0% found this document useful (0 votes)
671 views339 pages

Erection BOQ - Saran

This document provides a schedule of work items for the erection of a partly outdoor 33/11kV substation, including civil works, equipment installation, and commissioning. Some of the key work items include: 1) Earth filling and site leveling of the substation area. 2) Construction of a control room building, cable trenches, drainage system, and perimeter fencing. 3) Installation of a 10MVA power transformer, 100kVA station transformer, vacuum circuit breakers, and other switchgear. 4) Construction of indoor control panels and installation of metering equipment. 5) Erection of gantry structures and installation of conductors. 6) Testing and commission
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
671 views339 pages

Erection BOQ - Saran

This document provides a schedule of work items for the erection of a partly outdoor 33/11kV substation, including civil works, equipment installation, and commissioning. Some of the key work items include: 1) Earth filling and site leveling of the substation area. 2) Construction of a control room building, cable trenches, drainage system, and perimeter fencing. 3) Installation of a 10MVA power transformer, 100kVA station transformer, vacuum circuit breakers, and other switchgear. 4) Construction of indoor control panels and installation of metering equipment. 5) Erection of gantry structures and installation of conductors. 6) Testing and commission
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 339

Schedule 3: Erection P

Name of Work: Strengthening Of Distribution Network in Bi


Phase-I for 17 districts and Phase-II-Part-C for all 21 Distri
Districts: Saran, Siwa
Bidder's Name & Address:

NIT No

Sr. No.

Description

Unit

33/11 KV Substation Works - Partly outdoor type


substation ( 2x 10 MVA ) (with 33 KV outdoor type
bay 2 nos. and 11 KV bay indoor type 8 Nos.)

Civil works: Design, supply of all material, T&P,


labour etc for the following civil works complete as
per TS
1

Soil Investigation & Contour Survey of Substation


area as per Technical Specification

Earth Filling & Site Levelling

PER S/S

Earth work in PSS site with ordinary soil (vide


classification of soil item - A) obtained from borrow
pits free from logs, stumps, roots, rubbish or any
other ingredients likely to deteriorate or affect the
stability of the (1.00 meter filling considered size
60*40) site surface including breaking the clods
maximum to 60 mm. cube, placing the earth in
layers not exceeding 225 mm in loose thickness,
rough dressing including cost of cutting and
removing shrubs, roots falling in borrow area all
complete as per approved design & technical
specification and as per direction of Engineer in
Charge (payment will be made as per actual
requirement per cubic meter)

Cubic
Meters

Antiweded treatment and stone spreading in


switchyard area excluding road, Cable trench,
Drainage etc (Stone Spreading 6 inches over 4
inches lean cement concrete layer as per technical
specification, approved desgn and drawing and as
per directon of Engineer in Charge. (payment will be
made as per actual requirement per Square meter)

Sq. m

Construction of Boundary Wall including Barbed Wire


Fencing on MS angle over the Boundary Wall and
one Gate per Substation, including Supply,
Fabrication, Fixing, Painting all complete as per
approved Drawing & Technical Specification and as
per directon of Engineer in Charge in all 33/11 kV
new sub-stations (payment will be made as per
actual requirement per meter)

Mtr

Security fencing along with one switchyard gate per


Substation as per Technical specifications in all 33/11
kV new sub-stations - to isolate electrical yard and as
per directon of Engineer in Charge in all 33/11 kV
new sub-stations (payment will be made as per
actual requirement per meter)

Mtr

Design, engineering and construction of Control


Room Building ( Hall of control room building -16 x 8
Mtr. (size may vary as per availability of land) and
Guard room, store room, Battery room, Incharge
room & Wash room etc.) including supply of T&P,
Labour, Cement, Reinforcement Steel, Form Work,
Excavation etc, all complete as per Technical
Specification and Approved Drawing and as per
directon of Engineer in Charge in all 33/11 kV new
sub-stations (payment will be made as per actual
requirement per Sq. meter plinth area)

Sqm

Design, engineering and construction of Cable Trench


of 0.75 Mtr wide , 1.0 Mtr. depth, precast RCC Trench
Cover, Water stops, Brick Work wherever required
including supply of T&P, Labour, Cement, Sand,
Reinforcement Steel, Steel Angles, Flats, Form Work,
Excavation and providingcement plaster (1:4)
including floating coat of cement punning (1.5 MM)
with clean pores sand etc, all complete as per
Technical Specification, approved Drawing and as per
directon of Engineer in Charge in all 33/11 kV new
sub-stations (payment will be made as per actual
requirement per meter)

Mtr

Design, engineering and construction of Drainage


System in the Substation premises including supply
of T&P, Labour, Cement, , bricks, Form Work,
Excavation etc, all complete as per design, Technical
Specification and Tender Drawings in all 33/11 kV
new sub-stationas as per directon of Engineer in
Charge in all 33/11 kV new sub-stations (payment
will be made as per actual requirement per meter)

Design, engineering and construction of PCC road,


footpath including supply of T and P, labour, brick,
stone and stonechips, earth, and excavation,
compaction etc. all complete as per Technical
specifications.

width of PCC road 3.75 m- in M20, 200 mm Thick


over compacted WBM in three layers (Grade-I-100
mm thick, Grade-II-75 mm thick, Grade - III - 75mm
thick) etc as per PWD Specification and direction of
Engineer In Charge. (payment will be made as per
actual requirement per meter)

Mtr

width of footpath 1.5 m-PCC in M15, 150 mm Thick


over Brick on edge soling over 75 mm thick local
sand filling etc as per PWD Specification and
direction of Engineer In Charge. (payment will be
made as per actual requirement per meter)

Mtr

10

Mtr

Stone pitching over sloping including supply of stone


and surface preparation as per drawing and as per
Sq. Meter
direction of Engineer in charge.(payment will be
made as per actual requirement per Sq. meter)

11

Sinking of tube well and installation of motor


operated submersible pump of suitable capacity with
1000 ltr. Sintex or reputed make water tank including
GI Pipe(heavy duty) pipe line and sanitary fittings
complete in all respect for toilets , drinking water
and providing water tap near the power transformer
for watering the earth pit as per requirement. The
depth of Tube-Well should be minimum 80 mtr.

12

Design, Engineering and construction of transformer


foundation, erection, filtration, testing and
commissioning of 33/11 kV, 3 ph, 50 Hz, ONAN, Cu
Wound, Outdoor Conventional type Power
Transformer along with transformer oil, Buchholtz
relay, breather, OTI & WTI, Marshalling Box,
Conservator tank, oil level indicator, valves, 2 sets of
50x8 mm GS Neutral Earthing strips with braided
conductor on bushing end supported with insulators,
OTI & WTI Indicators, Vent explosion plug, control
wiring / cabling, cable supporting tray on the body,
transformer wheels, bushing and extended copper
connector made of 50x10 mm copper flat for
connection of 11 KV side bushing with suitable bolts
nuts and washers of Brass etc as required . 2 sets of
body earthing with 50x8 mm GS Strip as per TS ,
approved drawing and direction of Engineer in
Charge.

10 MVA with off load tap changer

Per PSS

Set

13

Design, Engineering, providing and construction of


transformer support/foundation, erection, testing and
commissioning of 100 KVA, 11/0.433 kV, 3 ph, 50 Hz,
ONAN, aluminium would outdoor type (three star
rated) Station Transformer on double pole structure
alongwith HG Fuse set, AB Switch/ Isolator, LA,
Earthing, etc complete to complete the erection
testing & commissioning of SST as required as per
specifications, approved drawing and direction of
Engineer in Charge complete in all respect.

Set

14

Excavation, erection, cement concrete foundation,


erection, testing and commissioning of all type of
structures i.e. Gantry/Swing
bus/isolator/CT/PT/PI/S.S.T structures etc. made of
joist / channel / angle / flat of different sections as
per approved drawings and direction of Engineer in
Charge complete in all respect

MT

15

Design, Engineering and construction of foundation ,


erection, testing and commissioning of 36kV, 1250A,
25kA for 3 seconds, 3-ph, Outdoor type Vacuum
Circuit breaker along with 36kV, 1-Phase, 25kA for 3
seconds, 800-400-200/1-1-1 Amp.or 800-400-200/11, Amps outdoor type Current Transformer along with
junction box (1 no junction box for 3 no of 1-phase
CTs)], Jumpers, earthing, supporting structures,
maintenance platform, marshalling box, control &
Power cabling between VCB and indoor control panel
and required accessories complete as per approved
drawings, technical specifications and direction of
Engineer in Charge and scope of the work.

Set

16

Design, Engineering providing and installation of


ISMC 75 channel on top of indoor trench, erection of
panels on ISMC 75 channels, welding, testing and
commissioning of 33kV indoor Control & Relay panel
along with E/F & O/C relays, control and power supply
cabling in trench between field equipment and
panels, Mimic Diagram, Voltmeter, Ammeter,
Annunciation Windows with annunciation relays and
other components etc as per approved drawings,
technical specifications and scope of the work for
controlling complete in all respect

33 kV feeder Panel (without diffirential relays) with


DLMS (modem compactible ) Trivector Static Energy
Meter complete

No

33 kV Transformer Panel (with diffirential relays) with


DLMS (modem compactible ) Trivector Static Energy
Meter complete

No

17

Design, Engineering and construction , Erection,


testing and commissioning of 36kV, 800 A, 25kA , 3ph double break center rotating type (DBCR), Gang
Operated, isolator along with Support Insulators,
Operating Mechanism, Base Channel down Pipe and
all required accessories complete as per approved
drawings, technical specifications and scope of the
work,(with and without Earth Switch)

Set

18

Design, Engineering , Erection, testing and


Commissioning of 30 kV, 10kA, 1-ph Station Class
Lightening Arresters with mounting on erected
structures, jumpering from bus bar, earthing
connection using 50x6mm GS flat, hardware etc as
required, as per approved drawings, technical
specifications and scope of the work complete in all
respect (1 Set= 3 Nos)

Set

19

Design, Engineering, Erection, testing and


Commissioning of 9kV, 10kA, 1-ph Station Class
Lightening Arrester with mounting on erected
structure, jumpering from bus bar, earthing
connection using 50x6mm GS flat, hardware, etc as
required as per approved drawings, technical
specifications and scope of the work. (1 Set=3 Nos)

Set

20

Design, Engineering and construction , Erection,


testing and Commissioning of 36 kV, 1-Phase,
33kV/110 volt, Single core outdoor type Potential
transformer along with junction box (1 no junction
box for 3 no of 1-phase PTs) including control and
power supply cabling, earthing connection using
50x6mm GS flat and required accessories etc.,
complete as per as per approved drawings, technical
specifications and scope of the work,

Set

21

Design, Engineering and construction , erection,


wiring, testing and commissioning of 12 kV, 1250
A/630 A , 25kA, 3-ph, indoor type Vacuum Circuit
breaker along with 12 kV, 1-Phase, 25kA for 3
seconds, 600-300-150/5-5 A and 1200-600-300/1-1-1
A CT , PT, and along with control and relay panel
consisting of Ammeter, volt-meter, E/F, O/C ,diff.
Relay and 3 Phase Energy meter & accessories
complete cabling between VCB and indoor control
panel and required accessories complete as per
approved drawings, technical specifications and
scope of the work,

For Transformer Protection

No

For Feeder Protection

No

For Bus Coupler

No

22

Installation, initial charging, cabling, interconnection


cabling, testing and commissioning of 30 V, 100 AH
Pb Acid battery on battery stand made of teak wood
duly painted with anti acid resistive paint, battery
insulators, inter-battery wiring using 30 sqm copper
single core multi strand cable, terminal connectors, &
all other accessories and connectors as per as per
approved drawings, technical specifications and
scope of the work complete in all respect,

Set

23

Design, engineering, construction , Installation,


interconnection cabling, testing and commissioning
of 30V, 40 Amp. Float-Cum-Boost Battery Charger
with full wave rectification for 230 V, 1 phase, 50 Hz
AC Input Supply with DCDB (as per supply schedule)
as per approved drawings, technical specifications
and scope of the work complete in all respect

No

24

Design, engineering, construction , Installation,


interconnection cabling, testing and commissioning
of 30V Supply DCDB as per approved drawings,
technical specifications and scope of the work &
supply schedule complete in all respect.

No

25

Design, engineering, construction , Installation,


interconnection cabling, testing and commissioning
of 433V, ACDB as per approved drawings, technical
specifications and scope of the work,

No

25

Excavation, laying, welding, refilling, earthing &


grounding of MS Flat as per Approved drawing and
erection of riser up to various equipment/structures
as per scope of the work, specifications and
approved drawings,

75 x 8 mm MS flat for ground mat

MT

50 x 6 mm Galvanized GS flat (risers)

MT

25 mm dia MS Rod 3 m long for earth mat

MT

26

Excavation, erection, testing and commissioning of


40 mm dia., 3000 mm long GI pipe earth electrode
by providing test link, RCC pit, RCC cover, placed on
GI frame, Charcoal & Salt in alternate layer as per
REC Specification and other accessories complete as
per approved drawings, technical specifications and
scope of the work for power transformer neutral,
station transformer neutral, lightening arresters
direct earthing.

Set

27

Erection, testing and commissioning of Bus Bar,


jumpering and Dropper (Zebra Conductor), by using
all types of insulators, clamps and connectors (by
providing & using) etc. with all accessories complete
in all respect.

Per PSS

28

Erection, testing and commissioning of Sub-Station


Lighting System (External+Internal) with proper
illumination levels complete for Switchyard, Control
Room building, Main gate and Sub station boundary
including all associated materials etc complete in all
respect as per applicable TS and approved drawing.

Per PSS

29

Erection, testing and commissioning of Fire Fighting


Equipment as per Supply Schedule

Set

30

Design, engineering,Erection, testing and


commissioning ofFully automatic Capacitor bank with
automatic control panel, isolator,indoor type suitable
Vacuum Circuit Breaker, mounting structures, All
types of cable (11 KV grade 185 sqmm, XLPE &
control cable etc.) & its accessories complete ,
earthing etc as required as per technical
specifications, approved drawings, scope of the
works of following capacities: (Banks in Muiltiple of
600 KVAR as per REC Specification)

1200 KVAr

Set

3600 KVAr

Set

31

Erection, testing and commissioning of All types


control cable and LT power cable required for the
commissioning of sub-station

32

Laying & termination, Testing and commissioning of


11 KV grade, XLPE, power cable armored, aluminium
conductor, stranded complete in all respect as per
Technical Specification.

Per PSS

1Cx 630 sqmm (Un -armoured)

km

3Cx 185 sqmm (armoured)

km

3Cx35 Sqmm (Un -armoured)

km

33

Design, Engineering and construction , Erection,


testing and commissioning of 12 kV, 630 A, 25 kA, 3ph double break center rotating type (DBCR), Gang
Operated, isolator along with Support Insulators,
Operating Mechanism, Base Channel down Pipe and
all required accessories complete as per approved
drawings, technical specifications and scope of the
work, (with and without earth Switch)

Set

34

Erection, testing & commissioning of pipe bus by


using IPS Aluminium Pipe 65 mm. dia.with all types of
Clamps and Connectors and insulator as per TS &
approved drawings

Mtr.

Sub Total

33/11 KV Substation Works - Partly outdoor type


substation ( 2x 5 MVA ) (with 33 KV outdoor type
bay 2 nos. and 11 KV bay indoor type 4 Nos.)

Civil works: Design, supply of all material, T&P,


labour etc for the following civil works complete as
per TS

Soil Investigation & Contour Survey of Substation


area as per Technical Specification

Earth Filling & Site Levelling

Earth work in PSS site with ordinary soil (vide


classification of soil item - A) obtained from borrow
pits free from logs, stumps, roots, rubbish or any
other ingredients likely to deteriorate or affect the
stability of the (1.00 meter filling considered size
60*40) site surface including breaking the clods
maximum to 60 mm. cube, placing the earth in
layers not exceeding 225 mm in loose thickness,
rough dressing including cost of cutting and
removing shrubs, roots falling in borrow area all
complete as per approved design & technical
specification and as per direction of Engineer in
Charge (payment will be made as per actual
requirement per cubic meter)

Cubic
Meters

Antiweded treatment and stone spreading in


switchyard area excluding road, Cable trench,
Drainage etc (Stone Spreading 6 inches over 4
inches lean cement concrete layer as per technical
specification, approved desgn and drawing and as
per directon of Engineer in Charge. (payment will be
made as per actual requirement per Square meter)

Sq. m

Construction of Boundary Wall including Barbed Wire


Fencing on MS angle over the Boundary Wall and
one Gate per Substation, including Supply,
Fabrication, Fixing, Painting all complete as per
approved Drawing & Technical Specification and as
per directon of Engineer in Charge in all 33/11 kV
new sub-stations (payment will be made as per
actual requirement per meter)

Mtr

PER S/S

Security fencing along with one switchyard gate per


Substation as per Technical specifications in all 33/11
kV new sub-stations - to isolate electrical yard and as
per directon of Engineer in Charge in all 33/11 kV
new sub-stations (payment will be made as per
actual requirement per meter)

Mtr

Design, engineering and construction of Control


Room Building ( Hall of control room building -16 x 8
Mtr. (size may vary as per availability of land) and
Guard room, store room, Battery room, Incharge
room & Wash room etc.) including supply of T&P,
Labour, Cement, Reinforcement Steel, Form Work,
Excavation etc, all complete as per Technical
Specification and Approved Drawing and as per
directon of Engineer in Charge in all 33/11 kV new
sub-stations (payment will be made as per actual
requirement per Sq. meter plinth area)

Sqm

Design, engineering and construction of Cable Trench


of 0.75 Mtr wide , 1.0 Mtr. depth, precast RCC Trench
Cover, Water stops, Brick Work wherever required
including supply of T&P, Labour, Cement, Sand,
Reinforcement Steel, Steel Angles, Flats, Form Work,
Excavation and providingcement plaster (1:4)
including floating coat of cement punning (1.5 MM)
with clean pores sand etc, all complete as per
Technical Specification, approved Drawing and as per
directon of Engineer in Charge in all 33/11 kV new
sub-stations (payment will be made as per actual
requirement per meter)

Mtr

Design, engineering and construction of Drainage


System in the Substation premises including supply
of T&P, Labour, Cement, , bricks, Form Work,
Excavation etc, all complete as per design, Technical
Specification and Tender Drawings in all 33/11 kV
new sub-stationas as per directon of Engineer in
Charge in all 33/11 kV new sub-stations (payment
will be made as per actual requirement per meter)

Design, engineering and construction of PCC road,


footpath including supply of T and P, labour, brick,
stone and stonechips, earth, and excavation,
compaction etc. all complete as per Technical
specifications.

width of PCC road 3.75 m- in M20, 200 mm Thick


over compacted WBM in three layers (Grade-I-100
mm thick, Grade-II-75 mm thick, Grade - III - 75mm
thick) etc as per PWD Specification and direction of
Engineer In Charge. (payment will be made as per
actual requirement per meter)

Mtr

width of footpath 1.5 m-PCC in M15, 150 mm Thick


over Brick on edge soling over 75 mm thick local
sand filling etc as per PWD Specification and
direction of Engineer In Charge. (payment will be
made as per actual requirement per meter)

Mtr

10

Mtr

Stone pitching over sloping including supply of stone


and surface preparation as per drawing and as per
Sq. Meter
direction of Engineer in charge.(payment will be
made as per actual requirement per Sq. meter)

11

Sinking of tube well and installation of motor


operated submersible pump of suitable capacity with
1000 ltr. Sintex or reputed make water tank including
GI Pipe(heavy duty) pipe line and sanitary fittings
complete in all respect for toilets , drinking water
and providing water tap near the power transformer
for watering the earth pit as per requirement. The
depth of Tube-Well should be minimum 80 mtr.

