PLANT LAYOUT
SUBMITTED TO:
SUBMITTED BY:
Mr. Pavan Godiawala
TAMANNA
M.FTECH 2010-12
FACTORY LAYOUT
1. GROUND FLOOR
a. Raw material storage department
b. Cutting department
c. Sampling department
d. Warehouse
e. Operator Canteen
f. Maintenance department
g. Boiler room
h. Training department, utility room, medical room, executive parking, labour parking
2. FIRST FLOOR
a. Director Cabin
b. Administrative department & H.R department
c. Production floor
d. Conference Room
e. I.E. Department
f. Q.A. Department
g. Compliance department
h. Display Room
i. Finishing department
j. Staff Canteen
WORKING IN AN INDUSTRY
BUYER
PRODUCT DEVELOPER
MERCHANT
SAMPLING
FABRIC
TESTING
MARKER PLANNING
SPREADING
CUTTING
BUNDLING & TICKETING
RESEARCH & DEVELOPMENT
PRODUCTION
WASHING
3 & PRESSING
FINISHING
PACKING & FINISHING
PRODUCT DEVEVELOPEMENT
PROCESS FLOW OF INTERNAL DESIGNING
MOCK OR SAMPLES WILL BE PREPARED FOR SELECTION
IF SELECTED THEN MEETING SAMPLES WILL BE MADE
COSTING AND NEGOTIATIONS
SALESMAN SAMPLE
GRADING
ORDER CONFIRMATION
FURTHER TO PD IT PASSED TO MERCHANDISING DEPT
EXTERNAL DESIGNING
LINE ADOPTION WITH BASIC DETAILS
SAMPLES WILL BE MADE (2 Pcs)
APPROVAL/COMMENTS
BUYER SENTS A TECH PACK
THEN AGAIN PROTO SAMPLE MADE (3 Pcs)
FIT SAMPLES MADE (3 Pcs)
APPROVAL/COMMENTS
BUYER WILL SENT FIT SAMPLE SPECIFICATIONS
SIZE SET ARE MADE
APPROVAL
REVISE FIT OR SEALER SAMPLE IS MADE
ORDER CONFIRMATION
MERCHANDISING
PROCESS FLOW OF MERCHANDISING DEPARTMENT
Start
Obtain tech pack from buyer
Costing
Analyze fabric
consumption from
CAD
Sampling
Obtain general
sewing data from
IED
Analyze cost of
trims and fabric
Develop sample as
per the tech pack
Prepare cost sheet
from sample
Develop proto
sample
Cost sheet & sample sent to buyer for approval
Confirmation
of order
Source trims &
fabric from
concerned dept.
Obtain PCD &
details from
production unit
Yes
No
Approv
al
Book washing &
embroidery capacity if
required
Cost sheet
reworked
Obtain GSD
from IED
Execution of order by entering details in ERP
Prepare sample as per buyer requirements
Forward the sample to buyer for approval
Hold pre production
meeting with the
production unit
Execute
bulk order
Yes
Follow up with
production
departments &
update the buyer
Approv
al
Submit required
documents to
documentation
dept
No
Comments received from buyer
should be incorporated and fit
sample reworked
Offer garments
for final
inspection.
Truck out
Follow up
on the
payments
for goods
En
d
SAMPLING
STEPS OF SAMPLING:
PROTO TYPE SAMPLE MADE
FIT SAMPLE MADE
8
PP SAMPLE MADE
SHIPPMENT
TOP
SIZE
SAMPLE
SET
SAMPLE
MADE
MADE
MADE
FABRIC SOURCING
Fabric requisition from merchandiser
Order placed
Fabric receive invoice/challan
Unloading after checking
Tally with supplier invoice for quantity
Send bill to gate for entry
Receive fabric in store
Forward fabric for inspection
Inspection report sends to the concern merchant or sourcing dept.
After comments reentry in the system with final comments if rejected or accepted
If accepted
Relocation in store
Issue against job order
FLOW FOR ORDER PROCESSING
RECEIVE PO FROM
MERCHANDISER
RECEIVE SHADE APPROVAL
PREPARE A FABRIC
REQUISITION
SEND GOODS FOR DYEING
RAISE THE REQUISITION TO
VENDORS
RECEIVE DYED GOODS
10
SEND
SEND YARDAGE FOR INTERNAL FOR
REDYEIN
SUBMIT FORTESTING
BUYERS APPROVAL
BULK FABRIC IN - HOUSE
G,
FOR COLOR AND QUALITY
SOURCE OUT THE GOODS
FINALIZE THE VENDORS
NO
PLACE THE ORDER
APPROVE
D
FIRST LOT IN - HOUSE
YES
LAB TESTING
SUBMIT FOR APPROVAL TO
MERCHANT
REOR
DE
R
NO
READY FOR ISSUE
APPROV
ED
YES
LAB DIPS PREPARED AT DYEING
UNIT IN NEAREST SHADE
SAND LAB DIPS FOR SHADE
APPROVALBY THE BUYER
FABRIC STORE
PROCESS FLOW OF FABRIC STORE:
FABRIC DISPATCHED FROM
SUPPLIER
FABRIC RECEIVING
11
SOLID/YARN
GRIEGE FABRIC
DYED/PRINTE
D
SEND IT FOR
PROCESSING
BACK TO INHOUSE AFTER DYEING OR
PRINTING
100 % CHECKING (4 POINT SYSTEM)
METER CHECKING BY SECURITY
GUARDS
LOT MAKING AND SEND IT TO THE
MERCHANDISING
QUALITY CHECKING FOR DEFECTS
KEPT IN STORE
FABRIC INSPECTION
12
Sta
rt
Receive
fabrics
Conduct shrinkage
test on minimum 2
bits/bale or
minimum 10 bits
of consignment
If No
Inform to stores and
prepare goods received
note (in case of imported
fabric)
Verify whether
quantity received
match with quantity
ordered
If No
If
Yes
Forward one
meter of each
consignment for
lab test
Inspection based on
four points system.
