DAILY SITE OBSERVATION-REPOR
Site Name
POWER PLANT
Date
Type
(Colo/Ow
n)
LOAD ON RECTIFIER MODULE
Capacity
PLANT
LOAD
R1
R2
R3
R4
R5
R6
R7
R8
R9
BATTERY
SCVS
No.of
CAPACITY (In Bank
Ah)
(in NO)
TOTAL
LOAD (in
AC Amps)
PIU
LOAD CURRENT
R PAHSE
(Amps)
Y PAHSE
(Amps)
* External Alarm 1) Door Open 2) Mains Fail 3) DG On 4) DC Low 5) Room Temp.High 6) Fire In Equipment Room 7) DG Battery Low 8) Low Fuel level
* Also use the vendor provided Manual (of infra products like DG, Battery etc.) for conducting the PM activities
* if more SMR please create more columns
PORT
DATE:
AC UNIT
T
B PAHSE
(Amps)
ROOM
TEMP.
DG SET
(if any
Rack space changes) Site
(if any
B PAHSE available
Layout is
changes) SLD
(Amps)
(Nos)
updated
is updated
LOAD CURRENT
R PAHSE
(Amps)
Y PAHSE
(Amps)
Remarks
Weekly Preventive Maintenance Report
Month
Route Name
Date ..
Site Name
1.Rectifier Testing
Sl. No
Activity
1 Display Panel
Spec.
Measured
Value
Status
Spec.
Measured
Value
Status
Measured
Value
Status
Measured
Value
Status
Measured
Value
Status
Measured
Value
Status
Measured
Value
Status
Dust free
2. Earth Pits
Sl.No
Activity
1 Water curing
Done
2 Earth Chamber condition
Good
3.Visual Check List
3.1Air Conditioner
Sl.No
Activity
Spec.
1 Cooling
At 22+1 degree centigrade
compressor 1 gets off
2 Cooling
At 25+1 degree centigrade
compressor 1 gets on
2 Cooling
At 22+1 degree centigrade
compressor 2 gets off
4 Cooling
At 25+1 degree centigrade
compressor 2 gets on
5 Grill Temperature
No alarms of Grill High/ Low
3.1A PEC type Air Conditioner
Sl.No
Activity
Spec.
1 Room Temperature
At 22+1 degree centigrade
2 Acutal Humidity RH %
At 50+ 5% RH
3 Any Active alarms
No Active alarms
3.2 Power Distribution Unit
Sl. No.
Activity
Spec.
1 Condition of spare MCB
Satisfactory working condition
2 Tightness of earthing cable
Tightened properly
3 Panel lock
Proper working condition
3.3 Energy Meter / Tube Lights & Bulbs
Sl.No
Activity
Spec.
1 Running in under load
Yes
2 Running in over load
No
3 Seal of Energy meter
Properly sealed condition
4 Tube Light & bulbs
Proper working condition
3.4 Servo Stabilizer
Sl.No
Activity
Spec.
1 Front panel volt meter
working without calibration error
2 Front panel Amp. meter
working without calibration error
3 Auto/ Manual/ Bypass operation
To be oprational in both Auto/
Manual Mode
Condition of Knobs & Alarm
indicator
Proper working condition
4 Front panel screw condition
Properly tightened
5 Oil Leakage
No Oil Leakage
Note: This point should be removed from the proces
3.5 Civil work
Sl.No
Activity
Spec.
Measured
Value
Status
Measured
Value
Status
Measured
Value
Status
Seepage in the equipment room or
No seepage
any other room
2 Function of equipment room door
No A/C leakage & Function
properly
3 Rodenticide in the equipment room Availability at proper point
3.6 Canopy
Sl.No
1
Activity
Rusting inside /outside of the
surface of canopy
Spec.
Rust free
2 Lock of all doors
Proper working condition
3 Cooling and exhaust fan
Proper working condition
4 Leakage in the Canopy Roof Top
No Leakage
4 Diesel Generator
Sl.No
Activity
Spec.
Check the DG Battery voltage
it should be within the range of
12V to 13V
Check the DG Battery terminals
Terminals should be rust free
Check the Battery specific gravity
it should be within the range of
1.20 to 1.28
* Also use the vendor provided Manual (of infra products like DG, Battery etc.) for conducting the PM activities
Note : Activities Mentioned in the Daily PMT to be carried out apart from the above
Sign & Name of Engineer
Doc No:
OPS.O&M.1.0.2
Territory
ROOT CAUSE (For the Out of Spec.
