Steel Structure Work

This document outlines the job safety analysis for steel structure works on a proposed bus depot project. It identifies potential hazards at each job sequence, assesses the risk level, and lists current and proposed risk controls. Some key hazards identified include falls, being caught in machinery, welding hazards, painting hazards, and working at heights. Control measures proposed include using proper personal protective equipment, restricting access, training workers, and designating supervisors to oversee safety compliance. The analysis was prepared by Mohd Firdaus Bin Kamaruddin and approved by the project manager.

Uploaded by

mohd firdaus
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
325 views9 pages

Steel Structure Work

This document outlines the job safety analysis for steel structure works on a proposed bus depot project. It identifies potential hazards at each job sequence, assesses the risk level, and lists current and proposed risk controls. Some key hazards identified include falls, being caught in machinery, welding hazards, painting hazards, and working at heights. Control measures proposed include using proper personal protective equipment, restricting access, training workers, and designating supervisors to oversee safety compliance. The analysis was prepared by Mohd Firdaus Bin Kamaruddin and approved by the project manager.

Uploaded by

mohd firdaus
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 9

PROJECT : CADANGAN MEMBINA SEBUAH DEPOH BAS

DAN KEMUDAHAN SOKONGAN BERKAITAN BAGI PROJEK MASS RAPID


TRANSIT LEMBAH KLANG ,JAJARAN SUNGAI BULOHKAJANG DIATAS LOT 81520
SELUAS 10.55 EKAR SEKSYEN U4,40150 SHAH ALAM SELANGOR DARUL EHSAN

DESCRIPTION OF JOB :
Steel structure works

PREPARED BY :
Mohd Firdaus Bin Kamaruddin

LEGAL AND OTHER REQUIREMENTS : OSHA 1994 SECTION 15(2)

APPROVED BY: Ching Soon Seng (PM)

REV : 00

PAGE : 01

(a) (b) (c) ,FMA section 10,26 shw reg 32 bowec Reg 8,9

LOCATION :

RISK ASSESSMENT

Trip & falls

Used approved type safety shoe.


Housekeeping & material arrangement.

Caught in between / hit by machinery

Experianced/licensed operator.
Stop all work near the excavation area

Provide Banksman to controll


machnery movement

Slips,Trip & falls

Used approved type safety shoe.


Housekeeping & material arrangement.

Standing supervision.
Cover all opening

Pinch point / sharp edge

Briefing safe methode before start work.


Remove or cover sharp edge

Wear hand glove.


Apply buddy system

Briefing on safe manual handling.


& correct body posture when working.

CURRENT RISK CONTROL


Hazard/Effect

PROPOSED RISK CONTROL

LEVEL

Job sequence /steps

SCORE

COSEQUENCE (B)

RISK RANKING

PROBABILITY (A)

HAZARD INDENTICATION

NO

JSA NO :

1 Transfer material to work location

RESPONSIBILITY

PE
Standing supervision.
Install rigid barrier to all excation area
above 1.5 meter.

Site Engineer
Site supervisor

2 Marking & setting up

Back injury

Used proper body posture

Site safety supervisor

PROJECT : CADANGAN MEMBINA SEBUAH DEPOH BAS


DAN KEMUDAHAN SOKONGAN BERKAITAN BAGI PROJEK MASS RAPID
TRANSIT LEMBAH KLANG ,JAJARAN SUNGAI BULOHKAJANG DIATAS LOT 81520
SELUAS 10.55 EKAR SEKSYEN U4,40150 SHAH ALAM SELANGOR DARUL EHSAN

DESCRIPTION OF JOB :
Steel structure works

PREPARED BY :
Mohd Firdaus Bin Kamaruddin

LEGAL AND OTHER REQUIREMENTS : OSHA 1994 SECTION 15(2)

APPROVED BY: Ching Soon Seng (PM)

JSA NO :
REV : 00

PAGE : 02
(a) (b) (c) ,FMA section 10,26 shw reg 32 bowec Reg 8,9

CURRENT RISK CONTROL


Hazard/Effect

3 Installation hold down bolt


Welding, cutting & grinding

Radiation / skin burn

Used coverall / jacket


Used welding hand glove

PROPOSED RISK CONTROL

LEVEL

Job sequence /steps

RISK RANKING

COSEQUENCE (B)

NO

RISK ASSESSMENT
PROBABILITY (A)

HAZARD INDENTICATION

SCORE

LOCATION :

RESPONSIBILITY

Certified welder.
Utilise welding apron

PE

Do not carry out this activity to long


Without stop.