Match bulk with
approved dye lot,
width of fabric etc.
If
Yes
Name shade lot as
ABC
Send to merchant for
buyers approval
If No
If
approved
If
Yes
Forward to
cutting dept.
Reject lot
End
13
TESTING LAB
14
Star
t
Fabric
Sourcing
Accessory
stores
Test
Test
Count
Merchandising
Buttons
Construction
Color
fastness to
washing
Color
fastness to
crocking
Lining
fabrics
Carry on
test on
fabric and
garment as
per buyer
requirement
On meeting
buyer
requirement
, samples to
be sent to
external lab
to get
approval
Dimensional
stability to
washing
Fabric
Strength
Fabric
Weight
En
d
ACC
ESSO
RIES STORE
WORK FLOW OF ACCESSORIES STORE
15
Merchandiser prepares swatch card
Swatch card is send to the purchase dept.
Accessories purchased by purchase dept.
Accessories received by receiving dept.
Testing of accessories is done
Storing of accessories in accessory store
Issuing accessories to the sampling and production dept.
TYPES OF ACCESSORIES
LABELS AND TAGS: Main label, size label, wash care label, price tag & hand tag
THREADS: Sewing threads.
BUTTON
INTERLINING AND FUSING MATERIAL: Shoulder pads paper foams etc.
NEEDLES
STATIONARY: Record books, role paper, pens etc.
16
PROCESS FLOW OF INDUSTRIAL ENGINEERING DEPARTMENT:
Receiving sketch/garment from merchant
sampling dept.
construction enquiry 
Prod. Friendly solution
Calculate SMV
dept.
merchandising dept.
Prod. Cost
Tech analysis before fit stage-suggest amendments(stamp)
incorporate in sampling
PPC
prod. planning
merchandising dept.
start thinking innovation
tool room
Receive sample for thread consumption
Make opern bullttin & calculate T.C
merchandising. dept
Receive red tag sample
thread order
In depth style study & construction engineered way
folders tool room
develop customized
(innovate)
Prepare opern bullttin
prepare R & D report
17
Update SMV & finalize reports
Factory IE discuss & collects reports
Prepare work station layout
maintenance
m/c & work aid REQMT to
Line setting according to IE reports
procure from maintenance
Capacity check analysis & feedback
dept
R & D analysis and feedback
IE
Prod. Studies to increase efficiency
Improve methods
rebalance
line
Achieve target
18
MACHINE MAINTENANCE
FUNCTION OF MAINTENANCE DEPARTMENT:-
Care of the fittings
Adjusting settings
Oil changing
Graph maintenance
Outward/inward reports
Needle weekly reports.
Machine configuration chart
History card
Needle log cards.
19
CAD DEPARTMENT
PROCESS FLOW OF CAD:
Receive spec
sheet form
Receive
patterns from
pattern
Digitize
pattern to
feed in
Pattern
correction
Output to
Graphtec
plotter
Pattern
grading
Cut ratio
planning
Pattern sent
to
merchandiser
for sampling
Market
planning
according to
the cut plan
20
Output
marker to
plotter
Output mini
marker to
printer
WORK FLOW
IN CAD
DEPARTMENT
Send to
cutting room
for cutting
Send to
merchandiser
for costing
WORK FLOW OF SPREADING AND CUTTING:
SPREADING
RELAXATION FOR
8 HR.
CUTTING
MANUAL/AUTOMA
TIC
TICKETING
FUSING
CHECKING
BUNDLING
21
TRANSFER TO
PRODUCTION
SPREADING
PROCESS FLOW OF SPREADING:
FABRIC IS LOADED ON SPREADING MACHINE
PAPER IS SPREAD ON SPREADING TABLE
22
MANUAL SPREADING IS DONE
RELAXATION FOR 8 HR.
PROPER TENTION IS MAINTAINED WHILE
MARKER IS SPREAD OVER IT AND PASTED BY TAPE
TRANSFERRED TO THE CUTTING
PROCESS FLOW OF CUTTING DEPARTMENT:-
Cutting
package from
production
manager
Acquire fabric
from fabric
store
23
Cut sample to
check
Requir
e
Checki
ng
Yes
Send to CAD
for Change
No
Receive
changed
pattern from
Cut for initial
size set
Assemble and
check
Requir
e
chang
NO
es
Yes
No
Issue job
order
Cut plan
Bulk cutting
Sortin
g
24
Bundlin
g
Issue
PRODUCTION PLANNING & CONTROL
Start
On receiving the orders, allocate the same
to units based on line openings and
buyers ratings
Provide details to the respective units
on PCD, order quantity & sample
Take inputs from
IED on productivity
based on garment
analysis
Confirm the above details
given to concerned units in
consultation with GM & FM
Confirm in
consultation with
embroidery, washing
departments
Confirm order plan with
merchandising team
SEWING DEPARTMENT
Provide MIS report to management
every fortnight
Production floor follows Assembly Line system. Following are steps to start a production line:
To study the production file.