REMARKS
cases)
ROOT CAUSE (For the Out of Spec.
REMARKS
cases)
ROOT CAUSE (For the Out of Spec.
REMARKS
cases)
ROOT CAUSE (For the Out of Spec.
REMARKS
cases)
ROOT CAUSE (For the Out of Spec.
REMARKS
cases)
ROOT CAUSE (For the Out of Spec.
REMARKS
cases)
ROOT CAUSE (For the Out of Spec.
REMARKS
cases)
removed from the process
ROOT CAUSE (For the Out of Spec.
REMARKS
cases)
ROOT CAUSE (For the Out of Spec.
REMARKS
cases)
ROOT CAUSE (For the Out of Spec.
REMARKS
cases)
tivities
Monthly Preventive Maintenance Report
Month
Site Name
Route Name
1. Earth Resistance Measurements
Sl. No.
Activity
Measured
Value
Spec.
1 Water curing of pits
Done
2 DG Neutral
< 2 Ohms
3 Electrical
< 2 Ohms
4 Power Plant
< 2 Ohms
5 SDH Equipment
< 2 Ohms
6 Continiuty from Pit to Equipment
No Discontinuity
7 Isolation Transformer
< 2 Ohms
Status
2. Serviceability of Fire Fighting Equipment
Sl. No.
Activity
Spec.
1 Fire Extinguisher Bucket
Adequately filled with sand
2 Expiry date checking
Not expired
Measured
Value
Status
NA
3. OFC Parameters Measurements
Sl. No.
Activity
1 Dark fiber testing by OTDR
2
Measured
Value
Spec.
Check for Dust Caps on all the
Unused Ports
3 Routing of Patch cords
Status
All the Dark fibers to meet the Link loss
Specifications
To be available on all the Unused ports
No Temporary Hanging Patch cords inside
the Equipment Room
4. VRLA Battery Parameter Measurements
Sl. No.
Activity
Spec.
Discharge Battery Bank with
Equipment Load for 1 hour
Refer the check sheet No: OPS.O&M.1.0.8
Check terminals before corrosion
Corrosion free / Petrolium Zelly applied
5. DC Power Plant Parameter Meausrements
5.1 Rectifier Testing - Power Plant # 1
Measured
Value
Status
Sl. No.
Activity
1
Module Cleaning by Vacuum
Cleaner
Spec.
Properly Cleaned
2 Output voltage test
52V +/-2 V
3 Display Panel
Dust free
4 Check for any Active Alarms
No active alarms
5 Plant Load
Actual
6 Power Plant Capcity
Actual
a) Load on Rectifier 1
Actual
b) Load on Rectifier 2
Actual
c) Load on Rectifier 3
Actual
d) Load on Rectifier 4
Actual
e) Load on Rectifier 5
Actual
f) Load on Rectifier 6
Actual
g) Load on Rectifier 7
Actual
h) Load on Rectifier 8
Actual
Check for the Health of all the
LED's by Lamp test
Measured
Value
Status
NA
All LED's to glow in the Lamp test
Note: This point to be rem
5.2 Rectifier Testing - Power Plant # 2
Sl. No.
Activity
1
Module Cleaning by Vacuum
Cleaner
Spec.
Properly Cleaned
2 Output voltage test
52V +/-2 V
3 Display Panel
Dust free
4 Check for any Active Alarms
No active alarms
5 Plant Load
Actual
6 Power Plant Capcity
Actual
a) Load on Rectifier 1
Actual
b) Load on Rectifier 2
Actual
c) Load on Rectifier 3
Actual
d) Load on Rectifier 4
Actual
e) Load on Rectifier 5
Actual
f) Load on Rectifier 6
Actual
g) Load on Rectifier 7
Actual
h) Load on Rectifier 8
Actual
Measured
Value
Status
NA
6. Servo Stabilizer
Sl. No.
Activity
Spec.
Checking the Three Phase output
Voltage
Cleaning of Unit including Isolation
Properly clean
Transformer
Measured
Value
As per Spec.
NA
Status
Check the Neutral Voltage with
respect to Ground
< 3Volts
7. Power Integration Unit (PIU)
1
Check the Front Panel Output Volt
'+/- 2% w.r.t.actual measured value
Meter
Check Front Panel Output Amp.