12

Design, Engineering and construction of transformer


foundation, erection, filtration, testing and
commissioning of 33/11 kV, 3 ph, 50 Hz, ONAN, Cu
Wound, Outdoor Conventional type Power
Transformer along with transformer oil, Buchholtz
relay, breather, OTI & WTI, Marshalling Box,
Conservator tank, oil level indicator, valves, 2 sets of
50x8 mm GS Neutral Earthing strips with braided
conductor on bushing end supported with insulators,
OTI & WTI Indicators, Vent explosion plug, control
wiring / cabling, cable supporting tray on the body,
transformer wheels, bushing and extended copper
connector made of 50x10 mm copper flat for
connection of 11 KV side bushing with suitable bolts
nuts and washers of Brass etc as required . 2 sets of
body earthing with 50x8 mm GS Strip as per TS and
as per direction of Engineer in Charge

5 MVA with off load tap changer

Per PSS

Set

13

Design, Engineering, providing and construction of


transformer support/foundation, erection, testing and
commissioning of 100 KVA, 11/0.433 kV, 3 ph, 50 Hz,
ONAN, aluminium would outdoor type (three star
rated) Station Transformer on double pole structure
alongwith HG Fuse set, AB Switch/ Isolator, LA,
Earthing, etc complete to complete the erection
testing & commissioning of SST as required as per
specifications & drawings complete in all respect.as
per direction of Engineer in Charge

Set

14

Excavation, erection, cement concrete foundation,


erection, testing and commissioning of all type of
structures i.e. Gantry/Swing
bus/isolator/CT/PT/PI/S.S.T structures etc. made of
joist / channel / angle / flat of different sections as
per approved drawings complete in all respect as per
direction of Engineer in Charge

MT

15

Design, Engineering and construction of foundation ,


erection, testing and commissioning of 36kV, 1250A,
25kA for 3 seconds, 3-ph, Outdoor type Vacuum
Circuit breaker along with 36kV, 1-Phase, 25kA for 3
seconds, 800-400-200/1-1-1 Amp.or 800-400-200/11, Amps outdoor type Current Transformer along with
junction box (1 no junction box for 3 no of 1-phase
CTs)], Jumpers, earthing, supporting structures,
maintenance platform, marshalling box, control &
Power cabling between VCB and indoor control panel
and required accessories complete as per approved
drawings, technical specifications and scope of the
work. as per direction of Engineer in Charge

Set

16

Design, Engineering providing and installation of


ISMC 75 channel on top of indoor trench, erection of
panels on ISMC 75 channels, welding, testing and
commissioning of 33kV indoor Control & Relay panel
along with E/F & O/C relays, control and power supply
cabling in trench between field equipment and
panels, Mimic Diagram, Voltmeter, Ammeter,
Annunciation Windows with annunciation relays and
other components etc as per approved drawings,
technical specifications and scope of the work for
controlling complete in all respect

33 kV feeder Panel (without diffirential relays) with


DLMS (modem compactible ) Trivector Static Energy
Meter complete

No

33 kV Transformer Panel (with diffirential relays) with


DLMS (modem compactible ) Trivector Static Energy
Meter complete

No

17

Design, Engineering and construction , Erection,


testing and commissioning of 36kV, 800 A, 25kA , 3ph double break center rotating type (DBCR), Gang
Operated, isolator along with Support Insulators,
Operating Mechanism, Base Channel down Pipe and
all required accessories complete as per approved
drawings, technical specifications and scope of the
work,(with and without Earth Switch)

Set

18

Design, Engineering , Erection, testing and


Commissioning of 30 kV, 10kA, 1-ph Station Class
Lightening Arresters with mounting on erected
structures, jumpering from bus bar, earthing
connection using 50x6mm GS flat, hardware etc as
required, as per approved drawings, technical
specifications and scope of the work complete in all
respect (1 Set= 3 Nos)

Set

19

Design, Engineering, Erection, testing and


Commissioning of 9kV, 10kA, 1-ph Station Class
Lightening Arrester with mounting on erected
structure, jumpering from bus bar, earthing
connection using 50x6mm GS flat, hardware, etc as
required as per approved drawings, technical
specifications and scope of the work. (1 Set=3 Nos)

Set

20

Design, Engineering and construction , Erection,


testing and Commissioning of 36 kV, 1-Phase,
33kV/110 volt, Single core outdoor type Potential
transformer along with junction box (1 no junction
box for 3 no of 1-phase PTs) including control and
power supply cabling, earthing connection using
50x6mm GS flat and required accessories etc.,
complete as per as per approved drawings, technical
specifications and scope of the work,

Set

21

Design, Engineering and construction , erection,


wiring, testing and commissioning of 12 kV, 1250
A/630 A , 25kA, 3-ph, indoor type Vacuum Circuit
breaker along with 12 kV, 1-Phase, 25kA for 3
seconds, 600-300-150/5-5 A and 1200-600-300/1-1-1
A CT , PT, and along with control and relay panel
consisting of Ammeter, volt-meter, E/F, O/C ,diff.
Relay and 3 Phase Energy meter & accessories
complete cabling between VCB and indoor control
panel and required accessories complete as per
approved drawings, technical specifications and
scope of the work,

For Transformer Protection

No

For Feeder Protection

No

For Bus Coupler

No

22

Installation, initial charging, cabling, interconnection


cabling, testing and commissioning of 30 V, 100 AH
Pb Acid battery on battery stand made of teak wood
duly painted with anti acid resistive paint, battery
insulators, inter-battery wiring using 30 sqm copper
single core multi strand cable, terminal connectors, &
all other accessories and connectors as per as per
approved drawings, technical specifications and
scope of the work complete in all respect,

Set

23

Design, engineering, construction , Installation,


interconnection cabling, testing and commissioning
of 30V, 40 Amp. Float-Cum-Boost Battery Charger
with full wave rectification for 230 V, 1 phase, 50 Hz
AC Input Supply with DCDB (as per supply schedule)
as per approved drawings, technical specifications
and scope of the work complete in all respect

No

24

Design, engineering, construction , Installation,


interconnection cabling, testing and commissioning
of 30V Supply DCDB as per approved drawings,
technical specifications and scope of the work &
supply schedule complete in all respect.

No

25

Design, engineering, construction , Installation,


interconnection cabling, testing and commissioning
of 433V, ACDB as per approved drawings, technical
specifications and scope of the work,

No

25

Excavation, laying, welding, refilling, earthing &


grounding of MS Flat as per Approved drawing and
erection of riser up to various equipment/structures
as per scope of the work, specifications and
approved drawings,

75 x 8 mm MS flat for ground mat

MT

50 x 6 mm Galvanized GS flat (risers)

MT

25 mm dia MS Rod 3 m long for earth mat

MT

26

Excavation, erection, testing and commissioning of


40 mm dia., 3000 mm long GI pipe earth electrode
by providing test link, RCC pit, RCC cover, placed on
GI frame, Charcoal & Salt in alternate layer as per
REC Specification and other accessories complete as
per approved drawings, technical specifications and
scope of the work for power transformer neutral,
station transformer neutral, lightening arresters
direct earthing.

Set

27

Erection, testing and commissioning of Bus Bar,


jumpering and Dropper (Zebra Conductor), by using
all types of insulators, clamps and connectors etc.
with all accessories complete in all respect.

Per PSS

28

Erection, testing and commissioning of Sub-Station


Lighting System (External+Internal) with proper
illumination levels complete for Switchyard, Control
Room building, Main gate and Sub station boundary
including all associated materials etc complete in all
respect as per applicable TS and approved drawing.

Per PSS

29

Erection, testing and commissioning of Fire Fighting


Equipment as per Supply Schedule

Set

30

Design, engineering,Erection, testing and


commissioning ofFully automatic Capacitor bank with
automatic control panel, isolator,indoor type suitable
Vacuum Circuit Breaker, mounting structures, All
types of cable (11 KV grade 185 sqmm, XLPE &
control cable etc.) & its accessories complete ,
earthing etc as required as per technical
specifications, approved drawings, scope of the
works of following capacities: (Banks in Muiltiple of
600 KVAR as per REC Specification)

1200 KVAr

Set

3600 KVAr

Set

31

Erection, testing and commissioning of All types


control cable and LT power cable required for the
commissioning of sub-station

32

Laying & termination, Testing and commissioning of


11 KV grade, XLPE, power cable armored, aluminium
conductor, stranded complete in all respect as per
Technical Specification.

Per PSS

1Cx 630 sqmm (Un -armoured)

km

3Cx 185 sqmm (armoured)

km

3Cx35 Sqmm (Un -armoured)

km

33

Design, Engineering and construction , Erection,


testing and commissioning of 12 kV, 630 A, 25 kA, 3ph double break center rotating type (DBCR), Gang
Operated, isolator along with Support Insulators,
Operating Mechanism, Base Channel down Pipe and
all required accessories complete as per approved
drawings, technical specifications and scope of the
work, (with and without earth Switch)

Set

34

Erection, testing & commissioning of pipe bus by


using IPS Aluminium Pipe 65 mm. dia.with all types of
Clamps and Connectors and insulator as per TS &
approved drawings

Mtr.

Sub Total

Additional/Augmentation of Power Transformers

No

Additional/Augmentation of Power Transformers

No

Civil works: Design, supply of all material, T&P,


labour etc for the following civil works complete as
per TS

Earth Filling & Site Levelling

Cu.m

Gravel filling in switchyard area excluding road and


footpath as per TS.

Sq. m

Design, engineering and construction of Cable Trench


of 0.75 Mtr wide , 1.0 Mtr. depth, precast RCC Trench
Cover, Water stops, Brick Work wherever required
including supply of T&P, Labour, Cement, Sand,
Reinforcement Steel, Steel Angles, Flats, Form Work,
Excavation and providingcement plaster (1:4)
including floating coat of cement punning (1.5 MM)
with clean pores sand etc, all complete as per
Technical Specification, approved Drawing and as per
direction of Engineer in Charge. (Payment will be
made as per actual requirement per Mtr.)

Mtr

Design, engineering and construction of Drainage


System in the Substation premises including supply
of T&P, Labour, Cement, , bricks, Form Work,
Excavation etc, all complete as per design, Technical
Specification and Tender Drawings in all 33/11 kV
new sub-station as per direction of Engineer in
Charge. (Payment will be made as per actual
requirement per Mtr.)

Substation works

Design, Engineering and construction of transformer


foundation, erection, filtration, testing and
commissioning of 33/11 kV, 3 ph, 50 Hz, ONAN, Cu
Wound, Outdoor Conventional type Power
Transformer along with transformer oil , Buchholtz
relay, breather, OTI & WTI, Marshalling Box,
Conservator tank, oil level indicator, valves, 2 sets of
50x8 mm GS Neutral Earthing strips with braided
conductor on bushing end supported with insulators,
OTI & WTI Indicators, Vent explosion plug, control
wiring / cabling, cable supporting tray on the body,
transformer wheels, bushing and extended copper
connector made of 50x10 mm copper flat for
connection of 11 KV side bushing with suitable bolts
nuts and washers of Brass etc as required . 2 sets of
body earthing with 50x8 mm GS Strip as per TS and
as per direction of Engineer in Charge.

5 MVA

Set

10 MVA

Set

Mtr

Dismantaling, Transportation from existing site to


proposed site, Installation, Erection, Testing and
Commisiioning of 5 MVA released Power Transformers
with suitable Clamps, Connectors, bolts nuts and
washers of Brass etc as required with 2 sets each of
body & neutral earthing with 50x8 mm GS Strip as
per TS completely required for commissioning.

Set

Modification of existing Power Transformer foundation


required for installation and commissionig of
augmented 5/10 MVA Power Transformers completely
as per TS. (As per requirement)

Nos

Design, Engineering , erection, testing and


commissioning of 36kV, 1250A, 25kA for 3 seconds,
3-ph, Outdoor type Vacuum Circuit breaker along
with 36kV, 1-Phase, 25kA for 3 seconds, 800-400200/1-1-1 Amp.or 800-400-200/1-1, Amps outdoor
type Current Transformer along with junction box (1
no junction box for 3 no of 1-phase CTs)], Jumpers,
earthing, supporting structures, maintenance
platform, marshalling box, control & Power cabling
between VCB and indoor control panel and required
accessories complete as per approved drawings,
technical specifications, scope of the work and as per
direction of Engineer in Charge. (For released Power
Transformers)

Nos

Excavation, erection, cement concrete foundation,


erection, testing and commissioning of all type of
structures i.e. Swing bus/isolator/VCB/CT/PT/PI
structure etc. made of joist / channel / angle / flat of
different sections as per approved drawings

MT

10

Design, Engineering and construction of VCB


foundation , erection, testing and commissioning of
36kV, 1250A, 25kA for 3 seconds, 3-ph, Outdoor
type Vacuum Circuit breaker along with 36kV, 1Phase, 25kA for 3 seconds, 800-400-200/1-1-1
Amp.or 800-400-200/1-1, Amps outdoor type Current
Transformer along with junction box (1 no junction
box for 3 no of 1-phase CTs)], Jumpers, earthing,
supporting structures, maintenance platform,
marshalling box, control & Power cabling between
VCB and indoor control panel and required
accessories complete as per approved drawings,
technical specifications and scope of the work.

11

Design, Engineering providing and installation of


ISMC 75 channel on top of indoor trench, erection of
panels on ISMC 75 channels, welding, testing and
commissioning of 33kV indoor Control & Relay panel
along with E/F & O/C relays, control and power supply
cabling in trench between field equipment and
panels, Mimic Diagram, Voltmeter, Ammeter,
Annunciation Windows with annunciation relays and
other components etc as per approved drawings,
technical specifications and scope of the work for
controlling:

12

33 kV Transformer VCB (with diffirential relays)

Design, Engineering and construction , Erection,


testing and commissioning of 36kV,800 A, 25kA, 3-ph
double break center rotating type (DBCR), Gang
Operated, isolator along with Support Insulators,
Operating Mechanism, Base Channel down Pipe and
all required accessories complete as per approved
drawings, technical specifications and scope of the
work, (with and without Earth Switch)

Set

No

Set

13

Design, Engineering and construction , erection,


testing and commissioning of 12kV, 1250A, 25kA for
3 seconds, 3-ph, Outdoor type Vacuum Circuit
breaker along with 12kV, 1-Phase, 25kA for 3
seconds, 1200-600-300/1-1-1 Amp.(having 3
secondary core), outdoor type Current Transformer
along with junction box (1 no junction box for 3 no of
1-phase CTs)], Jumpers, earthing, supporting
structures, maintenance platform, marshalling box,
control & Power cabling between VCB and indoor
control panel and required accessories complete as
per approved drawings, technical specifications and
scope of the work.

Set

14

12 KV Control & Relay panel for 12 KV VCB (suitable


for 30 V DC tripping/closing coil and associated
control Circuitry) alongwith, ElF & O/C relays, Static
energy meter (class 0.5 with communication port) ,
Mimic Diagram, Voltmete, Ammeter, etc complete as
per REC

No

15

Excavation, laying, welding, refilling, earthing &


grounding of conductor as per Approved Electrical
Layout for each sub station with ten no of treated
40mm dia, 3000 mm long GI pipe (Medium gauge)
earth electode by providing test link, RCC pit, RCC
cover, placed on GI frame, Charcoal & Salt in
alternate layer as per REC Specification and other
accessories complete as per approved drawings,
technical specifications and scope of the work for
power transformer neutral, station transformer
neutral up to various equipment/structures as per
scope of the work, specifications and approved
drawings etc (treated earthing)

Set per
Power
Transform
er bay

16

Erection, testing and commissioning of Bus Bar,


jumpering and Dropper (Zebra conductor), by using
all types of insulators, clamps and connectors etc.
with all accessories complete in all respect.

17

Design, Engineering and construction , Erection,


testing and commissioning of 12 kV, 630 A, 25 kA , 3ph double break center rotating type (DBCR), Gang
Operated, isolator along with Support Insulators,
Operating Mechanism, Base Channel down Pipe and
all required accessories complete as per approved
drawings, technical specifications and scope of the
work,

Set

18

Dismentling of existing dismentled materials and


devolution of the dismantled materials including
storage, handling, insurance, loading, unloading,
transportation to store of Utility as per the direction
of Engineer-in-charge with propoer accounting as per
the inventory.

Per
Transformer

Per Power
Transform
er Bay

Sub Total

Erection, testing commissioning of NEW 33 KV Line


on rail pole with ACSR wolf Conductor

Survey, route alignment & pole spotting, preparation


of survey report after approval of Engineer-in-charge
& redressal of ROW issues.

Excavation of pit, foundation, erection of following


Support for 33 KV overhead line (by installing danger
board and barbed Wires on DP/TP/FP Structures) and
pole numbering as per scope of work, approved
drawings and Technical specifications:

CKm

13 m long 52 Kg/mtr. Rail Pole (Painted with 2 coat


Red oxide, 2 coat Al-Paint and 1/6th part of the Rail
pole from bottom with Black enamel paint cf
Reputed make) including fixing of (RCC Base Plate
of size 500x500x100 mm./Stone Base Plate of Size
450x450x50mm) with cement concreting foundation
and top mopping (1:4:8) (0.65 cmt per pole).

No.

Erection of galvanised fabricated steel materialsChannels, angle, flats for over head line structures by
using Bolts, Nuts, Washer etc as per approved
drawing and TS

Kg

Erection, testing and commissioning of ACSR Wolf


Conductor including mid point jointing sleeves fixing
and jumpering, binding of conductor with pin
insulator and disc insulator by providing and using
Aluminium tape at DP and all cut-points and angle
points by using PG Clamp etc. including fixing &
fitting of Danzer board, barbed wire at DP/TP/FP as
required (1 CKm= 1 km line length of 3 phase
conductor)

CKM

Erection, testing and commissioning of 33 KV


porcelain Disc insulator assembly (1 set DI= 3 nos
DI) 70 KN along with HW fittings complete by
providing Al. Tape in all respect as per TS & approved
drawings.

Set

Erection, Testing and Commissioning of 33 KV


porcelain Pin Insulators with GI PIN complete in all
respect as per TS & approved drawings.

Set

Earthing

a)

Excavation, Erecting, Testing and Commissioning of


Pipe type untreated earthing by providing & using 8
SWG GI wire for connections complete in all respect
and approved drawing as per TS.

Set

b)

Excavation, Erecting, Testing and Commissioning of


Coil type untreated earthing by providing & using 8
SWG GI wire for connections complete in all respect
and approved drawing as per TS.

Set

Excavation, Foundation and erection of galvanised


Stay Set complete in all respect as per supply
schedule by providing 0.2 cum cement concrete
(1:4:8) PCC foundations as per scope of work,
specifications and approved drawings.