Planning follow up with factory till
order execution
To study operation bulletin and set line accordingly.
End
Manpower  tailors and helpers.
Load and feeding lines.
To arrange buffer or work-in-progress.
Manufacturing.
To make daily production and to achieve targets accordingly.
To understand bottlenecks stage of production.
Working steps of production dept:
Shrinkage production pattern is issued to production floor from CAD dept.
Ready patterns are made as per the requirement of production room.
Cutting receives from cutting dept.
Cross checking of cut panels with patterns.
25
Bundling of cut panels is done.
Operation wise feeding of cut panel into the line.
Inline checkpoints.
Output of line.
Final checkpoints.
Auditing of checked pieces.
PROCESS FLOW OF PRODUCTION DEPARTMENT
Star
t
Bulk Production
Cut parts received
from cutting
Sewing process
begins
In-Line
checking
Washing
Assembly
End line checking & AQL
audit
Button & button hole/ Bar
tack
Rough checking
Ironing
Final checking
Measurement
checking
Tagging
Packing
FSA Audit
Auditing by buyer
QA
Truck out
26
En
d
WASHING
PROCESS FLOW:
Start
Washing Normal wash
N
Hydro Extraction
Drying
Inspection
(Random)
Accounting &
despatch to
different units
27
End
FINISHING
PROCESS FLOW OF FINISHING
GARMENT COMES FROM PRODUCTION
WASHING
THREAD CUTTING
INITIAL CHECKING AND SPOTTING
ALTERATION
REIRONING
FINAL CHECKING
28
PRESENTATION/FINAL IRONING
MEASUREMENT
SENT FOR PACKING
PACKAGING
PROCESS FLOW OF PACKAGING
GARMENTS COMES FROM
INSPECTION
IT IS THEN FOLDED
1 OR 2 ARE PACKED TOGETHER
ALL PIECES PUT IN TO CARTONS
DETAILS ARE PASTED ON CARTON
CARTON IS SEALED
LOADED INTO TRUCKS
SENT FOR SHIPMENT
29
PACKING NORMS
Packages are sent under licensing rules for shipment. The rules are also specified by the individual buyer and
are universal for their respective order. Some of such norms include:
All garments packed in individual poly bags.
Poly bag sticker on poly bags, which may be printed by the factory.
Order must be completed (packed, ready for shipment) prior to bulk orders.
Order must be inspected and audited by the factory 100%.
Order must be of first quality, no repair or ungraded garments should be in license shipments.
Order must be shipped 100% complete otherwise notified.
The packed goods are now ready to be passed through the
CALCULATION FOR PLANT AREA
Given Parameter:
Plant size = 120*100 sq. mt
FSI =1.2
G.C = 40%
Front margin = 5 mt
Side margin = 5 mt
Total space = 120*100 = 12000 sq. mt
FSI = 1.2*12000 = 00 sq. mt (Maximum available floor space)
Ground coverage = .65*3600 = 2340 sq. mt
Available floor space = (60-12) * (60-21)
30
= 48*39 sq. mt
= 1872 sq. mt
SPACE ALLOCATION FOR EACH DEPARTMENT IN EACH FLOOR
GROUND FLOOR :
DEPARTMENTS
AREA (in sq
TOTAL NO.
31
TOTAL NO.
AIR
mts)
OF LIGHTS
OF FANS
CONDITION
EXCUTIVE PARKING
353.5 sq mts.
1 halogen
TIME OFFICE
13.77 sq mts.
MAIN ENTRY
15 mts.
UNLOADING AREA
91.8 sq mts.
STORE MANAGER
13.77 sq mts.
TRIMS AREA
12.39 sq mts.
REJECTED ROLLS
16.06 sq mts
TESTING LABS
23.87 sq mts.
LABOURWASH ROOMS
6.88 sq mts.
UTILITY ROOM
17.90 sq mts.
CRECHE
17.9 sq mts.
LOCKERS
35.8 sq mts.
SUPERVISOR
3.67 sq mts.
WASTE ROOM
18.36 sq mts.
REMENENT
18.36 sq mts.
CAD
28.4 sq mts.
CUT PANEL AREA
112.02 sq mts.
PATTERN MAKING
48.2 sq mts
MANAGER
28.12 sq mts.
MEDICAL
28.12 sq mts.
EXECUTIVE WASH
ROOM
4.59 sq mts.
EXECUTIVE CANTEEN
22.95 sq mts.
CONFERENCE
27.54 sq mts.
RECEPTION
20.66 sq mts.
PPC
27.54 sq mts
GM
20.66 sq mts
MD
21.34 sq mts
STUDIO
27.54 sq mts
32
PURCHASE
20.66 sq mts
EXPORT
20.66 sq mts
ACCOUNTS
20.66 sq mts
MIS
20.66 sq mts
HR
30.99 sq mts
LOGISTICS
13.77 sq mts
MERCHANDISER
27.54 sq mts
SENIOR MERCHANDISER
13.77 sq mts
WORKER PARKING
91.5 sq mts
FIRST FLOOR:
DEPARTMENTS
AREA (in sq
mts)
TOTAL NO.
