SSM Cost Variation

The document contains details of 95 villa numbers including their length, height, width, total width and cost increase. It also lists details of 2 additional buildings including their length, height, width and total estimated additional quantity of SSM required. The costs are calculated based on a width of 0.3 cum and 0.4 cum.

Uploaded by

bishu70
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
68 views2 pages

SSM Cost Variation

The document contains details of 95 villa numbers including their length, height, width, total width and cost increase. It also lists details of 2 additional buildings including their length, height, width and total estimated additional quantity of SSM required. The costs are calculated based on a width of 0.3 cum and 0.4 cum.

Uploaded by

bishu70
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Villa No.

Length

Height

BG/34
BG/42
BG/43

58.52
58.52
58.52

0.875
1.925
2.025

BG/44
BG/45
BG/46
BG/53

72.74
72.74
72.74
72.74

1.875
2.025
1.675
0.225

BG/54
BG/55
BG/56
BG/57
BG/58
BG/59
BG/60
BG/61
BG/62
BG/63

58.52
58.52
58.52
58.52
58.52
58.52
58.52
58.52
58.52
58.52

1.025
1.125
1.225
1.575
1.925
2.275
2.125
2.225
2.075
2.175

BG/64
BG/65
BG/66
BG/67
BG/68
BG/69
BG/70
BG/71
BG/72
BG/73

72.74
72.74
72.74
72.74
72.74
72.74
72.74
72.74
72.74
72.74

2.175
2.175
2.075
1.875
1.825
1.525
1.175
1.075
0.725
0.625

BG/74
BG/75
BG/76
BG/77
BG/78
BG/79
BG/80
BG/81
BG/82
BG/83
BG/84

58.52
58.52
58.52
58.52
58.52
58.52
58.52
58.52
58.52
58.52
58.52

1.025
0.875
1.225
1.325
1.425
1.275
1.625
1.475
2.325
2.175
2.025

SMM Cost Variation


Width Total Width Total Difference
Building 3 (W1)
0.3 15.36
0.4 20.48
5.12
0.3 33.80
0.4 45.06
11.27
0.3 35.55
0.4 47.40
11.85
Building 3 (E3)
0.3 32.92
0.4 43.89
10.97
0.3 35.55
0.4 47.40
11.85
0.3 29.41
0.4 39.21
9.80
0.3
3.95
0.4
5.27
1.32
Building 4 (W1)
0.3 17.99
0.4 23.99
6.00
0.3 19.75
0.4 26.33
6.58
0.3 21.51
0.4 28.67
7.17
0.3 27.65
0.4 36.87
9.22
0.3 33.80
0.4 45.06
11.27
0.3 39.94
0.4 53.25
13.31
0.3 37.31
0.4 49.74
12.44
0.3 39.06
0.4 52.08
13.02
0.3 36.43
0.4 48.57
12.14
0.3 47.46
0.4 63.28
15.82
Building 4 (E3)
0.3 38.18
0.4 50.91
12.73
0.3 47.46
0.4 63.28
15.82
0.3 45.28
0.4 60.37
15.09
0.3 40.92
0.4 54.56
13.64
0.3 39.83
0.4 53.10
13.28
0.3 33.28
0.4 44.37
11.09
0.3 25.64
0.4 34.19
8.55
0.3 23.46
0.4 31.28
7.82
0.3 15.82
0.4 21.09
5.27
0.3 13.64
0.4 18.18
4.55
Building 5 (W1)
0.3 17.99
0.4 23.99
6.00
0.3 15.36
0.4 20.48
5.12
0.3 21.51
0.4 28.67
7.17
0.3 23.26
0.4 31.02
7.75
0.3 25.02
0.4 33.36
8.34
0.3 22.38
0.4 29.85
7.46
0.3 28.53
0.4 38.04
9.51
0.3 25.90
0.4 34.53
8.63
0.3 40.82
0.4 54.42
13.61
0.3 38.18
0.4 50.91
12.73
0.3 35.55
0.4 47.40
11.85
Building 5 (E4 & E5)

Increase in cost
13,366.50
29,406.30
30,933.90
28,642.50
30,933.90
25,587.30
3,437.10
15,657.90
17,185.50
18,713.10
24,059.70
29,406.30
34,752.91
32,461.50
33,989.11
31,697.70
41,298.85
33,225.30
41,298.85
39,400.05
35,602.46
34,653.06
28,956.66
22,310.87
20,412.08
13,766.28
11,867.49
15,657.90
13,366.50
18,713.10
20,240.70
21,768.30
19,476.90
24,823.50
22,532.10
35,516.71
33,225.30
30,933.90

BG/85
BG/86
BG/87
BG/88
BG/89
BG/90
BG/91
BG/92
BG/93
BG/94
BG/95

38
38
38
38
38
38
38
38
38
38
38

2.975
2.875
2.775
2.925
2.825
2.975
2.125
2.025
2.175
1.825
0.975

0.3 33.92
0.3 142.03
0.3 242.54
0.3 366.80
0.3 461.61
0.3 599.17
0.3 508.72
0.3 561.74
0.3 686.00
0.3 644.95
0.3 381.62
Building 7 & 8
62.00
51.00

0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4

45.22
152.95
253.08
377.91
472.34
610.47
516.80
569.43
694.26
651.89
385.32

29,510.46
28,518.51
27,526.56
29,014.48
28,022.54
29,510.46
21,078.90
20,086.95
21,574.87
18,103.05
9,671.49

12.00
31,324.68
8.85
23,101.95
496.60
1,296,323.07
Note :- As per BOQ the SSM quantity is 5,508 CUM, and approx additional quantity is 611.45 CUM
(approx)
BG/102
BG/103

74.00
59.85

11.31
10.93
10.55
11.12
10.74
11.31
8.07
7.70
8.27
6.93
3.71