1
RAMP 1 in 21.4
RAMP 1 in 21.4
STORE
1
10 11 12 13 14 15 16 17 18 19
GENERAL NOTES
BG-038
1.
2.
STAIR B05
BG-039
OUTDOOR PLAY AREA
G01 - CLASSROOM 07
G01 - CLASSROOM 08
3.
BG-020
BG-021
4.
BG-038
5.
6.
7.
This Drawing is not to be scaled.
All dimensions shown are in millimeters and do not take into
account applied finishes unless specifically indicated otherwise.
Any omissions or discrepancies found shall be reported to the
Architect / Engineer immediately.
Levels are given in meters to three decimal places above survey
datum.
This drawing is to be read in conjunction with the relevant section
of the specification and schedules.
The contractor shall submit full shop / setting out drawing for
approval (based on site dimensions) prior to commencement of
any site works, placing of orders, manufacture of fittings, fixtures
and components.
For External Finishes refer to Landscape Drawings and
Specifications.
F
KEY PLAN
RISER
IDF ROOM
BG-016
G01 - CLASSROOM 01
SUPPORT ROOM
G01 - CLASSROOM 02
G01 - CLASSROOM 03
G01 - CLASSROOM 04
G01 - CLASSROOM 05
G01 - CLASSROOM 06
BG-007
BG-008
BG-009
BG-010
BG-011
BG-012
SMDB-0-03
LOBBY
ELEC ROOM
BG-017
BG-018
LOBBY
G02 - CLASSROOM 08
BG-019
BG-029
ZONE-A
ZONE-B
STAIR B02
UP
BG-030
ROAD LVL +7.45M
KS1 LIBRARY
BG-015
FINISH FLOOR LEVEL +0.480 = F.F.L. +8.40 ON SITE
SSL +0.405
REVISIONS
CORRIDOR
ICT BASES
ICT BASES
BG-003A
BG-013
BG-014
RISER
-
FFL +8.40M
No. DATE
DESCRIPTION
C0
CONSTRUCTION ISSUE
15-06-15
BY
DA
FFL +8.22M
FFL +8.38M
LOBBY
BG-031
1.
WC-T05
BG-004
LOBBY
BG-003
SECURITY
CLNR-T04
BG-002
BG-032
FFL. + 8.40M
G02 - CLASSROOM 01
G02 - CLASSROOM 02
G02 - CLASSROOM 03
G02 - CLASSROOM 04
G02 - CLASSROOM 05
G02 - CLASSROOM 06
G02 - CLASSROOM 07
BG-022
BG-023
BG-024
BG-025
BG-026
BG-027
BG-028
LOBBY
BG-033
BG-034
DESIGN ARCHITECTS & MEP ENGINEERS
M WC - T01
STAIR B01
DIS WC-T04
BG-035
Godwin Austen Johnson
Architects
BG-001
UP
STRUCTURAL ENGINEERS
FFL +8.38M
LOBBY
BG-036
SHADED PLAY AREA
F WC - T01
BG-038
BG-037
KS1 / ADMIN ENT
B
OWNER
PRIMARY /
ADMIN
ENTRANCE
LPG RE-FILLING
VALVE ASSEMBLY
FFL +8.18M
FORTES HOLDING
FFL +8.20M
ISSUED FOR
CONSTRUCTION
PROJECT
JVT SCHOOL
Plot No. JVT05SCP001
Jumeirah Village Triangle, Dubai, UAE
DRAWING TITLE
MECHANICAL SERVICES
GROUND FLOOR PART PLAN
GAS LAYOUT
A
ROAD LVL +7.52M
Drawn
Date
Project No.
RT Checked
08.06.2014 Scale
Zone
3350
Authority Dwg. No.
EL Approved
OP
1:100 @ A1
Drawing No.
L54-100
Rev.
C0
Consecutive No.
This drawing, the designs and details shown are the copyright of
GODWIN AUSTEN JOHNSON and shall not be copied or reproduced in
any form without their written consent.
13
A1
14
15
Original Sheet FILE PATH : F:\- PROJECTS CURRENT\3350 - Fortes School\LIVE\ACAD\MEP DEPT\Sheet Files\Mechanical\54-Gas\3350-L54-100.dwg
Size
16
17
18
19
20
21
22
23
T +971 4 3237555 E mail@gaj-uae.ae
F +971 4 3237717 W www.gaj-uae.ae
PO Box 7185 Dubai United Arab Emirates