OF LIGHTS
TOATAL
NO. OF
FANS
AIR
CONDITION
SAMPLING
530.3 sq mts.
14
MAINTAINENCE
123.9 sq mts.
IE
19.2 sq mts.
QUALITY ASSURANCE
1.83 sq mts
SEWING AREA
2107.2 sq mts
1065
59
COMPLIANCE
36.7 sq mts.
TRAINING
31.22 sq mts.
MANAGER ROOM
13.77 sq mts.
STORE
31.22 sq mts.
BOILER
18.36 sq mts.
EXECUTIVE WASH
ROOMS
11.01 sq mts
--
EXECUTIVE CANTEEN
22.9 sq mts
WASTE ROOM
18.36 sq mts
33
DRINKING WATER
4.59 sq mts.
WASH ROOMS
4.59 sq mts.
RACKS
27.5 sq mts.
SECOND FLOOR :
DEPARTMENTS
AREA
(in sq mts.)
TOTAL NO.
OF LIGHTS
TOTAL NO.
OF FANS
AIR
CONDITI
ON
WASH ROOMS
9.18 sq mts.
EXECUTIVE CANTEEN
34.4 sq mts.
LABOUR CANTEEN
385.6 sq mts.
11
MEASUREMENT &
INSPECTION
128.5 sq mts.
65
AUDIT AREA
80.34 sq mts.
40
PACKAGING
144.6 sq mts.
50
DISPATCH AND
LOADING
96.4 sq mts.
CARTON STORAGE
18.36 sq mts.
WASHING AREA
146.9 sq mts.
10
WASHROOMS
4.59 sq mts.
DRINKING WATER
4.59 sq mts.
SUPERVISOR
2.52 sq mts.
WASHING MANAGER
27.5 sq mts.
FINISHING MANAGER
27.5 sq mts.
FINISHING ZONE
156.1 sq mts.
78
WORKFORCE IN DIFFERENT DEPARTMENT
ADMINISTRATION DEPARTMENT:-
34
DEPARTMENT
NO. OF EMPLOYEES
Executive
Accounts and finance
Human resources
Purchase
Export and import
MIS
Logistics
Merchandising
PPC
IE
CAD
Maintenance
TOTAL
42
SAMPLING DEPARTMENT:
Cutting master
Sampling manager
Sampling in charge
Pattern master
Supervisor
Tailors
35
35
Helpers
Ironer
checker
TOTAL
51
STORE DEPARTMENT:Fabric store
Store manager
Assistant manager
Checker
Workers/helpers
20
TOTAL
26
Store manager
Assistant manager
Workers/helpers
10
TOTAL
14
Trim store
CUTTING DEPARTMENT:
Production manager
Pattern master
Assistant pattern master
Cutting master
3
36
Workers/helpers
50
TOTAL
58
SEWING DEPARTMENT:
Production manager
Supervisor
Quality checker
Workers/helpers
268
Male:female(ratio)
70:30
TOTAL
277
QUALITY ASSURANCE DEPARTMENT:
Quality manager
Workers/helpers
TOTAL
FINISHING DEPARTMENT:
OPERATION
WORKER
HELPER
Button holing
Button attaching
Thread cutting
25
37
Pressing
20
Initial checking
15
Final checking
Re final checking
Spot removal
PACKAGING DEPARTMENT
Assistant manager
Quality checker
Workers/helpers
Equipment details of various department
FABRIC INSPECTION MACHINE
38
Specifications of Fabric Inspection Machine for Fabric up to 3500 mm are:
Speed of Machine: 30meters/minute.
2HP x 1440rpm, 415volts Electric Motor.
Reverse - Stop - Forward Arrangements [From Three Sides].
Roll Compact with 5" Dia.
M. S. Rubber Striped Rolls: 2 Nos.
Adopter for Paper Tube as per your requirement.
Revolution type Meter Counter.
Batching on Operator Side.
Transparent Horizontal Inspection Table with Bottom illumination.
Tension Device and Guide Rolls.
Cloth Inspection & Winding Unit are completely wired electrically, only main supply is to be
provided.
39
Equipment details of testing lab
1. AUTOMATIC TWIST TESTER
Specifications of Automatic Twist Tester:
Yarn test length
Range
Resolution
Elongation
Range
Motor Speed
Clamps
Averaging
Supply
Size
: 25mm to 500 mm adjustable (metric unit) OR 1 to 20 adjustable (imperial
unit). The test length is automatically taken into account for calculation and
final reading is displayed directly in TPM/TPI.
: Up to 9999 TPM or 99.99 TPI.
: 1 TPM or 0.01 TPI.
: Up to 9999 TPM or 99.99 TPI.
: With tolerance of -15mm or 0.6 inch for movement in
other direction.
: Up to 1500 RPM
: Manual control of rotation is possible by hand.
: Spring loaded clamps at motor end for easy clamping of yarn.
: Toggle clamp at spool end for easy, quick and continuous clamping of yarn
through spool.
: Reading of at least 20 samples can be stored and average TPM/TPI value is
calculated and displayed.
: 230 V AC, 30 Watts.
: 1000mm x 150mm x 200mm (approx).