Set

Design, Engineering and construction , Erection,


testing and commissioning of 36kV, 800 A, 25kA , 3ph double break center rotating type (DBCR), Gang
Operated, isolator along with Support Insulators,
Operating Mechanism, Base Channel down Pipe and
all required accessories complete as per approved
drawings, technical specifications and scope of the
work,(with and without Earth Switch)

Set

Sub-Total

Erection, testing commissioning of Reconductoring


of 33 KV Line By ACSR Wolf Conductorr

Survey, route alignment & pole spotting, preparation of


survey report , Inventory after approval of Engineer-incharge & redressal of ROW issues.

Excavation of pit, foundation, erection of following


Support for 33 KV overhead line by providing and
installing danger board and barbed Wires on DP/TP/FP
Structures and pole numbering as per scope of work,
approved drawings and Technical specifications:

CKm

11 m long 52 Kg/mtr. Rail Pole (Painted with 2 coat Red


oxide, 2 coat Al-Paint and 1/6th part of the Rail pole from
bottom with Black enamel paint cf Reputed make)
including fixing of (RCC Base Plate of size 500x500x100
mm./Stone Base Plate of Size 450x450x50mm) with
cement concreting foundation and top mopping (1:4:8)
(0.54 cmt per pole).

No.

13 m long 52 Kg/mtr. Rail Pole (Painted with 2 coat Red


oxide, 2 coat Al-Paint and 1/6th part of the Rail pole from
bottom with Black enamel paint cf Reputed make)
including fixing of RCC/Stone Base plate (500X500X100
mm) with cement concreting foundation and top mopping
(1:4:8) (0.65 cmt per pole).

Kg

PSC Pole 9 Mtr 400 Kg including fixing of RCC Base plate


(500x500x100 mm) with brick blast or boulder refilling
(50% depth of pole pit) and ramming foundation with
excavated soil with pouring water as required as per
scope of work , approved drawing & technical
specification. Fixing of Danger Board on DP/TP/FP & Pole
numbering.

Nos

Erection of galvanised fabricated steel materialsChannels, angle, flats for over head line structures by
providing and using Bolts, Nuts, Washer etc as per
approved drawing and TS

Kg

Erection, testing and commissioning of ACSR Wolf


Conductor including mid point jointing sleeves fixing and
jumpering, binding of conductor with pin insulator and
disc insulator by providing and using Aluminium tape at
DP and all cut-points and angle points by using PG Clamp
etc. as required (1 CKm= 1 km line length of 3 phase
conductor)

CKM

Erection, testing and commissioning of 33 KV porcelain


Disc insulator 70 KN along with HW fittings complete in all
respect as per TS & approved drawings.

Set

Erection, Testing and Commissioning of 33 KV porcelain


Pin Insulators with GI PIN complete in all respect as per TS
& approved drawings.

Set

Earthing

a)

Excavation, Erecting, Testing and Commissioning of Pipe


type untreated earthing by providing & using 8 SWG GI
wire for connections complete in all respect and approved
drawing as per TS.

Set

b)

Excavation, Erecting, Testing and Commissioning of Coil


type untreated earthing by providing & using 8 SWG GI
wire for connections complete in all respect and
approved drawing as per TS.

Set

Excavation, Foundation and erection of galvanised Stay


Set complete in all respect as per supply schedule by
providing 0.2 cum cement concrete (1:4:8) PCC
foundations as per scope of work, specifications and
approved drawings.

Set

Dismentling of existing defective/damaged polesupport (Rail/joist/tubular),conductor and other


dismantled line materials from existing line and
devolution of the dismentled pole, structure,
conductor and other line materials including storage,
handling, insurance, loading, unloading,
transportation to designated store of Utility as per
the direction of Engineer-in-charge and handing over
the pole and other dismentled material to the store
of Utility with propoer accounting as per the
inventory.

Ckm

Sub Total

33 KV Bay Extension

Excavation, erection, cement concrete foundation,


erection, testing and commissioning of all type of
structures i.e. Gantry/Swing bus/isolator/VCB/CT/PT/PI
structures etc. made of Lattice structures of equal
angles sections, flat as per approved drawings.

MT

Design, Engineering and construction , erection,


testing and commissioning of 36kV, 1250A, 25kA for
3 seconds, 3-ph, Outdoor type Vacuum Circuit
breaker along with 36kV, 1-Phase, 25kA for 3
seconds, 800-400-200/1-1-1 Amp. outdoor type
Current Transformer along with junction box (1 no
junction box for 3 no of 1-phase CTs)], Jumpers,
earthing, supporting structures, maintenance
platform, marshalling box, control & Power cabling
between VCB and indoor control panel and required
accessories complete as per approved drawings,
technical specifications and scope of the work.

Set

Design, Engineering providing and installation of


ISMC 75 channel on top of indoor trench, erection of
panels on ISMC 75 channels, welding, testing and
commissioning of 33kV indoor Control & Relay panel
along with E/F & O/C relays, control and power supply
cabling in trench between field equipment and
panels, Mimic Diagram, Voltmeter, Ammeter,
Annunciation Windows with annunciation relays and
other components etc as per approved drawings,
technical specifications and scope of the work for
controlling:

33 kV VCB (without diffirential relays) and DLMS


Trivector Static Energy Meter complete.

No

Design, Engineering and construction , Erection,


testing and commissioning of 36kV, 800 A, 25kA 3ph double break center rotating type (DBCR), Gang
Operated, isolator along with Support Insulators,
Operating Mechanism, Base Channel down Pipe and
all required accessories complete as per approved
drawings, technical specifications and scope of the
work,

Set

Erection, testing and commissioning of Bus Bar,


jumpering and Dropper (Zebra Conductor), by using
all types of insulators, clamps and connectors, Al
tape etc. with all accessories complete in all respect.

Per Bay

Design, Engineeringi , Erection, testing and


Commissioning of 30 kV, 10kA, 1-ph Station Class
Lightening Arresters with mounting on erected
structures, jumpering from bus bar, earthing
connection using 50x6mm GS flat, hardware etc as
required, as per approved drawings, technical
specifications and scope of the work,

3a

Set

Excavation, laying, welding, refilling, earthing &


grounding of MS Flat as per Approved drawing and
erection of riser up to various equipment/structures
as per scope of the work, specifications and
approved drawings,

Excavation, erection, testing and commissioning of


40 mm dia., 3000 mm long GI pipe earth electrode
by providing test link, RCC pit, RCC cover, placed on
GI frame, Charcoal & Salt in alternate layer as per
REC Specification and other accessories complete as
per approved drawings, technical specifications and
scope of the work for power transformer neutral,
station transformer neutral, lightening arresters
direct earthing.

Set

Design, engineering and construction of Cable Trench


of 0.75 Mtr wide , 1.0 Mtr. depth, precast RCC Trench
Cover, Water stops, Brick Work wherever required
including supply of T&P, Labour, Cement, Sand,
Reinforcement Steel, Steel Angles, Flats, Form Work,
Excavation and providingcement plaster (1:4)
including floating coat of cement punning (1.5 MM)
with clean pores sand etc, all complete as per
Technical Specification, approved Drawing and as per
direction of Engineer In Charge (payment will be
made as per actual requirement per Mtr.)

Mtr

Sub Total

33 KV Railway Crossing (Double Circuit)

LS per
bay

Laying,termination, Erection, Testing &


commissioning of 33 KV grade 3-core 400 Sqmm
XLPE power cable (Double Circuit) for underground
Railway Crossing including using jointing/Termination
Kit, GI pipe, CI pipe, clamps, conectors bolts, nuts,
fixing and fitting of barbed wire, pipe earthing etc.
with all accessories complete in all respect as per
TS/ approved drawing

Mtr

Sub Total
H

33 KV Metering System
Erection, testing, commissioning of 33 kV Metering
system along with DLMS Static Trivector Energy
Meter alongwith combined CT- PT metering unit
33KV/110 V, CT ratio-800-400/1A with bimetalic
connectors and DLMS Static Trivector feeder meter
with communication port of 33 KV/110 v of CT ratio400/1 A with 12cx2.5 Sqmm Control Cable complete
alongwith earthing and all associated accessories
complete in all respest

No

Sub Total
I

Construction of Single Circuit 11 KV Line with


ACSR Dog Conductor on Rail Pole :

Survey, route alignment & pole spotting, preparation


of survey report after approval of Engineer-in-charge
& redressal of ROW issues.

Excavation of pit, foundation, erection of following


Support for 11 KV overhead line by installing danger
board and barbed wire on DP/TP/FP structure and
pole numbering as per scope of work, approved
drawings and technical specifications:

CKm

13 m long 52 Kg/mtr. Rail Pole (Painted with 2 coat


Red oxide, 2 coat Al-Paint and 1/6th part of the Rail
pole from bottom with Black enamel paint cf
Reputed make) including fixing of (RCC Base Plate of
size 500x500x100 mm./Stone Base Plate of Size
450x450x50mm) with cement concreting foundation
and top mopping (1:4:8) (0.65 cmt per pole).

No.

Erection of galvanised fabricated steel materialsChannels, angle, flats for over head line structures by
using Bolts, Nuts, Washer etc as per approved
drawing and TS

Kg

Erection, testing and commissioning of ACSR Dog


Conductor including mid point jointing sleeves fixing
and jumpering by using PG clamp, binding of
conductor (by providing & using Al. tape) with pin
insulator and disc insulator at DP and all cut-points
and angle points etc. as required (1 CKm= 1 km line
length of 3 phase conductor)

CKM

Erection, testing and commissioning of 11 KV


porcelain Disc insulator 45 KN along with HW fittings
complete in all respect as per TS & approved
drawings.

Set

Erection, Testing and Commissioning of 11 KV


porcelain Pin Insulators with GI PIN complete in all
respect as per TS & approved drawings.

Set

Earthing

a)

Excavation, Erecting, Testing and Commissioning of


Pipe type untreated earthing by providing & using 8
SWG GI wire, pipe clamp, bolts& Nuts etc. for
connections as per TS/ REC construction standard.

Set

b)

Excavation, Erecting, Testing and Commissioning of


Coil type untreated earthing by providing & using 8
SWG GI wire, pipe clamp, bolts& Nuts etc. for
connections as per TS/ REC construction standard.

Set

Excavation and erection of galvanised Stay Set as


per supply schedule by providing 0.2 cum cement
concrete (1:4:8) PCC foundations as per scope of
work, specifications and approved drawings.

Set

Erection, Testing and Commissioning of 12 kV AB


Switch along with Support Insulators, Base Channel
down Pipe, Arcing Horns etc. complete as per
technical specifications, scope of works and
approved drawings

Set

Sub-Total
J

11 KV Lines on 13 M 52 Kg /M Rail Pole with ACSR


Dog Conductor (Double Circuit)

Survey, route alignment & pole spotting, preparation


of survey report after approval of Engineer-in-charge
& redressal of ROW issues.

Excavation of pit, foundation, erection of following


Support for 11 KV overhead line by installing danger
board and barbed wire on DP/TP/FP structure and
pole numbering as per scope of work, approved
drawings and technical specifications:

13 m long 52 Kg/mtr. Rail Pole (Painted with 2 coat


Red oxide, 2 coat Al-Paint and 1/6th part of the Rail
pole from bottom with Black enamel paint cf
Reputed make) including fixing of (RCC Base Plate
of size 500x500x100 mm./Stone Base Plate of Size
450x450x50mm) with cement concreting foundation
and top mopping (1:4:8) (0.65 cmt per pole).

No.

Erection of galvanised fabricated steel materialsChannels, angle, flats for over head line structures by
using Bolts, Nuts, Washer etc as per approved
drawing and TS

Kg

CKm

Erection, testing and commissioning of ACSR Dog


Conductor including mid point jointing sleeves fixing
and jumpering, binding of conductor with pin
insulator and disc insulator by providing and using
Aluminium tape at DP and all cut-points and angle
points by using PG Clamp etc. including fixing &
fitting of Danzer board, barbed wire at DP/TP/FP as
required (1 CKm= 1 km line length of 3 phase
conductor)

CKM

Erection, testing and commissioning of 11 KV


porcelain Disc insulator 45 KN along with HW fittings
complete in all respect as per TS & approved
drawings.

Set

Erection, Testing and Commissioning of 11 KV


porcelain Pin Insulators with GI PIN complete in all
respect as per TS & approved drawings.

Set

Earthing

a)

Excavation, Erecting, Testing and Commissioning of


Pipe type untreated earthing by providing & using 8
SWG GI wire, pipe clamp, bolts& Nuts etc. for
connections as per TS/ REC construction standard.

Set

b)

Excavation, Erecting, Testing and Commissioning of


Coil type untreated earthing by providing & using 8
SWG GI wire, pipe clamp, bolts& Nuts etc. for
connections as per TS/ REC construction standard.

Set

Excavation and erection of galvanised Stay Set as


per supply schedule by providing 0.2 cum cement
concrete (1:4:8) PCC foundations as per scope of
work, specifications and approved drawings.

Set

Sub-Total
K

Construction of Single Circuit 11 KV Line with ACSR


Dog Conductor on 9 M, 400 Kg PSC Pole :

Survey, route alignment & pole spotting, preparation


of survey report after approval of Engineer-in-charge
& redressal of ROW issues.

Excavation of pit, foundation, erection of following


Support for 11 KV overhead line by installing danger
board and barbed wire on DP/TP/FP structure and
pole numbering as per scope of work, approved
drawings and technical specifications:

PSC Pole 9 Mtr 400 Kg including fixing of (RCC Base


Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work , approved drawing &
technical specification. Fixing of Danger Board on
DP/TP/FP & Pole numbering.

No.

Erection of galvanised fabricated steel materialsChannels, angle, flats for over head line structures by
using Bolts, Nuts, Washer etc as per approved
drawing and TS

Kg

Erection, testing and commissioning of ACSR Dog


Conductor including mid point jointing sleeves fixing
and jumpering, binding of conductor with pin
insulator and disc insulator by providing and using
Aluminium tape at DP and all cut-points and angle
points by using PG Clamp etc. including fixing &
fitting of Danzer board, barbed wire at DP/TP/FP as
required (1 CKm= 1 km line length of 3 phase
conductor)

CKM

Erection, testing and commissioning of 11 KV


porcelain Disc insulator 45 KN along with HW fittings
complete in all respect as per TS & approved
drawings.

Set

Erection, Testing and Commissioning of 11 KV


porcelain Pin Insulators with GI PIN complete in all
respect as per TS & approved drawings.

Set

CKm

Earthing

Excavation, Erecting, Testing and Commissioning of


Pipe type untreated earthing by providing & using 8
SWG GI wire, pipe clamp, bolts& Nuts etc. for
connections as per TS/ REC construction standard.

Set

Excavation, Erecting, Testing and Commissioning of


Coil type untreated earthing by providing & using 8
SWG GI wire, pipe clamp, bolts& Nuts etc. for
connections as per TS/ REC construction standard.

Set

Excavation and erection of galvanised Stay Set as


per supply schedule by providing 0.2 cum cement
concrete (1:4:8) PCC foundations as per scope of
work, specifications and approved drawings.

Set

Erection, Testing and Commissioning of 12 kV AB


Switch along with Support Insulators, Base Channel
down Pipe, Arcing Horns etc. complete as per
technical specifications, scope of works and
approved drawings

Set

Sub-Total
L

11 KV Lines on 9 mtr./400 kgs PSC pole with ACSR


Rabbit conductor

Survey, route alignment & pole spotting, preparation


of survey report after approval of Engineer-in-charge
& redressal of ROW issues.

Excavation of pit, foundation, erection of following


Support for 11 KV overhead line by installing danger
board and barbed wire on DP/TP/FP structure and
pole numbering as per scope of work, approved
drawings and technical specifications:

CKm

PSC Pole 9 Mtr 400 Kg including fixing of (RCC Base


Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work , approved drawing &
technical specification. Fixing of Danger Board on
DP/TP/FP & Pole numbering.

No.

Erection of galvanised fabricated steel materialsChannels, angle, flats for over head line structures by
using Bolts, Nuts, Washer etc as per approved
drawing and TS

Kg

Erection, testing and commissioning of ACSR Rabbit


Conductor including mid point jointing sleeves fixing
and jumpering, binding of conductor with pin
insulator and disc insulator by providing and using
Aluminium tape at DP and all cut-points and angle
points by using PG Clamp etc. including fixing &
fitting of Danzer board, barbed wire at DP/TP/FP as
required (1 CKm= 1 km line length of 3 phase
conductor)

CKM

Erection, testing and commissioning of 11 KV


porcelain Disc insulator 45 KN along with HW fittings
complete in all respect as per TS & approved
drawings.

Set

Erection, Testing and Commissioning of 11 KV


porcelain Pin Insulators with GI PIN complete in all
respect as per TS & approved drawings.

Set

Earthing

Excavation, Erecting, Testing and Commissioning of


Pipe type untreated earthing by providing & using 8
SWG GI wire, pipe clamp, bolts& Nuts etc. for
connections as per TS/ REC construction standard.

Set

Excavation, Erecting, Testing and Commissioning of


Coil type untreated earthing by providing & using 8
SWG GI wire, pipe clamp, bolts& Nuts etc. for
connections as per TS/ REC construction standard.

Set

Excavation and erection of galvanised Stay Set as


per supply schedule by providing 0.2 cum cement
concrete (1:4:8) PCC foundations as per scope of
work, specifications and approved drawings.

Set

Erection, Testing and Commissioning of 12 kV AB


Switch along with Support Insulators, Base Channel
down Pipe, Arcing Horns etc. complete as per
technical specifications, scope of works and
approved drawings

Set

Sub-Total
M

11 KV Lines on 8 m/ 200 kgs PSC pole with Rabbit


conductor

Survey, route alignment & pole spotting, preparation


of survey report after approval of Engineer-in-charge
& redressal of ROW issues.

Excavation of pit, foundation, erection of following


Support for 11 KV overhead line by installing danger
board and barbed wire on DP/TP/FP structure and
pole numbering as per scope of work, approved
drawings and technical specifications:

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base


Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work , approved drawing &
technical specification. Fixing of Danger Board on
DP/TP/FP & Pole numbering.

CKm

No.

Erection of galvanised fabricated steel materialsChannels, angle, flats for over head line structures by
using Bolts, Nuts, Washer etc as per approved
drawing and TS

Kg

Erection, testing and commissioning of ACSR Rabbit


Conductor including mid point jointing sleeves fixing
and jumpering, binding of conductor with pin
insulator and disc insulator by providing and using
Aluminium tape at DP and all cut-points and angle
points by using PG Clamp etc. including fixing &
fitting of Danzer board, barbed wire at DP/TP/FP as
required (1 CKm= 1 km line length of 3 phase
conductor)

CKM

Erection, testing and commissioning of 11 KV


porcelain Disc insulator 45 KN along with HW fittings
complete in all respect as per TS & approved
drawings.

Set

Erection, Testing and Commissioning of 11 KV


porcelain Pin Insulators with GI PIN complete in all
respect as per TS & approved drawings.

Set

Earthing

Excavation, Erecting, Testing and Commissioning of


Pipe type untreated earthing by providing & using 8
SWG GI wire, pipe clamp, bolts& Nuts etc. for
connections as per TS/ REC construction standard.

