Tips
for a smooth erection sequence
 Spray formwork on all sides with PERI BIO CLEAN
before using it for the rst time.
 Spray the rear of the formwork with water immediately
after concreting. This reduces the amount of cleaning work
needed.
 Always begin at a corner or obstruction.
Take note of the wall thickness, (see section 4. corners).
 Only use the number of ties actually required. Seal
unused tie holes with  20 mm plugs (Item no. 030290).
HANDSET
The Panel Formwork with the Quick-Action Clip
45
20/20
20/20
Filler
Panel
HSAP
Multi
Panel
HSM
Inside
Corner
HSE
Articulated
Corner
HSG
Height
45
Only one part is required for all connections including
mounting of accessories.
Wall thickness adjustments with
ller bar HSAS 5/6 or timber inlls
HSM
30
8.
Clip HSC, Item no. 034500
It functions on the principle of a three-point tension force:
 ush connections
 tight t
 does not wear after prolonged use
75
External formwork:
Panel HS 60
Internal panel:
Inside Corner HSE
Clip spacing:
preferably every second, but maximum every third internal section.
The clip can be tted from the left or right.
HSM
30
HS
150
With panel HS
30
15
1. Panel Connections
45
45
30
HSM
HS
60
With multi panel HSM
HSM
90
Guidelines for T-junctions,
20 - 40 cm wall thicknesses
HS
Width
8. Wall Connections
HSM
Permissible fresh concrete pressure: 40 kN/m2 according to DIN 18218
7. T-Junctions
HS
HANDSET Panels
Without exception, current safety regulations must be observed
in those countries where our products are used.
HSAS 6
This means:
Panel height
90 cm 2 Clips
Panel height 120 cm 2 Clips
Panel height 150 cm 3 Clips
12,5 mm
30
45
The hole arrangement in the edge
proles allow the
height of the panels to be adjusted
in 12.5 mm increments.
HS
24
60
HSE
Clip HSC
Only one connecting part
7.
HSE
30
HSAS 5
SM
20
60
45
30
HSE
HSE
HSM
45
HSM
30
45
HSAS 5
150 x 15
034130
11.90
0.23
150 x 45
034100
26.90
0.68
150 x 20/20
034150
26.50
0.60
150 x 20/20
034200
36.10
0.60
6. Stopend Formwork
2. Oblique Angles  75
HSE
45
45
Using:
 Stopend plywood
 Compensation Waler HSR 59
 Stopend Tie HST
SM
30
120
HSAS 5/6
45
2.
30
HSM
30
28
60
Connections on external formwork
Connections on internal formwork
External formwork:
 Multi Panel HSM 45
 1 Clip HSC per panel section
 1 Compensation Waler HSR 59
per tie point
Internal formwork:
 Panel HS 30
 Clip HSC arrangement as for standard panel joints
HSE
HSE
Basic requirements for
oblique angles
SM
150 x 30
034060
16.20
0.45
150 x 60
034050
27.80
0.90
30
150 x 90
034010
39.10
1.35
60
Type
Item no.
Weight [kg]
m2
25
HSE
6.
HSAS 5/6
Compensation
Waler HSR 59
2 HSAS 5
120 x 60
034070
22.80
0.72
120 x 30
034080
13.20
0.36
120 x 15
034280
9.62
0.18
120 x 45
034110
22.20
0.54
120 x 20/20
034220
21.50
0.48
120 x 20/20
034230
29.20
0.48
90
Always position stopend tie HST close to
transverse strut of the
panel
HSE
35
36
120 x 90
034020
32.10
1.08
60
Type
Item no.
Weight [kg]
m2
3. Inlls
Insert timber wedge
against waler
3.
With HANDSET ller plate HSLA
(plate) 3 to 18 cm
With ller support HSP
and 21 mm thick plywood 6 to 36 cm
HSE
45
HSAS 5/6
2 HSAS 5
15
HSE
25
45
40
90 x 30
034040
10.30
0.27
90 x 15
034140
7.54
0.14
90 x 45
034120
17.50
0.41