40
2. FABRIC ABRASION TESTER
Specifications of fabric abrasion tester:
Standards: GB/T4802.2, GB8690, ASTMD4966, ASTMD4970, ISO12945.2
Friction head: 8 pcs
Sample clip diameter: diameter 38mm and diamter90mm
Diameter grinding platform: diamter 120mm
38mm Sample clip and guide rod total weight: (200  1) g
Hammer: 395g  2g, 594g  2g
Counter counting range: 1-65535 times preset
Test speed (grinding speed): 50  2r.p.m
Power: 380V  5%, 50Hz, three-phase four-wire
Dimensions: 850mm  600mm  350mm
Weight: about 80kg
3. FABRIC PILLING TESTER:
41
Specifications of fabric pilling tester:
Model: YG502B
Standard: GB/T4802.1-1997
Main technical data: trajectory diameter 40, circular orbit
Brush Height 2-12mm adjustable
Dimensions 520x280x360
Weight 45kg
Power AC220V
4. FABRIC PICK COUNTER
Specification for fabric pick counter:
Y511B Fabric pick counter
Standard: GB/T4668, ISO7211
Magnification 10, 20
Figured scale travel 0~50mm
Dimensions 975335mm
42
5. WASHING COLOR FASTNESS TESTER
Specification for washing color fastness
Reciprocating travel 100mm
Rubbing finger pressure 60Times/min
Rubbing finger pressure 9N
Reciprocating times 10 times (automatic stop)
Rubbing head size Circular diameter 16mm
External Dimensions L760W270H240mm
Weight 20kg
Power- AC220 50Hz 40W
Manual
Applicable standards: Built according with: AATCC
Features: It applies for AATCC standard.
Model Y571M
Testing Times 1-99999
43
Rubbing Travel 105mm (Can be adjusted)
Rubbing Speed Manual
Rubbing Pressure 9N
Rubbing Head diameter: 16mm
External Dimensions 660160mm215mm (LWH)
Power Source :NO
6. COLOR ASSESSMENT CABINET
Specification of color assessment cabinet
Brand: JAG
Model: JAG60
Configuration: D65, TL84, F, UV (4 light sources)
Weight: 25Kg
Cabinet dimensions (W x D x H): 710x420x570 mm
Packing dimensions (L x W x H): 750x600x350mm
Light Tube Length: 600mm (24")
44
7. SINGLE FIBER TESTER
Specification of single fiber tester:
Electronic single fiber strength tester
Testing breaking strength; break elongation rate, fixed elongation, etc. of fibers, or thin metal wires.
Standard: GB/T14337, ISO5079, 11566, ASTM D3822, BS4029, AATCC, etc.
Unit: N, CN, KG, LB, IN etc.
Max Strength Range: 100cN, 200cN, 300cN, 500cN.
Scale limits: 2-120%
Scale value: 0.01N
Accuracy: < 0.5%
Sensor Accuracy: <0.05%FS
Resolution 0.01cN
Minim clamp distance: 10mm Digital setting, automatic fixing
Drawing speed: 2-200mm/min. Scale value: 1 mm/min. Accuracy: 1%
45
Return speed: 2- 200mm/min. Scale value: 1 mm/min. Accuracy: 1%
Work motion: 100mm. Elongation resolution: 0.01mm
Maximum elongation: 150mm
Host size: L370  W300  H550mm
Weight: 85KG
WASHING MACHINE
FABCARE WASHING MACHINE
specifications:
Fabcare 'Washing Machines' are designed for all types of Laundry Jobs, Technical and Enzyme
Washings.
Machines are available with different types and size to cater the need of different Fabrics such as
Denim, Cotton, Rayon, Knitted, Woolen Garments.
Automatic, Auto timed, Auto reverse, Auto Digital temperature control.
Front plate/Inner Basket/Outer Drum all in SS Heavy duty fabrication.
Heating system available in Electric/Steam Direct Injection/Indirect steam through Seamless pipe of
SS 316 quality Coils/Thermic Heat Transfer Fluids, Oil/Gas fired heated.
Available in 20, 35, 70, 140 Kg. Dry weight per charge capacity.
46
47
DRYING TUMBLER
MODEL CAPACITY
CAPACITY DRY WTPEPCHARGE : 30 KG 1:24
BASKET SIZE
MOTOR DRIVE BLOWER
STEAM CONN.
CONSUMPTION
ELECTRIC
: 18/24 KW
OVERALL DIMENSIONS
: 1150 X 1460 X 1980
NET WEIGHT
:SDS 30
: 950 X850
: 0.75 KW
: 15 (0.5" BSP)50KG/HR
: 560 KG
48
CUTTING ROOM MACHINE DETAILS
TYPES OF MACHINES USED & THEIR SPECIFICATIONS:1. BAND KNIFE MACHINESLF-BK-00850
MODEL EC-700
220V,50/60 HZ,1PH,3AMP
KNIFE SIZE 3500 mm.
2. END CUTTER
MODE EC-3
LF EC-00900
220 V,50HZ,1 PH,0.5AMP
EASTMAN M/C CO.