Meter
Manual bypass of Stabiliser (which
Ok
is applicable for Tyco make only)
Check the DG battery charging
through PIU
Condition of the MCB's & Load
Cables
any overheating
Tightness of MCB & cable
connection
Tightend properly
Actual Value
Check the Auto function of DG set
7 through PIU unit (on DC low and
Functional
High Temperature condition)
8
Check the Neutral Voltage with
respect to Ground
< 3Volts
8.Air Conditioner
Sl. No.
Activity
Spec.
Measured
Value
1 Check all bolts & nuts
Tightend properly
NA
2 Main switch & fuses
Tightend properly
NA
3 Terminal connection
Cleaned &Tightend properly
NA
4 Thermostat working
Properly working
NA
5 Grill Temperature
18 +/- 1
6 Load Current of Compressor 1
Manufacturer recommendations as per the
tonnage of the AirConditioner
7 Load Current of Compressor 2
Manufacturer recommendations as per the
tonnage of the AirConditioner
8 Filter Cleaning
Proper Cleaning
Status
8.1 PEC type Air Conditioner
Sl. No.
Activity
Spec.
1 Set Temperature
At 21+1 degree centigrade
2 Room Temperature
At 22+1 degree centigrade
3 Set Humidity RH %
At 50+ 5% RH
4 Acutal Humidity RH %
At 50+ 5% RH
5 Any Active alarms
No Active alarms
5 Any Active alarms
No Active alarms
Measured
Value
Status
9. RIL Panel / PIU
Sl. No.
Activity
Check for alarm reporting in the
Guard Room and in the Equipment
room and NMS - Door open , Fire ,
1
High RoomTemperature , DG
running , EB Mains Fail, Low Fuel
level .
Spec.
Measured
Value
Status
Measured
Value
Status
All Alarms to report in the Guard Room
Panel , Equipment Room Panel , NMS.
(Activity to be carried out by Planned
Event Notification
10.Diesel Generator
Sl. No.
Activity
Mounting pads , Bolt and Nuts
Spec.
Tightened
Check for Output Voltage Per Phase Within the range of 385Volts to 430Volts
Check for DG battery
It should be within the range of 12V to 13V
Servicing of 15kva
1)Change Mob oil & filter after 6 months
from the last date of Service or 500 hours
running whichever is earlier.2) Change
diesel filter after 250hrs or 3 months
whichever comes first 3)DG top
overhauling period after 5000hrs & Major
overhauling period after 10000hrs
Servicing of 50kva
1)Change Mob oil & filter after 6 months
from the last date of Service or 300 hours
running whichever is earlier.
11.SDH /DWDM/DXC/ ROUTER / SWITCH/ ATMEquipments
Sl. No.
Activity
1 Fan Filter Cleaning
2
Measurement of DC Current in A
feed and B feed
Spec.
Measured
Value
Status
Dust Free
The feed Current should not cross 80% of
MCB or fuse rating.
Remove from the monthly & add in the qtl
12. Rack Space , DC Power, Fiber
Sl. No.
Activity
1 Availability of Rack space
Spec.
Actual
Measured
Value
Status
Rack space or Power Requirement by
Planning dept.
3 Availability of Fiber
The requirement of power and Rack space
to be intimated by Planning by before
three months (if not available required
Rack space and power at site then site
/Infra upgradation to be done )
Minimum of 5 pairs of dark Fibers (Else
plan for upgradation)
Note : Activities Mentioned in the Weekly PMT to be carried out apart from the above
Sign & Name of Engineer
7.SDH /DWDM/DXC / DATA Equipments
* Also use the vendor provided Manual (of infra products like DG, Battery etc.) for conducting the PM activities
Doc No:
OPS.O&M.1.0.3
ort
Date ..
Territory
ROOT CAUSE (For the Out of
Spec. cases)
Remarks
ROOT CAUSE (For the Out of
Spec. cases)
Remarks
ROOT CAUSE (For the Out of
Spec. cases)
Remarks
ROOT CAUSE (For the Out of
Spec. cases)
Remarks
ROOT CAUSE (For the Out of
Spec. cases)
Remarks
s point to be removed from the process
ROOT CAUSE (For the Out of
Spec. cases)
Remarks
ROOT CAUSE (For the Out of
Spec. cases)
Remarks
ROOT CAUSE (For the Out of
Spec. cases)
ROOT CAUSE (For the Out of
Spec. cases)
Remarks
REMARKS
ROOT CAUSE (For the Out of
Spec. cases)
Remarks
ROOT CAUSE (For the Out of
Spec. cases)
Remarks
ROOT CAUSE (For the Out of
Spec. cases)
Remarks
y & add in the qtly PM along with measurement sheet
ROOT CAUSE (For the Out of
Spec. cases)
Remarks
es
Page 1 of 1
Doc No:
OPS.O&M.1.0.4
Quarterly Preventive Maintenance Report
Quarter
Site Name
Territory
Date
Route Name
1. VRLA Battery Parameter Measurements
Sl.
