Villa No.
Length
Height
BG/34
BG/42
BG/43
58.52
58.52
58.52
0.875
1.925
2.025
BG/44
BG/45
BG/46
BG/53
72.74
72.74
72.74
72.74
1.875
2.025
1.675
0.225
BG/54
BG/55
BG/56
BG/57
BG/58
BG/59
BG/60
BG/61
BG/62
BG/63
58.52
58.52
58.52
58.52
58.52
58.52
58.52
58.52
58.52
58.52
1.025
1.125
1.225
1.575
1.925
2.275
2.125
2.225
2.075
2.175
BG/64
BG/65
BG/66
BG/67
BG/68
BG/69
BG/70
BG/71
BG/72
BG/73
72.74
72.74
72.74
72.74
72.74
72.74
72.74
72.74
72.74
72.74
2.175
2.175
2.075
1.875
1.825
1.525
1.175
1.075
0.725
0.625
BG/74
BG/75
BG/76
BG/77
BG/78
BG/79
BG/80
BG/81
BG/82
BG/83
BG/84
58.52
58.52
58.52
58.52
58.52
58.52
58.52
58.52
58.52
58.52
58.52
1.025
0.875
1.225
1.325
1.425
1.275
1.625
1.475
2.325
2.175
2.025
SMM Cost Variation
Width Total Width Total Difference
Building 3 (W1)
0.3 15.36
0.4 20.48
5.12
0.3 33.80
0.4 45.06
11.27
0.3 35.55
0.4 47.40
11.85
Building 3 (E3)
0.3 32.92
0.4 43.89
10.97
0.3 35.55
0.4 47.40
11.85
0.3 29.41
0.4 39.21
9.80
0.3
3.95
0.4
5.27
1.32
Building 4 (W1)
0.3 17.99
0.4 23.99
6.00
0.3 19.75
0.4 26.33
6.58
0.3 21.51
0.4 28.67
7.17
0.3 27.65
0.4 36.87
9.22
0.3 33.80
0.4 45.06
11.27
0.3 39.94
0.4 53.25
13.31
0.3 37.31
0.4 49.74
12.44
0.3 39.06
0.4 52.08
13.02
0.3 36.43
0.4 48.57
12.14
0.3 47.46
0.4 63.28
15.82
Building 4 (E3)
0.3 38.18
0.4 50.91
12.73
0.3 47.46
0.4 63.28
15.82
0.3 45.28
0.4 60.37
15.09
0.3 40.92
0.4 54.56
13.64
0.3 39.83
0.4 53.10
13.28
0.3 33.28
0.4 44.37
11.09
0.3 25.64
0.4 34.19
8.55
0.3 23.46
0.4 31.28
7.82
0.3 15.82
0.4 21.09
5.27
0.3 13.64
0.4 18.18
4.55
Building 5 (W1)
0.3 17.99
0.4 23.99
6.00
0.3 15.36
0.4 20.48
5.12
0.3 21.51
0.4 28.67
7.17
0.3 23.26
0.4 31.02
7.75
0.3 25.02
0.4 33.36
8.34
0.3 22.38
0.4 29.85
7.46
0.3 28.53
0.4 38.04
9.51
0.3 25.90
0.4 34.53
8.63
0.3 40.82
0.4 54.42
13.61
0.3 38.18
0.4 50.91
12.73
0.3 35.55
0.4 47.40
11.85
Building 5 (E4 & E5)
Increase in cost
13,366.50
29,406.30
30,933.90
28,642.50
30,933.90
25,587.30
3,437.10
15,657.90
17,185.50
18,713.10
24,059.70
29,406.30
34,752.91
32,461.50
33,989.11
31,697.70
41,298.85
33,225.30
41,298.85
39,400.05
35,602.46
34,653.06
28,956.66
22,310.87
20,412.08
13,766.28
11,867.49
15,657.90
13,366.50
18,713.10
20,240.70
21,768.30
19,476.90
24,823.50
22,532.10
35,516.71
33,225.30
30,933.90
BG/85
BG/86
BG/87
BG/88
BG/89
BG/90
BG/91
BG/92
BG/93
BG/94
BG/95
38
38
38
38
38
38
38
38
38
38
38
2.975
2.875
2.775
2.925
2.825
2.975
2.125
2.025
2.175
1.825
0.975
0.3 33.92
0.3 142.03
0.3 242.54
0.3 366.80
0.3 461.61
0.3 599.17
0.3 508.72
0.3 561.74
0.3 686.00
0.3 644.95
0.3 381.62
Building 7 & 8
62.00
51.00
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
45.22
152.95
253.08
377.91
472.34
610.47
516.80
569.43
694.26
651.89
385.32
29,510.46
28,518.51
27,526.56
29,014.48
28,022.54
29,510.46
21,078.90
20,086.95
21,574.87
18,103.05
9,671.49
12.00
31,324.68
8.85
23,101.95
496.60
1,296,323.07
Note :- As per BOQ the SSM quantity is 5,508 CUM, and approx additional quantity is 611.45 CUM
(approx)
BG/102
BG/103
74.00
59.85
11.31
10.93
10.55
11.12
10.74
11.31
8.07
7.70
8.27
6.93
3.71