90 x 20/20
034160
16.30
0.36
90 x 20/20
034210
21.80
0.36
25
HSE
60
4.
The compensation waler HSR 59
carries the tie forces.
45
HSE
2 HSAS 5
Push-Pull Props and Kicker Braces
Height Adjustment and Fixing
5. Wall Offsets
4. Corners
Push-pull props and kickers to brace
the formwork and bearing the windload are to be arranged as shown on
the adjacent diagram and table.
The rst panel must always be braced
with 2 push-pull props. Subsequent
push-pull props according to the table.
HANDSET can be extended in 30 cm
increments. Clips are tted in every second
internal section.
In addition to the standard equipment,
the following is required:
 Multi Panel HSM
 Compensation Waler HSR 59
 Stopend Tie HST
Basic requirements for corners,
18 - 40 cm wall thicknesses
Connections to the HANDSET panels
take place using brace connector
HSRA.
Connectors whilst matching base
plates and PERI MMS 20 x 130 anchor
bolts are used for xing kicker braces
to the slab.
Brace Connector HSRA
Item no. 034550
HSAS 5/6
External formwork: Panel HS 45 or HS 60
Outside Corner Angle HSW
1 Clip HSC per panel section
300
Internal formwork:
240
Table for PERI push-pull props and kicker braces
3.53 2.73 2.19 1.82
1.58 1.42
Actual prop load FRS [kN]
at maximum prop spacing
9.7
9.8
Actual kicker brace load FAV [kN]
at maximum prop spacing
2.1
x = distance of base plate from
front face of formwork
1.2
1.6
2.0
2.4
2.9
3.5
y = *top connection point from
top of formwork
1.0
1.2
1.5
1.8
2.0
2.0
2.3
2.2
9.8
2.2
2.3
2.6
60
120
9.6
HS
90
FAV
60
Stopend tie HST with
wingnut counterplate
DW 15
HSE
Stopend tie HST and
cam nut DW 15 used
to take tension force
when ller timber is
used.
For xing push-pull
props and kicker
braces to the panels. Mounted with
the clip HSC.
F RS
0.5 kN/m2
9.8
HS
150
9.7
24
HS
HSE
60
HS
x
x
*If necessary, the distance from top of formwork must be
adapted to the system.
Quick Connector HSSA
HSSA 10/12, galv., Item no. 034660
for 10 x 12, 12 x 12 timbers
HSSA 14/16, galv., Item no. 034670
for 14 x 12, 16 x 12 timbers
A maximum force of 11.3 kN is to be led into the building at
the foot of the push-pull-prop for the given width of inuence.
Timber Strut Coupling HSRB
Item no. 034640
h < 8 m = 0.5 kN/m
8 m < h < 20 m = 0.8 kN/m2
Timber Holder HSKH
HSKH 14, galv., Item no. 034650
for 12 x 10 timbers
HSKH 22, galv., Item no. 034620
for 20 x 10 timbers
External corner connection
One clip per panel section and side are
required for connecting the panels on
the outside corner.
This means:
Panel height
90 cm 3 Clips
Panel height 120 cm 4 Clips
Panel height 150 cm 5 Clips
HSAS 5
HSAS 6
HSE
HSE
"7
.94(2%1&)-/-&.3
-"7 !."
$),=22&,6&*3&
#23".%
!.."
"
> !.."
".%"#23".%
"1
> !.."
*.%&23#"43&*,%*$+&
> !.."
41$)(".(2,/$)*-94#&'&23*(&.%&.&*,
%#
!.."
HSAS 5
!.."
&-0'/),&.&"23*.	
5/)'2+33'/'2'40/
*$)&1)&*32#&*6&132
"
> !.."
%
&3/.'&23*(+&*3
`7
	..
'40/5/)'2+33'/'/
*$)&1)&*32#&*6&132
"
!.."
)
14$),"23-*33&
+/#)'#-4'.5/)'2+33'/'.'40/
$'+'22'+%*4'2'34+),'+4
`7
	..
"
!.."
3'*7
Anchor Bolt
PERI MMS 20 x 130
Item no.: 103606
.#8!,"
'.1(!,"
'.1( !,"
'.1(!,"
'.1( !,"
The multi panel is equipped with
several rows of holes which allows
adjustments to be made in 2.5 cm
increments.
	