NEW YORK,US
3. STRAIGHT KNIFE
49
Motors
110v, 1ph:
Weight
34 lbs. (15.4kg)
Horsepower
.65hp
Blade Size
(inches): 5"
(cm): 12.7cm
Cutting Capacity
(inches):3.5"
(cm):8.89cm
Stroke Size
(inches):1.125"
(cm): 2.86cm
SEWING MACHINES DETAILS
TYPES OF MACHINES USED 
1. SINGLE NEEDLE LOCK STITCH
50
Specifications :
Bed dimensions:
 Length: 18 3/4" (477 mm) Width: 7" (178 mm) Space to right of needle: 10 5/16" (262 mm)
 Outside diameter of machine pulley: 2 61/64 (75 mm) effective diameter for V-belt
 Regular machine: Singer clutch motor high speed 1/2 H.P.
 Under bed thread trimmer (U.T.T): Singer AC servo motor/EC (N.P.) motor
 Including the operation panel C-30
 Needle bar Stroke: For 200A: 1 3/16 " (30 mm) For 300A: 1 3/18" (35 mm)
 Clearance under presser foot: By hand 7/32 " (5.5 mm) By knee 1/2" (13 mm)
2.DOUBLE NEEDLE LOCKSTITCH :
SPECIFICATIONS ;
Max sewing speed -3000rpm
Max. stitch length-5mm
Needle bar stroke-33.4mm
Needle-DPX5 #14.
Bed size-517mm*478mm
Weight of machine-43kgs
Power required- single phase 100,420V,200.
Three phase 200,240V/650VA.
With automatic UBT.
5 THREAD OVERLOCK
51
SPECIFICATIONS :
Brand: Juki
Application: For light-weight materials
Feed Dog: 4-Row
Feed System: Bottom-Feed
Max. Sewing Speed: 7000 rpm/spm
Max. Stitch length: 1.5~4mm
Needle Bar Stroke: 24.5mm
Needle System (at time of delivery): DC X 27
Lubrication: Automatic
Lubricating Oil: Juki New Defrix Oil #2(Equivalent to ISO VG32)
Lift of Presser Foot by Hand: 7 mm
Number of Threads: 2/3/4/5 Threads
3. BUTTON STITCHING MACHINE :
SPECIFICATIONS :
Max. sewing speed- 1500 spm.
Number of stitches-8, ,16 and 32.
Applicable buttons- round shaped ,flat(2 holed,4 holed),shank/snap/metal.
Needle bar stroke-48.6 mm
 Needle size -TQ x 7 #18 ~#20TQ x 1 # 14~#18.
 Button clamp lifting height / system- >9mm/Automatic System.
3. BUTTON HOLE SEWING MACHINES 
52
Max. SewingSpeed -3,000 spm
Number ofStitches -83~225 (by gear change method).
Max lift of work clamp-12 mm (15/32)
Needle bar stroke -34.6 mm
Length ofbottom holes -6.4-38.0 mm
Needle Size -DP x 5 # 11~ 16
FINISHING MACHINES DETAIL
1. FUSING MACHINE
Specifications: - CONTINOUS FUSING MACHINE: -
AE-300
MODEL
POWER SUPPLY
HEATER
53
SINGLE PHASE
3 KW
MOTOR
0.40 KW
CURRENT
17 A
TEMPERATURE
200 C
PRESSURE
1 KG/CM2
BELT SPEED
8.7 M/MIN
FUSING WIDTH
300 MM
2. PRESSING
MODEL
NX-2429
NO. OF
MOTORS
POWER
DIMENSIONS(L*W*H
) INCHES
WEIGHT KG.
.75 HP, 1 PH/3PH
50*30*36
80
54
RAW MATERIAL STORE DEPARTMENT
CALCULATION:Total area=390 sq mt
Rack size=7*6
Fabric Gsm=220
Fabric weight-100 kg
Fabric width =56
Capacity of 1 rack=1800 kg.
Fabric diameter=2.5
55
Total no. of racks=28racks
Total capacity of racks=28*1800
= 50400 kg.
CUTTING DEPARTMENT
CALCULATION
Total area=694 sq mt
No of pieces cut per day=2000
3% extra=2000*3*2060/100 pcs/day
Avg consumption/t-shirt=0.9 mtr
Avg consumption /t-shirt=220*100/.9*56*2.5=1.4 kg
Marker way=10 way
Total no. of layers=100
Total garments/cut=10*100=100 pcs/cut
For one cut (assumption)
Spreading:
One lay spreading time=35 sec=30/60=0.50 min
Total spreading for 100 layers=0.50*100
=50 min
Lay preparation time=10 min
Total spreading time for one cut=50+10
=60 min
Total cutting for one lay or cut=100 min
Total required time for one cut finishing=100+60
=160 min
Total no. of cuts/ day=480/160=3 cut
From 3 cut=3*1000
=3000 pcs
Production of cutting department=4*3000
56
=12000pcs/day
9000 pcs issued to sewing department
In sewing department=4 line
1 line capacity=2000 pcs
4 line capacity=2000*4
=8000 pcs
Thus WIP in cutting department=12000-8000
=4000 pcs/day
Total fabric required per day in cutting room
=9000*1.4
=12600 kg
COMPLIANCE ISSUES FOLLOWED IN THE INDUSTRY:
Displays
Factory Act Abstract
Minimum Wages Abstract
The Payment of Wages Abstract
The Payment of Gratuity Abstract
The Maternity Benefit Act Abstract
The Payment of Bonus Abstract
ESI Abstract
EPF Abstract
Form 11
Weekly Holiday Notice
Notice Nearest Hospital, Fire Station, Police Station etc.