Set

Excavation, Erecting, Testing and Commissioning of


Coil type untreated earthing by providing & using 8
SWG GI wire, pipe clamp, bolts& Nuts etc. for
connections as per TS/ REC construction standard.

Set

Excavation and erection of galvanised Stay Set as


per supply schedule by providing 0.2 cum cement
concrete (1:4:8) PCC foundations as per scope of
work, specifications and approved drawings.

Set

Erection, Testing and Commissioning of 12 kV AB


Switch along with Support Insulators, Base Channel
down Pipe, Arcing Horns etc. complete as per
technical specifications, scope of works and
approved drawings

Set

Sub-Total
N

11 KV Lines on 8 mtr./ 200 kgs PSC pole with ACSR


Weasel conductor

Survey, route alignment & pole spotting, preparation


of survey report after approval of Engineer-in-charge
& redressal of ROW issues.

Excavation of pit, foundation, erection of following


Support for 11 KV overhead line by installing danger
board and barbed wire on DP/TP/FP structure and
pole numbering as per scope of work, approved
drawings and technical specifications:

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base


Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work , approved drawing &
technical specification. Fixing of Danger Board on
DP/TP/FP & Pole numbering.

No.

Erection of galvanised fabricated steel materialsChannels, angle, flats for over head line structures by
using Bolts, Nuts, Washer etc as per approved
drawing and TS

Kg

CKm

Erection, testing and commissioning of ACSR Weasel


Conductor including mid point jointing sleeves fixing
and jumpering, binding of conductor with pin
insulator and disc insulator by providing and using
Aluminium tape at DP and all cut-points and angle
points by using PG Clamp etc. including fixing &
fitting of Danzer board, barbed wire at DP/TP/FP as
required (1 CKm= 1 km line length of 3 phase
conductor)

CKM

Erection, testing and commissioning of 11 KV


porcelain Disc insulator 45 KN along with HW fittings
complete in all respect as per TS & approved
drawings.

Set

Erection, Testing and Commissioning of 11 KV


porcelain Pin Insulators with GI PIN complete in all
respect as per TS & approved drawings.

Set

Earthing

Excavation, Erecting, Testing and Commissioning of


Pipe type untreated earthing by providing & using 8
SWG GI wire, pipe clamp, bolts& Nuts etc. for
connections as per TS/ REC construction standard.

Set

Excavation, Erecting, Testing and Commissioning of


Coil type untreated earthing by providing & using 8
SWG GI wire, pipe clamp, bolts& Nuts etc. for
connections as per TS/ REC construction standard.

Set

Excavation and erection of galvanised Stay Set as


per supply schedule by providing 0.2 cum cement
concrete (1:4:8) PCC foundations as per scope of
work, specifications and approved drawings.

Set

Erection, Testing and Commissioning of 12 kV AB


Switch along with Support Insulators, Base Channel
down Pipe, Arcing Horns etc. complete as per
technical specifications, scope of works and
approved drawings

Set

Sub-Total
Reconductoring of 11 KV Line With ACSR Dog
Conductor on Rail pole

Survey, route alignment & pole spotting, preparation


of survey report , Inventory after approval of
Engineer-in-charge & redressal of ROW issues.

Excavation of pit, foundation, erection of following


Support for 11 KV overhead line by providing and
installing danger board and barbed Wires on
DP/TP/FP Structures and pole numbering as per
scope of work, approved drawings and Technical
specifications:

13 m long 52 Kg/mtr. Rail Pole (Painted with 2 coat


Red oxide, 2 coat Al-Paint and 1/6th part of the Rail
pole from bottom with Black enamel paint cf
Reputed make) including fixing of RCC/Stone Base
plate (500X500X100 mm) with cement concreting
foundation and top mopping (1:4:8) (0.65 cmt per
pole).

No.

11 m long 52 Kg/mtr. Rail Pole (Painted with 2 coat


Red oxide, 2 coat Al-Paint and 1/6th part of the Rail
pole from bottom with Black enamel paint cf
Reputed make) including fixing of (RCC Base Plate
of size 500x500x100 mm./Stone Base Plate of Size
450x450x50mm) with cement concreting foundation
and top mopping (1:4:8) (0.54 cmt per pole).

No.

Erection of galvanised fabricated steel materialsChannels, angle, flats for over head line structures by
using Bolts, Nuts, Washer etc as per approved
drawing and TS

Kg

CKm

Erection, testing and commissioning of ACSR Dog


Conductor including mid point jointing sleeves fixing
and jumpering, binding of conductor with pin
insulator and disc insulator by providing and using
Aluminium tape at DP and all cut-points and angle
points by using PG Clamp etc. including fixing &
fitting of Danzer board, barbed wire at DP/TP/FP as
required (1 CKm= 1 km line length of 3 phase
conductor)

CKM

Erection, testing and commissioning of 11KV


porcelain Disc insulator 45 KN along with HW fittings
complete in all respect as per TS & approved
drawings.

Set

Erection, Testing and Commissioning of 11 KV


porcelain Pin Insulators with GI PIN complete in all
respect as per TS & approved drawings.

Set

Earthing

a)

Excavation, Erecting, Testing and Commissioning of


Pipe type untreated earthing by providing & using 8
SWG GI wire, pipe clamp, bolts& Nuts etc. for
connections as per TS/ REC construction standard.

Set

b)

Excavation, Erecting, Testing and Commissioning of


Coil type untreated earthing by providing & using 8
SWG GI wire, pipe clamp, bolts& Nuts etc. for
connections as per TS/ REC construction standard.

Set

Excavation, Foundation and erection of galvanised


Stay Set complete in all respect as per supply
schedule by providing 0.2 cum cement concrete
(1:4:8) PCC foundations as per scope of work,
specifications and approved drawings.

Set

Dismentling of existing defective/damaged polesupport (Rail/joist/tubular),conductor and other


dismantled line materials from existing line and
devolution of the dismentled pole, structure,
conductor and other line materials including storage,
handling, insurance, loading, unloading,
transportation to designated store of Utility as per
the direction of Engineer-in-charge and handing over
the pole and other dismentled material to the store
of Utility with propoer accounting as per the
inventory.

Ckm

Sub-Total
P

Reconductoring of 11 KV Line With ACSR Dog


Conductor on 9 mtr. 400 kg PSC pole

Survey, route alignment & pole spotting, preparation


of survey report , Inventory after approval of
Engineer-in-charge & redressal of ROW issues.

Excavation of pit, foundation, erection of following


Support for 11 KV overhead line by providing and
installing danger board and barbed Wires on
DP/TP/FP Structures and pole numbering as per
scope of work, approved drawings and Technical
specifications:

PSC Pole 9 Mtr 400 Kg including fixing of (RCC Base


Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm)) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work , approved drawing &
technical specification. Fixing of Danger Board on
DP/TP/FP & Pole numbering.

CKm

No.

Erection of galvanised fabricated steel materialsChannels, angle, flats for over head line structures by
using Bolts, Nuts, Washer etc as per approved
drawing and TS

Kg

Erection, testing and commissioning of ACSR Dog


Conductor including mid point jointing sleeves fixing
and jumpering, binding (by providing & using Al.
tape) of conductor with pin insulator and disc
insulator at DP and all cut-points and angle points by
providing and using PG Clamp etc. as required (1
CKm= 1 km line length of 3 phase conductor)

CKM

Erection, testing and commissioning of 11KV


porcelain Disc insulator 45 KN along with HW fittings
complete in all respect as per TS & approved
drawings.

Set

Erection, Testing and Commissioning of 11 KV


porcelain Pin Insulators with GI PIN complete in all
respect as per TS & approved drawings.

Set

Earthing

a)

Excavation, Erecting, Testing and Commissioning of


Pipe type untreated earthing by providing & using 8
SWG GI wire, pipe clamp, bolts& Nuts etc. for
connections as per TS/ REC construction standard.

Set

b)

Excavation, Erecting, Testing and Commissioning of


Coil type untreated earthing by providing & using 8
SWG GI wire, pipe clamp, bolts& Nuts etc. for
connections as per TS/ REC construction standard.

Set

Excavation, Foundation and erection of galvanised


Stay Set complete in all respect as per supply
schedule by providing 0.2 cum cement concrete
(1:4:8) PCC foundations as per scope of work,
specifications and approved drawings.

Set

Dismentling of existing defective/damaged polesupport (Rail/joist/tubular),conductor and other


dismantled line materials from existing line and
devolution of the dismentled pole, structure,
conductor and other line materials including storage,
handling, insurance, loading, unloading,
transportation to designated store of Utility as per
the direction of Engineer-in-charge and handing over
the pole and other dismentled material to the store
of Utility with propoer accounting as per the
inventory.

Ckm

Sub-Total
Q

Reconductoring of 11 KV Line With ACSR


Rabbit Conductor on PSC Pole

Survey, route alignment & pole spotting, preparation


of survey report , Inventory after approval of
Engineer-in-charge & redressal of ROW issues.

Excavation of pit, foundation, erection of following


Support for 11 KV overhead line by providing and
installing danger board and barbed Wires on
DP/TP/FP Structures and pole numbering as per
scope of work, approved drawings and Technical
specifications:

PSC Pole 9 Mtr 400 Kg including fixing of (RCC Base


Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work , approved drawing &
technical specification. Fixing of Danger Board on
DP/TP/FP & Pole numbering.

CKm

No.

PSC Pole 8 Mtr 200 Kg including fixing of RCC Base


plate (500x500x100 mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work , approved drawing &
technical specification. Fixing of Danger Board on
DP/TP/FP & Pole numbering.

No

Erection of galvanised fabricated steel materialsChannels, angle, flats for over head line structures by
using Bolts, Nuts, Washer etc as per approved
drawing and TS

Kg

Erection, testing and commissioning of ACSR Rabbit


Conductor including mid point jointing sleeves fixing
and jumpering, binding (by providing & using Al.
tape) of conductor with pin insulator and disc
insulator at DP and all cut-points and angle points by
providing and using PG Clamp etc. as required (1
CKm= 1 km line length of 3 phase conductor)

CKM

Erection, testing and commissioning of 11KV


porcelain Disc insulator 45 KN along with HW fittings
complete in all respect as per TS & approved
drawings.

Set

Erection, Testing and Commissioning of 11 KV


porcelain Pin Insulators with GI PIN complete in all
respect as per TS & approved drawings.

Set

Earthing

a)

Excavation, Erecting, Testing and Commissioning of


Pipe type untreated earthing by providing & using 8
SWG GI wire, pipe clamp, bolts& Nuts etc. for
connections as per TS/ REC construction standard.

Set

b)

Excavation, Erecting, Testing and Commissioning of


Coil type untreated earthing by providing & using 8
SWG GI wire, pipe clamp, bolts& Nuts etc. for
connections as per TS/ REC construction standard.

Set

Excavation, Foundation and erection of galvanised


Stay Set complete in all respect as per supply
schedule by providing 0.2 cum cement concrete
(1:4:8) PCC foundations as per scope of work,
specifications and approved drawings.

Dismentling of existing defective/damaged polesupport (Rail/joist/tubular),conductor and other


dismantled line materials from existing line and
devolution of the dismentled pole, structure,
conductor and other line materials including storage,
handling, insurance, loading, unloading,
transportation to designated store of Utility as per
the direction of Engineer-in-charge and handing over
the pole and other dismentled material to the store
of Utility with propoer accounting as per the
inventory.

Set

Ckm

Sub-Total
R

11 KV Metering System

Erection, testing, commissioning of 11 kV Metering


system along with Static Trivector Energy Meter
alongwith combined CT- PT metering unit 11KV/110
V, CT ratio-600-300/5 A with bimetalic connectors
and DLMS Static Trivector feeder meter with
communication port of 11 KV/110 v of CT ratio-300/5
A with 12cx2.5 Sqmm Control Cable, earthing and all
associated accessories complete in all respest

Sub total
S

11 KV Railway Crossing (Double Circuit)

No.

Laying,termination, Erection, Testing &


commissioning of 11 KV grade 3-core 300 Sqmm
XLPE power cable (Double Circuit) for underground
Railway Crossing including using jointing/Termination
Kit, GI pipe, CI pipe, clamps, conectors bolts, nuts,
fixing and fitting of anti-climbing device with all
accessories,Earthing in all respect etc. complete in
all respect as per TS, approved drawing

KMs

Sub Total
T

11 KV Bay Extension

Excavation, erection, cement concrete foundation,


erection, testing and commissioning of all type of
structures i.e. Gantry/Swing bus/isolator/VCB/CT/PT/PI
structures etc. made of Lattice structures of equal
angles sections, flat as per approved drawings.

MT

Design, Engineering and construction , erection,


testing and commissioning of 12 kV,630 A, 25kA for
3 seconds, 3-ph, Outdoor type Vacuum Circuit
breaker along with 12 kV, 1-Phase for 3 seconds ,
25kA, 600-300-150/5-5 Amp. outdoor type Current
Transformer along with junction box (1 no junction
box for 3 no of 1-phase CTs)], Jumpers, earthing,
supporting structures, maintenance platform,
marshalling box, control & Power cabling between
VCB and indoor control panel and required
accessories complete as per approved drawings,
technical specifications and scope of the work.

Set

Design, Engineering and construction, Erection,


testing and commissioning of 12 kV, 630 A, 25kA , 3ph double break center rotating type (DBCR), Gang
Operated, isolator along with Support Insulators,
Operating Mechanism, Base Channel down Pipe and
all required accessories complete as per approved
drawings, technical specifications and scope of the
work.

Set

Design, Engineeringi , Erection, testing and


Commissioning of 9 kV, 10kA, 1-ph Station Class
Lightening Arresters with mounting on erected
structures, jumpering from bus bar, earthing
connection using 50x6mm GS flat, hardware etc as
required, as per approved drawings, technical
specifications and scope of the work,

Set

12 KV Control & Relay panel for 12 KV VCB (suitable


for 30 V DC tripping/closing coil and associated
control) alongwith, ElF & O/C relays, Static energy
meter (class 0.5 with communication port) , Mimic
Diagram, Voltmete, Ammeter, etc complete as per
REC

Set

Erection, testing and commissioning of Bus Bar,


jumpering and Dropper (Zebra/wolf Conductor),with
using all type of insulator, Clamps and connectors,
Bolts, Nuts and Washers, Al. Tape etc with all
accessories complete in all respect.

Per Bay

Excavation, laying, welding, refilling, earthing &


grounding of MS Flat as per Approved drawing and
erection of riser up to various equipment/structures
as per scope of the work, specifications and
approved drawings.

LS per
bay

Excavation, erection, testing and commissioning of


40 mm dia, 3000 mm long GI pipe earth electrode by
providing test link, RCC pit, RCC cover, placed on GI
frame, Charcoal & Salt in alternate layer as per REC
Specification and other accessories complete as per
approved drawings, technical specifications and
scope of the work for power transformer neutral,
station transformer neutral, lightening arresters
direct earthing.

Design, engineering and construction of Cable Trench


of 0.5 Mtr wide , 1.0 Mtr. depth, precast RCC Trench
Cover, Water stops, Brick Work wherever required
including supply of T&P, Labour, Cement, Sand,
Reinforcement Steel, Steel Angles, Flats, Form Work,
Excavation and providingcement plaster (1:4)
including floating coat of cement punning (1.5 MM)
with clean pores sand etc, all complete as per
Technical Specification and approved Drawing and as
per direction of Engineer in charge (Payment will be
made as per actual requirement per Mtr.)

Set

Mtr

Sub-Total
U

Capacitor Banks

Design, engineering,Erection, testing and


commissioning of Fully automatic Capacitor bank
with automatic control panel, isolator, outdoor type
suitable Vacuum Circuit Breaker, mounting
structures, All types of cable & its accessories
complete , earthing etc as required as per technical
specifications, approved drawings, scope of the
works of following capacities: (Banks in Muiltiple of
600 KVAR as per REC Specification):

1200 KVAR

Set

3600 KVAr

Set

Sub Total
Distribution Transformer Substations ( 200
KVA) on Rail pole

Erection, Testing and Commissioning of 50 Hz,


11/0.433 KV, oil immersed naturally cooled,
Aluminium wound outdoor type (Three Star Rated)
Distribution Transformer Filled with Oil completely
with all accessories and fittings as per technical
specifications and approved Drawing.

Three Phase 200 KVA

No

Erection, testing and Commissioning of 3-pole,


Distribution Class 9 KV, 5 kA Lightening Arrester for
Distribution Transformer Substation by providing and
erecting Hot Dip galvanised stranded wire 7/3.15 mm
as per scope of work, approved drawings and
technical specifications. (1 Set= 3 Nos)

Set

Excavation of pit, foundation, erection of following


Support for DSS and installation with DT numbering
as per scope of work, approved drawings and
specifications:

13 m long 52 Kg/mtr. Rail Pole (Painted with 2 coat


Red oxide, 2 coat Al-Paint and 1/6th part of the Rail
pole from bottom with Black enamel paint of
Reputed make) including fixing of (RCC Base Plate
of size 500x500x100 mm./Stone Base Plate of Size
450x450x50mm)) with cement concreting foundation
and top mopping (1:4:8) (0.65 cmt per pole).

No

Erection, fixing and fitting of galvanised fabricated


steel materials- channel, angle, flats of various size
for DTstructures with bolts, nuts and washers etc.
complete in all respect as per TS and approved
drawing.

Kg

Erection, fixing and fitting, Testing and


Commissioning of Porcelain Insulators with mounting
hardware fittings etc. complete in all respect as per
TS and approved drawing.

11 KV 45 KN Disc Insulator with hardware fittings

Set

Erection, Testing and Commissioning of 12kV, 200A,


25kA, 3-ph, 3 Pin type, Horizontal Mounting type,
Gang Operated, AB Switch along with Support
Insulators, Base Channel down Pipe, Arcing Horns
etc. complete as per technical specifications
etc.complete as per technical specifications, scope
of works and approved drawings

Set

Erection, testing and commissioning of 3 pole, 12 KV


HG fuse set compleete on the DSS Structue complete
in all respect for 3-ph DTs

Sets

Erection, testing and Commissioning of LT


Distribution box with LTCT meter (CT Ratio 400/5 A )
with bar type CTs- 400/5 A metering, Al-Bus bar of
Adequate Size and LT control mechanism and
connections from LV Bushings to LTDB and LTDB to LT
line with Cables by providing and using Lugs,Washer
etc. complete in all respect with one no. Of TPMCCB
as per technical specifications for Three Phase 200
KVA Distribution Transformer.

No

10

Excavation, erection, testing and commissioning of a


set of 3 Nos pipe earthing using 40 mm dia GI pipe
3000 mm long, as per IS 1161 and as per REC
construction drawings complete with H/w and lugs
etc by providing charcoal, salt,/Bitumen Clay in
alternate layers and GI Wires 8 SWG for connections
as per scope of work, approved drawings and
technical specifications.(1 Set= 3 Nos earthing per
DT)

Per DSS

11

Erection, testing and commissioning of ACSR Dog


Conductor for jumpering by providing PG Clamps, bimetallic/Al connectors, hardware, Al Tape etc as
required complete in all respect for commissioning of
DSS.

