5.1. Perencanaan Bangunan Sadap (Romyn) 5.1.1. Saluransekunder A (Sii) - Bsa1 Kiri

This document summarizes the planning of a drainage system (Romyn) for a secondary channel (SII). It includes calculations of the heights of the Romyn and water levels for four sections of the secondary channel: BSA1 Left, BSA2 Left, BSA1 Right, and BSA2 Right. The given parameters such as discharge and Strickler coefficient are used to calculate the cross-sectional dimensions including height, width, area, and velocity. The height of the Romyn structure and submerged depth are also determined for each section. Diagrams illustrate the cross-sections and water levels.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views5 pages

5.1. Perencanaan Bangunan Sadap (Romyn) 5.1.1. Saluransekunder A (Sii) - Bsa1 Kiri

This document summarizes the planning of a drainage system (Romyn) for a secondary channel (SII). It includes calculations of the heights of the Romyn and water levels for four sections of the secondary channel: BSA1 Left, BSA2 Left, BSA1 Right, and BSA2 Right. The given parameters such as discharge and Strickler coefficient are used to calculate the cross-sectional dimensions including height, width, area, and velocity. The height of the Romyn structure and submerged depth are also determined for each section. Diagrams illustrate the cross-sections and water levels.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

5.1.

Perencanaan Bangunan Sadap (Romyn)


5.1.1. SaluranSekunder A(SII) BSA1 Kiri
Diketahui :

Q BSA1 Kiri

= 0,22 m3/dt

K.Strickler

= 45

Dari Tabeldidapat :

Sehingga

b/h

=1

=1

A1

= 2h2

= 0,292 m/dt

= 0,614 m

= 0,614 m

= 1,912 10-4

= 0,30

MenghitungtinggiRomyn
h BSA1 Kiri

= 0,614 m

h SIIA

= 1,041 m

Q=1,71 b h3 /2
220=1,71 0,50 h3 /2
0,22/1,71 0,50 2

(OK)

3
h=
hRomyn
Tinggihilang (z)

= 0,405 m
= (1/3) 0,405 = 0,135 m

+249,709
z = 0.135

+249,574

h romyn = 0.405

V = 0,484 m/dt
V = 0,292 m/dt

h Saluran sekunder
BSA1 SIIA = 1,041 m

h BSA1 Kiri = 0.614 m

+248,960

+248,668

33

PenampangMemanjang BSA1 KIRI

5.1.2

Saluransekunder A(SII) BSA2 Kiri


Diketahui :

Q BSA1 Kiri

= 0,2 m3/dt

K.Strickler

= 50

Dari Tabeldidapat :

Sehingga:

b/h

=1

=1

A1

= 2h2

= 0,285 m/dt

= 0,592m

= 0,592m

= 1,559 10-4

= 0,30

MenghitungtinggiRomyn
h BSA2Kiri

= 0,592 m

hHulu A SIIA = 0,955 m


Q=1,71 b h3 /2
200=1,71 0,50 h3 /2
2

0,20/1,71 0,50

h=3
hRomyn
Tinggihilang (z)

(OK)
= 0,379 m
= (1/3) 0,38 = 0,127 m

+243,65
z = 0.127

+243,523

h Romyn = 0.379 m

V = 0,461 m/dt
h Saluran sekunder
BSA2 SIIA = 0,955 m

V = 0,285 m/dt

h BSA2 Kiri = 0.592 m

+242,931
+242,695

34

PenampangMemanjang BSA2 KIRI

5.1.3

Saluransekunder A(SII) BSA1 Kanan


Diketahui :Q BSA1 Kanan
K.Strickler
Dari Tabeldidapat :

Sehingga:

= 0,2 m3/dt
= 40

b/h

=1

=1

A1

= 2h2

= 0,285 m/dt

= 0,592 m

= 0,592 m

= 2,435 10-4

= 0,30

MenghitungtinggiRomyn
h BSA1 Kanan = 0,592 m
h SIIA

= 1,041 m

Q=1,71 b h3 /2
200=1,71 0,50 h3 /2
0,20/1,71 0,50 2

(OK)

h=3
hRomyn
Tinggihilang (z)

= 0,379 m
= (1/3) 0,379 = 0,127 m

35

+249,709
+249,583

z = 0.126
h romyn = 0.379

h BSA1 Kanan = 0.592 m

V = 0,484 m/dt

V = 0,292 m/dt

h Saluran sekunder
BSA1 SIIA = 1,041 m

+248,991

+248,668

PenampangMemanjang BSA1 KANAN

5.1.4

Saluransekunder A(SII) BSA2 KANAN


Diketahui : Q BSA2Kanan
K.Strickler
Dari Tabeldidapat :

Sehingga :

= 0,22 m3/dt
= 50

b/h

=1

=1

A1

= 2h2

= 0,292 m/dt

= 0,614 m

= 0,614 m

= 1,549 10-4

= 0,30

MenghitungtinggiRomyn
h BSA2Kanan = 0,614 m
hHuluSIIA

= 0,955 m

Q=1,71 b h3 /2
220=1,71 0,50 h3 /2
0,22/1,71 0,50 2

(OK)

3
h=
hRomyn

= 0,405 m
36

= (1/3) 0,405 = 0,135 m

Tinggihilang (z)

+245,73
z = 0.135

+245,595

h Romyn = 0.405 m

V = 0,461 m/dt
h BSA2 Kanan = 0.614 m

h Saluran sekunder
BSA2 SIIA = 0,955 m

V = 0,285 m/dt
+244,981
+244,775

PenampangMemanjang BSA2 KANAN

37