Notice Important Officials Phone Numbers
Form V (National & Festival Holiday)
57
Standing Order (Tamil & English)
Needle Control Policy
Voluntary Work Policy
Sexual Harrassment Policy
Health and Safety Policy
Child labour abolition policy
Anti discrimination policy
Urgent Business need policy
Zero abusement policy
Working hours policy
Broken needle policy
Sexual harrassment policy
Hiring / Recruitment policy
Environmental policy
Security policy
Buyers code of conduct
Workmen Committee Members Photo with Name
Health & Safety Committee Members Photo with Name
Canteen Members Photo with Name
Transport Committee Members Photo with Name
Harrassment & Discrimination committee Members Photo with Name
Unit Work Flow
Organisation Chart with manpower details
Weekly Holiday Announcement
Excise Certificate
Building
Name Sign to All Rooms / Area
Indicators / Direction from Security Gate onwards
Storage above Storage limit Carton Box etc.
Aisle marking
Aisle width minimum 112 cm.
Indicators Arrows in the passage
Aisle without block
Health
Drinking Water
At least4.5 Litres water provided per day per employee
Water Testing Certificate
Drinking water not in plastic pot
Drinking Water, Cup availability
Drinking Water centre (one place to every 150 employees upto 500)
58
Drinking Water centre (one place to every 500 employees above 500)
Water Cooler / Heater available at every canteen, dining hall, rest room etc.
Drinking Water Signage in English and Tamil
Locate from 20 feet away from toilet
Locate maximum 50 meteres distance from work spot
Drinking Water vessale cleaned at least once in a day
Water Reservoir or Tank Cleaned at least once in a week
Water centre cleaning condition
Water Vessal Cleaning log sheet
Water Centre Incharge person with cleanliness
Suggessation Box Register
Toilets
Toilet Seat to Every 20 Women
Toilet Seat to Every 20 men upto 100
Toilet Seat to Every 50 men beyond 100
All toilet seat with proper privacy and lock facility
Urinal Accomodation Min. 61 cm for every 50 employees upto first 500
Urnial Accomodation Min. 61 cm for every 100 employees for above 500
Effective water Sewage system
Soap/ Towel
Bathroom Lock
Water tap
Dust Bins
Buckets with mug at toilets
Toilet White Washed once in every four month
Tiles/Mosaic floors washed with Detergent or disinfectant once in four month
Daily Cleaning Log sheet provided
Adeaquate Water Tabs
No smoking Sign in Gents Toilet
59
Awareness Quotes in Toilets
Ladies / Gents Toilet Name Sign in Dual Language and Picture
Spittoons
Adequate Spittoons
Sipittoons filled by Sand or Suitable disinfectant
Spittoons covered by bleaching powder layer
Spittoons scrapped or cleaned at least once in every day
Others
500 Cubic feet for every employees
Disposal of Wastes and effluents
Room Temperature
Lighting facility
Trees on factory campus
Safety Guards
Metal Glows on good Condition
Rubber Mat to ironers
Rubber Glows to ironers
Ironers wearing slipper
Motar Guard
Needle Guard
Eye Guard
Sharp Tools
Paddle Mat
Scissors and trimmers are tied
Sharp Boxes
Mask
Needle disposal once in six month
Broken Needle Register
Human resources
Dining Hall
60
Dining Hall with sufficient Space
Dining Hall with Sufficient Chair/Table
Water Facility
Ambulance Room
Doctor Visit
Nurse
Medicines
Medicines Issueing Record
Creach
Sufficient Space
Creach Attender
Creach Children Detail
Daily Register
Cradle
Toys
Postures
Wash Room Facility
Toilet
Milk
Eatables Available
Drinking Water
Ventilation
Chairs for mothers
Shady plaground for older children
First Aid
First Aid Boxes with All medicines
First Aid Boxes Location List
First Aid Box Daily Checklist
First Aid Training employees (20 %)
First Aid Trainer Name & Photo List
First Box once for 150 employees
First Aid Stations
Fire
Sufficient Fire Extinguisher
Fire Extinguisher all in good Condition
Fire Extinguisher Location List
Fire Extinguisher Service Checklist
Access area without hindarance
Fire Extinguisher kept in 3 feet
Fire Signage in Tamil & English
Usage Guide in dual language
Fire Extinguisher Colour Background Marking
Space beneath marked
Space beneath kept empty
Refilling Service Done
Fire Certified persons photo
Evacuation Drill (External) Every Six Month
61
Evacuation Drill (External) File
Evacuation Drill (Internal) Every Three Month
Evacuation Drill (Internal) File
Sufficient Fire Safety trained employees
Fire safety trained employees name & Photo List
Fire Buckets to Diesel Storage Area with Water and Sand
Fire Buckets to Boiler Room with Water and Sand
Fire Buckets to Genset room with Water and Sand
Fire Buckets to E.B. Panal Board with Water and Sand
Fire Buckets to Motor Room with Water and Sand
Fire Buckets to Appropriate place.
