Job Procedure
Page 1 of 6
No. LTCDRev.0
SSPL-ST-CIVILJP-17
: SIDHPUR - SANGANER PIPELINE PROJECT.
: M/S INDIAN OIL CORPORATION LIMITED
LARSEN & TOUBRO LTD
ECC DIVISION
Project
Owner
Painting
0
Rev.
No.
23.02.0 For review
4
& Approval
Date
SML
RKS
Prepare
Checked
Description
d by
by L&T
L&T
ANA
Approved
by L&T
Reviewed &
approved by
IOCL
Job Procedure
Page 2 of 6
No. LTCDRev.0
SSPL-ST-CIVILJP-17
: SIDHPUR - SANGANER PIPELINE PROJECT.
: M/S INDIAN OIL CORPORATION LIMITED
LARSEN & TOUBRO LTD
ECC DIVISION
Project
Owner
Index
Sl. No.
Description
Page No.
Purpose
Scope
Controlling Spec.
Material
Procedure
Documendation
ITP-
LTCD-SSPL-ST-CIVIL-ITP-17
Formats-
LTCD-SSPL-ST-CIVIL-FM-17
3&4
4
Job Procedure
Page 3 of 6
No. LTCDRev.0
SSPL-ST-CIVILJP-17
: SIDHPUR - SANGANER PIPELINE PROJECT.
: M/S INDIAN OIL CORPORATION LIMITED
LARSEN & TOUBRO LTD
ECC DIVISION
Project
Owner
1.0
Scope:
This procedure covers the minimum requirements for materials, execution and method of record keeping for
Painting Work at site.
2.0
a)
Controlling Specifications:
The Painting work shall comply to the relevant IS codes and speciication no. IOCL(PL) - CIVIL - SPEC of the
Contract Document No. PL/E&C/CONTR/CIVIL/SSPL/ML/2002-03/20 (Volume II)
Exhibit drawings
b)
3.0
a)
b)
Materials
Lime shall be conforming to IS 712 and Indigo, gum, pigments etc. shall be of good quality.
e)
Oil bound distemper shall be conforming to IS 427 & IS 428 and of approved shade, brand and manufactures.
Primer for Oil bound distemper shall be of the same manufactures.
Water proof cement paint shall be conforming to IS 5410 and of approved shade manufactured by 'Snowcem'
or equivalent brand.
Synthetic enamel paint shall be conforming to IS 106 and of approved shade & manufacturer.
4.0
Procedure
4.1
White Washing / Colour Washing
4.2
Surface area shall be thoroughly brushed to remove the mortar dropping and foreign matters before applying
the wash. The wash shall be prepared from fresh stone shale lime. The lime shall be thoroughly soaked and
screened through a clean coarse cloth and admixed with gum and indigo. In each one kg. of lime 3 gm. of
indigo and 20 gm. of gum shall be mixed. One kg of lime will produce 5 litres of white milky solution. The
wash solution shall be applied with brush on the surface ready for painting. Each coat shall be allowed to dry
before application of next coat. Total three coats shall be applied. For colour wash, pigment of desired shade
shall be added in the solution to get the desired shade.
Oil Bound Distemper
c)
d)
The surface shall be thoroughly cleaned of dust, mortar dropping, foreign matters etc. If any old white or
colour wash is present, the same shall be removed by washing and scrubbing and then be allowed to dry for
at least 48 hours. It shall then be sand papered to remove any unevenness. The depressions shall be made
up with plaster of paris putty.
The primer of the approved make shall be applied first horizontally and then vertically immediately afterwards.
The surface shall be finished as uniformly as possible leaving no brush marks. It shall be allowed to dry for at
least 48 hours before oil bound distemper is applied. The surface thus prepared shall be lightly sand papered
to make it smooth for receiving distemper, taking care not to rub out the primer coat. One coat of distemper
properly diluted with thinner as per the manufacturer's recommendation shall be applied with brush in
horizontal strokes followed immediately by vertical ones which together constitute one coat. The subsequent
coat shall be applied in the same way so as to obtain an even surface. A time interval of at least 24 hours
shall be allowed between consecutive coats to permit proper drying of the preceding coat.
Job Procedure
Page 4 of 6
No. LTCDRev.0
SSPL-ST-CIVILJP-17
: SIDHPUR - SANGANER PIPELINE PROJECT.
: M/S INDIAN OIL CORPORATION LIMITED
LARSEN & TOUBRO LTD
ECC DIVISION
Project
Owner
4.3
Water proof Cement Paint
The surface shall be thoroughly cleaned of dust, mortar dropping, foreign matters etc.by scrubbing and
washing.
The surface shall be thoroughly wetted with clean water before the water proof cement paint is applied. Water
proof cement paint shall be mixed in clean water as per the manufacturer recommendation to get a
homogenious liquid paint. Liquid paint shall be prepared in such a quantity that it can be consumed within
one hour of its mixing. Paint shall be applied with brush in horizontal strokes followed immediately by vertical
ones which together constitute one coat. A time interval of at least 24 hours shall be allowed between
consecutive coats to permit proper drying of the preceding coat. Total three coats of paint shall be applied.
Painting shall be done with proper care so as to avoid any brush mark on the finished surface. After the
painting is over curing with water shall be done at least for three days.
5.0
Documents
ITP:
Format:
NOTE:
LTCD-SSPL-ST-CIVIL-ITP-17
LTCD-SSPL-ST-CIVIL-FM-17
In case of any conflict between this procedure and contract specification, the later shall
govern.
Page5 of 6
LARSEN & TOUBRO LTD - ECC DIVISION
Inspection & Test Plan for White / Colour washing, OBD & Water proof painting work.
Project:Client:-
Contractor
Sl.
No.
SIDHPUR - SANGANER PIPELINE PROJECT
I.O.C.L.
L & T, ECC Division
Activity Description
Inspection
by L&T
Verification by
Records to be Submitted by L&T
IOCL
MTC ( if required ) & shade card for
colour approval
Type of Material / Brand name
Surface preparation
RM
Application of Primer
RM
-DO-
Application of finishing coat
RM
-DO-
Curing ( if any )
RM
-DO-
LTCD-SSPL-ST-CIVIL-FM-17
W - Witness
RM - Random
R - Review Documents
23.02.04
For review & Approval
SML
RKS
OPK
Rev.
No.
Date
Description
Prepared by
L&T
Checked by
L&T
Reviewed & approved by IOCL
LTCD-SSPL-ST-CIVIL-ITP-17
LARSEN & TOUBRO LTD - ECC DIVISION
Inspection Report for White / Colour washing, OBD & Water proof painting work.
Project:Client:-
Contractor
SIDHPUR - SANGANER PIPELINE PROJECT.
I.O.C.L.
L & T, ECC Division
Drawing number
Report No.
Structure
Date
Sl.
No
Description
Checked by L&T Verified by IOCL
Type of Paint
Type of Material / Brand name
Date of Manufacturing / expiry date
( if required )
Color / Shade
Surface preparation
Primer application
Remarks
1st coat
7
Painting
2nd coat
3rd coat (if any)
Curing ( if any )
Others ( if any )
The work at the above location was checked and found to be in accordance with relevant drawings and
specification of the contract.
FOR L & T
FOR IOCL
LTCD-SSPL-ST-CIVIL-FM-17