Controlling
FI Basic Settings
Step 1: Define Company (OX15)
And save
Step 2: Define Company Code (OX02)
And save
Following screen will appear. Update the required information
Enter and save
Step 3: Assign Company Code to Company (OX16)
And save
Step 4: Define Business Area (OX03)
And save
Step 5: Define Segments
Path: SPRO Enterprise Structure Definition Financial Accounting
Define Segment
And save
Step 6: Define Fiscal Year Variant (OB29)
For the company code TSL we are using V3 Fiscal year variant
Step 7: Assign Fiscal Year variant to company code (OB37)
And save
Step 8: Define Posting Period Variant (OBBO)
And save
Step 9: Define Open and Close Posting Period Variants (OB52)
And save
Step 10: Assign Posting Period Variant to Company Code (OBBP)
And save
Step 11: Define Field Status Variant (OBC4)
And save
Step 12: Assign Field Status Variant to Company Code (OBC5)
And save
Step 13: Define Chart of Accounts (OB13)
And save
Step 14: Assign Chart of Accounts to Company Code (OB62)
And save
Step 15: Define Account Groups (OBD4)
And save
Step 16: Define Retained Earnings (OB53)
And save
Step 17: Define Document Types (OBA7)
And save
Step 18: Define Tolerance Range for GL Accounts (OBA0)
And save
Step 19: Define Tolerance Range for Customer or Vendors (OBA3)
Step 20: Define Tolerance Range for Users (OBA4)
And save
Step 21: Create GL Accounts (FS00)
Step 22: Post GL Invoice (F-02)
CONTROLLING
Organizational Structure:
Operating Concern
Controlling Area
Company Code
I
Profit center -------Cost center 1
Cost center 2 ------Profit
center
Profit Centers are at controlling area level but Cost centers are at
company code level
Operating Concern: It is the highest node of organizational unit in SAP. It is
required in CO-PA module.
Controlling Area: It is the highest level of organizational unit in Controlling. At this
stage we can track overhead management, product costing, profit controlling.
Company code: It is one of the organizational units in FI. It is the place where we
prepare financial statements.
Scenarios: In controlling area we have two scenarios:
(i) Controlling area at company code level Each company code have
different controlling area
(ii) Controlling area at country level No. of company codes having one
controlling area
Prerequisites for 1st scenario:Chart of Accounts and fiscal year variant should be
same for all the company codes
Cost Element: It carries costs from FI module to CO Module. There are two
types of cost elements: Primary cost element and Secondary cost element.
Cost element codification finalizes at business blue print stage only. FI Consultant
finalizes primary cost element codification and CO Consultant finalizes secondary
cost elements
Primary Cost Elements:
01 primary cost element category values will not flow to CO-PA. Only 11 and 12
cost elements categories flow to CO PA.
Secondary Cost Elements:
Business Transactions: It is similar to document types in FI. In CO number
ranges are year independent.
Version: All CO values stored under versions
Version 0: The actual and planned values stored under zero versions. In addition
to zero versions we can maintain few more plan versions also but it is not
possible to maintain actual values in other than zero versions.
Basic Configuration Settings for Controlling:
Step 1: Maintain Controlling area (OKKP)
Path: SPRO Controlling General Controlling Organization
Maintain Controlling Area
CoCd-> CO Area:
Controlling area same as company code: If a company code uses one controlling
area
Cross company code cost accounting: If multiple company codes use one
controlling area
Currency type:
Group currency (30): For material Ledger, we have to select this currency
Controlling currency (20): It is nothing but our company code currency
Curr/Val. Profile:
We use this field, if we have transfer price concept either in profit center
accounting (or) in material ledger.