Site Engineer
Site supervisor

Inhalation toxic fumes

Actarac or burn to rentina

Explosion

Flying particle

Used welding mask.

Always used welding face shield

Provide fire extinguisher around


Remove all flammable material surounding
Remove all broken item
Used safety goggles & face sheild

Provide blower to maintain good


ventilation

Certified welder to carry out weding work.

Check welding cable & gas hose


Safety part (earthing & flash back arrestor)
in order.
Inspection & make sure rotating cover
not removed.

Site safety supervisor

PROJECT : CADANGAN MEMBINA SEBUAH DEPOH BAS


DAN KEMUDAHAN SOKONGAN BERKAITAN BAGI PROJEK MASS RAPID
TRANSIT LEMBAH KLANG ,JAJARAN SUNGAI BULOHKAJANG DIATAS LOT 81520
SELUAS 10.55 EKAR SEKSYEN U4,40150 SHAH ALAM SELANGOR DARUL EHSAN

DESCRIPTION OF JOB :
Steel structure works

PREPARED BY :
Mohd Firdaus Bin Kamaruddin

LEGAL AND OTHER REQUIREMENTS : OSHA 1994 SECTION 15(2)

APPROVED BY: Ching Soon Seng (PM)

JSA NO :
REV : 00

PAGE : 03
LOCATION :

(a) (b) (c) ,FMA section 10,26 shw reg 32 bowec Reg 8,9

RISK RANKING

Trip & falls

Used approved type safety shoe.


Housekeeping & material arrangement.

Standing supervision.
Put barricade & signage

Pinch point / sharp edge

Briefing safe methode before start work.


Remove or cover sharp edge

Wear hand glove.


Apply buddy system

Fail of lifting gear

Used the right lifting gear & ensure that


lifting gear capable to take the load.

Inspect that chain block before used.


Only used lifting gear with certificate

Provide signalman to controll


lifting & provide tag line.

CURRENT RISK CONTROL


Hazard/Effect

PROPOSED RISK CONTROL

LEVEL

Job sequence /steps

SCORE

COSEQUENCE (B)

NO

RISK ASSESSMENT
PROBABILITY (A)

HAZARD INDENTICATION

4 Pre-assembly (fit up)

RESPONSIBILITY

PE
Site Engineer
Site supervisor

Crush by material

Crane topple

Experianced/licensed operator.
Not allowed workers underneath during
lifting.
Experianced / licensed operator.
Attach steel plate at crane outrigger

Provide signalman.
Standing supervision.
Ground condition inspection.

Site safety supervisor

PROJECT : CADANGAN MEMBINA SEBUAH DEPOH BAS


DAN KEMUDAHAN SOKONGAN BERKAITAN BAGI PROJEK MASS RAPID
TRANSIT LEMBAH KLANG ,JAJARAN SUNGAI BULOHKAJANG DIATAS LOT 81520
SELUAS 10.55 EKAR SEKSYEN U4,40150 SHAH ALAM SELANGOR DARUL EHSAN

DESCRIPTION OF JOB :
Steel structure works

JSA NO :

PREPARED BY :
Mohd Firdaus Bin Kamaruddin

REV : 00
APPROVED BY: Ching Soon Seng (PM)

LEGAL AND OTHER REQUIREMENTS : OSHA 1994 SECTION 15(2)

PAGE : 04
(a) (b) (c) ,FMA section 10,26 shw reg 32 bowec Reg 8,9

CURRENT RISK CONTROL


Hazard/Effect

make sure the wind direction.


used jacket or coverall.

Provide blower for good ventilation.


do not spray against wind direction.

Provided designated smoking are


Stop all hot work activities nearest.

PROPOSED RISK CONTROL

LEVEL

Job sequence /steps

RISK RANKING

COSEQUENCE (B)

NO

RISK ASSESSMENT
PROBABILITY (A)

HAZARD INDENTICATION

SCORE

LOCATION :

5 Painting of steel work.


Paint mixing

Splash into eye

Used safety goggles.


experience person to handle.

RESPONSIBILITY

Test & adjust speed the paint stirrer


outside paint can.

PE

Air wash or water tapping nearest.

Site Engineer
Site supervisor

Skin contact ( irratation)

Inhalation of spray paint

fire / burn

Used rubber glove.