12

Excavation and erection of galvanised Stay Set as


per supply schedule by providing 0.2 cum cement
concrete (1:4:8) PCC foundations as per scope of
work, specifications and approved drawings.

Per DT

Set

Sub-Total
Distribution Transformer Substations ( 200
KVA) on 9 Mtr. 400 Kg PSC Pole

Erection, Testing and Commissioning of 50 Hz,


11/0.433 KV, oil immersed naturally cooled,
Aluminium wound outdoor type (Three Star Rated)
Distribution Transformer Filled with Oil completely
with all accessories and fittings as per technical
specifications and approved Drawing.

Three Phase 200 KVA

No

Erection, testing and Commissioning of 3-pole,


Distribution Class 9 KV, 5 kA Lightening Arrester for
Distribution Transformer Substation by providing and
erecting Hot Dip galvanised stranded wire 7/3.15 mm
as per scope of work, approved drawings and
technical specifications. (1 Set= 3 Nos)

Set

Excavation of pit, foundation, erection of


following Support for DSS and installation with
DT numbering as per scope of work, approved
drawings and specifications:

PSC Pole 9 Mtr 400 Kg including fixing of (RCC Base


Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work as per approved
drawing & technical specification.

No

Erection, fixing and fitting of galvanised fabricated


steel materials- channel, angle, flats of various size
for DTstructures with bolts, nuts and washers etc.
complete in all respect as per TS and approved
drawing.

Kg

Erection, fixing and fitting, Testing and


Commissioning of Porcelain Insulators with mounting
hardware fittings etc. complete in all respect as per
TS and approved drawing.

11 KV 45 KN Disc Insulator with hardware fittings

Set

Erection, Testing and Commissioning of 12kV, 200A,


25kA, 3-ph, 3 Pin type, Horizontal Mounting type,
Gang Operated, AB Switch along with Support
Insulators, Base Channel down Pipe, Arcing Horns
etc. complete as per technical specifications
etc.complete as per technical specifications, scope
of works and approved drawings

Set

Erection, testing and commissioning of 3 pole, 12 KV


HG fuse set compleete on the DSS Structue complete
in all respect for 3-ph DTs

Sets

Erection, testing and Commissioning of LT


Distribution box with LTCT meter (CT Ratio 400/5 A )
with bar type CTs- 400/5 A metering, Al-Bus bar of
Adequate Size and LT control mechanism and
connections from LV Bushings to LTDB and LTDB to LT
line with Cables by providing and using Lugs,Washer
etc. complete in all respect with one no. Of TPMCCB
as per technical specifications for Three Phase 200
KVA Distribution Transformer.

No

10

Excavation, erection, testing and commissioning of a


set of 3 Nos pipe earthing using 40 mm dia GI pipe
3000 mm long, as per IS 1161 and as per REC
construction drawings complete with H/w and lugs
etc by providing charcoal, salt,/Bitumen Clay in
alternate layers and GI Wires 8 SWG for connections
as per scope of work, approved drawings and
technical specifications.(1 Set= 3 Nos earthing per
DT)

Per DSS

11

Erection, testing and commissioning of ACSR Dog


Conductor for jumpering by providing and using Al
tape PG Clamps, bi-metallic/Al connectors, hardware
etc as required complete in all respect for
commissioning of DSS.

Per DT

12

Excavation and erection of galvanised Stay Set as


per supply schedule by providing 0.2 cum cement
concrete (1:4:8) PCC foundations as per scope of
work, specifications and approved drawings.

Sub-Total
Distribution Transformer Substations 100 KVA
on 9 Mtr. 400 kg PSC Pole

Set

Erection, Testing and Commissioning of 50 Hz,


11/0.433 KV, oil immersed naturally cooled,
Aluminium wound outdoor type (Three Star Rated)
Distribution Transformer Filled with Oil completely
with all accessories and fittings as per technical
specifications and approved Drawing.

Three Phase 100 KVA

No

Erection, testing and Commissioning of 3-pole,


Distribution Class 9 KV, 5 kA Lightening Arrester for
Distribution Transformer Substation by providing and
erecting Hot Dip galvanised stranded wire 7/3.15 mm
as per scope of work, approved drawings and
technical specifications. (1 Set= 3 Nos)

Set

Excavation of pit, foundation, erection of


following Support for DSS and installation with
DT numbering as per scope of work, approved
drawings and specifications:

PSC Pole 9 Mtr 400 Kg including fixing of (RCC Base


Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm)) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work as per approved
drawing & technical specification.

No

Erection, fixing and fitting of galvanised fabricated


steel materials- channel, angle, flats of various size
for DTstructures with bolts, nuts and washers etc.
complete in all respect as per TS and approved
drawing.

Kg

Erection, fixing and fitting, Testing and


Commissioning of Porcelain Insulators with mounting
hardware fittings etc. complete in all respect as per
TS and approved drawing.

11 KV 45 KN Disc Insulator with hardware fittings

Set

Erection, Testing and Commissioning of 12kV, 200A,


25kA, 3-ph, 3 Pin type, Horizontal Mounting type,
Gang Operated, AB Switch along with Support
Insulators, Base Channel down Pipe, Arcing Horns
etc. complete as per technical specifications
etc.complete as per technical specifications, scope
of works and approved drawings

Set

Erection, testing and commissioning of 3 pole, 12 KV


HG fuse set compleete on the DSS Structue complete
in all respect for 3-ph DTs

Sets

Erection, testing and Commissioning of LT


Distribution box with LTCT meter (CT Ratio 200/5 A )
with bar type CTs- 200/5 A metering, Al-Bus bar of
Adequate Size and LT control mechanism and
connections from LV Bushings to LTDB and LTDB to LT
line with Cables by providing and using Lugs,Washer
etc. complete in all respect with one no. Of TPMCCB
as per technical specifications for Three Phase 100
KVA Distribution Transformer.

No

Excavation, erection, testing and commissioning of a


set of 3 Nos pipe earthing using 40 mm dia GI pipe
3000 mm long, as per IS 1161 and as per REC
construction drawings complete with H/w and lugs
etc by providing charcoal, salt,/Bitumen Clay in
alternate layers and GI Wires 8 SWG for connections
as per scope of work, approved drawings and
technical specifications.(1 Set= 3 Nos earthing per
DT)

Per DSS

Erection, testing and commissioning of ACSR Rabbit


Conductor for jumpering by providing and using Al
Tape PG Clamps, bi-metallic/Al connectors, hardware
etc as required complete in all respect for
commissioning of DSS.

Per DT

10

Excavation and erection of galvanised Stay Set as


per supply schedule by providing 0.2 cum cement
concrete (1:4:8) PCC foundations as per scope of
work, specifications and approved drawings.

Set

Sub-Total
Distribution Transformer Substations ( 100
KVA) on 8 Mtr. 200 kg PSC Pole

Erection, Testing and Commissioning of 50 Hz,


11/0.433 KV, oil immersed naturally cooled,
Aluminium wound outdoor type (Three Star Rated)
Distribution Transformer Filled with Oil completely
with all accessories and fittings as per technical
specifications and approved Drawing.

Three Phase 100 KVA

No

Erection, testing and Commissioning of 3-pole,


Distribution Class 9 KV, 5 kA Lightening Arrester for
Distribution Transformer Substation by providing and
erecting Hot Dip galvanised stranded wire 7/3.15 mm
as per scope of work, approved drawings and
technical specifications. (1 Set= 3 Nos)

Set

Excavation of pit, foundation, erection of


following Support for DSS and installation with
DT numbering as per scope of work, approved
drawings and specifications:

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base


Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work as per approved
drawing & technical specification.

No

Erection, fixing and fitting of galvanised fabricated


steel materials- channel, angle, flats of various size
for DTstructures with bolts, nuts and washers etc.
complete in all respect as per TS and approved
drawing.

Erection, fixing and fitting, Testing and


Commissioning of Porcelain Insulators with mounting
hardware fittings etc. complete in all respect as per
TS and approved drawing.

11 KV 45 KN Disc Insulator with hardware fittings

Set

Erection, Testing and Commissioning of 12kV, 200A,


25kA, 3-ph, 3 Pin type, Horizontal Mounting type,
Gang Operated, AB Switch along with Support
Insulators, Base Channel down Pipe, Arcing Horns
etc. complete as per technical specifications
etc.complete as per technical specifications, scope
of works and approved drawings

Set

Erection, testing and commissioning of 3 pole, 12 KV


HG fuse set compleete on the DSS Structue complete
in all respect for 3-ph DTs

Sets

Erection, testing and Commissioning of LT


Distribution box with LTCT meter (CT Ratio 200/5 A )
with bar type CTs- 200/5 A metering, Al-Bus bar of
Adequate Size and LT control mechanism and
connections from LV Bushings to LTDB and LTDB to LT
line with Cables by providing and using Lugs,Washer
etc. complete in all respect with one no. Of TPMCCB
as per technical specifications for Three Phase 100
KVA Distribution Transformer.

No

Kg

Excavation, erection, testing and commissioning of a


set of 3 Nos pipe earthing using 40 mm dia GI pipe
3000 mm long, as per IS 1161 and as per REC
construction drawings complete with H/w and lugs
etc by providing charcoal, salt,/Bitumen Clay in
alternate layers and GI Wires 8 SWG for connections
as per scope of work, approved drawings and
technical specifications.(1 Set= 3 Nos earthing per
DT)

Per DSS

Erection, testing and commissioning of ACSR Rabbit


Conductor for jumpering by providing PG Clamps, bimetallic connectors, hardware etc as required
complete in all respect for commissioning of DSS.

Per DT

10

Excavation and erection of galvanised Stay Set as


per supply schedule by providing 0.2 cum cement
concrete (1:4:8) PCC foundations as per scope of
work, specifications and approved drawings.

Set

Sub-Total
Distribution Transformer Substations 63 KVA
on 8 Mtr. PSC pole

Erection, Testing and Commissioning of 50 Hz,


11/0.433 KV, oil immersed naturally cooled,
Aluminium wound outdoor type (Three Star Rated)
Distribution Transformer Filled with Oil completely
with all accessories and fittings as per technical
specifications and approved Drawing.

Three Phase 63 KVA

No

Erection, testing and Commissioning of 3-pole,


Distribution Class 9 KV, 5 kA Lightening Arrester for
Distribution Transformer Substation by providing and
erecting Hot Dip galvanised stranded wire 7/3.15 mm
as per scope of work, approved drawings and
technical specifications. (1 Set= 3 Nos)

Set

Excavation of pit, foundation, erection of


following Support for DSS and installation with
DT numbering as per scope of work, approved
drawings and specifications:

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base


Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work as per approved
drawing & technical specification.

No

Erection, fixing and fitting of galvanised fabricated


steel materials- channel, angle, flats of various size
for DTstructures with bolts, nuts and washers etc.
complete in all respect as per TS and approved
drawing.

Kg

Erection, fixing and fitting, Testing and


Commissioning of Porcelain Insulators with mounting
hardware fittings etc. complete in all respect as per
TS and approved drawing.

11 KV 45 KN Disc Insulator with hardware fittings

Set

Erection, Testing and Commissioning of 12kV, 200A,


25kA, 3-ph, 3 Pin type, Horizontal Mounting type,
Gang Operated, AB Switch along with Support
Insulators, Base Channel down Pipe, Arcing Horns
etc. complete as per technical specifications
etc.complete as per technical specifications, scope
of works and approved drawings

Set

Erection, testing and commissioning of 3 pole, 12 KV


HG fuse set compleete on the DSS Structue complete
in all respect for 3-ph DTs

Sets

Erection, testing and Commissioning of LT


Distribution box with LTCT meter (CT Ratio 200/5 A )
with bar type CTs- 200/5 A metering, Al-Bus bar of
Adequate Size and LT control mechanism and
connections from LV Bushings to LTDB and LTDB to LT
line with Cables by providing and using Lugs,Washer
etc. complete in all respect with one no. Of TPMCCB
as per technical specifications for Three Phase 100
KVA Distribution Transformer.

No

Excavation, erection, testing and commissioning of a


set of 3 Nos pipe earthing using 40 mm dia GI pipe
3000 mm long, as per IS 1161 and as per REC
construction drawings complete with H/w and lugs
etc by providing charcoal, salt,/Bitumen Clay in
alternate layers and GI Wires 8 SWG for connections
as per scope of work, approved drawings and
technical specifications.(1 Set= 3 Nos earthing per
DT)

Per DSS

Erection, testing and commissioning of ACSR Rabbit


Conductor for jumpering by providing PG Clamps, bimetallic connectors, hardware etc as required
complete in all respect for commissioning of DSS.

Per DT

10

Excavation and erection of galvanised Stay Set as


per supply schedule by providing 0.2 cum cement
concrete (1:4:8) PCC foundations as per scope of
work, specifications and approved drawings.
Sub-Total

AA

Augmentation of 100 KVA Distribution


Transformer by 200 KVA new Distribution
Transformer

Set

Erection, Testing and Commissioning of 50 Hz,


11/0.433 KV, oil immersed naturally cooled,
Aluminium wound outdoor type (Three Star Rated)
Distribution Transformer Filled with Oil completely
with all accessories and fittings as per technical
specifications and approved Drawing.

Three Phase 200 KVA

Dismentling of existing dismentled Distt. Transformer


including storage, handling, loading, unloading,
transportation to designated store/proposed Site of
Utility as per the direction of Engineer-in-charge and
handing over the material to the authorised
representative of Utility with propoer accounting as
per the inventory.

No

per DT

Sub-Total
AB

Augmentation of 63 KVA Distribution


Transformer by 100 KVA Distribution
Transformer (NEW)

Erection, Testing and Commissioning of 50 Hz,


11/0.433 KV, oil immersed naturally cooled,
Aluminium wound outdoor type (Three Star Rated)
Distribution Transformer Filled with Oil completely
with all accessories and fittings as per technical
specifications and approved Drawing.

Three Phase 100 KVA

Dismentling of existing dismentled Distt. Transformer


including storage, handling, loading, unloading,
transportation to designated store/proposed Site of
Utility as per the direction of Engineer-in-charge and
handing over the material to the authorised
representative of Utility with propoer accounting as
per the inventory.

No

Sub-Total
AC

Augmentation of 63 KVA Distribution


Transformer by 100 KVA Released Distribution
Transformer (Released)

per DT

Erection, Testing and Commissioning of 50 Hz,


11/0.433 KV, oil immersed naturally cooled,
Aluminium wound outdoor type Distribution
Transformer filled with oil complete required for
proper commissioning of Distribution Transformers
with all accessories and fittings as per technical
specifications and approved Drawing.

Three Phase 100 KVA (released DT will be Utilised)

Dismentling of existing dismentled Distt. Transformer


including storage, handling, loading, unloading,
transportation to designated store/proposed Site of
Utility as per the direction of Engineer-in-charge and
handing over the material to the authorised
representative of Utility with propoer accounting as
per the inventory.

No

per DT

Sub-Total
AD

R & M of Existing Distribution Substations

Excavation of pit, foundation, erection of following


Support for 11 KV overhead line by providing and
installing danger board and barbed Wires on
DP/TP/FP Structures and DT numbering as per scope
of work, approved drawings and Technical
specifications: for

PSC Pole 9 Mtr 400 Kg including fixing of (RCC Base


Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work , approved drawing &
technical specification. Fixing of Danger Board on
DP/TP/FP & Pole numbering.

No.

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base


Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work , approved drawing &
technical specification. Fixing of Danger Board on
DP/TP/FP & Pole numbering.

No.

Erection, testing and Commissioning of 3-pole,


Distribution Class 9 KV, 5 kA Lightening Arrester for
Distribution Transformer Substation by providing and
erecting Hot Dip galvanised stranded wire 7/3.15 mm
as per scope of work, approved drawings and
technical specifications.(1 Set = 3 Nos)

Set

Erection, fixing and fitting of galvanised prefabricated steel materials- channel, angle, flats of
various size for DT structures with bolts, nuts and
washers etc. complete in all respect as per TS and
approved drawing.

Kg

Erection, Testing and Commissioning of 12kV, 200A,


25kA, 3-ph, 3 Pin type, Horizontal Mounting type,
Gang Operated, AB Switch along with Support
Insulators, Base Channel down Pipe, Arcing Horns
etc. complete as per technical specifications
etc.complete as per technical specifications, scope
of works and approved drawings

Set

Erection, testing and commissioning of 3 pole, 12 KV


HG fuse set compleete on the DSS Structue complete
in all respect for 3-ph DTs

Sets

Excavation, erection, testing and commissioning of a


set of 3 Nos pipe earthing using 40 mm dia GI pipe
3000 mm long, as per IS 1161 and as per REC
construction drawings complete with H/w and lugs
etc by providing charcoal, salt,/Bitumen Clay in
alternate layers and GI Wires 8 SWG for connections
as per scope of work, approved drawings and
technical specifications.(1 Set= 3 Nos earthing per
DT)

Erection, testing and commissioning of LT bus bar


distribution system with kit-kat complete and
jumpering Connections of 11 KV side complete by
providing & using P G clamp/ connectors in all
respect for commssioning of DSS.

Per DT

Excavation and erection of galvanised Stay Set as


per supply schedule by providing 0.2 cum cement
concrete (1:4:8) PCC foundations as per scope of
work, specifications and approved drawings.

Set

Dismentling of existing dismentled materials and


devolution of the dismantled materials i.e
Transformer angle, channel, clamp, AB Switch, HG
fuse Set etc. including storage, handling, insurance,
loading, unloading, transportation to store of Utility
as per the direction of Engineer-in-charge with
propoer accounting as per the inventory.

Per DSS

Per DT

Sub Total
AE
1

Construction of 3 Phase 4 Wire LT Line on 8M,


200 Kg PSC with ACSR Weasel Conductor in
Vertical configuration
Route Survey

CKms

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base


Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm)with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work as per approved
drawing & technical specification.

No

Erection, testing and commissioning of ACSR Weasel Conductor


including mid point jointing (by providing and using PG clamps, Al
Tape) and jumpering , binding of conductor with insulator, binding
wire, fixing and fitting of LT PVC phase spacers etc. complete in
all respect. (1 CKm= 1 km line length of 4 phase conductor)

CKM

Erection of galvanised fabricated steel materials- U clamp


& stay clamp by using Bolts, Nuts, Washer etc as per
approved drawing and TS

Kg

Excavation and erection of galvanised Stay Set with 50x10 mm


stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m
long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI
stranded wire by using Stone stay plate 450x450x50 mm Stay
plate foundations as per scope of work, specifications and
approved drawings.

Set

Spiral type earthing as per REC construction drawing J-1 including


supply of all materials like 8 SWG G.I. wire closely wound having
115 turns, 50mm dia & 450mm long coil (untreated without
charcoal & salt) in all type of soil including excavation, refilling with
earth, fixing of bolts, nuts, washers for connection with pole
support/ metalic part all complete as per TS & direction of
Engineer-in charge (individual pole earthing)

Set

Sub-Total
AF
1

Construction of 3 Phase 4 Wire LT Line on 8M,


200 Kg PSC with ACSR Weasel Conductor in
Horizontal configuration
Route Survey

CKms

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base


Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work as per approved
drawing & technical specification.