Double click on assignment of company code
Double click on activate components/control indicators button
Profitability Analysis: This field is automatically activated here, if we activate the
same in CO-PA
Profit Center Accounting: If we select this check box, then the system treats it as
a classic profit center accounting. For ECC 6.0 Version, no need to select this
check box
Projects: When we implement PS module, we select this check box
W. Commit. Mgt: When we implement FSCM module, we select this check box
Variance and CoCd validation: If more than one company code using same
controlling area then we haves to select the check boxes of variance and CoCd
validation
Step 2: Maintain Number Ranges (KANK)
Path: Same Path
Select maintain group button
Menu Group Insert and give the description & number range interval
Double click on all the business transactions
And then select check box of co doc no range interval for TSL
And then click on Assign element icon
and save
Step 3: Maintain Versions
Path: Same Path
Enter
Select on FY 2013 and click on details button
Planning Tab:
Version locked: If we select this check box, we cannot post to any transaction for
that particular FY
Integrated Planning with cost centers/bus. Process: In cost center master data
(KS01), we specify profit center. If we select this check box, whatever planning
we do for cost center the same will update in profit center also and vice versa.
But for ECC 6.0 Version, no need to select this check box
Price Calculation Tab:
And save
Plan Price: Plan price controls system calculated price:
System calculated price is the combination of both input planning (KP06) and
output planning (KP26)
In KP06, we will make planning by the combination of cost center and cost
element
In KP26, we will make planning by the combination of cost center and activity
type.
Periodic price formula: Current period input planning / current period output
planning
Average price formula: Total periods of input planning / total periods of output
planning
Cost Element Accounting
Creation of Primary Cost Element:
We can create cost elements in 3 ways:
A) In FI area FS00
B) In CO area KA01
C) Automatically we can create cost elements
In FI Area FS00
Select edit cost element button
Enter
And save
Note: We are not supposed to give cost centers or orders under default
assignment tab. Please find the below screenshot for further reference
In CO area KA01:
Enter
And save
Automatically we can create cost elements:
Creation of Automatic Cost Elements (OKB2)
Path: SPRO Controlling Cost Element Accounting Master Data Cost
Elements Automatic creation of primary and secondary cost elements Make
Default Settings
And save
Create Batch Input Session (OKB3)
Execute
Execute Batch input session in same path
Note: In the above steps, we gave the primary cost element categories for
revenues and expenses
Once the execution is completed, these primary cost element categories will
update in available GL Accounts.
If we select Automatic cost element (2nd option) in COA (OB13), then for all the
revenues and expenses GL accounts which we are going to create in future also
will be updated with these primary cost element categories only.
To View the Cost Elements (KA23)
To create cost element group (KAH1)
Creation of Secondary Cost Elements (KA06):
Cost Element
Name
Category
931000
931001
931002
931003
941000
941001
942000
943000
943001
943002
921000
Technical
WIP raw material
WIP activity cost
WIP indirect OH
Material OH
Activity OH
Assessment
Labour
Machine
Power
Internal Settlement
31
31
31
31
41
41
42
43
43
43
21
Creation of secondary cost element group (KAH1)
To view the cost elements (KA23)
Cost Center Accounting
We can create cost center in two ways: either in OKEON or KS01
1st Method: Define Standard Hierarchy (OKEON)
Give group name as Tata Steel Limited
Keep the cursor on TSL and right click and select Create cost center
And save
2nd Method: Creation of Cost center (KS01)
Enter
Save
To view the cost center (KS03)
Activity Types
Creation of Activity Types (KL01)
Path: SPRO Controlling Cost center accounting Master Data
Activity Types Create Activity Types
Note: To create activity types 43 cost element is required.
Enter
Save
In the same way, create activity types for Machine and Power also.
All the fields are remains same except below fields.