"
3'*7
For attaching timber struts to brace
connectors HSRA.
-#
$)",4.(&1=23 .(*.&&1*.(
034(#%*
'+:'/*02/
'543%*-#/&
'-'(0/
 	 	 	  	
'-'(#8 
 	 	 
 	
+/(01'2+&'
7771'2+&'
Concreting Scaffold
Foundations
Ties
60
60
Transportation and Storage
PERI Paletten und
Stapelrungen
Bedienungsanleitung
Scaffold bracket HSK 80
Item no. 034560
Mounted to the panels transverse struts - self-locking,
no loose parts. Maximum spacing 1.50 m.
Permissible load according to DIN 4420 = 150 kg/m2.
For vertical panels
If two 1.20 m high panels are being used, three ties are required for the overall height of 2.40 m. Four ties are needed
for 2.70 or 3.00 m high formwork.
Locking Strip HSS 60
Item no. 034530
Eliminates the need for the top tie position whilst acting
as a spacer for strip foundations.
HANDSET pallets for fast and safe
transportation as well as storage of
HANDSET panels and accessories.
The pallets are suitable for lifting by
crane of fork-lift truck.
Ausgabe 05/2007
Always refer to
the Instructions
for Use!
3.00 m
2 HANDSET clips
Locking Strip HSS 60
2.70 m
Pallet HS 120 x 90, galv.
Item no. 065080
Pallet HS 150 x 90, galv.
Item no. 065081
Foundation Tie Clamp HLS and Top Tie Bracket HSAH
Concreting height 1.20 m (with 90 x 120 panel vertical)
90
Permissible tension force of the HANDSET foundation
tie clamp with perforated foundation tie = 16 kN
90
90
150
120
120
Pallet HS 150 x 90, galv.,
lled with 10 panels 150 x 90.
For horizontal panels
The bottom tie point of a panel can be used with the aid of a
cam nut. This is an efcient solution if the tie point above it
cannot be used e.g. if box-outs or built-in components are in
the way.
Crane Hook HSKA
The maximum lifting capacity is 500 kg
with a maximum 30 angle of inclination.
120
Always use in pairs!
Top Tie Bracket HSAH, galv.
Item no. 034610
Kranaufhngung HSKA
Art.-Nr. 034520
Bedienungsanleitung
Concreting height 0.90 m (with 90 x 150 panel horizontal)
Ausgabe 05/2007
150
Always refer to
the Instructions
for Use!
150
Foundation Tie Clamp HLS
Item no. 034680
90
HANDSET
unit ready for use:
Complete with push-pull
props, kicker braces and
concreting platform with
guardrails.
Bracket HSK 60
Item no. 034570
For erecting a working scaffold at low formwork heights.
Maximum spacing 1.50 m.
Permissible load according to DIN 4420 = 150 kg/m2.
150
Wall thicknesses
150
2,40 m
from 15 to 60 cm
in 5 cm increments
)./-
HSE
HSE
"
"
40
60
9 '+/(#%*'52%*34'%,.0/4#)'
9 '/02.' '+45/&034'/'231#2/+3
9 ,'+/'12'/)7+2,5/)&'3<$'-3
9 )'12<(4'+%*'2*'+4#5%*+//+'&'2
('34'./+%*4#53)'*;24'4'.'40/
)./- > !.."
35
120
&$).*2$)&"3&.
!41&'&23*(4.(5/.*$)323=39&.
#20"..4.(&.#&* =).&.
.+&1,<.(&
/%&1"42+1"(&.%&.&$+&.3*2$)&.*23
%*&
.+&12$)1"4#&&*.&*%&",&
,&--23<1+&
,3&1."3*5&94#*2)&1&*.(&2&393&.
&1".+&14.(23*&'&
&'&23*(4.(22823&-&.
/)13*&'&
*&/13&*,&*-;#&1#,*$+
/)1&1:#..'2$0*2'2	
9 .'*2(#%*7+'&'26'27'/&$#2
45
45
Scaffold Tube Holder HSGH
Item no. 034690
For scaffold tubes with  48.3 mm
For assembling
the base plates
.+&12$)1"4#&7
131
30
60
Wind loads:
45
Corner HSE
Clip HSC arrangement as for standard panel joints
45
Max. width of inuence [m]
180
8.0
45
7.0
HSM
3.0
45
Formwork height h [m]
HSM
6.0
HSE
210
5.0
20
18
Wall thickness adjustments with ller bar HSAS 5/6 or timber inlls
270
4.0
To resist tension force in the inll area
stopend tie HST or tie rod DW 15 are
required. It is only neccessary in the
vicinity of external corners or other obstructions.
45
90 x 60
034030
17.90
0.54
15
45
60
Type
Item no.
Weight [kg]
m2
HSE
HSM
HSE
6-36 cm
5.
45
as
ble x 90 idth
a
l
i
w
a
Av 120 ng a
i
S
H vid cm
pro 120
of
3-18 cm
HSM
60
Perforated Foundation Tie,
25 m roll
Item no. 023020
Cam nut DW 15
Crane Hook HSKA
Item no. 034520
Edition 02/2008
 #"
 % 
 % 
%1)/250:25.
-5()5250:25.
-5'8/%5250:25.
%'%()250:25.
5%')5%0)
&!"!
/-0&-1+"'%**2/(
")/*/-0&-1+"<67)0
/-0&-1+ 527)'7-21 %1)/
/%7*250"<67)06
# % 
"48%5)
!)'7%1+8/%5
-5'8/%5
" %&!
 
