050- Inspection Paint Report
Report No.
Painting Inspection Report
Project No
Test Package No.
Line No
Time
Air Temp.
Wet Temp
% R.H.
Steel Temp.
Dew Point
Date
Project Description
Client :
Climatic condition in work area
8.00 AM. 11.00 AM. 14.00 PM. 16.00 PM.
Contractor Name
Surface Preparation
Surface Cleanliness
Condition of steel prior to blasting
A
B
C
D
E
Page
Heavy Mill Scale
Light Mill Scale
Rust All Scale
Pitted
Other
Required
Actual
Surface profile
Required
Actual
WFT.(Microns)
Required
Actual
DFT.(Microns)
Required
Actual
Type of abrasive steel grit & shot
Item painted
Coat No.
Type of paint
Batch No.
Colour
Mixed ratio
Thinner
Application
Final inspection in field : Acceptable
Point
A (0)
B ( 90 )
C (180 )
D (270 )
Thickness (Microns)
5
6
Sign
Date
Result
10
Pass
Pass
Pass
Pass
Contractor's QC
Name
Inspector
Not Pass
Not Pass
Not Pass
Not Pass
Client
050- Inspection Paint Report