No.
Activity
Spec.
Battery ReCharging
Current
10% to 20% of rated Battery Capacity
Auto float/Boost change
Float-to-boost 5%
over
Auto float/Boost change
Boost-to-float 3%
over
Tightening of terminal
bolt
Boost charge at the rate Boost Charging to be provided for 24 hours
of 2.30VPC
without Interruption
Measured
Value
Status
ROOT CAUSE (For the Out
of Spec. cases)
Note: These two points to be removed from the proce
available in the power plant
11Nm / 100Lb-inch
2.Air Conditioner
Sl.
No.
Activity
1 Filter Cleaning
Spec.
Properly clean
Measured
Value
Status
ROOT CAUSE (For the Out
of Spec. cases)
Note: not required in the qtly because its already in th
2. Servo Stabilizer
Sl.
No.
Activity
1 Terminal Connection
Spec.
Measured
Value
Cleaned & tightened
NA
Cleaning of variac
transformer
Cleaned
NA
Cleaning/Replacement of
Cleaned
carbon bush
NA
4 Alignment of variac
Properly aligned
5 Servo cord checking
a) out put voltage setting As per spec.
b) Hi cut off voltage
As per spec.
c) Senstivity of servo
variac
As per spec.
Three phase out put
voltage checking
Voltage & Phase sequence
7 Check oil
3. PIU
Status
ROOT CAUSE (For the Out
of Spec. cases)
Sl.
No.
Activity
Spec.
Measured
Value
Status
ROOT CAUSE (For the Out
of Spec. cases)
Measured
Value
Status
ROOT CAUSE (For the Out
of Spec. cases)
Measured
Value
Status
ROOT CAUSE (For the Out
of Spec. cases)
Measured
Value
Status
ROOT CAUSE (For the Out
of Spec. cases)
Cleaning of the LCU
1 without dismentling from Dust free
the unit
4. OTDR and Splicing machine Battery
Sl.
No.
Activity
Spec.
Discharge OTDR Battery
As recommended by the Manufacturer
after fully charging
Discharge Splicing
2 Machine Battery after
fully charging
As recommended by the Manufacturer
5. SDH /DWDM/DXC/ ROUTER / SWITCH/ ATMEquipments
Sl.
No.
Activity
Measurement of DC
1 Current in A feed and B
feed
Spec.
refer the Measurement sheet No:
OPS.O&M.1.0.12, if exceed the 40% capacity
of the MCB or Fuse rating of A or B Feed for
dual supply equipment then to be reduced
the load by migrating to new DCDB and for
single feed equipment should not be cross
more than 80% of MCB or Fuse Rating
5. Site Information
Sl.
No.
Activity
1 Check the site status
Spec.
refer the Measurement sheet NO:
OPS.O&M.1.0.13
Note : Activities Mentioned in the Weekly PMT, Monthly PMT to be carried out apart from the above
* Also use the vendor provided Manual (of infra products like DG, Battery etc.) for conducting the PM activities
Sign & Name of Engineer
..
e
Remarks
ess - optional not
Remarks
he monthly PM
Remarks
Remarks
Remarks
Remarks
Remarks
Yearly Preventive Maintenance Report
Year
Site Name
Route Name
1. VRLA Battery Parameter Measurements
Sl. No.
Activity
1
Spec.
Measured Value
Status
Measured Value
Status
Measured Value
Status
Discharge Battery Bank with External
For 10 hours @ C10
Load
2. OFC Parameters Measurements
Sl. No.
Activity
Spec.
Testing of Fiber attenuation of Dark Fiber Attenuation to be within the
Fibers with OLS and OPM
Link Budget
3. Air Conditioner
Sl. No.
Activity
1 Filter Replacement
Spec.
Within 1year from the date of the
Previous replacement
* Also use the vendor provided Manual (of infra products like DG, Battery etc.) for conducting the PM activities
Note : Activities Mentioned in the Weekly PMT, Monthly PMT, Quraterly PMT to be carried out apart from the a
Next Yearly maintenance to be conducted within 12 months - 15 months.
