
3694
2188
5882
92
55
147
10
185
109
294
100
100
200
100
100
200
25
25
25
50
12
12
al Plan (BRGF) Phase-II PART-C
9
1.2
17.2
1.2
17.2
10
90
70
12
172
36
28
69
10
90
70
12
172
1.2
17.2
1.2
17.2
1.2
17.2
1.2
17.2
10
90
70
12
172
36
28
69
10
90
70
12
172
1.2
17.2
1.2
17.2
27
21
3.6
51.6
27
21
3.6
51.6
10
270
210
36
516
108
84
14
206
10
270
210
36
516
27
21
3.6
51.6
27
21
3.6
51.6
72
58
56
186
72
58
56
186
10
720
580
560
1860
432
348
336
1116
432
348
336
1116
72
58
56
186
72
58
56
186
180
145
140
465
180
145
140
465
10
1800
1450
1400
4650
1080
870
840
2790
1080
870
840
2790
180
145
140
465
180
145
140
465
108
87
84
279
108
87
84
279
10
1080
870
840
2790
648
522
504
1674
648
522
504
1674
108
87
84
279
108
87
84
279
Phase-II, Balance Work Of
l Plan (BRGF) Schemes
Unit
Service
tax
10
Unit
Charges
including Total Price
Erection
for
and
Erection
Service
Tax
11=9+10
12=8x11
0
0
0
0
0
0
0