Machine: Activity unit HR and Allocation Cost element 943001
Power: Activity unit KWH and Allocation cost element 943002
Splitting Structure
Step 1: Maintain Splitting Structure (OKES)
Select new entries button
Select 01 splitting structure and double click on splitting rules button and select
new entries button
Select rule -01 splitting rule and double click on assignment folder
And enter
Select new entries button and give the below details
And save
Select Assignment 1 Labour Cost Split and double click on selection for
assignment folder
Select new entries button
Enter cost element - 400000 (salaries) and activity type Labour and save
Assignment 2:
Save
Assignment 3:
Save
Step 2: Assign Splitting Structure to Cost Center (OKEW)
Select change button
Select the check boxes of Production 1 and Production 2
And keep the cursor on splitting structure and assign
Activity Independent Planning (With splitting
structure)
1st case: Cost Element Assigned to Activity Type
Step 1: Maintain Input Planning (KP06)
Select overview button
And save
Step 2: Maintain Output Planning (KP26)
Select overview button
Save
Step 3: Run Plan Activity Price Calculation (KSS4)
Select test run check box and execute
Select back arrow
Remove test run check box and execute
Step 4: Create Production Cost Center Group (KSH1)
Enter
And save
Step 5: Price Calculation (KSPI)
Select settings button
Select not optimised check box
and save
Select back arrow and remove test run check box and execute
To view the system calculated price (KP27):
2nd Case: Unassigned Cost Elements
Step 1: Maintain Input Planning (KP06)
Select overview button
And save
Step 2: Maintain Output Planning (KP26)
Select overview button
And save
Step 3: Run Plan Activity Price Calculation (KSS4)
Execute
Here, we can see clearly that planned rent amount (1500) distributed to all the
three activity types equally.
Select back arrow and remove test run check box and execute
Step 4: Execute Price Calculation (KSPI)
Execute
Back arrow and remove test run and execute
To view the document (KP27):
3rd Case: Number of Activity types to Single Cost Element
Step 1: Creation of Secondary Cost Element (KA06)
And enter
Save
Step 2: Create Activity type (KL01)
Path: SPRO Controlling Cost center accounting Master Data
Activity Types Create Activity Types
Enter
Save
Step 3: Create Production Cost Center (KS01)
Enter
Save
Step 4: Creation of cleaning GL Master (FS00)
Make sure to give cost element as 1 and save
Step 5: Define Splitting Structure (OKES)
Select 1 and double click on assignments folder
Select 1 and double click on selection for assignment folder
Remove activity type Labourand then create activity type group by using KLH1
(or) through the path: MenuExtrasCreate Group.
Creation of activity type group:
Keep the cursor on Group (activity type) and give the description as Lab_clean
AT
Select Menu ExtrasCreate Group
Select insert activity type
Assign labour and clean activity types
And save
Select back arrow and save
Step 6: Assign Splitting Structure to Production cc 3 (OKEW)
Select edit button
Select the check box of production 3 and keep the cursor on splitting structure
for TSL and assign
Step 7: Assign Production 3 Cost Center to Production Cost Center
Group (KSH2)
Step 8: Create Cost Element Group (KAH1)
Enter
Select assign cost element button
Assign accounts and save
Step 8: Maintain Input Planning (KP06)
Select overview button
Save
Step 9: Maintain Output Planning (KP26)
Select overview button
And save
Step 10: Run Plan Activity Price Calculation (KSS4)
Execute
Remove test run and execute
Step 11: Run
Allocation Methods
There are four types of allocation methods:
A)
B)
C)
D)
Distribution
Assessment
Periodic posting
Indirect Activity Allocation
Distribution
Scenario 1: Sender rule posted amount and Receiver rule Fixed
percentage
Step 1: Creation of sender service cost centers (KS01)
Canteen service cost center:
Enter
Save
Admn service cost center:
Enter
Save
Step 2: Creation of Receiver Production Cost Center (KS01)
Production 4 cost center
Enter
Sa
ve
Production 5 cost center:
Save
Step 2: Define Distribution Cycle (KSV1)
Enter
Select Attach segment button
Segment header tab:
Senders/receivers tab:
Sender values tab:
Receiver tracing factor:
Save
Step 3: Posting an FI invoice (FB50)
Invoice posting to canteen cost center
Invoice posting to Admn cc
Save
Step 4: Execute Actual Distribution Cycle (KSV5)
Execute
Select sender button
Select back arrow and select receiver button
Select back arrow two times and remove test run and execute.
