Development of Hydro power and Renewable Energy(HRE)
Project in Khyber-Pakhtunkhwa (PhaseI)
Inspection Report of LV Pole
36 KW MHP Bagaria Khwar
Inspection of Transmission Line poles of 36 kW MHP BagariaKhwar carried out on dated
September 27, 2016 at Khani Khel workshop Texila. The inspection team comprised of PPAF,
INTEGRATION and NRSP engineers.
Item wise inspection remarks and observation in the Transmission line pole as per technical and
contract specifications are as enlisted below;
Transmission Line Pole
Item
Required
Offered
Inspection Remarks
Overall Length (m)
7.00
As Required
OK
Planting depth (m)
1.25
As Required
OK
Height above ground (m)
5.75
As Required
OK
As Required
OK
As Required
OK
As Required
OK
Section Length (m):
1. Top (h1)
2. Middle (h2)
3. Bottom (h3)
1.70
1.70
3.60
Outside Diameter (mm):
1. Top (h1)
2. Middle (h2)
3. Bottom (h3)
114.30
88.90
76.10
Wall thickness (mm)
1. Top (h1)
2. Middle (h2)
3. Bottom (h3)
Breaking load (N)
Crippling load (N):
5.40
5.40
5.40
4,750
As Required
3,370
As Required
Working load (N)
As Required
1,690
1,900
Approximate weight (kg):
Application of load from top
of pole (m):
Load for permanent set
not exceeding 19 mm (N)
Load for temporary
deflection of 157.5 mm (N)
87
0.30
2,300
990
As Required
OK
As Required
As Required
OK
Development of Hydro power and Renewable Energy(HRE)
Project in Khyber-Pakhtunkhwa (PhaseI)
Stay wire
Size of Stay-wire:
Diameter of Individual Wires
- Nominal
- Maximum
- Minimum
Nominal overall diameter of stranded staywire
Minimum ultimate tensile strength of
individual wires
7/16 SWG As Required
20.0 mm
As Required
OK
OK
20.1 mm
19.9 mm
40.2 mm
As Required
OK
687 N/mm As Required
Maximum tensile strength of individual wires
Minimum elongation at rupture before
stranding
Wrapping test for ductility: Turns on and off
its own diameter
Lay ratio of finished strand
Minimum weight of zinc coating before
stranding
Minimum weight of zinc coating after
stranding
Length of wire in finished coil:
- Standard
- Maximum
- Minimum
Stay Wire Guy hooks
834 N/mm As Required
4.25 %
2
8
As Required
OK
As Required
OK
19 to 21
As Required
OK
260 g/m
As Required
2542g/m
As Required
2m
100
105
95 m
As Required
As per WAPDA standard
General Observations and Remarks:
1.
2.
3.
4.
5.
For stay wire selection, Please follow the Contract specifications.
Label and plate of each Pole should be display.
Earthing point of the poles shall be included.
Red Oxide and paint will be inspect on site.
In supporting material I-type hook will be prefer.
Conclusion:
Overall Transmission Pole, Stay wire and accessories are ok
S#
1
Name
Mr. Muhamad Ilyas
Designation
Assistant Manager
Organization
PPAF
Mr Muhammad Saeed Electrical Engineer
PPAF
Mr. Nasir Iqbal
Project Manager
NRSP
Mr. Fazlullah
Site Engineer-Electrical
NRSP
Mr. Maqbool Hussain
Electrical Engineer
INTEGRATION
Mr. Gorge
Electrical expert
INTEGRATION
Signature
Gorge