No

Erection, testing and commissioning of ACSR Weasel


Conductor including mid point jointing (by providing
and using PG clamps, Al Tape) and jumpering ,
binding of conductor with insulator, binding wire,
fixing and fitting of LT PVC phase spacers etc.
complete in all respect. (1 CKm= 1 km line length of
4 phase conductor)

CKM

Erection of galvanised fabricated steel materialsangle, flats for over head line structures by using
Bolts, Nuts, Washer etc as per approved drawing and
TS

Kg

Excavation and erection of galvanised Stay Set with 50x10 mm


stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m
long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI
stranded wire by using Stone stay plate 450x450x50 mm Stay
plate foundations as per scope of work, specifications and
approved drawings.

Set

Spiral type earthing as per REC construction drawing


J-1 including supply of all materials like 8 SWG G.I.
wire closely wound having 115 turns, 50mm dia &
450mm long coil (untreated without charcoal & salt)
in all type of soil including excavation, refilling with
earth, fixing of bolts, nuts, washers for connection
with pole support/ metalic part all complete as per TS
& direction of Engineer-in charge (individual pole
earthing)

Nos.

Sub-Total

Construction of 3 Phase 4 Wire LT Line on 8M,


200 Kg PSC with ACSR Rabbit Conductor in
Horizontal configuration

AG
1

Route Survey

Kms

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base


Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work as per approved
drawing & technical specification.

No

Erection, testing and commissioning of ACSR Rabbit Conductor


including mid point jointing (by providing and using PG clamps, Al
Tape) and jumpering , binding of conductor with insulator, binding
wire, fixing and fitting of LT PVC phase spacers etc. complete in
all respect. (1 CKm= 1 km line length of 4 phase conductor)

CKM

Erection of galvanised fabricated steel materials- angle, flats for


over head line structures by using Bolts, Nuts, Washer etc as per
approved drawing and TS

Kg

Excavation and erection of galvanised Stay Set with 50x10 mm


stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m
long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI
stranded wire by using Stone stay plate 450x450x50 mm Stay
plate foundations as per scope of work, specifications and
approved drawings.

Set

Spiral type earthing as per REC construction drawing J-1 including


supply of all materials like 8 SWG G.I. wire closely wound having
115 turns, 50mm dia & 450mm long coil (untreated without
charcoal & salt) in all type of soil including excavation, refilling with
earth, fixing of bolts, nuts, washers for connection with pole
support/ metalic part all complete as per TS & direction of
Engineer-in charge (individual pole earthing)

Nos.

Sub-Total

R&M of 3-Ph, 4 Wire LT line with ACSR Rabbit


conductor

AH
1

Route Survey

CKms

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base


Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work as per approved
drawing & technical specification.

No

Erection, testing and commissioning of ACSR Rabbit Conductor


including mid point jointing (by providing and using PG clamps, Al
Tape) and jumpering , binding of conductor with insulator, binding
wire, fixing and fitting of LT PVC phase spacers etc. complete in
all respect. (1 CKm= 1 km line length of 4 phase conductor)

CKM

Erection of galvanised fabricated steel materials- angle, flats for


over head line structures by using Bolts, Nuts, Washer etc as per
approved drawing and TS

Kg

Excavation and erection of galvanised Stay Set with 50x10 mm


stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m
long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI
stranded wire by using Stone stay plate 450x450x50 mm Stay
plate foundations as per scope of work, specifications and
approved drawings.

Set

Spiral type earthing as per REC construction drawing J-1 including


supply of all materials like 8 SWG G.I. wire closely wound having
115 turns, 50mm dia & 450mm long coil (untreated without
charcoal & salt) in all type of soil including excavation, refilling with
earth, fixing of bolts, nuts, washers for connection with pole
support/ metalic part all complete as per TS & direction of
Engineer-in charge (individual pole earthing)

Nos.

Dismentling of existing defective/damaged polesupport (Rail/joist/tubular),conductor and other


dismantled line materials from existing line and
devolution of the dismentled pole, structure,
conductor and other line materials including storage,
handling, insurance, loading, unloading,
transportation to designated store of Utility as per
the direction of Engineer-in-charge and handing over
the pole and other dismentled material to the store
of Utility with propoer accounting as per the
inventory.

Ckm

Sub-Total
R&M of 3-Ph, 4 Wire LT line with ACSR Weasel
conductor

AI
1

Route Survey

CKms

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base


Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work as per approved
drawing & technical specification.

No

Erection, testing and commissioning of ACSR Weasel Conductor


including mid point jointing (by providing and using PG clamps, Al
Tape) and jumpering , binding of conductor with insulator, binding
wire, fixing and fitting of LT PVC phase spacers etc. complete in
all respect. (1 CKm= 1 km line length of 4 phase conductor)

CKM

Erection of galvanised fabricated steel materials- angle, flats for


over head line structures by using Bolts, Nuts, Washer etc as per
approved drawing and TS

Kg

Excavation and erection of galvanised Stay Set with 50x10 mm


stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m
long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI
stranded wire by using Stone stay plate 450x450x50 mm Stay
plate foundations as per scope of work, specifications and
approved drawings.

Set

Spiral type earthing as per REC construction drawing J-1 including


supply of all materials like 8 SWG G.I. wire closely wound having
115 turns, 50mm dia & 450mm long coil (untreated without
charcoal & salt) in all type of soil including excavation, refilling with
earth, fixing of bolts, nuts, washers for connection with pole
support/ metalic part all complete as per TS & direction of
Engineer-in charge (individual pole earthing)

Nos.

Dismentling of existing defective/damaged polesupport (Rail/joist/tubular),conductor and other


dismantled line materials from existing line and
devolution of the dismentled pole, structure,
conductor and other line materials including storage,
handling, insurance, loading, unloading,
transportation to designated store of Utility as per
the direction of Engineer-in-charge and handing over
the pole and other dismentled material to the store
of Utility with propoer accounting as per the
inventory.

Ckm

Sub-Total
AJ

R&M of existing Single phase & 2 phase line


with Conversion in to Three Phase , 4 wire Line
by ACSR Weasel conductor

Route Survey

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base Plate of size
500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with
brick blast or boulder refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as required as
per scope of work as per approved drawing & technical
specification.

CKms

No

Erection, testing and commissioning of ACSR Weasel Conductor


with fixing & fitting of shackle/ pin insulator including mid point
jointing (by providing and using PG clamps, Al Tape) and
jumpering , binding of conductor with insulator, binding wire, fixing
and fitting of LT PVC phase spacers etc. complete in all respect.
(1 CKm= 1 km line length of 4 phase conductor )

CKM

Erection of galvanised fabricated steel materials- angle, flats for


over head line structures by using Bolts, Nuts, Washer etc as per
approved drawing and TS

Kg

Excavation and erection of galvanised Stay Set with 50x10 mm


stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m
long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI
stranded wire by using Stone stay plate 450x450x50 mm Stay
plate foundations as per scope of work, specifications and
approved drawings.

Set

Spiral type earthing as per REC construction drawing J-1 including


supply of all materials like 8 SWG G.I. wire closely wound having
115 turns, 50mm dia & 450mm long coil (untreated without
charcoal & salt) in all type of soil including excavation, refilling with
earth, fixing of bolts, nuts, washers for connection with pole
support/ metalic part all complete as per TS & direction of
Engineer-in charge (individual pole earthing)

Nos.

Dismentling of existing defective/damaged polesupport (Rail/joist/tubular),conductor and other


dismantled line materials from existing line and
devolution of the dismentled pole, structure,
conductor and other line materials including storage,
handling, insurance, loading, unloading,
transportation to designated store of Utility as per
the direction of Engineer-in-charge and handing over
the pole and other dismentled material to the store
of Utility with propoer accounting as per the
inventory.

Ckm

Sub-Total

AK

Erection, testing commissioning of New LT Line


on 3 phase ABC [3 X95Sq mm {Phase}+{1x70
Sq mm Messenger cum Neutral wire}]

Survey, route alignment & pole spotting,


preparation of survey report , Inventory after
approval of Engineer-in-charge & redressal of
ROW issues.

Excavation of pit, foundation, erection of


following Support for LT line and pole
numbering as per scope of work, approved
drawings and Technical specifications:

PSC Pole 8 Mtr 200 Kg including fixing of


(RCC Base Plate of size 500x500x100
mm./Stone Base Plate of Size
450x450x50mm)) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring
water as required as per scope of work ,
approved drawing & technical specification.

No

Excavation and erection of galvanised Stay Set with 50x10 mm


stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m
long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI
stranded wire by using Stone stay plate 450x450x50 mm Stay
plate foundations as per scope of work, specifications and
approved drawings.

Set

CKm

Installation, testing and commissioning of


Coil Earthing by providing GI wire no.-8SWG
for connections with nuts, bolts and washers
as per scope of work, technical specifications
and approved drawings and REC
Specification(untreated).

Erection, testing and Commissioning of LT


Line on AB Cables: (average span 40 to 45 m
approx.) including all erection accessories
required for successful erection of AB Cable
Complete in all respect as per approved
drawing and Technical Specification etc as
required as per scope for work for
Branching/termination etc.

3 phase ABC [3 X95Sq mm {Phase}+{1x70


Sq mm Messenger cum Neutral wire}]

Set

Ckm

Sub Total
AL

Erection, testing commissioning of New LT Line


on 3 phase ABC [3 X70Sq mm {Phase}+{1x50
Sq mm Messenger cum Neutral wire}]

Survey, route alignment & pole spotting,


preparation of survey report , Inventory after
approval of Engineer-in-charge & redressal of
ROW issues.

Excavation of pit, foundation, erection of


following Support for LT line and pole
numbering as per scope of work, approved
drawings and Technical specifications:

CKm

PSC Pole 8 Mtr 200 Kg including fixing of


(RCC Base Plate of size 500x500x100
mm./Stone Base Plate of Size
450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring
water as required as per scope of work ,
approved drawing & technical specification.

No

Excavation and erection of galvanised Stay Set with 50x10 mm


stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m
long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI
stranded wire by using Stone stay plate 450x450x50 mm Stay
plate foundations as per scope of work, specifications and
approved drawings.

Set

Installation, testing and commissioning of


Coil Earthing by providing GI wire no.-8SWG
for connections with nuts, bolts and washers
as per scope of work, technical specifications
and approved drawings and REC
Specification(untreated).

Set

Erection, testing and Commissioning of LT


Line on AB Cables: (average span 40 to 45 m
approx.) including all erection accessories
required for successful erection of AB Cable
Complete in all respect as per approved
drawing and Technical Specification etc as
required as per scope for work for
Branching/termination etc.

3 phase ABC [3 X70Sq mm {Phase}+{1x50


Sq mm Messenger cum Neutral wire}]

Ckm

Sub Total
AM

Erection, testing commissioning of New LT Line


on 3 phase ABC [3 X50 Sq mm {Phase}+{1x35
Sq mm Messenger cum Neutral wire}]

Survey, route alignment & pole spotting,


preparation of survey report , Inventory after
approval of Engineer-in-charge & redressal of
ROW issues.

Excavation of pit, foundation, erection of


following Support for LT line and pole
numbering as per scope of work, approved
drawings and Technical specifications:

PSC Pole 8 Mtr 200 Kg including fixing of


(RCC Base Plate of size 500x500x100
mm./Stone Base Plate of Size
450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring
water as required as per scope of work ,
approved drawing & technical specification.

No

Excavation and erection of galvanised Stay Set with 50x10 mm


stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m
long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI
stranded wire by using Stone stay plate 450x450x50 mm Stay
plate foundations as per scope of work, specifications and
approved drawings.

Set

CKm

Installation, testing and commissioning of


Coil Earthing by providing GI wire no.-8SWG
for connections with nuts, bolts and washers
as per scope of work, technical specifications
and approved drawings and REC
Specification(untreated).

Erection, testing and Commissioning of LT


Line on AB Cables: (average span 40 to 45 m
approx.) including all erection accessories
required for successful erection of AB Cable
Complete in all respect as per approved
drawing and Technical Specification etc as
required as per scope for work for
Branching/termination etc.

3 phase ABC [3 X50Sq mm {Phase}+{1x35


Sq mm Messenger cum Neutral wire}]

Set

Ckm

Sub Total
AN

New LT Line on 1 phase ABC [1X16 Sq mm


{Phase} + {1x25 Sq mm Messenger cum
Neutral wire}]

Survey, route alignment & pole spotting,


preparation of survey report , Inventory after
approval of Engineer-in-charge & redressal of
ROW issues.

Excavation of pit, foundation, erection of


following Support for LT line and pole
numbering as per scope of work, approved
drawings and Technical specifications:

CKm

PSC Pole 8 Mtr 200 Kg including fixing of


(RCC Base Plate of size 500x500x100
mm./Stone Base Plate of Size
450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring
water as required as per scope of work ,
approved drawing & technical specification.

No

Excavation and erection of galvanised Stay Set with 50x10 mm


stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m
long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI
stranded wire by using Stone stay plate 450x450x50 mm Stay
plate foundations as per scope of work, specifications and
approved drawings.

Set

Installation, testing and commissioning of


Coil Earthing by providing GI wire no.-8SWG
for connections with nuts, bolts and washers
as per scope of work, technical specifications
and approved drawings and REC
Specification(untreated).

Set

Erection, testing and Commissioning of LT


Line on AB Cables: (average span 40 to 45 m
approx.) including all erection accessories
required for successful erection of AB Cable
Complete in all respect as per approved
drawing and Technical Specification etc as
required as per scope for work for
Branching/termination etc.

1 phase ABC [1 X 16 Sq mm {Phase}+{1x35


Sq mm Messenger cum Neutral wire}]

Ckm

Sub Total
Total

BALANCE PART
BA

Augmentation of 100 KVA Distribution


Transformer by 200 KVA new Distribution
Transformer

Erection, Testing and Commissioning of 50 Hz,


11/0.433 KV, oil immersed naturally cooled,
Aluminium wound outdoor type (Three Star Rated)
Distribution Transformer Filled with Oil completely
with all accessories and fittings as per technical
specifications and approved Drawing.

Three Phase 200 KVA

Dismentling of existing dismentled Distt. Transformer


including storage, handling, loading, unloading,
transportation to designated store/Proposed site of
Utility as per the direction of Engineer-in-charge and
handing over the material to the authorised
representative of Utility with propoer accounting as
per the inventory.

No

per DT

Sub-Total
BB

Augmentation of 63 KVA Distribution


Transformer by 100 KVA released Distribution
Transformer

Erection, Testing and Commissioning of 50 Hz,


11/0.433 KV, oil immersed naturally cooled,
Aluminium wound outdoor type (Three Star Rated)
Distribution Transformer Filled with Oil completely
with all accessories and fittings as per technical
specifications and approved Drawing.

Three Phase 100 KVA

No

Dismentling of existing dismentled Distt. Transformer


including storage, handling, loading, unloading,
transportation to designated store/Proposed site of
Utility as per the direction of Engineer-in-charge and
handing over the material to the authorised
representative of Utility with propoer accounting as
per the inventory.

per DT

Sub-Total
BC

Distribution Transformer Substations ( 63 KVA )


on 8 Mtr. PSC pole (New)

Erection, Testing and Commissioning of 50 Hz,


11/0.433 KV, oil immersed naturally cooled,
Aluminium wound outdoor type (Three Star Rated)
Distribution Transformer Filled with Oil completely
with all accessories and fittings as per technical
specifications and approved Drawing.

Three Phase 63 KVA

No

Erection, testing and Commissioning of 3-pole,


Distribution Class 9 KV, 5 kA Lightening Arrester for
Distribution Transformer Substation by providing and
erecting Hot Dip galvanised stranded wire 7/3.15 mm
as per scope of work, approved drawings and
technical specifications. (1 Set= 3 Nos)

Set

Excavation of pit, foundation, erection of


following Support for DSS and installation with
DT numbering as per scope of work, approved
drawings and specifications:

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base


Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work as per approved
drawing & technical specification.

No

Erection, fixing and fitting of galvanised fabricated


steel materials- channel, angle, flats of various size
for DTstructures with bolts, nuts and washers etc.
complete in all respect as per TS and approved
drawing.

Erection, fixing and fitting, Testing and


Commissioning of Porcelain Insulators with mounting
hardware fittings etc. complete in all respect as per
TS and approved drawing.

11 KV 45 KN Disc Insulator with hardware fittings

Set

Erection, Testing and Commissioning of 12kV, 200A,


25kA, 3-ph, 3 Pin type, Horizontal Mounting type,
Gang Operated, AB Switch along with Support
Insulators, Base Channel down Pipe, Arcing Horns
etc. complete as per technical specifications
etc.complete as per technical specifications, scope
of works and approved drawings

Set

Erection, testing and commissioning of 3 pole, 12 KV


HG fuse set compleete on the DSS Structue complete
in all respect for 3-ph DTs

Sets

Erection, testing and Commissioning of LT


Distribution box with LTCT meter (CT Ratio 200/5 A )
with bar type CTs- 200/5 A metering, Al-Bus bar of
Adequate Size and LT control mechanism and
connections from LV Bushings to LTDB and LTDB to LT
line with Cables by providing and using Lugs,Washer
etc. complete in all respect with one no. Of TPMCCB
as per technical specifications for Three Phase 63
KVA Distribution Transformer.

No

Kg

Excavation, erection, testing and commissioning of a


set of 3 Nos pipe earthing using 40 mm dia GI pipe
3000 mm long, as per IS 1161 and as per REC
construction drawings complete with H/w and lugs
etc by providing charcoal, salt,/Bitumen Clay in
alternate layers and GI Wires 8 SWG for connections
as per scope of work, approved drawings and
technical specifications.(1 Set= 3 Nos earthing per
DT)

Per DSS

Erection, testing and commissioning of ACSR Rabbit


Conductor for jumpering by providing PG Clamps, bimetallic connectors, hardware etc as required
complete in all respect for commissioning of DSS.

Per DT

10

Excavation and erection of galvanised Stay Set as


per supply schedule by providing 0.2 cum cement
concrete (1:4:8) PCC foundations as per scope of
work, specifications and approved drawings.

Set

Sub-Total
BD

Distribution Transformer Substations 100 KVA


on 8 Mtr. 200 kg PSC Pole by Released DT

Erection, Testing and Commissioning of 50 Hz,


11/0.433 KV, oil immersed naturally cooled,
Aluminium wound outdoor type Distribution
Transformer Filled with Oil completely with all
accessories and fittings as per technical
specifications and approved Drawing.

Three Phase 100 KVA (Released DT will be utilised)

No

Erection, testing and Commissioning of 3-pole,


Distribution Class 9 KV, 5 kA Lightening Arrester for
Distribution Transformer Substation by providing and
erecting Hot Dip galvanised stranded wire 7/3.15 mm
as per scope of work, approved drawings and
technical specifications. (1 Set= 3 Nos)

Set

Excavation of pit, foundation, erection of


following Support for DSS and installation with
DT numbering as per scope of work, approved
drawings and specifications:

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base


Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work as per approved
drawing & technical specification.

No

Erection, fixing and fitting of galvanised fabricated


steel materials- channel, angle, flats of various size
for DTstructures with bolts, nuts and washers etc.
complete in all respect as per TS and approved
drawing.

Kg

Erection, fixing and fitting, Testing and


Commissioning of Porcelain Insulators with mounting
hardware fittings etc. complete in all respect as per
TS and approved drawing.

