NEW PORT PROJECT
Construction Development Co. LLC
Boom Construction Co. LLC (JV)
NPP/0047: Centralised Customs
Inspection Area
Material Approval
Submittal
(MAS Form)
Contract:
MAS Ref:
NPP/0047 Centralised Customs Inspection Area
NPP0047-CDC-MEC-MAS-0000x_rev
Date on
ePM:
Manufacturer /
National Paints / National Paints Factories
Country of
Supplier name:
Co. W.L.L
material
origin:
Supplier Pre-Qualification
NPP0047-CDC-PQ-00316_1
Reference:
Description of
material:
Specification
details:
Location of use on
project:
Technical details:
Qatar
Primer, Undercoat Paint, and Topcoat Paint
Project Specification Section 23 Part 4 Clause 4.14.3; Technical Specification
Section 23 - Fire Fighting and Fire Alarm Doc. No. 9224-12-WW-SPC-0102 Rev B;
Qatar Construction Specification (QCS 2010) QCS 2010 Section 8 Part 8 Table 8.4
NPP/0047 CCIA Project Within the Buildings (Aboveground Fire Fighting Piping)
Epoxy Zinc Chromate Primer, Synthetic Undercoat Paint, Synthetic Enamel Gloss I
Paint
Attachments to support the materials submittal:
1
Compliance Statement
Remar Please refer to pages 01 07
ks:
2
Compliance Statement, Project
Remar Please refer to pages 08 13
Specification, QCS 2010, and Technical
ks:
Specification
3
Material Safety Data Sheet
Remar Please refer to pages 14 37
ks:
4
Material Test Certificate
Remar Please refer to pages 38 43
ks:
5
Previous approvals of the proposed
Remar Please refer to pages 44 50
material from other projects
ks:
6
Catalogue
Remar Please refer to pages 51 59
ks:
7
Supplier Local Registration
Remar Please refer to pages 60 63
ks:
8
Country of Origin Certificate
Remar Please refer to pages 64 65
ks:
9
Warranties / Guarantees
Remar Please refer to pages 66 67
ks:
10 Storage, Transport, & Handling
Remar Please refer to pages 68 82
requirements
ks:
11 ISO Certificates
Remar Please refer to pages 83 87
ks:
12 Employer's Approval Letter
Remar Please refer to pages 88 89
ks:
13 Manufacturer's Recommendation
Remar Please refer to pages 90 91
ks:
Disclaimer
We understand that approval of the material(s) submitted herein is only intended to determine general
conformance with the intent of the project contract documents. By submitting these materials for approval,
we confirm we have performed all necessary on-site dimensional and building utility requirement
coordination, and if approval is granted, will further coordinate the information contained within with all
other concerned contractors employed by the NPPSC.
NPP00100-ACM-PRO-1201-MAS
Revision 0 24 March 2014
Page 1 of 2
NEW PORT PROJECT
Construction Development Co. LLC
Boom Construction Co. LLC (JV)
NPP/0047: Centralised Customs
Inspection Area
Material Approval
Submittal
(MAS Form)
Action:
Prepare
d by /
Submitt
ed by:
Checke
d by:
Reviewe
d by:
Name:
Amjad
Rawashd
eh
MEP
Project
Manager
Muhame
dMustafa
Technical
Manager
Glisson
George
QA/QC
Manager
26-042016
26-042016
26-042016
Reviewe
d&
Approve
d by
Design
Consulta
nt:
Design
Consultant stamp
Approve
d by:
Company
stamp
Shadi
Khashab
Project
Director
Signat
ure:
Date:
PMC review comments
Review status:
Status A
(reviewed)
Status B
(reviewed as noted)
Status C
Status D
(revise and resubmit)
(cancelled)
(insert CSRC reference that refers to the details of the review outcome)
Reviewed by:
(insert full name)
Date returned
to Contractor:
NPP00100-ACM-PRO-1201-MAS
Revision 0 24 March 2014
Signat
ure:
Dat
e:
Copies
distributed to:
Page 2 of 2