Note: If we want to test remaining scenarios but we execute KSV5 without test
run check box. Then we need to reverse the run in KSV5 from menu path.
After that if we want to test remaining scenarios, go to KSV2 and select first
segment button and make necessary changes
Scenario 2: Allocation amount excess than actuals (receiver rule fixed
amount)
Sender rule posted amount and receiver rule fixed amount
Step 1: Change Distribution Cycle (KSV2)
Enter
Select first segment button
Segment header:
Change receiver rule to fixed amounts
Senders/receivers tab:
Note: Dont touch it
Receiver tracing factor:
Note: Actually posted values to salaries and rent under canteen cost center is
10000 & 5000 respectively in scenario 1 (Step 3)
Actually posted values to salaries and rent under admn cost center is 20000 &
15000 respectively.
But here we are allocating more than actuals. Lets see the result in next step
Step 2: Execute Actual Distribution Cycle (KSV5)
Execute
Select sender button
Select receiver button
Scenario 3: Sender rule posted amounts and Receiver rule fixed
portions
Enter
Select first segment button
Segment header button:
Sender/receivers tab:
All the fields in this tab remain same
Receiver Tracing Factor:
Save
Step 2: Execute Actual Distribution Cycle (KSV5)
Execute
Sender button
Receiver button
Scenario 4: Sender rule fixed amount and receiver rule fixed portion
Step 1: Change actual distribution cycle (KSV2)
Enter
Select first segment button
Sender/receivers tab:
Note: These fields remain same
Sender value tab:
Receiver tracing factor:
Save
Step 2: Execute actual distribution cycle (KSV5)
Execute
Select sender button
Receiver button
Scenario 5: Sender fixed rates and receiver rule fixed portion
Step 1: Change Actual Distribution cycle (KSV2)
Enter
Select first segment button
Sender value tab:
Receiver tracing factor tab:
Save
Step 2: Execute Actual Distribution Cycle (KSV5)
Enter
Sender button
Receiver button
Scenario 6: Statistical Key Figure
Step 1: Creation of statistical key figure (KK01)
Enter
And save
Step 2: Maintain Employee Number (KB31N)
Save
Step 3: Change the actual distribution cycle (KSV2)
Enter
Select first segment button
Receiver tracing factor:
Save
Step 2: Execute Actual Distribution Cycle (KSV5)
Execute
Select sender button
Select receiver button
Assessment
Scenario 1: Assessment Cost Element
Step 1: Creation of service cost centers (KS01)
Enter
Save
Service cost center:
Enter
Save
Step 2: Creation of Production Cost centers (KS01)
Enter
Save
Assessment 2 production cost center:
Enter
Save
Step 3: Creation of Assessment Cycle (KSU1)
Enter
Select attach segment button
Segment header:
Senders/receivers tab:
Sender value tab:
Receiver tracing factor:
Save
Step 2: Posting of an invoices (FB50)
And save
Save
Step 3: Execute Assessment Cycle (KSU5)
Execute
Sender button
Receiver button
Scenario 2: Allocation Structure
Step 1: Create Secondary Cost Element (KA06)
Enter
Save
Step 2: Create Allocation Structure (KSES)
Select new entries
Save
Select 11 and double click on assignment folder
Select new entries
Select 01 salaries and double click on source folder
Give 400000 salaries account and save. Double click on assessment cost
element folder
Select new entries button
And save and select back arrow
Select 02 rent and double click on source folder
Give the rent account number and save. Double click on assessment cost
element folder
Give secondary cost element number and save
Step 3: Change of assessment cycle (KSU2)
Enter
Select first segment button
Remove assessment cost element number and give allocation structure and save
Step 4: Execute cycle (KSU5)
Execute
Sender button
Receiver button
FI-MM Integration
Define Valuation Area at Plant/Company Code Level (OX14)
