0% found this document useful (0 votes)
253 views3 pages

Daily Morning Meeting Report at 06.10 Am: Follow Up Job Remarks

This document contains the daily morning meeting report from 06.10 AM listing various departments at the facility. It includes safety/environmental issues from the last 24 hours, any breakdown jobs, and the safety status of each department. Departments reported on include electrical, night shift, operations, mechanics for various areas, fabrication shop, machine shop, lubrication team, service equipment, condition monitoring, process control, instrumentation, reliability, and suppliers on site. The goal is to review safety across all areas of the facility from the prior 24 hours.

Uploaded by

mupi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
253 views3 pages

Daily Morning Meeting Report at 06.10 Am: Follow Up Job Remarks

This document contains the daily morning meeting report from 06.10 AM listing various departments at the facility. It includes safety/environmental issues from the last 24 hours, any breakdown jobs, and the safety status of each department. Departments reported on include electrical, night shift, operations, mechanics for various areas, fabrication shop, machine shop, lubrication team, service equipment, condition monitoring, process control, instrumentation, reliability, and suppliers on site. The goal is to review safety across all areas of the facility from the prior 24 hours.

Uploaded by

mupi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

DAILY MORNING MEETING REPORT AT 06.

10 AM
Date
By
Safety/environmental
issue during last 24
hours
Follow Up job

Remarks

1.
2.
3.
4.
5.
6.
7
8
9.
10
Electrical

1.
2
3
4
5
Break down job during last 24 hours

Remarks

Night Shift Reported


Safety Status :

1.
2.
3
Electric N/Shift Reported

Remarks

Safety Status :

1.
2.

Operation Reported

Remarks

Page : 1

Overland ,Crusher & SWTP Mechanic


Safety Status :

OLC, Crusher & SWTP Electric


Safety Status :

1.
2
Grinding Mechanic
Safety Status :

Grinding & Flot.130 Electric


Safety Status :

1.
2.
3
Flotation#130 Mechanic
Safety Status :

1.

Regrind Cleaner & CCD Mechanic


Safety Status :

Down Stream Electric


Safety Status :

1.
2

TWC Mechanic
Safety Status :

1.
2.
3.
Fabrication Shop

Remarks

Safety Status :

1.
2
Machine & Rebuild Shop

Remarks

Safety Status :

1.
2.
3.
Lube. & TFM team

Remarks

Safety Status :

1.
2.
3.
Service Equipment

Remarks

Safety Status :

1. Flat bad :
2. Boom truck :

Page : 2

Condition Monitoring Reported

Remarks

Safety Status :

1.
2.
Process Control

Remarks

Safety Status :

Instrument

Remarks

Safety Status :

Reliability

Remarks

Safety Status :

SUPRA Reported

Remarks

Safety Status :

Atlas Copco Indonesia

Remarks

Safety Status :

DEMAG

Remarks

Safety Status :

Atlas CopcoNusantara

Remarks

PDP

BBS

Planning

Remarks

Page : 3

You might also like