Fire Tray with sand
Diesel Storage area floor filled by sand
Evacuation Plan in all Floor / Area
Emergency Exit
Emergency Exit on Open
Emergency Exit Signage
Emergency Exit with outside open facility
Emergency Exit Board Light with UPS Connection
Emergency Light to All room / Area Adequate
Emergency Light to All staircase
Emergency Light to All Exit & Emergency Exit
Emergency Light daily On/Off Log Sheet
Emergency Light Location List
Emergency Light kept on 6 feet hight
Sufficient Spare Emergency Light in stock
Emergency Electricity Switch off System (floorwise)
Signage Emergency Electricity Switch Off
No Hindrance Emergency Switch off Access Area
Chemical Users Awareness
Medical Certificate to Canteen employees
Committees
Workmen Committee
Workmen Committee Meeting
Workmen Committee Meeting File (with Circular, Agenda, Minutes, etc.)
Workmen Committee Meeting Photos
Health & Safety Committee
Health & Safety Committee Meeting
Health & Safety Committee Meeting File (with Circular, Agenda, Minutes, etc.)
Health & Safety Committee Meeting Photos
Canteen Committee
Canteen Committee Meeting
Canteen Committee Meeting File (with Circular, Agenda, Minutes, etc.)
Canteen Committee Meeting Photos
Transport Committee
Transport Committee Meeting
Transport Committee Meeting File (with Circular, Agenda, Minutes, etc.)
62
Transport Committee Meeting Photos
Harrassment & Discrimination Committee
H & D Committee Meeting
H & D Committee Meeting File (with Circular, Agenda, Minutes, etc.)
H & D Committee Meeting Photos
Documents
Personnel File to All
Application Form
Passport Size Photo
Educational Qualification Certificate
Age Proof
I.D. Proof
Address Proof
Technical Certificate
Previous Company Experience/Relieving order
Old Salary Slip
ESI Nomination Form 1
PF Nomination Form 2
Gratuity Nomination Form F
Factory Act Nomination Form 34
Track Record
Appointment Order
Insurance
NDA with Signature
Employee Manual
I.d. Card to All
Adequate Swiping machine
Punching Card to All
ESI Card to All
PF Slip to All
Awareness Programme
Stress Relieve Counselling
Meetings
Performance appraisal
Leave Card
Full & Final Settlement
Exit Interview
Gratuity
Bonus
Salary Breakup
Salary on Date
Induction Programme
Induction Register
63
Manpower
Manpower Departmentwise Male/Female Strength Report
Presentism Report
Late Report
Absentism Report
Daily Staff In-Out Register
Is there Under Age
Contract Employees
Punch report
Leave card to each employee
MIR (Material Issue Register)
Salary
Salary date before 7 every month
Bank Salary Account to all
Salary Registers with employees signature monthwise
Minimum Wages
Basic
D.A.
Other Salary Breakups
Over Time
Double Salary to Over Time
Any unwanted deduction for employee
Unpaid salary are reversed
Pay Cover Availability
Security
Adequate Securities
Lady Guards
Staff Movement Register
Visitors Note
Others In-Out Register
Material Inward Register
Material Outward Register
Vehicle Movement Register
Visitor Pass
Visitor Slip
Guards Knowledge about their Roles & Responsibilities
Securities Personnel File
Securities Uniform/Cap/Shoe/Belt etc.
Securities Knowledge about Fire Evacuation & Fire Safety
Security Agreement file (If outsourced)
Security Salary register file (If outsourced)
Security ESI, PF Challan (If Outsourced)
Housekeeping
64
Adequate Housekeeping Employees
Lady Housekeeping employees
Gents Housekeeping employees
Housekeeping Supervisor
Areawise work allocation
Housekeeping Time Schedule
Toilet Cleaning Log Sheet
Brooms Availability
Broom Stick Availability
Water Mop Availability
Thread Mop Availability
Buckets Availability
Phenoil Availability
Harpic Availability
Soap on All toilet & Bathroom
Towel on All toilet & Bathroom
Tissues & Hand Wash Shampoo Availability on Visitor Restroom
Daily Cleaning Schedule
MSDS for apropriate place.
Maintenance
E.B.
E.B. Service Card
Electricity Board Cardonned off from work place
E.B. Meter Reading Register
E.B. File
Rubber Mat to E.B. Panel Board
Rubber Mat to All swtich Board
Authorized Persons Photo Display on E.B. related Rooms
Caution board and danger signal on Electricity related Rooms
Electrecians File
C or B license certificates of Electrecian
Rubber Glows to all Electrecian
Safety instructions Displayed on E.B. Related Rooms
Broken Wire
Loose Wire
Broken Switch
Boiler room
Boiler room cardonned off from work place
Fire Safety Instruments availability
Authorized persons Photo list
Genset
Genset Running Note
Genset File
AMC to Genset
Gloves
Safety shoes
65
Ear Muff
Tray of Sand
Machinary
Machinary Detail
Machinary File (Machinarywise) with purchase, service etc detail.
AMC to all machinary
Machinary Service Card
Material Safety Data Sheet (MSDS)
Personal Productivity Equipment (PPE) Issue Register
PPE Awareness
Logistics
All Staff Bus/Van R.C. Book Copy
All Staff Bus/Van Insurance Copy
All Drivers Licence Copy
Transport In - Out Time Register
Transport Travellers Name List
Transport Committee
Transport Agreement Copy
Load Van R.C.Book/Insurance Copy
Company Drivers Licence Copy
Company Van Trip Sheet Book
General
Fixed Asset Stock Register
Diesel Consume Register
White Petrol Consume Register
Gen Set Usage Note
Gen Set AMC
Electrical Plan
AMC to Computers
AMC to Swiping Machines
66