Here, valuation area is defined at plant level
Step 1: Define Plant
Path: SPRO Enterprise Structure Definition Logistics General Define
Copy, Check and Edit Plant
Select new entries
And save
STEP2: Define Division
Path: Same Path
Select new entries
And save
STEP3: Maintain storage location
Path: SPRO-Enterprise structure Definition- materials management Maintain
storage location (OX09)
Select new entries
And save
Step 4: Maintain Purchase Organisation
Path: same Path
Select new entries
And save
Step 5: Assign plant to company code:
Path: SPRO-Enterprise structure Assignment- logistics General Assign plant to
company code
(OX18)
Select new entries
And save
Step 6: Assign business area to plant/valuation area and division
Path: Same path
Select plant/valuation area- division button
Select new entries
And save
STEP 7: Assign purchasing organization to company code
Path: Up to assignment the path is same Materials management Assign
purchasing organization to company code
And save
STEP 8: Assign purchasing organization to plant
Path: Same path
And save
STEP 9: Create purchasing groups
Path: SPRO-Materials management Purchasing Create purchasing groups
Select new entries
And save
STEP 10: Define material groups: (OMSF)
Path: SPRO-Logistic general Material master-Settings for key fields Define
Material groups
Select new entries
And save
STEP 11: Maintain company code for material management (OMSY)
Path: SPRO-Logistic General Material master-Basic settings-Maintain company
code for materials management
Select position button & give your company code
And save
Note:
If we select ABP (Allow back posting) check box then we are allow to post in
12/2012
If we select DBP (Dont back posting) check box then we are not allow to post in
12/2012
Step 12: Define attributes of material types (OMS2)
Path: up to the material master the path is same Basic settings Material typeDefine attributes of material types.
Select position button
Select FERT and select check boxes of Qty updating Value updating
Save
Select position button
Select HALB and select check boxes of Qty updating Value updating
Save
Select position button
Select HALB and select check boxes of Qty updating Value updating
Save
Step13: Set tolerance limits for price variance for purchase order
Path: SPRO-Material management Purchasing Purchase order set tolerance
limits for price variance.
Select keys ofPE and SE of company code 0001(sap standard)
Select copy as button
Enter
Save
Step 14 Plant parameters
Path:SPRO-Materials management Inventories management and physical
inventory Plant parameters
Select plant of 0001 (sap standard) and select copy as button
And save
Step 15: Set tolerance limits for goods receipt
Path: Up to inventory management and physical inventory the path is same
-Goods receipt-Set tolerance limits
Select tolerance keys of B1, B2 and VP for company code 0001 (sap standard)
Select copy as button
Enter
Enter
And save
Step 16: Maintain default values for tax codes
Path: SPRO- Materials management Logistics invoice verification-Incoming
invoice -Maintain default values for tax codes
Select new entries button
And save
Step 17: Set tolerance limits for invoice verification
Path: Up to logistics invoice verification the path is same Invoice block-Set
tolerance limits
Select tolerance keys of BD, ST and PP for company code 1000 and select copy
as button
Enter
Enter
And save
Step 18: Define automatic status change
Path: Up to the logistic invoice verification the path is same Invoice verification
in back ground Define automatic status change
Select new entries
And save
STEP 19: Group together valuation areas (OMWD)
Path:SPRO-Material management Valuation and account assignment-Account
determination-Account determination without wizard-Group together valuation
areas.