11 KV 45 KN Disc Insulator with hardware fittings

Set

Erection, Testing and Commissioning of 12kV, 200A,


25kA, 3-ph, 3 Pin type, Horizontal Mounting type,
Gang Operated, AB Switch along with Support
Insulators, Base Channel down Pipe, Arcing Horns
etc. complete as per technical specifications
etc.complete as per technical specifications, scope
of works and approved drawings

Set

Erection, testing and commissioning of 3 pole, 12 KV


HG fuse set compleete on the DSS Structue complete
in all respect for 3-ph DTs

Sets

Erection, testing and Commissioning of LT


Distribution box with LTCT meter (CT Ratio 200/5 A )
with bar type CTs- 200/5 A metering, Al-Bus bar of
Adequate Size and LT control mechanism and
connections from LV Bushings to LTDB and LTDB to LT
line with Cables by providing and using Lugs,Washer
etc. complete in all respect with one no. Of TPMCCB
as per technical specifications for Three Phase 100
KVA Distribution Transformer.

No

Excavation, erection, testing and commissioning of a


set of 3 Nos pipe earthing using 40 mm dia GI pipe
3000 mm long, as per IS 1161 and as per REC
construction drawings complete with H/w and lugs
etc by providing charcoal, salt,/Bitumen Clay in
alternate layers and GI Wires 8 SWG for connections
as per scope of work, approved drawings and
technical specifications.(1 Set= 3 Nos earthing per
DT)

Per DSS

Erection, testing and commissioning of ACSR Rabbit


Conductor for jumpering by providing PG Clamps, bimetallic connectors, hardware etc as required
complete in all respect for commissioning of DSS.

Per DT

10

Excavation and erection of galvanised Stay Set as


per supply schedule by providing 0.2 cum cement
concrete (1:4:8) PCC foundations as per scope of
work, specifications and approved drawings.
Sub-Total

BE

Distribution Transformer Substations 63 KVA


on 8 Mtr. PSC pole by Release DT

Set

Erection, Testing and Commissioning of 50 Hz,


11/0.433 KV, oil immersed naturally cooled,
Aluminium wound outdoor type Distribution
Transformer Filled with Oil completely with all
accessories and fittings as per technical
specifications and approved Drawing.

Three Phase 63 KVA (release DT will be utilised)

No

Erection, testing and Commissioning of 3-pole,


Distribution Class 9 KV, 5 kA Lightening Arrester for
Distribution Transformer Substation by providing and
erecting Hot Dip galvanised stranded wire 7/3.15 mm
as per scope of work, approved drawings and
technical specifications. (1 Set= 3 Nos)

Set

Excavation of pit, foundation, erection of


following Support for DSS and installation with
DT numbering as per scope of work, approved
drawings and specifications:

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base


Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work as per approved
drawing & technical specification.

No

Erection, fixing and fitting of galvanised fabricated


steel materials- channel, angle, flats of various size
for DTstructures with bolts, nuts and washers etc.
complete in all respect as per TS and approved
drawing.

Kg

Erection, fixing and fitting, Testing and


Commissioning of Porcelain Insulators with mounting
hardware fittings etc. complete in all respect as per
TS and approved drawing.

11 KV 45 KN Disc Insulator with hardware fittings

Set

Erection, Testing and Commissioning of 12kV, 200A,


25kA, 3-ph, 3 Pin type, Horizontal Mounting type,
Gang Operated, AB Switch along with Support
Insulators, Base Channel down Pipe, Arcing Horns
etc. complete as per technical specifications
etc.complete as per technical specifications, scope
of works and approved drawings

Set

Erection, testing and commissioning of 3 pole, 12 KV


HG fuse set compleete on the DSS Structue complete
in all respect for 3-ph DTs

Sets

Erection, testing and Commissioning of LT


Distribution box with LTCT meter (CT Ratio 200/5 A )
with bar type CTs- 200/5 A metering, Al-Bus bar of
Adequate Size and LT control mechanism and
connections from LV Bushings to LTDB and LTDB to LT
line with Cables by providing and using Lugs,Washer
etc. complete in all respect with one no. Of TPMCCB
as per technical specifications for Three Phase 63
KVA Distribution Transformer.

No

Excavation, erection, testing and commissioning of a


set of 3 Nos pipe earthing using 40 mm dia GI pipe
3000 mm long, as per IS 1161 and as per REC
construction drawings complete with H/w and lugs
etc by providing charcoal, salt,/Bitumen Clay in
alternate layers and GI Wires 8 SWG for connections
as per scope of work, approved drawings and
technical specifications.(1 Set= 3 Nos earthing per
DT)

Per DSS

Erection, testing and commissioning of ACSR Rabbit


Conductor for jumpering by providing PG Clamps, bimetallic connectors, hardware etc as required
complete in all respect for commissioning of DSS.

Per DT

10

Excavation and erection of galvanised Stay Set as


per supply schedule by providing 0.2 cum cement
concrete (1:4:8) PCC foundations as per scope of
work, specifications and approved drawings.

Set

Sub-Total
BF

R & M of Existing Distribution Substations

Excavation of pit, foundation, erection of following


Support for 11 KV overhead line by providing and
installing danger board and barbed Wires on
DP/TP/FP Structures and DT numbering as per scope
of work, approved drawings and Technical
specifications: for

PSC Pole 9 Mtr 400 Kg including fixing of (RCC Base


Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work , approved drawing &
technical specification. Fixing of Danger Board on
DP/TP/FP & Pole numbering.

No.

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base


Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work , approved drawing &
technical specification. Fixing of Danger Board on
DP/TP/FP & Pole numbering.

No.

Erection, testing and Commissioning of 3-pole,


Distribution Class 9 KV, 5 kA Lightening Arrester for
Distribution Transformer Substation by providing and
erecting Hot Dip galvanised stranded wire 7/3.15 mm
as per scope of work, approved drawings and
technical specifications.(1 Set = 3 Nos)

Set

Erection, fixing and fitting of galvanised prefabricated steel materials- channel, angle, flats of
various size for DT structures with bolts, nuts and
washers etc. complete in all respect as per TS and
approved drawing.

Kg

Erection, Testing and Commissioning of 12kV, 200A,


25kA, 3-ph, 3 Pin type, Horizontal Mounting type,
Gang Operated, AB Switch along with Support
Insulators, Base Channel down Pipe, Arcing Horns
etc. complete as per technical specifications
etc.complete as per technical specifications, scope
of works and approved drawings

Set

Erection, testing and commissioning of 3 pole, 12 KV


HG fuse set compleete on the DSS Structue complete
in all respect for 3-ph DTs

Sets

Excavation, erection, testing and commissioning of a


set of 3 Nos pipe earthing using 40 mm dia GI pipe
3000 mm long, as per IS 1161 and as per REC
construction drawings complete with H/w and lugs
etc by providing charcoal, salt,/Bitumen Clay in
alternate layers and GI Wires 8 SWG for connections
as per scope of work, approved drawings and
technical specifications.(1 Set= 3 Nos earthing per
DT)

Per DSS

Erection, testing and commissioning of LT bus bar


distribution system with kit-kat complete and
jumpering Connections of 11 KV side complete by
providing & using P G clamp/ connectors in all
respect for commssioning of DSS.

Per DT

Excavation and erection of galvanised Stay Set as


per supply schedule by providing 0.2 cum cement
concrete (1:4:8) PCC foundations as per scope of
work, specifications and approved drawings.

Set

Dismentling of existing dismentled materials and


devolution of the dismantled materials i.e
Transformer angle, channel, clamp, AB Switch, HG
fuse Set etc. including storage, handling, insurance,
loading, unloading, transportation to store of Utility
as per the direction of Engineer-in-charge with
propoer accounting as per the inventory.

Per DT

Sub Total
BG

Erection, testing commissioning of New LT Line


on 3 phase ABC [3 X95Sq mm {Phase}+{1x70
Sq mm Messenger cum Neutral wire}]

Survey, route alignment & pole spotting, preparation


of survey report , Inventory after approval of
Engineer-in-charge & redressal of ROW issues.

Excavation of pit, foundation, erection of following


Support for LT line and pole numbering as per scope
of work, approved drawings and Technical
specifications:

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base


Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work , approved drawing &
technical specification.

No

Excavation and erection of galvanised Stay Set with 50x10 mm


stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m
long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI
stranded wire by using Stone stay plate 450x450x50 mm Stay
plate foundations as per scope of work, specifications and
approved drawings.

Set

CKm

Installation, testing and commissioning of Coil


Earthing by providing GI wire no.-8SWG for
connections with nuts, bolts and washers as per
scope of work, technical specifications and approved
drawings and REC Specification(untreated).

Erection, testing and Commissioning of LT Line on AB


Cables: (average span 40 to 45 m approx.) including
all erection accessories required for successful
erection of AB Cable Complete in all respect as per
approved drawing and Technical Specification etc as
required as per scope for work for
Branching/termination etc.

3 phase ABC [3 X95Sq mm {Phase}+{1x70 Sq mm


Messenger cum Neutral wire}]

Set

Ckm

Sub Total
BH

Erection, testing commissioning of New LT Line


on 3 phase ABC [3 X70Sq mm {Phase}+{1x50
Sq mm Messenger cum Neutral wire}]

Survey, route alignment & pole spotting, preparation


of survey report , Inventory after approval of
Engineer-in-charge & redressal of ROW issues.

Excavation of pit, foundation, erection of following


Support for LT line and pole numbering as per scope
of work, approved drawings and Technical
specifications:

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base


Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work , approved drawing &
technical specification.

CKm

No

Excavation and erection of galvanised Stay Set with 50x10 mm


stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m
long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI
stranded wire by using Stone stay plate 450x450x50 mm Stay
plate foundations as per scope of work, specifications and
approved drawings.

Set

Installation, testing and commissioning of Coil


Earthing by providing GI wire no.-8SWG for
connections with nuts, bolts and washers as per
scope of work, technical specifications and approved
drawings and REC Specification(untreated).

Set

Erection, testing and Commissioning of LT Line on AB


Cables: (average span 40 to 45 m approx.) including
all erection accessories required for successful
erection of AB Cable Complete in all respect as per
approved drawing and Technical Specification etc as
required as per scope for work for
Branching/termination etc.

3 phase ABC [3 X70Sq mm {Phase}+{1x50 Sq mm


Messenger cum Neutral wire}]

Ckm

Sub Total
BI

Erection, testing commissioning of New LT Line


on 3 phase ABC [3 X50 Sq mm {Phase}+{1x35
Sq mm Messenger cum Neutral wire}]

Survey, route alignment & pole spotting, preparation


of survey report , Inventory after approval of
CKm
Engineer-in-charge & redressal of ROW issues.

Excavation of pit, foundation, erection of following


Support for LT line and pole numbering as per scope
of work, approved drawings and Technical
specifications:

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base


Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
No
foundation with excavated soil with pouring water as
required as per scope of work , approved drawing &
technical specification.

Excavation and erection of galvanised Stay Set with 50x10 mm


stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m
long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI
stranded wire by using Stone stay plate 450x450x50 mm Stay
plate foundations as per scope of work, specifications and
approved drawings.

Installation, testing and commissioning of Coil


Earthing by providing GI wire no.-8SWG for
connections with nuts, bolts and washers as per
Set
scope of work, technical specifications and approved
drawings and REC Specification(untreated).

Erection, testing and Commissioning of LT Line on AB


Cables: (average span 40 to 45 m approx.) including
all erection accessories required for successful
erection of AB Cable Complete in all respect as per
approved drawing and Technical Specification etc as
required as per scope for work for
Branching/termination etc.

3 phase ABC [3 X50Sq mm {Phase}+{1x35 Sq mm


Ckm
Messenger cum Neutral wire}]

Set

Sub Total
BJ
1

Construction of 3 Phase 4 Wire LT Line on 8M,


200 Kg PSC with ACSR Weasel Conductor in
Vertical configuration
Route Survey

Kms

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base Plate of size
500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with
brick blast or boulder refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as required as
per scope of work as per approved drawing & technical
specification.

No

Erection, testing and commissioning of ACSR Weasel Conductor


including mid point jointing (by providing and using PG clamps, Al
Tape) and jumpering , binding of conductor with insulator, binding
wire, fixing and fitting of LT PVC phase spacers etc. complete in
all respect. (1 CKm= 1 km line length of 4 phase conductor)

CKM

Erection of galvanised fabricated steel materials- U clamp & stay


clamp by using Bolts, Nuts, Washer etc as per approved drawing
and TS

Kg

Excavation and erection of galvanised Stay Set with 50x10 mm


stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m
long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI
stranded wire by using Stone stay plate 450x450x50 mm Stay
plate foundations as per scope of work, specifications and
approved drawings.

Set

Spiral type earthing as per REC construction drawing J-1 including


supply of all materials like 8 SWG G.I. wire closely wound having
115 turns, 50mm dia & 450mm long coil (untreated without
charcoal & salt) in all type of soil including excavation, refilling with
earth, fixing of bolts, nuts, washers for connection with pole
support/ metalic part all complete as per TS & direction of
Engineer-in charge (individual pole earthing)

Set

Sub-Total
BK
1

Construction of 3 Phase 4 Wire LT Line on 8M,


200 Kg PSC with ACSR Weasel Conductor in
Horizontal configuration
Route Survey

Kms

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base Plate of size
500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with
brick blast or boulder refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as required as
per scope of work as per approved drawing & technical
specification.

No

Erection, testing and commissioning of ACSR Weasel Conductor


including mid point jointing (by providing and using PG clamps, Al
Tape) and jumpering , binding of conductor with insulator, binding
wire, fixing and fitting of LT PVC phase spacers etc. complete in
all respect. (1 CKm= 1 km line length of 4 phase conductor)

CKM

Erection of galvanised fabricated steel materials- angle, flats for


over head line structures by using Bolts, Nuts, Washer etc as per
approved drawing and TS

Kg

Excavation and erection of galvanised Stay Set with 50x10 mm


stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m
long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI
stranded wire by using Stone stay plate 450x450x50 mm Stay
plate foundations as per scope of work, specifications and
approved drawings.

Set

Spiral type earthing as per REC construction drawing J-1 including


supply of all materials like 8 SWG G.I. wire closely wound having
115 turns, 50mm dia & 450mm long coil (untreated without
charcoal & salt) in all type of soil including excavation, refilling with
earth, fixing of bolts, nuts, washers for connection with pole
support/ metalic part all complete as per TS & direction of
Engineer-in charge (individual pole earthing)

Nos.

Sub-Total
BL
1

Construction of 3 Phase 4 Wire LT Line on 8M,


200 Kg PSC with ACSR Rabbit Conductor in
Horizontal configuration
Route Survey

Kms

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base Plate of size
500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with
brick blast or boulder refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as required as
per scope of work as per approved drawing & technical
specification.

No

Erection, testing and commissioning of ACSR Rabbit Conductor


including mid point jointing (by providing and using PG clamps, Al
Tape) and jumpering , binding of conductor with insulator, binding
wire, fixing and fitting of LT PVC phase spacers etc. complete in
all respect. (1 CKm= 1 km line length of 4 phase conductor)

CKM

Erection of galvanised fabricated steel materials- angle, flats for


over head line structures by using Bolts, Nuts, Washer etc as per
approved drawing and TS

Kg

Excavation and erection of galvanised Stay Set with 50x10 mm


stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m
long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI
stranded wire by using Stone stay plate 450x450x50 mm Stay
plate foundations as per scope of work, specifications and
approved drawings.

Set

Spiral type earthing as per REC construction drawing J-1 including


supply of all materials like 8 SWG G.I. wire closely wound having
115 turns, 50mm dia & 450mm long coil (untreated without
charcoal & salt) in all type of soil including excavation, refilling with
earth, fixing of bolts, nuts, washers for connection with pole
support/ metalic part all complete as per TS & direction of
Engineer-in charge (individual pole earthing)

Nos.

Sub-Total
BM

Guarding of 33 &11 KV line


Erection, testing and commisiioning of Guarding & Lacing per
span by using Fabricated structure, Eye hook, G. I. Wire, Bolts,
nuts, washers etc. complete in all respect as per approved
drawing/REC standards.

per span

Sub Total
BN

New LT Line on 1 phase ABC [1X16 Sq mm


{Phase} + {1x25 Sq mm Messenger cum
Neutral wire}]

Survey, route alignment & pole spotting, preparation of survey


report , Inventory after approval of Engineer-in-charge &
redressal of ROW issues.

Excavation of pit, foundation, erection of following Support for LT


line and pole numbering as per scope of work, approved drawings
and Technical specifications:

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base Plate of


size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm)
with brick blast or boulder refilling (50% depth of pole pit) and
ramming foundation with excavated soil with pouring water as
required as per scope of work , approved drawing & technical
specification.

No

Excavation and erection of galvanised Stay Set with 50x10 mm


stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m
long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI
stranded wire by using Stone stay plate 450x450x50 mm Stay
plate foundations as per scope of work, specifications and
approved drawings.

Set

Installation, testing and commissioning of Coil Earthing by


providing GI wire no.-8SWG for connections with nuts, bolts and
washers as per scope of work, technical specifications and
approved drawings and REC Specification(untreated).

Set

Erection, testing and Commissioning of LT Line on AB Cables:


(average span 40 to 45 m approx.) including all erection
accessories required for successful erection of AB Cable
Complete in all respect as per approved drawing and Technical
Specification etc as required as per scope for work for
Branching/termination etc.

1 phase ABC [1 X 16 Sq mm {Phase}+{1x35 Sq mm Messenger


cum Neutral wire}]

Sub Total

CKm

Ckm

Special Plan (BRGF


CA

R&M of existing overhead 11 KV Line by 3 phase ABC


3X120 + 1X 100 Sq.mm

Survey, route alignment & pole spotting, preparation


of survey report , Inventory after approval of
Engineer-in-charge & redressal of ROW issues.

Excavation of pit, foundation, erection of following


Support for 11 KV line and pole numbering as per
scope of work, approved drawings and Technical
specifications:

PSC Pole 9 Mtr 400 Kg including fixing of (RCC Base


Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work , approved drawing &
technical specification.

No

Excavation and erection of galvanised Stay Set with


50x10 mm stay clamp, stay guy insulator, nut bolts,
turn buckles, 1.8 m long, 16 mm diameter solid GS
stay rod & 7/12 SWG dia GI stranded wire by
providing 0.2 cum cement concrete (1:4:8) and
200x200x6 mm Stay plate foundations as per scope
of work, specifications and approved drawings.

Set

Installation, testing and commissioning of Coil


Earthing by providing GI wire no.-8SWG for
connections with nuts, bolts and washers as per
scope of work, technical specifications and approved
drawings and REC Specification.

Set

Erection, testing and Commissioning of 11 KV Line on


AB Cables including all erection accessories required
for successful erection of AB Cable Complete in all
respect as per approved drawing and Technical
Specification etc as required as per scope for work
for Branching/termination etc.

CKm

3 phase ABC [3 X 120 Sq mm {Phase}+{1 X 100


Sqmm]

Ckm

Dismentling of existing defective/damaged polesupport (Rail/joist/tubular),conductor and other


dismantled line materials from existing line and
devolution of the dismentled pole, structure,
conductor and other line materials including storage,
handling, insurance, loading, unloading,
transportation to designated store of Utility as per
the direction of Engineer-in-charge and handing over
the all dismentled material to the store of Utility with
propoer accounting as per the inventory.