Sign & Name of Engineer
Doc No:
OPS.O&M.1.0.5
port
Date ..
Territory
ROOT CAUSE (For the Out of Spec.
cases)
Remarks
ROOT CAUSE (For the Out of Spec.
cases)
Remarks
ROOT CAUSE (For the Out of Spec.
cases)
Remarks
Doc No:
OFC TESTING
Creation Date
Link Details:
Route-Name
loss calculations ::
Area Name
Link Name
Site A
Site B
Cable Owner
Type of OFC
Total No. of Fiber
Fiber Used
Faulty Fiber
Optical Length
(B---->A)
Cable-1
Cable-2
Cable-1
Cable-2
Cable-1
Cable-2
Cable-1
Cable-2
(0.21*optical length)+(0.07
Cable Count
Cable-1
Spare Fiber
Cable-1
Optical Length
(A---->B)
Link Engineer
Duct Details
Number of Duct
Count
Fully/Partially/FreeFrom Location
To Location
Duct Used
OTDR Report:
Fiber
(Spare)
Cumulative OTDR
Loss (in dB)A---->B
Cumulative OTDR Loss
dB)B---->A
(in Average Cumulative
OTDR Loss(in db)
Fiber Attenuation
dB/Km
No. of Event
LSPM Report:
Fiber No.
Toatl Loss Measurement
A--->B(DB)
Fiber details given to
B--->A(DB)
Actual Loss Measurement
A---->B(DB)
B--->A(DB)
Average
Loss (DB)
Details provided to
Other Operator
YES or NO
Any Additional Details
Fiber Count -
Operator -
Number of Fiber
From-
Fiber Count -
Operator -
Number of Fiber
From-
Fiber Count -
Operator -
Number of Fiber
From-
Fiber Count -
Operator -
Number of Fiber
From-
OPS.O&M.1.0.6
(0.07*No.of Splices)+(0.5*1)
vent
Cable-2
Cable-2
(Atteunation loss >=.3dB)
Fiber Attenuation (DB/Km)
ToToToTo-
Doc No:
Battery Bank Discharge - Monthly
Site Name
Site Load
Battery Capacity
Date of Testing
Battery Bank No. 1
CELL NO.
Battery Bank No. 2
Volts under
Volts after running
Volts under
normal
the Battery on load
normal
condition(Volts)
for 1 hr.(volts)
CELL NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Terminal
voltage
Under Normal Condition:
Avg. Voltage per cell(BB-1) :(Total Voltage/24)
Avg. Voltage per cell(BB-2) :(Total Voltage/24)
Any cell of BB-1, whose voltage is less/greater than Avg. Voltage -0.06V?
Any cell of BB-2 ,whose voltage is less/ greater than Avg. Voltage -0.06V?
After 1 hour discharge
Avg. voltage per cell (BB-1) ;(Total Voltage/24)
Avg. voltage per cell (BB-2) ;(Total Voltage/24)
condition
Any cell of BB-1 , whose voltage is less than Avg. Voltage -0.06V?
Any cell of BB-2 , whose voltage is less than Avg. Voltage-0.06V?
OPS.O&M.1.0.8
Volts after running
the Battery on load
for 1 hr.(volts)
BATTERY DEEP DISCHARGE TEST REPORT
Site
Battery Supplier
Date of installation
Testing by
Battery Details
Model No.
Serial No.
No. of Cells
BTSOL Representative
Rated Capacity
Bank No.
Rate of Discharge
Start Time/ Date
End Time/ Date
VRLA
Dept.:
Doc No
Rev No
Eff. Date
Page:
10%
Room Temperature
23'C
Check for labeling of Battery Bank No. and Individual cells (for numbering)
Time (Hours)
Since start
Cell Serial No.
Cell No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Voltage In boost
mode
Open Ckt
Volts
Volts
Volts
Volts
Volts
Volts
Volts
Volts
Volts
Volts
Terminal Volts
Load Current
Acceptance
Criteria
The voltage of the individual cell should not be less than 1.75volts
The terminal voltage should not be less than 42 volts
Test Result
PASSED / FAILED
Vendor/Testing Agency
(Name of Person)
TNG
(Name of Person)
pt.:
No:
No:
Date:
ge:
Operations(O&M)
OPS.O&M.1.0.9
5
24.05.2013
1 of 1
9.15
9.3
9.45
10
Volts
Volts
Volts
Volts
Volts
Open Ckt.
Volts