And save
STEP 20: Define valuation classes (OMSK)
Path: Same path
Click on Account category reference
Select new entries
And save
Click on Valuation Class tab
Select new entries
And save
Click on Material type/account category reference
Assign Account category reference for material types ROH,FERT and HALB
And save
Step 21: GL Accounts (FS00)
Create below GL Accounts
GL Creation.docx
Note:Make sure to assign 01 cost element for 400005; 400006; 400007 and
400008
Step 22:Assignment of accounts for automatic postings (OBYC)(MM to
FI INTEGRATION)
PATH: UP to account determination without wizard the path is same Configure
automatic Postings
Double click on transaction BSX inventory posting
And save
Save
Double click on WRX GR/IR Clearing account
Save
Save
Double click on GBB offsetting
Save
Save
Double click on PRD Cost (Price) Difference
Save
Save
Step 23: Document types and number ranges (OBA7)
WE:
Goods receipt (50)
WA:
Goods issue (49)
RE:
Gross invoice receipt (51)
Step 24: Create Material Master (MM01)
Creation of RM X material
Enter
Select Basic Data1, Basic Data2, Purchasing, MRP 1-4, General plant
data/storage 1-2, Accounting 1-2, Costing 1-2 tabs
Enter
Basic Data 1 tab:
Purchasing Tab:
MRP 1 Tab:
Accounting 1 Tab:
Costing 1 Tab:
Save
Case 1: Stock Fully Available
Creation of Purchase Order (ME21N)
Select RM Y, Import material and maintain tax code (if necessary)
And save
PO is created with 4500000015
Creation of Goods Receipt (MIGO)
Now select RM Import and give the storage location
And save
MIGO is created with 5000000020
FI Accounting Document:
Creation of Invoice Verification (MIRO):
And save
MIRO is created with 5105600771
Note: In PO we have given 1000 and 2000 for RM X and RM Y respectively. Here,
we have increased the amounts to 1500 and 2500. Hence accounting document
appears as follows:
FI Accounting Document:
Check the updated price in MM03
RM X
Plant Stock
Check the RM Y also in the same way
Case 2: Stock Partially Available
Available stock in MM03 for RM Y
Creation of PO (ME21N)
Raising PO for another 4 KGs @ 250/-
Creation of Goods Receipt (MIGO)
And save
FI Accounting Document
MM03: Stock has increased to 14 and value 3500/-
RM Consumption (MIGO):
And save
FI Accounting Document
CO Accounting Document
One more consumption for 10 QTY:
FI Accounting Document
CO Accounting Document
MM03: Check the stock in material master
Previously available stock
10
PO and GR has been done for
Consumption (3+10)
13
Available Stock (10+4-13)
Prerequisite for MIRO:
For 400008 price variance GL Account, we have given cost element. We have to
maintain default cost center in OKB9 for time being. Otherwise we will get an
error while doing MIRO. Once profitability analysis has been activated, remove
the default cost center and select the check box of profitability segment.
Creation of Invoice Verification (MIRO):
Change the amount from 1000/- to 1100/- (highlighted automatically which was
given at PO time)
And save
FI Accounting Document:
At invoice verification time, we had increased price from 1000 to 1100/- for 4
quantities, hence price calculated as below:
Increased value = 100 and PO has been raised for 4 quantities
Available stock in material master = 1 and Consumed stock = 3 out of 4
RM Import (available stock) = 100*1/4 = 25
Price Variance (consumed stock) = 100*3/4 = 75
Check the material master (MM03):
Previously, we had moving price of 250/- and now it is 275/- (25/- added due to
increase of amount at time of invoice verification
Case 3: Stock is not available
Check the material master (MM03)
Presently, RM Y material had 1 qty of stock @ 275/-
Creation of PO (ME21N):
Creation of Goods Receipt (MIGO)
FI Accounting Document
Check moving average price in MM03:
Previously moving average price was 275 and PO has been raised for 250/-. Total
value was 525
Goods Issue (MIGO) Raw material Consumption
FI Accounting Document:
CO Accounting Document:
Check the stock in material master:
Now, stock has been fully consumed
Creation of Invoice Verification (MIRO):
FI Accounting Document
PO has been raised for 250/- and invoice verification done for 250/- and more
over stock was not available. Hence difference amount (25 = 275-250) was
posted to price variance
CO Accounting Document:
Product Costing
Step 1: Define Calculation Bases
Path: SPRO Controlling Product Cost Controlling Basic Settings for
Material Costing Overhead Costing Sheet: Components Define
Calculation Bases
Select new entries
And save
Select RAM and double click on details folder
Enter
Cost portion Total and select new entries
And save. Select back arrow
Select POH and double click on details folder
Enter
Cost portion Total and select new entries
And save
Step 2: Define Percentage OH Rates
Path: Same Path
Select new entries
Save. Select ROH and double click on details button
Ignore the warning message
Select new entries
And save. Select back arrow
Select COH and double click on details button
Select new entries
And save