Briefing on methode statement.

Used respirator with correct cartridge

Provide fire extinguisher around


Not allowed smoking at that area.

Site safety supervisor

PROJECT : CADANGAN MEMBINA SEBUAH DEPOH BAS


DAN KEMUDAHAN SOKONGAN BERKAITAN BAGI PROJEK MASS RAPID
TRANSIT LEMBAH KLANG ,JAJARAN SUNGAI BULOHKAJANG DIATAS LOT 81520
SELUAS 10.55 EKAR SEKSYEN U4,40150 SHAH ALAM SELANGOR DARUL EHSAN

DESCRIPTION OF JOB :
Steel structure works

JSA NO :

PREPARED BY :
Mohd Firdaus Bin Kamaruddin

REV : 00
APPROVED BY: Ching Soon Seng (PM)

LEGAL AND OTHER REQUIREMENTS : OSHA 1994 SECTION 15(2)

PAGE : 05
(a) (b) (c) ,FMA section 10,26 shw reg 32 bowec Reg 8,9

make sure the wind direction.


used jacket or coverall.

Provide blower for good ventilation.


do not spray against wind direction.

Provide fire extinguisher around


Not allowed smoking at that area.

Provided designated smoking are


Stop all hot work activities nearest.

Ensure painting hose in good


condition

Carry out visual inspection everyday


before start work.

CURRENT RISK CONTROL


Hazard/Effect

PROPOSED RISK CONTROL

LEVEL

Job sequence /steps

RISK RANKING

COSEQUENCE (B)

NO

RISK ASSESSMENT
PROBABILITY (A)

HAZARD INDENTICATION

SCORE

LOCATION :

6 Painting of steel work.


Painting activities

Splash into eye

Used safety goggles.


experience person to handle.

RESPONSIBILITY

Test & adjust speed the paint stirrer


outside paint can.

PE

Air wash or water tapping nearest.

Site Engineer
Site supervisor

Skin contact ( irratation)

Inhalation of spray paint

fire / burn

Painting hose burst

Used rubber glove.


Briefing on methode statement.

Used respirator with correct cartridge

Site safety supervisor

PROJECT : CADANGAN MEMBINA SEBUAH DEPOH BAS


DAN KEMUDAHAN SOKONGAN BERKAITAN BAGI PROJEK MASS RAPID
TRANSIT LEMBAH KLANG ,JAJARAN SUNGAI BULOHKAJANG DIATAS LOT 81520
SELUAS 10.55 EKAR SEKSYEN U4,40150 SHAH ALAM SELANGOR DARUL EHSAN

DESCRIPTION OF JOB :
Steel structure works

PREPARED BY :
Mohd Firdaus Bin Kamaruddin

LEGAL AND OTHER REQUIREMENTS : OSHA 1994 SECTION 15(2)

APPROVED BY: Ching Soon Seng (PM)

JSA NO :
REV : 00

PAGE : 06
(a) (b) (c) ,FMA section 10,26 shw reg 32 bowec Reg 8,9

CURRENT RISK CONTROL


Hazard/Effect

PROPOSED RISK CONTROL

LEVEL

Job sequence /steps

RISK RANKING

COSEQUENCE (B)

NO

RISK ASSESSMENT
PROBABILITY (A)

HAZARD INDENTICATION

SCORE

LOCATION :

7 Painting of steel work.


Painting activities at height
& using boomlift / skylift.

RESPONSIBILITY

PE
caught in between / hit by machinery

Experianced / trained operator


Inspection of machinery
barridace work area.

Provide banksman to controll machinery


Buddy system,do not operate alone.
Check & ensure safety device functioning.

Site Engineer
Site supervisor

Boomlift / skylift topple

Experianced / trained operator


Provide safe platform.

falling from height

Training workers for working at height.

Ground condition checking.


1

Material falling from height.

Provide safe working platform.


Provide lifelines / hook point.

Wear full body harness with large hook.


Maintain housekeeping and material
arrangement.

Provide banks man / signal man.


Standing supervision.

Provide boxes for loose item.


Barricade work area.