Ckm

Sub Total
CB

R&M of existing overhead 11 KV Line by 3


phase ABC 3X70 + 1X 70 Sq.mm

Survey, route alignment & pole spotting, preparation


of survey report , Inventory after approval of
Engineer-in-charge & redressal of ROW issues.

Excavation of pit, foundation, erection of following


Support for 11 KV line and pole numbering as per
scope of work, approved drawings and Technical
specifications:

PSC Pole 9 Mtr 400 Kg including fixing of (RCC Base


Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work , approved drawing &
technical specification.

CKm

No

Excavation and erection of galvanised Stay Set with


50x10 mm stay clamp, stay guy insulator, nut bolts,
turn buckles, 1.8 m long, 16 mm diameter solid GS
stay rod & 7/12 SWG dia GI stranded wire by
providing 0.2 cum cement concrete (1:4:8) and
200x200x6 mm Stay plate foundations as per scope
of work, specifications and approved drawings.

Set

Installation, testing and commissioning of Coil


Earthing by providing GI wire no.-8SWG for
connections with nuts, bolts and washers as per
scope of work, technical specifications and approved
drawings and REC Specification.

Set

Erection, testing and Commissioning of 11 KV Line on


AB Cables including all erection accessories required
for successful erection of AB Cable Complete in all
respect as per approved drawing and Technical
Specification etc as required as per scope for work
for Branching/termination etc.

3 phase ABC [3 X 70 Sq mm {Phase}+{1 X 70


Sqmm]

Ckm

Dismentling of existing defective/damaged polesupport (Rail/joist/tubular),conductor and other


dismantled line materials from existing line and
devolution of the dismentled pole, structure,
conductor and other line materials including storage,
handling, insurance, loading, unloading,
transportation to designated store of Utility as per
the direction of Engineer-in-charge and handing over
the all dismentled material to the store of Utility with
propoer accounting as per the inventory.

Ckm

Sub Total
CC

R&M of existing overhead 11 KV Line by 3 phase ABC


3X35 + 1X70 Sq.mm

Survey, route alignment & pole spotting, preparation


of survey report , Inventory after approval of
Engineer-in-charge & redressal of ROW issues.

Excavation of pit, foundation, erection of following


Support for 11 KV line and pole numbering as per
scope of work, approved drawings and Technical
specifications:

PSC Pole 9 Mtr 400 Kg including fixing of (RCC Base


Plate of size 500x500x100 mm./Stone Base Plate of
Size 450x450x50mm)with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring water as
required as per scope of work , approved drawing &
technical specification.

No

Excavation and erection of galvanised Stay Set with


50x10 mm stay clamp, stay guy insulator, nut bolts,
turn buckles, 1.8 m long, 16 mm diameter solid GS
stay rod & 7/12 SWG dia GI stranded wire by
providing 0.2 cum cement concrete (1:4:8) and
200x200x6 mm Stay plate foundations as per scope
of work, specifications and approved drawings.

Set

Installation, testing and commissioning of Coil


Earthing by providing GI wire no.-8SWG for
connections with nuts, bolts and washers as per
scope of work, technical specifications and approved
drawings and REC Specification.

Set

Erection, testing and Commissioning of 11 KV Line on


AB Cables including all erection accessories required
for successful erection of AB Cable Complete in all
respect as per approved drawing and Technical
Specification etc as required as per scope for work
for Branching/termination etc.

3 phase ABC [3 X 35 Sq mm {Phase}+{1 X 70


Sqmm]

CKm

Ckm

Dismentling of existing defective/damaged polesupport (Rail/joist/tubular),conductor and other


dismantled line materials from existing line and
devolution of the dismentled pole, structure,
conductor and other line materials including storage,
handling, insurance, loading, unloading,
transportation to designated store of Utility as per
the direction of Engineer-in-charge and handing over
the all dismentled material to the store of Utility with
propoer accounting as per the inventory.

Ckm

Sub Total
CD

R & M of LT Line on 3 phase ABC [3 X95Sq mm


{Phase}+{1x70 Sq mm Messenger cum
Neutral wire}]

Survey, route alignment & pole spotting,


preparation of survey report , Inventory after
approval of Engineer-in-charge & redressal of
ROW issues.

Excavation of pit, foundation, erection of


following Support for LT line and pole
numbering as per scope of work, approved
drawings and Technical specifications:

PSC Pole 8 Mtr 200 Kg including fixing of


(RCC Base Plate of size 500x500x100
mm./Stone Base Plate of Size
450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring
water as required as per scope of work ,
approved drawing & technical specification.

CKm

No

Excavation and erection of galvanised Stay Set with 50x10 mm


stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m
long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI
stranded wire by using Stone stay plate 450x450x50 mm Stay
plate foundations as per scope of work, specifications and
approved drawings.

Set

Installation, testing and commissioning of


Coil Earthing by providing GI wire no.-8SWG
for connections with nuts, bolts and washers
as per scope of work, technical specifications
and approved drawings and REC
Specification(untreated).

Set

Erection, testing and Commissioning of LT


Line on AB Cables: (average span 40 to 45 m
approx.) including all erection accessories
required for successful erection of AB Cable
Complete in all respect as per approved
drawing and Technical Specification etc as
required as per scope for work for
Branching/termination etc.

3 phase ABC [3 X95Sq mm {Phase}+{1x70


Sq mm Messenger cum Neutral wire}]

Ckm

Dismentling of existing defective/damaged polesupport (Rail/joist/tubular),conductor and other


dismantled line materials from existing line and
devolution of the dismentled pole, structure,
conductor and other line materials including storage,
handling, insurance, loading, unloading,
transportation to designated store of Utility as per
the direction of Engineer-in-charge and handing over
the all dismentled material to the store of Utility with
propoer accounting as per the inventory.

Ckm

Sub Total
CE

R & M of LT Line on 3 phase ABC [3 X70Sq mm


{Phase}+{1x50 Sq mm Messenger cum
Neutral wire}]

Survey, route alignment & pole spotting,


preparation of survey report , Inventory after
approval of Engineer-in-charge & redressal of
ROW issues.

Excavation of pit, foundation, erection of


following Support for LT line and pole
numbering as per scope of work, approved
drawings and Technical specifications:

PSC Pole 8 Mtr 200 Kg including fixing of


(RCC Base Plate of size 500x500x100
mm./Stone Base Plate of Size
450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring
water as required as per scope of work ,
approved drawing & technical specification.

CKm

No

Excavation and erection of galvanised Stay Set with 50x10 mm


stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m
long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI
stranded wire by using Stone stay plate 450x450x50 mm Stay
plate foundations as per scope of work, specifications and
approved drawings.

Set

Installation, testing and commissioning of


Coil Earthing by providing GI wire no.-8SWG
for connections with nuts, bolts and washers
as per scope of work, technical specifications
and approved drawings and REC
Specification(untreated).

Set

Erection, testing and Commissioning of LT


Line on AB Cables: (average span 40 to 45 m
approx.) including all erection accessories
required for successful erection of AB Cable
Complete in all respect as per approved
drawing and Technical Specification etc as
required as per scope for work for
Branching/termination etc.

3 phase ABC [3 X70Sq mm {Phase}+{1x50


Sq mm Messenger cum Neutral wire}]

Ckm

Dismentling of existing defective/damaged polesupport (Rail/joist/tubular),conductor and other


dismantled line materials from existing line and
devolution of the dismentled pole, structure,
conductor and other line materials including storage,
handling, insurance, loading, unloading,
transportation to designated store of Utility as per
the direction of Engineer-in-charge and handing over
the all dismentled material to the store of Utility with
propoer accounting as per the inventory.

Ckm

Sub Total
CF

R &M of LT Line on 3 phase ABC [3 X50Sq mm


{Phase}+{1x35 Sq mm Messenger cum
Neutral wire}]

Survey, route alignment & pole spotting,


preparation of survey report , Inventory after
approval of Engineer-in-charge & redressal of
ROW issues.

Excavation of pit, foundation, erection of


following Support for LT line and pole
numbering as per scope of work, approved
drawings and Technical specifications:

PSC Pole 8 Mtr 200 Kg including fixing of


(RCC Base Plate of size 500x500x100
mm./Stone Base Plate of Size
450x450x50mm) with brick blast or boulder
refilling (50% depth of pole pit) and ramming
foundation with excavated soil with pouring
water as required as per scope of work ,
approved drawing & technical specification.

CKm

No

Excavation and erection of galvanised Stay Set with 50x10 mm


stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m
long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI
stranded wire by using Stone stay plate 450x450x50 mm Stay
plate foundations as per scope of work, specifications and
approved drawings.

Set

Installation, testing and commissioning of


Coil Earthing by providing GI wire no.-8SWG
for connections with nuts, bolts and washers
as per scope of work, technical specifications
and approved drawings and REC
Specification(untreated).

Set

Erection, testing and Commissioning of LT


Line on AB Cables: (average span 40 to 45 m
approx.) including all erection accessories
required for successful erection of AB Cable
Complete in all respect as per approved
drawing and Technical Specification etc as
required as per scope for work for
Branching/termination etc.

3 phase ABC [3 X50Sq mm {Phase}+{1x35


Sq mm Messenger cum Neutral wire}]

Ckm

Dismentling of existing defective/damaged polesupport (Rail/joist/tubular),conductor and other


dismantled line materials from existing line and
devolution of the dismentled pole, structure,
conductor and other line materials including storage,
handling, insurance, loading, unloading,
transportation to designated store of Utility as per
the direction of Engineer-in-charge and handing over
the all dismentled material to the store of Utility with
propoer accounting as per the inventory.

Sub Total
Total Part C
Grand TOTAL

Ckm

Schedule 3: Erection Price Component

tion Network in Bihar Under Special Plan (BRGF) Phase-II, Balance W


t-C for all 21 Districts of North Bihar under Special Plan (BRGF) Sche
stricts: Saran, Siwan and Gopalganj
0
233 /PR/NBPDCL/2014

NIT No:-

Total
Quantity

Unit Price
for
Erection

8=5+6+7

Unit
Quantity

Qty. for
District
Saran

Qty. for
District
Siwan

Qty. for
District
Gopalganj

Qty. for
District

2400

2400

2400

600

600

600

200

200

200

40

40

40

160

160

160

120

120

120

50

50

50

60

60

60

10

10

10

50

50

50

16

16

16

0.5

0.5

0.5

40

40

40

0.5

0.5

0.5

0.9

0.9

0.9

0.1

0.1

0.1

50

50

50

2400

2400

2400

600

600

600

200

200

200

40

40

40

160

160

160

120

120

120

50

50

50

60

60

60

10

10

10

50

50

50

14

14

14

0.5

0.5

0.5

40

40

40

0.5

0.5

0.5

0.6

0.6

0.6

0.1

0.1

0.1

50

50

50

Addl. 5
MVA

Addl.10
MVA

5-10 MVA

3.15-10
MVA

3.15/1.65 MVA

3.15-5
MVA
(Released
)

1.6-5
MVA
(Released
)

Total

25

25

25

25

25

25

2.5

2.5

2.5

32

78

110

32

78

110

18

576

1404

1980

700

22400

54600

77000

32

78

110

192

468

660

51

1632

3978

5610

32

78

110

16

512

1248

1760

192

468

660

0.1

11

26

33

26

33

130

35

165

52

14

66

26

33

300

7800

2100

9900

26

33

156

42

198

30

780

210

990

26

33

208

56

264

156

42

198

26

33

2.5

2.5

7.5

12

18

10

15

115

115

115

11.33

17.8

29.13

11.33

17.8

29.13

16

181

285

466

425

4815.25

7565

12380.25

11.33

17.8

29.13

67.98

106.8

174.78

45

509.85

801

1310.85

11

18

29

14

159

249

408

68

107

175

0.1

11.33

17.8

29.13

11.33

17.8

29.13

20

227

356

583

1100

12463

19580

32043

22.66

35.6

58.26

12

136

214

350

114

1292

2029

3321

11

18

29

18

204

320

524

91

142

233

79.3

124.6

203.9

79.3

124.6

203.9

20

1586

2492

4078

365

28944.5

45479

74423.5

79.3

124.6

203.9

476

748

1223

57

4520

7102

11622

79

125

204

18

1427

2243

3670

476

748

1223

0.1

12

20

170.56

138.05

308.61

170.56

138.05

308.61

18

3070

2485

5555

365

62254.4

50388.25

112642.65

170.56

138.05

308.61

1023.36

828.3

1851.66

51

8698.56

7040.55

15739.11

0
0

171

138

309

16

2729

2209

4938

1023

828

1852

0.1

17

14

31

255.84

207.08

462.92

255.84

207.08

462.92

18

4605

3727

8333

365

93381.6

75584.2

168965.8

255.84

207.08

462.92

1535.04

1242.48

2777.52

51

13047.84

10561.08

23608.92

256

207

463

16

4093

3313

7407

1535

1242

2778

0.1

26

21

46

18

365

51

16

0.1

50

15

50

18

54

43

97

54

43

97

162

129

291

108

86

194

150

8100

6450

14550

54

43

97

162

129

291

15

810

645

1455

270

215

485

108

86

194

54

43

97

14

22

36

14

22

36

0.115

0.115

0.115

2.5

12.5

10

22.5

10

18

30

24

54

25

20

45

16

32

48

16

32

48

16

32

48

32

64

96

280

4480

8960

13440

48

96

144

16

32

48

16

32

48

16

32

48

16

32

48

16

32

48

32

64

96

37

75

112

37

75

112

37

75

112

74

150

224

265

9805

19875

29680

111

225

336

37

75

112

37

75

112

37

75

112

37

75

112

37

75

112

74

150

224

40

20

60

40

20

60

40

20

60

80

40

120

250

10000

5000

15000

120

60

180

40

20

60

40

20

60

40

20

60

40

20

60

40

20

60

80

40

120

40

21

61

40

21

61

40

21

61

80

42

122

250

10000

5250

15250

120

63

183

40

21

61

40

21

61

40

21

61

40

21

61

40

21

61

80

42

122

137

96

233

137

96

233

137

96

233

274

192

466

250

34250

24000

58250

411

288

699

137

96

233

137

96

233

137

96

233

137

96

233

137

96

233

274

192

466

42

41

83

42

41

83

42

41

83

77

75

152

77

75

152

77

75

152

36

35

71

36

35

71

36

35

71

187

356

543

18

27

0.05

0.05

18

27

187

356

543

30

5610

10680

16290

0.75

140

267

407

0.5

94

178

272

187

356

543

187

356

543

187

356

543

187

356

543

61.4

49.7

111.1

61.4

49.7

111.1

20

1228

994

2222

1.00

61.4

49.7

111.1

50

3070

2485

5555

307

249

556

10

614

497

1111

143.26

115.96

259.22

143.26

115.96

259.22

20

2865

2319

5184

1.00

143.26

115.96

259.22

200

28652

23192

51844

860

696

1555

10

1433

1160

2592

368.7

298.4

667.1

368.7

298.4

667.1

20

7374

5968

13342

1.00

368.7

298.4

667.1

200

73740

59680

133420

1843.5

1492

3335.5

10

3687

2984

6671

22.68

18.24

40.92

22.68

18.24

40.92

20

454

365

818

1.00

22.68

18.24

40.92

60

1360.8

1094.4

2455.2

45

36

82

113

91

205

22.68

18.24

40.92

52.92

42.56

95.48

52.92

42.56

95.48

20

1058

851

1910

1.00

52.92

42.56

95.48

60

3175.2

2553.6

5728.8

106

85

191

265

213

477

52.92

42.56

95.48

109.5

91.2

200.7

109.5

91.2

200.7

219

182

401

1.00

109.5

91.2

200.7

200

21900

18240

40140

219

182

401

548

456

1004

109.5

91.2

200.7

7.48

6.06

13.54

7.48

6.06

13.54

25

187

152

339

44.88

36

81

44.88

36

81

7.48

6.06

13.54

13.97

11.11

25.08

13.97

11.11

25.08

25

349.25

278

627

83.82

67

150

83.82

67

150

13.97

11.11

25.08

52.38

42.4

94.78

52.38

42.4

94.78

25

1309.5

1060

2370

314.28

254

569

314.28

254

569

52.38

42.4

94.78

25

25

25

50

12

12

ALANCE PART OF PHASE-I


41

33

74

41

33

74

41

33

74

21

11

32

21

11

32

11

32

250

14

15

14

15

14

15

28

30

250

3500

250

3750

42

45

14

15

14

15

14

15

14

15

14

15

28

30

250

850

750

1600

0.05

43

38

80

0.05

43

38

80

0.5

425

375

800

30

25500

22500

48000

0.75

638

563

1200

0.5

425

375

800

850

750

1600

850

750

1600

850

750

1600

850

750

1600

4.1

2.43

6.53

4.1

2.43

6.53

25

102.5

61

163

24.6

15

39

24.6

15

39

4.1

2.43

6.53

7.21

3.86

11.07

7.21

3.86

11.07

25

180.25

97

277

43.26

23

66

43.26

23

66

7.21

3.86

11.07

28.73

17.01

45.74

17.01

45.74

28.73

25

718.25

425

1144

172.38

102

274

172.38

102

274

28.73

17.01

45.74

12.93

7.65

20.58

12.93

7.65

20.58

20

259

153

412

1.00

12.93

7.65

20.58

50

646.5

382.5

1029

65

38

103

10

129

77

206

30.16

17.86

48.02

30.16

17.86

48.02

20

603

357

960

1.00

30.16

17.86

48.02

200

6032

3572

9604

181

107

288

10

302

179

480

18.47

10.94

29.41

18.47

10.94

29.41

20

369

219

588

1.00

18.47

10.94

29.41

200

3694

2188

5882

92

55

147

10

185

109

294

100

100

200

100

100

200

25

25

25

50

12

12

al Plan (BRGF) Phase-II PART-C


9

1.2

17.2

1.2

17.2

10

90

70

12

172

36

28

69

10

90

70

12

172

1.2

17.2

1.2

17.2

1.2

17.2

1.2

17.2

10

90

70

12

172

36

28

69

10

90

70

12

172

1.2

17.2

1.2

17.2

27

21

3.6

51.6

27

21

3.6

51.6

10

270

210

36

516

108

84

14

206

10

270

210

36

516

27

21

3.6

51.6

27

21

3.6

51.6

72

58

56

186

72

58

56

186

10

720

580

560

1860

432

348

336

1116

432

348

336

1116

72

58

56

186

72

58

56

186

180

145

140

465

180

145

140

465

10

1800

1450

1400

4650

1080

870

840

2790

1080

870

840

2790

180

145

140

465

180

145

140

465

108

87

84

279

108

87

84

279

10

1080

870

840

2790

648

522

504

1674

648

522

504

1674

108

87

84

279

108

87

84

279

Phase-II, Balance Work Of


l Plan (BRGF) Schemes

Unit
Service
tax

10

Unit
Charges
including Total Price
Erection
for
and
Erection
Service
Tax

11=9+10

12=8x11

0
0

0
0

0
0
0