" !
%'%()"'%**2/(
$25.-1+ /%7*250
$)%7,)5 527)'7-21!22*
"7%-5:%<'')66
 % 
%1)/250:25.
)%05-(250:25.
-5()5250:25.
"/%&#%&/)
)%0250:25.
 #
 % 
%17-/)9)5)( %5%3)7%55-%+)
%17-/)9)5)( %5%3)7 /%7*250
1+-1))5=6216758'7-21-7
 &!"!
"7))/"/%& 5236
/80-1-80"/%& 5236
#2:)5"<67)06
)%9<87< 5236
 $!
250:25.66)0&/<
/)%1-1+!)3%-56
250:25. /%11-1+
"2*7:%5)
"7%7-'6
"3)'-%/216758'7-216
((-7-21%/"<67)06
/<:22(
250:25.-5()56
"723)1("<67)06
%//)76
#5%163257%7-21217%-1)56
(-7-21
	
 %  
2;	
$)-66)1,251
)50%1<
#)/ 
 
%;
	 
-1*23)5-()
:::3)5-()
)
0%575	>23<5-+,7&< !0&
267)5
 #"
 % 
 % 
%1)/250:25.
-5()5250:25.
-5'8/%5250:25.
%'%()250:25.
5%')5%0)
&!"!
/-0&-1+"'%**2/(
")/*/-0&-1+"<67)0
/-0&-1+ 527)'7-21 %1)/
/%7*250"<67)06
# % 
"48%5)
!)'7%1+8/%5
-5'8/%5
" %&!
 
" !
%'%()"'%**2/(
$25.-1+ /%7*250
$)%7,)5 527)'7-21!22*
"7%-5:%<'')66
 % 
%1)/250:25.
)%05-(250:25.
-5()5250:25.
"/%&#%&/)
)%0250:25.
 #
 % 
%17-/)9)5)( %5%3)7%55-%+)
%17-/)9)5)( %5%3)7 /%7*250
1+-1))5=6216758'7-21-7
 &!"!
"7))/"/%& 5236
/80-1-80"/%& 5236
#2:)5"<67)06
)%9<87< 5236
 $!
250:25.66)0&/<
/)%1-1+!)3%-56
250:25. /%11-1+
"2*7:%5)
"7%7-'6
"3)'-%/216758'7-216
((-7-21%/"<67)06
/<:22(
250:25.-5()56
"723)1("<67)06
%//)76
#5%163257%7-21217%-1)56
(-7-21
	
 %  
2;	
$)-66)1,251
)50%1<
#)/ 
 
%;
	 
-1*23)5-()
:::3)5-()
)
0%575	>23<5-+,7&< !0&
267)5