Prerequisite step before step 3:
Step 3: Define Credits
Path: Same Path
Select new entries
Save
Select MCK and double click on details button
And continue button
Select new entries button
And save
Select CCK and double click on details button
And save
Step 4: Define Costing Sheet
Path: SPRO Controlling Product Cost Controlling Product Cost Planning
Basic Settings for Material Costing Overhead Define Costing Sheets
Select new entries
And save
Select TSLCS and double click on costing sheet rows and select new entries
And save
Step 5: Define Valuation Variant
Path: SPRO Controlling Product Cost Controlling Product Cost Planning
Material Cost Estimate with Quantity Structure Costing Variant: Components
Define Valuation Variants
Select new entries button
Material Valuation Tab:
Activity Types/Processes Tab:
Subcontracting:
External Processing:
Overhead:
And save
Step 6: Maintain Cost Component Structure
Path: SPRO Controlling Product Cost Controlling Product Cost Planning
Basic Settings for Material Costing Define Cost Component Structure
Select new entries
And save
Select 11 (CCS for TSL) and double click on cost components with attributes
Select new entries Raw material Local
And save
Select next entry
- Raw material Import
And save
Select next entry
- Labour Cost
And save
Select next entry
- Machine Cost
And save
Select next entry
- Power Cost
And save
Select next entry
- Material OH
And save
Select next entry
- Activity OH
And save
Select next entry
- Cleaning Cost
And save and select back arrow
Select 1 (Raw material Local) and double click on Assignment: Cost Component
Cost Element Interval
Select new entries
And save and select back arrow
Select 2 (Raw material Import) and double click on Assignment: Cost Component
Cost Element Interval
Select new entries
And save and select back arrow
Select 3 (Labour Cost) and double click on Assignment: Cost Component Cost
Element Interval
Select new entries
And save and select back arrow
Select 4 (Machine Cost) and double click on Assignment: Cost Component Cost
Element Interval
Select new entries
And save and select back arrow
Select 5 (Power Cost) and double click on Assignment: Cost Component Cost
Element Interval
Select new entries
And save and select back arrow
Select 6 (Material OH) and double click on Assignment: Cost Component Cost
Element Interval
Select new entries
And save and select back arrow
Select 7 (Activity OH) and double click on Assignment: Cost Component Cost
Element Interval
Select new entries
And save and select back arrow
Select 8 (Cleaning Cost) and double click on Assignment: Cost Component Cost
Element Interval
Select new entries
And save
Double click on Cost component group folder and select new entries
And save
Double click on cost components with attributes folder
Select cost component 01 (Raw material local) and select detail button
Save and select back arrow
Select cost component 02 (Raw material Import) and select detail button
Save and select back arrow
Select cost component 03 (Labour Cost) and select detail button
Save and select back arrow
Select cost component 04 (Machine Cost) and select detail button
Save and select back arrow
Select cost component 05 (Power Cost) and select detail button
Save and select back arrow
Select cost component 06 (Material OH) and select detail button
Save and select back arrow
Select cost component 07 (Activity OH) and select detail button
Save and select back arrow
Select cost component 07 (Activity OH) and select detail button
Save
Double click on Assignment: Organizational Units Cost Component Structure
Save and select back arrow twice. Select active check box
Once we activated the cost component structure. We get the following message
. Save
Define Costing Type
Path: SPRO Controlling Product Cost Controlling Product Cost Planning
Material Cost Estimate with Quantity Structure Costing Variant: Components
Define Costing Types
Select 01 (Standard Cost Estimate) and click on details button
Following screen will appear
Note: Dont make any changes. Make sure of standard price and legal valuation
Step 7: Define Date Control
Path: Same path
Select PC01 and select copy as button
And save
Note: Standard date control is PC01. If we select manual entry check box, we can
change the dates in front end if required
Step 8: Define Quantity Structure Control
Path: Same Path
Select PC01 and select copy as button
BOM Tab:
Routing Tab
And save
Step 9: Define Transfer Control
Path: Same Path
Select PC01 and select copy as button
And save
Step 10: Define Costing Variant
Path: SPRO Controlling Product Cost Controlling Product Cost Planning
Material Cost Estimate with Quantity Structure Define Costing Variant
Select PPC1 and select copy as button
Give description as TSL and enter twice. Select TSL and then select details
button
And save
Qty Struct. Tab:
Ignore Prod Cost Est w/o Qty Structure: If we select this check box, systems
throws an error message if we run cost estimate without BOM and Routing.