Site safety supervisor

PROJECT : CADANGAN MEMBINA SEBUAH DEPOH BAS


DAN KEMUDAHAN SOKONGAN BERKAITAN BAGI PROJEK MASS RAPID
TRANSIT LEMBAH KLANG ,JAJARAN SUNGAI BULOHKAJANG DIATAS LOT 81520
SELUAS 10.55 EKAR SEKSYEN U4,40150 SHAH ALAM SELANGOR DARUL EHSAN

DESCRIPTION OF JOB :
Steel structure works

PREPARED BY :
Mohd Firdaus Bin Kamaruddin

LEGAL AND OTHER REQUIREMENTS : OSHA 1994 SECTION 15(2)

APPROVED BY: Ching Soon Seng (PM)

JSA NO :
REV : 00

PAGE : 07
LOCATION :

(a) (b) (c) ,FMA section 10,26 shw reg 32 bowec Reg 8,9

RISK RANKING

Misuse equipment cause injury

CURRENT RISK CONTROL

PROPOSED RISK CONTROL

LEVEL

Job sequence /steps

SCORE

Hazard/Effect

COSEQUENCE (B)

NO

RISK ASSESSMENT
PROBABILITY (A)

HAZARD INDENTICATION

8 Bolt & nut tightening.


Manual tightening.

RESPONSIBILITY

PE
Site Engineer
Site supervisor

Pneumatic air gun


tightening

Slips, trips & falls

Used approved type safety shoe.


Housekeeping & material arrangement.

Standing supervision.
Cover all opening

finger injury / stuck

Briefing safe methode before start work.


Placed out finger from pinch point area

Wear hand gloves


Proper communication.

Ensure painting hose in good


condition

Carry out visual inspection everyday


before start work.

Check all joint or connection before start


work.

Briefing before start work


Wear suitable PPE.

Budy system & replace worker with rotating


system.

Briefing safe methode before start work.


Used Safety shoe.

Hose burst

Joint hose uprooted & hit workers

Hand arm vibration

Air gun slipped

Noise

Install whip check

Used ears plug

Put landyard when used air gun at height

limit exposure to workers with rotating


system.

Site safety supervisor

PROJECT : CADANGAN MEMBINA SEBUAH DEPOH BAS


DAN KEMUDAHAN SOKONGAN BERKAITAN BAGI PROJEK MASS RAPID
TRANSIT LEMBAH KLANG ,JAJARAN SUNGAI BULOHKAJANG DIATAS LOT 81520
SELUAS 10.55 EKAR SEKSYEN U4,40150 SHAH ALAM SELANGOR DARUL EHSAN

DESCRIPTION OF JOB :
Steel structure works

REV : 00
LEGAL AND OTHER REQUIREMENTS : OSHA 1994 SECTION 15(2)
(a) (b) (c) ,FMA section 10,26 shw reg 32 bowec Reg 8,9

CURRENT RISK CONTROL


Hazard/Effect

9 General housekeeping
issues

RISK RANKING
PROPOSED RISK CONTROL

LEVEL

Job sequence /steps

RISK ASSESSMENT
COSEQUENCE (B)

NO

PAGE : 08

PROBABILITY (A)

HAZARD INDENTICATION

APPROVED BY: Ching Soon Seng (PM)

SCORE

LOCATION :

JSA NO :

PREPARED BY :
Mohd Firdaus Bin Kamaruddin

RESPONSIBILITY

PE
slip ,trip & fall

Keep Floor clean and debris free

conduct daily tool box talk


Site Suoervisor
Safety Supervisor

Cuts/ punctures

Back injury

Do not put hand in trash cans pick up plastics bags from the
edges

use hand gloves for the


protection

use proper body posture

use safety lifiting techniques

Risk Rating

IMPACT SEVERITY
1
Minimal

2
Minor

3
Moderate

4
Major

5
Severe

Financial

Less than Rm 50 k

RM 50 K to RM 250 K

RM 250 K- RM 1.0m

RM 1.0m to RM 10m

Greater than Rm 10 m

Safety

None

First aid required

Medical treatment
required

serious injury

a fatality case

Programme

Less than one week

1-4 Weeks

1-3 months

3-6 months

greater than 6 months

Third party impact

Negligible damage

Minor damage
some repairs
required

Moderate to high
damage requires
specialist to repair

Almost certain -happen frequenly (more than 10 times


within the project

very likely -could happen frequenly (more than 3


times within the project

Likely-could happen occasionly (less than 3 times


within the project

Unlikely- could happen rarely (1 times within the


project

Very unlikely- probablilty will not happen (has never


occurred)

LIKEHOOD

IMPACT CATEGORY

RISK AREA

Significant/permanent
widespread subtantial
damage
/permanent damage