Transfr Ctrl Can Be Changed: If we select this check box, then system allows us
to change the transfer control in front end
Transfer Active Std Cost Est. if Mat. Costed w/Errors: If we select this check box,
the cost will move to higher level, eventhough the cost estimation is wrong
Additive Costs Tab:
Include Additive Costs with Stock Transfers:If we select this check box, system
includes additive costs also.
Update Tab:
And save.
Step 11: Maintain Fixed Price for Activity Types (KP26)
Select overview button
Select next combination button
Save
Step 12: Creation of Work Center (CR01)
Path: SAP Easy Access Logistics Production Master Data Work centers
Work Center Create
Creation of Work center 1
Enter
And save
Creation of work center 2:
Enter
And save
Step 13: Creation of Materials (MM01)
Please find the attached document for creation of RM A, RM B and FG A Materials
and for PO and MIGO
Creation of Materials
and PO, MIGO.docx
Step 14: Creation of BOM (CS01)
Enter
Select Item Category as L (Stock Item)
And save
Step15: Creation of Routing (CA01)
Enter
Select operations tab
Note: After entering the work center and control key, press enter. Then only we
will get the activities
And save
Step 16: Run Standard Cost Estimate (CK11N)
Press on enter still we get standard cost estimate
And save
BOM
QTY in
BOM
BOM
Price in
MM03
RM A
10
6.67
RM B
15
13.33
Total
66.6
7
199.
95
266.
62
Overhe
ad
BOM
266.62
*15%
40
Routing
Se
t
FP in
Up KP26
60
10
12
0
20
Tot
al
600
240
0
Machi
ne
240
FP in
KP26
15
180
30
Total
3600
Labo
ur
300
FP in
KP26
5
Total
1500
5400
240
25
6000
Overhea
d
Routi
ng
19500*2
0%
Total Costs = Fixed Costs (23,400) + Variable Costs (306.65)
Fixed Costs =
3900
Grand
Total
5700
13800
19500
13800+5700+3900 =23400
Variable Costs = 266.65+40 =
306.65
To view the breakup of fixed and variable costs:
Menu Costs Display Cost Components
And save
Check the material master before running price update
No values were updated in costing 2 tab
Step 16: Price Update (CK24)
Select Marking Allowance button
Select TSL and give costing variant as TSL
Save
Select back arrow
Remove test run check box
And execute
Select back arrow
Double click on FG A material
Note: When it is marked, price was updated in future tab. Whenever it is
released it will update in Current tab
Select back arrow twice and select release tab
Remove test run check box and select execute button
Select back arrow
Select FG A material
Now the price was moved to current tab due to release
To View the price change documents (CKMPCSEARCH):
Execute.
Double click on Document number.
Enter
Click on Accounting Documents to view the Accounting Documents
Note: Here Accounting document was not updated at the time of price update
(CK24) because stock was not available in FG A material master.
For that purpose we are uploading initial stock through MB1C
Prerequisites for MB1C:
Initial Stock GL Account (FS00):
FI MM Integration (OBYC):
And save
Initial stocks upload for MB1C:
Enter
And save
Accounting Document:
Journal Entry:
Finished Goods A/C Dr
To Initial Stock Account
Check FG A Material Master (MM03)